Upton Site Remediation, LLC. 466 Northeast Main Street Site Plan Review Permit Pursuant to Section 9.4 of the Douglas Zoning Bylaws

Similar documents
Upton Site Remediation, LLC. 466 Northeast Main Street Site Plan Review Permit Pursuant to Section 9.4 of the Douglas Zoning Bylaws.

Main Street Auto & Towing, LLC. 120 Gilboa St., Douglas, MA Site Plan Review Permit. State

October 10, Town Clerk Town of Douglas 29 Depot Street Douglas, MA 01516

Town of Douglas, Massachusetts FORM C-1. Certificate of Approval of a Definitive Plan

FORM C-1. Certific4te of Approval of a Definitive Plan

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

Town of Douglas Planning Board ANR Submittal Review Form

CAPE COD COMMISSION MAIN STREET P.O. Box 226 BARNSTABLE, MA FAX:

ROAD USE AGREEMENT RELATING TO THE DEVELOPMENT OF (WIND FARM NAME) WIND FARM

ARTICLE 7. SPECIFIC USE STANDARDS

Town of Scarborough, Maine

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

A Minor Land Excavation Operating Permit is used to:

Fee $1, Property information and location (All lines applicable to this site must be filled in)

City of San Juan Capistrano Supplemental Agenda Report

Josephine County, Oregon

APPLICATION. Telephone Fax Address. Telephone Fax Address FOR MARTIN COUNTY USE ONLY

REPORT CENTRAL LAKE ONTARIO CONSERVATION AUTHORITY

CHAPTER 14: DRIVEWAYS, TOWN HIGHWAYS, AND PRIVATE ROADS

TEMPORARY USE APPLICATION Sec and Temporary Housing

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No.

Point Aquarius Property Owners Association Architectural Control Committee REQUEST FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL

RESOLUTION NO. PC 18-14

DEVELOPMENT COVENANTS PROPOSED PUD B 1 ZONING FOR THE MAXPAC SITE

Application for Short-Term Rental (STR) Permit

Greenbrier County Building Code Administrative Policy Manual

EXCAVATION SITE PLAN REVIEW REGULATIONS

APPLICATION FOR A CERTIFICATE OF ZONING COMPLIANCE

By-Law of The Corporation of the City of Oshawa

Mesa County Engineering Division Stormwater Construction Permit

Appendix F - Earth Materials Extraction, Processing and Site Reclamation

THE REGULATIONS GOVERNING SOIL DISPLACEMENT AND DISPOSAL IN THE EAST HELENA SUPERFUND AREA IN LEWIS AND CLARK COUNTY, MONTANA.

Zoning Board of Appeals

Community Development Department Planning Division 1600 First Street + P.O. Box 660 Napa, CA Napa (707)

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

MOVE-IN/MOVE-OUT PROCEDURES

Financial Impact Statement There are no immediate financial impacts associated with the adoption of this report.

Chapter 136. SOIL EROSION

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

PC RESOLUTION NO. 15~11-10~01 CONDITIONAL USE PERMIT (CUP)

Zoning Board of Appeals Decisions Decisions for: Close Window

Conditional Use Permit / Standard Subdivision Application

The purpose of this Chapter is to establish rules, regulations, standards and procedures for approval of subdivisions of land to promote and ensure:

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

Guideline to Site Alteration in the Town of Whitby

WHEREAS, the staff of The Maryland-National Capital Park and Planning Commission recommended APPROVAL of the application with conditions; and

CITY OF SOUTH SAN FRANCISCO PLANNING DIVISION 315 Maple Avenue, South San Francisco, CA (650)

City of Sanibel. Planning Department STAFF REPORT

Application for Conditional Use Permit CITY OF VALDOSTA PLANNING AND ZONING DIVISION

MATERIAL EXCAVATION AND SALE AGREEMENT

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

1.0 REQUEST. SANTA BARBARA COUNTY ZONING ADMINISTRATOR Coastal Zone Staff Report for Vincent New Single-Family Dwelling & Septic System

ZONING BOARD OF APPEALS CHECKLIST

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

CITY OF CUDAHY CALIFORNIA Incorporated November 10, 1960 P.O. Box Santa Ana Street Cudahy, California

City Of Attleboro Conservation Commission

APPLICATION FOR A CERTIFICATE OF ZONING COMPLIANCE SIGNAGE

This is a conditional use permit request to establish a commercial wind energy conversion system.

