Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

Similar documents
THE TOWN OF Angier N O R T H C A R O L I N A

Location in Code Subject Fees

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

10% of Building Permit in addition to the full Building Permit Fee

City of Roswell - Fee Schedule

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Planning&Development Fee Standards

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

RESOLUTION NO

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

New Electronic Planning Commission Submittal Process

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Final Plats for Major Residential and Commercial Subdivisions Checklist

City of High Point Development Fee Schedule

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

Township of Collier 2418 Hilltop Road Presto, PA 15142

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

JOHNNY S RV PARK SUBDIVISION

FEE SCHEDULE. Updated December 18, 2018

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

Community Development Fees (as of March 2015)

4.2 RESIDENTIAL ZONING DISTRICTS

ARTICLE FIVE FINAL DRAFT

CHAPTER 5 RULES, RATES AND CHARGES FOR THE STORMWATER UTILITY SERVICE 1

DAUPHIN CREEK ESTATES SUBDIVISION

SUBDIVISION APPLICATION

"The City ofvaytona Beach UtiCity BiCCing Division

BUILDING SERVICES ~ FEE SCHEDULE

Schedule of City Fees & Charges

PROPOSED AMENDMENTS TO THE DERBY ZONING REGULATIONS AUGUST 12, 2008

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

9. Public (Federal, State, or local

Zoning Permit Application

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

Community Development Department Fee Schedule

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES

Currituck County Phone: Planning and Community Development Fax: Courthouse Road, Suite 110 Currituck, NC 27929

Department of Public Works and Engineering Planning and Development Services Division Utility Planning and Analysis Section

Community Development

City of Brevard Fiscal Year Schedule of Taxes, Fees and Charges GENERAL FUND

CITY OF FERNDALE HEARING EXAMINER

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

NEW SINGLE FAMILY RESIDENTIAL

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

STEP 1: SOIL EVALUATION

(if more than one, give square footage for each) ANNEXATION LOT LINE Adjustments PRE/FINAL PLAT SPECIAL USE PERMIT

STAFF REPORT Administrative Subdivision Hearing West 150 South Street, Parcel # , and

TOWN OF CASTLE ROCK. Fee Schedules. Development Services MAY 2018

MINUTES. Council Members Present: Mayor Sears, Councilmen James Cobb, Tim Sack and Hank Dickson and Councilwomen Linda Hunt-Williams and Cheri Lee.

BUILDING PERMIT APPLICATION

Industrial Road Cross Dock Subdivision Minor Subdivision Preliminary Plat PLNSUB South Industrial Road Hearing date: May 9, 2013

Community Development

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

1.94 acres. Gwinnett Prado, L.P. c/o Brogdon Consulting Duluth, GA Contact: Ted Sandler

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

COMMERCIAL/ INDUSTRIAL PERMIT APPLICATION

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

ARTICLE 7 UTILITIES AND EASEMENTS

Site Plan Application

CITY OF GALION OHIO CONSOLIDATED FEE SCHEDULE

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards

CHAPTER 18 SITE CONDOMINIUM PROJECTS

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

Report to the Plan Commission February 4, 2013

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

REPORT OF SPECIAL TAX LEVY FOR THE CITY OF LAKE ELSINORE. CITY OF LAKE ELSINORE CFD 98-1 (Summerhill Public Improvements) Fiscal Year

Zoning/Building Permit Application

Initial Subdivision Applications Shall Include the Following:

City of Mosier Site Development Permit Information

FEES. Facility Rental/Damage Deposit $ Inspection, review, examine, search for, etc. of a public document

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

APPLICATION PROCESS FOR PROJECT REVIEW

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

Section Preliminary Plat Checklist and Application Forms

Town of Apex, North Carolina Fee Schedule - Effective 7/1/2018

PASCO COUNTY, FLORIDA INTEROFFICE MEMORANDUM

CONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242

REPORT OF SPECIAL TAX LEVY FOR THE CITY OF LAKE ELSINORE. CITY OF LAKE ELSINORE CFD NO (West Lake Elsinore Public Improvements)