Request for Qualifications Legal Services

4. Building plans should include top of foundation elevation

Planning Department Permit Application

Zoning Board of Appeals Minutes January 11, Andre Bissonnette, Chairman; Anthony Aveni, Member; and Brian Heath, Associate Member

CHARLES CITY COUNTY SITE PLAN ORDINANCE. This Ordinance shall be known as the Charles City County Site Plan Ordinance.

PLANNED UNIT DEVELOPMENT (PUD)

SOLAR MASSACHUSETTS RENEWABLE TARGET PROGRAM (225 CMR 20.00) GUIDELINE

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

ARLINGTON COUNTY, VIRGINIA

INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY

KASSON TOWNSHIP PRIVATE ACCESS ROAD ORDINANCE ORDINANCE NO (EFFECTIVE: MAY 12, 2007)

FALMOUTH ZONING BOARD OF APPEALS FINDINGS AND DECISION. APPLICANT/OWNER: MICHAEL A. FARIA and DONNA J. FARIA of E. Taunton, MA

City of San Juan Capistrano Agenda Report. Honorable Mayor and Members of the City Council. Joel Rojas, Development Services Director ~ )P

-928- Documents submitted: Route 105 U.S.G.S. Locus Map dated July 18, 2017 and Rochester Route 105 Erosion Repair Sketch dated July 19, 2017

BOSTON REDEVELOPMENT AUTHORITY

CONDITIONAL USE PERMIT Application Packet

PUD Ordinance - Thornapple Manor #2 of 1998

FINAL PLAT CHECKLIST

RESOLUTION NO ORDINANCE NO. 02-1

Home Occupation Permit Application Information and Helpful Hints

City of Burlington Joint Land Use Board. Land Use Development Application Application Submission Section A

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS

ARTICLE XI CONDITIONAL USE PERMITS

RULES OF THE TENNESSEE ALCOHOLIC BEVERAGE COMMISSION CHAPTER RULES FOR SALES OF WINE AT RETAIL FOOD STORES TABLE OF CONTENTS

BARROW COUNTY, GEORGIA

DOUGLAS COUNTY DEPARTMENT OF HEARING EXAMINER th Street NW East Wenatchee, WAS BEFORE THE DOUGLAS COUNTY HEARING EXAMINER

ARTICLE B ZONING DISTRICTS

COASTAL DEVELOPMENT PERMIT APPLICATION

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

Drafting a Commercial Lease Agreement Appendix A 5 Leases

Legal Description Part of the Western Half of the Eastern Half of the Northwest Quarter of Section 30, Le Ray Township

CITY OF SONORA PLANNING COMMISSION SITE PLAN REVIEW APPLICATION

SHORT TERM RENTAL REGISTRATION PROCESS

SUFFOLK COUNTY LANDBANK CORP ( SCLBC ) SOLICITATION

SUBJECT: CUP ; Conditional Use Permit - Telegraph Road Vehicle Sales / Storage

VARIANCE APPLICATION

SOIL DEPOSIT BYLAW

TOWN OF CONCORD Planning Board 141 Keyes Road - Concord, MA Phone:

DO NOT START CONSTRUCTION UNTIL A PERMIT HAS BEEN ISSUED BY THE BUILDING INSPECTOR

Application for a HOME OCCUPATION - Conditional Use Permit

Transcription:

I. Owner Information Ronald L. Mathieu Owner Name Contact Person P. 0. Box 341 Street Address Additional Address Manchaug MA 01526 City/Town State Zip Code 508-265-7228 Telephone Number Fax Number Email Address Other Comments II. Applicant Information Applicant Name 4 Open Square Way Street Address Holyoke Eugene N. Bernat Contact Person Suite 421 Additional Address MA 01040 City/Town State Zip Code 413-552-3688 413-552-3688 eugene.bernat@gmail.com Telephone Number Fax Number Email Address Upton Site Remediation will be providing construction service to the Owner Other Comments (anatman38@msn.com) III. Site Information 140 7 21389 215 Assessors Map Assessors Parcel Deed Book Deed Page Street Address Additional Address Douglas MA 01516 City/Town State Zip Code Also See WCRD Deed Book/Page: 14687 / 292 Other Comments JAN 29 A0111 -. SPR130819-DECISION.doc Page 1 of 8 Douglas Planning Board