BUILDING PERMIT SUBMITTAL REQUIREMENTS

Department of Public Works Permit Fee Schedule

Unified Development Code

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

Washington County, Minnesota Ordinances

Chapter 10 RD TWO-FAMILY (DUPLEX) RESIDENTIAL DISTRICT/ZONE

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

(voice) (fax) (voice) (fax) Site Plan Review

Transcription:

Town of Holly Springs Residential Development Fee Worksheet Single-Family Residential Subdivisions Townhome Developments Apartment/Condominium Developments Planning & Zoning Development Fees Engineering Development Fees Parks & Recreation Fees Building Code Fees The fees in this document or any estimates provided to you by Staff are only valid for plan or permit submittals/approvals (whichever is applicable) made during the effective dates of this schedule. All fees are subject to change on July 1 of each year. If plans or permits are submitted and/or approved after June 30, the fee estimate may no longer be valid and the fees may be higher than estimated. For a complete list of all Town fees, see the Fee Schedule in the Town Budget.

STEP 1: DEVELOPMENT PETITION SUBMITTAL Zoning/Subdivision/Site Plan Review Calculated and collected by Planning & Zoning at time of petition submittal (919.557.3908) Step 1 Fee Estimate Rezoning Petition Fee Amount Due Zone Map Change Petition $900* + $10/acre (double fee for part parcel) Planned Unit Development Packet Fee Amount Due PUD Mater Plan / Major Amendment $1,500* + $10/acre (double fee for part parcel) Development Petition Fee Amount Due Development Plan: Multi-Family / Residential Development Options / Major Amendment $1,500 + $5/unit (double fee for part parcel) Subdivision Plan: Master Plan $700 + $5/acre: Acres* (round to nearest tenth xx.x) Subdivision Plan: Preliminary Plan / Detailed Administrative Phase Review / Major Amendment $700 + $5/lot Development Waiver/Alternate Compliance Petition Fee Amount Due UDO Waiver/Alternate Compliance $100/each General Fees Minor Amendments to approved plans $200/plan Additional Review Fee 1/2 of Original Fee of $ * Double fee for part parcel Step 1 Subtotal STEP 2: CONSTRUCTION DRAWING SUBMITTAL Construction/Environmental/Stormwater/Special Studies Reviews Calculated and collected by Engineering at time of plan submittal (919.557.3938) Step 2 Fee Estimate Construction Drawing Plan Review Fee Amount Due Construction Drawing - Subdivision (Covers 1 st & 2 nd Reviews) $500 + $50 x Lots Construction Drawing - Other (Ex. Utility or Roadway) (Per Review) $1,500 Major Plan Revisions (per review) $1,000 Construction Drawing - Subsequent Plan Reviews (Per Review after 2 nd Review) $450 Construction Drawing Revisions Plan Review (Covers 1 st & 2 nd Reviews) $450 Construction Drawing Revisions - Subsequent Plan Reviews (Per Review after 2 nd Review) $450 Preliminary Pump Station Site Plan Review (Covers 1 st & 2 nd Reviews) $650 Construction Drawing Pump Station Review (Covers 1 st & 2 nd Reviews) $1,000 Subsequent Pump Station Reviews (Site Plan and CD) (Covers 1 st & 2 nd Reviews) $400 Timbering Review (Per Review) $500 Irrigation Well Review $200 Construction As-Built Review $200 Page 2 of 6