IV. Procedural History 1) Application for Site Plan Review was submitted on August 19, 2013 to the Douglas Planning Board ("The Board") pursuant to Section 9.4 of the Town of Douglas Zoning Bylaw by the above referenced Applicant(s) and Owner(s) identified above. 2) A duly advertised public hearing timely commenced on September 24, 2013 at 8:15 pm and was continued to October 8, 2013; November 12, 2013; December 10, 2013; January 14, 2014 and closed on January 28, 2014 in the Douglas Municipal Center, Community Meeting Room, 29 Depot Street, Douglas, MA. The Applicant cooperated with all procedural requirements for continuances and extensions. 3) The plans and other submission material were reviewed by the Planning Board and the Town Engineer. Throughout its deliberations, the Planning Board has been mindful of the statements of the Applicant, and the comments of the general public, all as made at the Public Hearing. 4) The Applicant was represented by Mr. Eugene Bernat of Upton Site Remediation, LLC. during the hearing regarding this project. 5) Throughout the hearing, the Applicant responded to the Board's concerns by revising the plans and providing additional materials, as requested. V. Findings Based upon the materials and evidence provided during the hearing process, the Board hereby finds the following: 6) The project site is located at, Douglas, MA ("subject property"), which is shown on the Town of Douglas Assessor Map as Map 140 and Parcel 7. 7) The majority of the subject property is located in an Industrial (I) zoning district and the small remainder is in a Village Residential (VR) zoning district, based upon Assessors Mapping, the property has a total lot area of 5.13± acres of land area and 196.67± feet of road frontage on Northeast Main Street. SPR130819-DECISION.doc Page 2 of 8 Douglas Planning Board

8) This site plan permit application was accompanied by and augmented by two Plans entitled: Sheet 1: "Existing Conditions" Earth Work Plan for a Filling Project on Northeast Main Street in Douglas, MA and Sheet 2: "Proposed Conditions" Earth Work Plan for a Filling Project on Northeast Main Street in Douglas, MA both dated June 25, 2013 and revised through January 10, 2014 and prepared by Allen Engineering, LLC. Civil Engineers and Land Development Consultants, 2 Willowbrook Lane Mendon, MA 01756. 9) The permit application Project Narrative indicates that the proposed use for the project is as follows: "The project involves filling and grading the site to produce the largest possible level area to maximize the value of the property for its zoned use. Current conditions prevent the highest and best use of the property due to its bowl shape and extremely limited area. Approved fill will be accepted and placed from 7AM 5PM Mon- Friday. Soil being delivered to the site will be surplus fill generated by construction projects within economic trucking distance from the site. These construction projects can range from residential construction activity on previously undeveloped sites to large commercial redevelopment projects in cities. To comply with MA DEP regulations and engineering best management practices, surplus soil generated by construction on a previously developed may require environmental testing site to ensure its safe and appropriate disposition. If environmental testing is conducted the soils is classified according to its chemical analysis in relation to M4 DEP standards that have been developed for this purpose. These standards are based on scientific risk assessment and background conditions found in virgin soils within the state. Soils that are deemed suitable for use as fill in residential areas, including in proximity to drinking water supplies, are generally classified as RCS 1 soils. However, MA DEP dictates that all classified soil reused as fill must be as clean or cleaner from a chemical analysis perspective than the soil present at the site of reuse. This standard requires that sampling and analysis be done at the receiving site to establish the sitespecific concentrations present. The process of conducting the testing of background conditions and establishing acceptance criterion for the receiving site is referred to as the development of a Soils Management Plan. Under a Soils Management Plan, the analytical information for all classified soils proposed to be reused at a receiving site must be reviewed and approved by a Licensed Site Professional prior to their use. An alternative, DEP approved, soil management approach is to demonstrate that the chemical analysis of the soil to be reused indicates that the soil meets DEP published data of background concentrations present in MA soils. SPR130819-DECISION.doc Page 3 of 8 Douglas Planning Board

J- If RCS 1 soils are to be used at the site, the applicant will engage a Licensed Site Professional to create a site specific Soils Management Plan based upon site specific soil sampling of the site to ensure that all materials delivered to the site are as clean or cleaner than those present at the site, i.e. chemically equivalent to the virgin soil present. The estimated volume of fill required to bring the site to the desired grade is approximately 70,000 cubic yards. The fill will be predominantly delivered by tractor-trailer and tri axle dump trucks. Assuming that the average truck will deliver 28 cubic yards of material, the site will require approximately 2,500 truckloads of material. Assuming the project requires three years to complete and approximately 200 operating days per year the project will require over 4 loads per operating day. As stated previously, supplies of surplus fill that meet the economic criterion of the site will mean that often there will be no truck activity at the site. In our experience high traffic days would have eight trucks delivering material to the site. We estimate that eight trucks will be the maximum number of truck delivering material to the site per day. Some trucks may be able to make multiple deliveries in a given day depending on how close the source surplus fill is. No gravel is to be removed from the site. Gravel will be excavated however for stockpiling and use in the final graded surface of the site." 10)This approval does not relieve the Applicant from complying with or obtaining the appropriate permits for any federal, state and local laws, rules or regulations. VI. Decision/Conditions The Board voted 5 to 0 to grant a to the Applicant for the subject property, subject to the following conditions: 11)The term "Applicant" shall refer to the current Applicant(s) and its assignees, successors, affiliates, subsidiaries or any other entity related thereto. Any sale, transfer or assignment of the permit, other than an assignment of the permit to a mortgagee pursuant to financing; and any sale of more than 50% of the assets or interests in the Applicant shall require Board approval, such approval not to be unreasonably withheld. JAN 29 am SPR130819-DECISION.doc Page 4 of 8 Douglas Planning Board-

12)This permit shall expire if construction is not commenced within three years from the date it is filed by the Board with the Town Clerk unless an extension is granted by the Board to a date certain. 13)Prior to the commencement of any activity associated with the approved project, the Applicant shall revise the above referenced plan (Item 8 above) to include reference to a site survey datum, show riprap slope stabilization on sideslopes in excess of 3:1 (33%) in steepness. In any event, no sideslopes shall exceed a maximum of 2:1 (50%) in steepness. 14)Prior to the commencement of any activity associated with the approved project, the Applicant shall provide a letter stamped by a registered professional engineer indicating that the proposed site access and egress meets the standards established by the American Association of State Highway and Transportation Officials (AASHTO) for site distance. 15)Prior to the commencement of any activity associated with the approved project, the Applicant shall meet with the Douglas Board of Health to review the scope of the project and inform them of the protocols that have been established herein (ie. reporting requirements). Any additional information/conditions requested by the Board of Health shall not be unreasonably withheld by the Applicant. 16)Prior to the commencement of any activity associated with the approved project, a surety in the amount of $145,611.40 shall be posted by the Applicant, and approved by the Planning Board for the loaming and seeding (erosion control) of the site. The form of the surety shall be reviewed by Town Counsel prior to Planning Board review. Loam and seeding shall meet the minimum specifications established by MassDOT in current edition of the Massachusetts Standard Specifications for Highways and Bridges. 17)Prior to commencement of any activity associated with the approved project, the Applicant will meet with the Planning Agent to review the proposed construction schedule and activity. The Applicant is encouraged to maintain regular and frequent communication with the Planning Agent in order to ensure a good flow of information. The Applicant is encouraged to communicate changes in activity at the site so the Planning Board is aware of site activity. 18)Prior to commencement of any activity associated with the approved project, a Licensed Site Professional (LSP) shall be designated for the project. The Applicant shall furnish the LSPs name, company name, address, phone number, email address and qualifications to the Planning Board and Board of Health. SPR130819-DECISION.doc Page 5 of 8 Douglas Planning Board