Environmental Plan Review Fee Amount Due Subdivision/Site (Covers 1 st & 2 nd Reviews) $300 x Acres Subsequent Plan Review/Revision (per Review after 2 nd Review) $450 Environmental Variance/Waiver Reviews (Per Review) $300 Environmental Variance/Waiver/Appeal Review After Fact Filing Fee (Per Review) $500 NPDES Stormwater Review Fee Amount Due NPDES - Subdivision (Covers 1 st & 2 nd Reviews) $500 + $25 x Lots NPDES - Stormwater Subsequent Reviews/Revisions (1 st & 2 nd review) $500 Utility Permit Fees (Due with Permit Application) Fee Amount Due Water Permit Processing $200 Wastewater Permit Processing $200 Reclaimed Water Permit Processing $200 Special Study Review Fees Fee Amount Due Special Study (Flood Study, Traffic Impact Analysis, Sewer, Basin, Fire Flow/Hydraulic Analysis, Pump Station, etc.) (Covers $350 Plus Actual Cost 1 st & 2 nd Reviews) Special Study Subsequent Reviews and Plan Revisions (per review) $200 Plus Actual Cost Hydraulic Model Update Proportionate to Development Step 2 Subtotal STEP 3: CONSTRUCTION DRAWING APPROVAL Calculated and collected by Engineering prior to Construction Drawing Approval (919.557.3938) Land Disturbance Permit Fee Amount Due Land Disturbance (Grading Permit)/Residential Lots Plan $400 x acres NPDES Stormwater Fee (for Stormwater Permit) Fee Amount Due plus Step 3 Fee Estimate Storm drainage pipe BMP s 5 acres drainage units @ $300 each BMP s > 5 acres drainage units @ $500 each Stormwater As-built/Engineer Certification Administration $200 Annual Stormwater BMP Inspection & Administration <5 acres drainage $150 per BMP >5 acres drainage $200 per BMP Neuse River Basin: Total fee-in-lieu = number of pounds/acre/year to be offset x acres in development x 30 yrs x $18.49 per pound Cape Fear River Basin: Total fee-in-lieu = number of pounds/acre/year to be offset x acres in impervious surface x 30 yrs x $14 per pound Development Utility Inspection Fees Fee Amount Due Sewer Water Reclaimed Streets/Firelanes /LN Sidewalks Greenway Pump Station Inspection $1,500 Re-inspection $ 0.25/LF for any after 1 st /2 nd Inspection Page 3 of 6

Development Fees in Lieu of Assessment Fee Amount Due Fee in Lieu of Pump Station Upgrade as Calculated $ Street Widening, Payment in Lieu of = per approved Engineer s Estimate $ Payment in Lieu Infrastructure Improvements Payment in Lieu Street Light Installation Step 3 Subtotal STEP 4: FINAL PLAT& ROW/EASEMENT PLATS Subdivision Plat Calculated and collected by Planning & Zoning at time of submittal (919.557.3908) Step 4 Fee Estimate Final Plat/Minor Subdivision/Recombination Plat Fee Amount Due Final Subdivision Plat $300 + $10/per lot Minor Subdivision / Recombination Plat $250 Amendment to Recorded Plat or Exempt Plat $200 per plat Each Additional Plat Review not included in base fee ½ of Original Final Plat Fee Original Fee: $ Exempt Plat or Easement R/W Plat (if not amending existing plat) $100 Step 4 Subtotal Infrastructure and Stormwater Bonding Calculated and collected by Engineering at time of submittal (919.557.3938) Bonding Fee Amount Due Infrastructure Surety Performance Infrastructure Surety Warranty Stormwater BMP Surety Performance Stormwater BMP Surety Maintenance NOTE: The Stormwater BMP Surety Maintenance must be in CASH; To be calculated and due before maintenance period begins. Step 4 Subtotal Residential Subdivision Parks & Recreation Fees Calculated and collected by Parks & Recreation prior to submittal of Mylar (919.557.3930) Land Dedication Land Dedication Area to be dedicated (in acres) equals one thirty-fifth (1/35) of an acre times the number of dwelling units or lots, whichever is greater. For land so dedicated which: (a) lies within an area within the one hundred-year floodplain or (b) has slopes greater than fifteen (15) percent or (c) is included within overhead utility easements, said land shall be dedicated at a rate of one twentieth (1/20) of an acre. Fee # dwelling units/lots X 1/35 acre = Acres to be dedicated # dwelling units/lots X 1/20 acre = Acres to be dedicated Amount Credited Page 4 of 6