19)Prior to commencement of any activity associated with the approved project, a Soils Management Plan (SMP) shall be prepared by the LSP. Upon completion, a copy of the SMP shall be furnished to the Douglas Planning Board and a copy shall be furnished to the Douglas Board of Health. The LSP shall certify that all incoming soils meet the requirements of the SMP as well as all relevant Department of Environmental Protection (DEP) Regulations pertaining to re-use of these soils for fill. Furthermore, all soils shall meet the DEPs anti-degredation policy for placement of soils at the site. In other words, all soil delivered and placed at the site shall be "cleaner" than the indigenous soils. Results of all soils analyses performed for native site soils as well as soils delivered to the site shall be furnished to the Planning Board and the Board of Health. 20) The Applicant shall ensure safe and convenient vehicular access to the project site during the entire duration of the project. Any Board member or representative shall be permitted access to the project site for the duration of the project provided that notice is given to the site construction foreman upon arrival. 21) The Applicant will utilize the site access/egress, as shown on the plan, to access the site. Construction shall not inhibit the normal use of Northeast Main Street. 22) During construction, the Applicant shall maintain all feasible and reasonable means of dust control and shall collect all debris on a daily basis. No construction may occur on Sundays or on New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving, Christmas Eve or Christmas. No construction may begin before 7:00 a.m. nor continue past 5:00 p.m., unless approved in advance by the Board. However, between November 15th and April 1st, equipment may be started at 6:30am but construction may not commence until 7:00am. 23) Noise - The Applicant shall implement measures to ensure that noise does not exceed acceptable levels, as set forth by Federal and State regulatory agencies. The Applicant shall cease any excessively loud activities when directed by the Planning Agent. No excessively loud activities are permitted prior to 8:00 AM or after 4:00 PM. 24) Vibration - The Applicant shall implement the necessary controls to ensure that vibration does not create a nuisance or hazard for property abutters. 25) Traffic - The Applicant shall implement necessary traffic safety controls to ensure a safe and convenient vehicular access in and around the site. Any traffic issues that occur as a result of site operations and construction shall be mitigated immediately, at the expense of the Applicant. Additional traffic mitigation measures may be required as necessary. SPR130819-DEC/S/ON.doc Page 6 of 8 Douglas Planning Board

26) Complaints All complaints related to the above or otherwise, shall be logged and tracked by the Planning Agent. Complaints will be brought to the attention of the Board, as necessary. Any complaints that are found to be repetitive in nature and continue with no mitigation in the opinion of the Board may constitute a violation of these conditions and may be grounds for a stop order or a partial stop order. 27) Stumps that are encountered/created from site construction activities shall be removed from the ground, and ultimately removed from the site. Burial of any stumps or other wood debris onsite is strictly forbidden. 28) The applicant shall submit to the Planning Board an annual report pertaining to all activities at the facility located at, Douglas, MA. The annual report shall include a summary of all materials deposited at the site indicating their origin, and any/all testing results, as appropriate. The Annual Report shall be prepared and stamped by a Licensed Site Professional (LSP). The LSP shall certify that all material received meets the Massachusetts Department of Envioronmental Protection (DEP) standards for "RCS-1" soils. Additionally, an as-built survey shall accompany the annual report showing the status of the grades for the site as well as all stormwater and erosion control measures. The survey plan may be stamped by a Civil Engineer or a Professional Land Surveyor. 29) After facility construction has been completed, but prior to issuance of an occupancy permit, a site walk shall be organized with Town safety personnel to familiarize them with the facility layout and operation. 30) Commercially registered construction vehicles associated with the project are not permitted to utilize Charles Street for travel to and from the site. &ON SPR130819-DECISION.doc Page 7 of 8 Douglas Planning Board

X. Record of Vote The members of the Planning Board voted as follows to grant a Site Plan Permit subject to the above-stated terms and conditions: Name Si nature In Favor Against Abstain Marks, Ernest 29.,/,,17/2 4 / V- Chesebrough, Eben Werme, Robert Zwicker, Michael Al 4-----i G----- - Sharkey, Tracy Greco, Michael AI i > 4 it a // ' Filed with the Town Clerk on / / 9. / / Christine Furno, Town Clerk Eileen Damore, Asst. Town Clerk Copy of Site Plan Permit Mailed to: Mr. Eugene Bernal 4 Open Square Way, Suite 421 Holyoke, MA 01040 Mr. Ronald L. Mathieu P.O. Box 341 Manchaug, M4 01526 SPR130819-DECISION.doc Page 8 of 8 Douglas Planning Board