Fee-in-Lieu of Land Dedication Density based upon units/acre, fee per unit Density Fee Density Fee Density Fee Single Family Detached $4,705/ unit Single Family Attached $4,555/ unit Multi- Family Attached Total Parks & Recreation Fees Due Fee-in-Lieu (If subdivision has less than 35 lots, fees are required to be paid) $4,420/ unit # of Lots/Units Land Dedication Credits X Fee Above Step 4 Subtotal Total Fee-in-lieu Amount Due STEP 5: BUILDING PERMIT SUBMITTAL Calculated and collected by Building Code Enforcement at issuance of building permit (919.557.3915) Step 5 Fee Estimate WATER AND SEWER SERVICES Amount Due Residential Capacity Replacement Fees NOTE: This fee is charged per unit regardless if there is a master meter Irrigation Meters (¾ only) $0 ¾ S: $3,741 W: $4,054 1 S: $4,135 W: $4,481 1 ¼ S: $4,922 W: $5,334 1 ½ S: $5,710 W: $6,188 2 S: $6,498 W: $7,041 3 S: $7,285 W: $7,895 4 S: $8,073 W: $8,748 6 S: $15,948 W: $17,283 8 S: $23,824 W: $25,818 Town-Installed Taps ( **or actual cost, whichever is greater) Fee Amount Due Water (for 3/4" only) $900/tap Wastewater (for 4" only) $900/tap Reclaimed $900/tap Add for street cuts ** $500 each Add for bores ** $500 each Add for curb & gutter crossings ** $250 each Developer-Installed Taps (all new developments) Fee Amount Due Water $90/tap Wastewater $90/tap Reclaimed $90/tap Potable Water Meter Fees Octave Meters replace compound meters Meter Cost by Size Permit Fee Meter Cost by Size Permit Fee Amount Due 3/4 $326.25 3 $2,700 1 $433.50 4 $3,500 1 1/2 $875 6 $5,400 2 $2,500 8 $6,825 Page 5 of 6

Irrigation Services Irrigation Meter Fees Meter Cost by Size Permit Fee Meter Cost by Size Permit Fee Amount Due 3/4 $326.25 3 $2,700 1 $433.50 4 $3,500 1 1/2 $875 6 $5,400 2 $2,500 8 $6,825 Town Installed Tap (** or actual cost whichever is greater) Fee Amount Due 3/4 split service only (greater than 3/4 cost to be determined**) $900 Engineering Inspection Fees Fee Amount Due Driveways $125 each Lot or Site Final (Prior to C.O.) $200 each Reclaimed Irrigation Installation Inspection $100 each Utility Encroachment Permit Without bore $50 With bore $100 BUILDING PERMIT FEES New dwelling (single family, duplex, & town homes) Note: Square footage includes total footage including all porches, decks & garages Fee Amount Due Up to 1,200 Sq ft $450 Over 1,2000 Add $ 0.25 per Sq Ft Additions: (bedroom, bathroom, sunrooms etc) Fee Amount Due 0-400 sq ft $ 200 over 400 sq ft same as new building Multi - Family (per building) Fee Amount Due First Unit $400 Each Additional Unit $250 Accessory Structures (garages, storage buildings, decks/screen porches, etc.) Fee Amount Due Fee per Square Foot $0.22 per Sq Ft Building $75 Electrical $75 Mechanical $75 Plumbing $75 Miscellaneous Permits/Fees Fee Amount Due Demolition Permit $100 Manufactured Homes $200 Modular Homes & Moved Dwellings Trade fees + $ 0.10 per sq. ft. Travel Trailers $61 Planning & Zoning UDO Permit Fee (due on all permits) $50 Homeowner Recovery Fund Fee $10 Re-stamped Plans $100 Permit Changes $100 Working without Permit Double Permit Fees Misc. Inspection (daycares/foster homes, etc) $100/150 Re-inspection Fee (Building Code, Engineering & Planning) $75 per trip Garbage Container Fee $75 Recycle Bin $45 Planning & Zoning UDO Compliance Surety Fee (Calculated and collected by Planning & Zoning, if needed) UDO Compliance Surety Review and Processing Fee $300 Step 5 Subtotal Amount Due ESTIMATED TOTAL FEES DUE $ Page 6 of 6