GUIDELINES FOR BUILD OVERS

Similar documents
Build Over Easement Guidelines

Proposed Encroachment over SA Water Easements

Building Over and Adjacent to SEQ Service Providers Assets. Assessment Manual

PRESSURE SEWER SYSTEM GUIDELINES

Title: ENCROACHMENT POLICY Number: 0132 Reference: Administrative Committee January 21, Adopted by City Council: February 2, 2009

Property Development Connection Requirements (Sewer)

Title Reference [Title Reference] In this Easement unless the context or subject matter require otherwise:

Prospective Builders, Utilities, Public Agencies, and Engineering Firms

Appendix 4 Agency Approval Letters

Q: When will the first SID payment become due?

OP Clearing Blocked Private Sewer Pipes Policy. 1. Policy Statement. 2. Purpose and Objectives. 3. Policy Scope/Coverage

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Land Development Manual

Ohio Township Association

PRELIMINARY PROVISIONS TEXT OF RESTRICTIONS

SCHEDULE OF EASEMENTS

Seqwater Network Consent Guidelines. For the Queensland Bulk Water Supply Authority trading as Seqwater

Appendix A. Definitions

SOUTH TIPPERARY COUNTY COUNCIL

CHECKLIST FOR DEVELOPMENT REVIEW

APPLICATION FOR A SWIMMING POOL ENCLOSURE PERMIT

Road Rights of Way And Obstructions

SECTION SITE SURVEYS

APPLICATION FOR A SWIMMING POOL ENCLOSURE PERMIT

Requirements for accepted development and assessment benchmarks for assessable development

22 History Note: Authority G.S ;

Automated Land Development Applications

FENCES BUILDING PERMIT APPLICATION

Grinder Pump & Greywater Systems Policy May 2016

PLEASE COMPLETE ALL SECTIONS USING BLOCK CAPITALS AND BLACK INK

HYDRAULIC SERVICES BY - LAW

City of Richmond Municipal Code

building or renovating your home?

April 10, 2017 WATER

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)

Permit No.: 1234/2014 ADDRESS OF THE LAND: GEELONG ROAD, PORTARLINGTON

4. Itemized cost data for cost of construction certified by a Professional Engineer.

Subdivisions and Permit Conditions for Electricity Supplies. A guide to our requirements

Guideline: Distribution Pole to Pillar

THE CORPORATION OF THE TOWNSHIP OF PERTH EAST BY-LAW NO

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) Updated: 12/12/2017

RM-7, RM-7N and RM-7AN Districts Schedules

Part 9 Specific Land Uses - Dual Occupancy

Taking In Charge Policy For Housing Developments

RM-8 and RM-8N Districts Schedule

Covenant A relating to Stage 7 Riemore Downs, Tamborine Page 1 of 8 TABLE OF CONTENTS INTRODUCTION 3 1. WATER SUPPLY 3 2.

SCHEDULE OF EASEMENTS

Development assessment and compliance fees 2010/11

GREATER VANCOUVER REGIONAL DISTRICT ELECTORAL AREA A BUILDING ADMINISTRATION BYLAW NO. 1043, 2006

WEB Mission Statement Quality of life depends on access to safe sustainable water. EQUAL OPPORTUNITY PROVIDER

SANCTUARY LAKES RESORT CODE (BODY CORPORATE RULES OF BODY CORPORATE NO. PS)

CHAPTER IV. ELECTRIC

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

SANITARY BACKWATER VALVE REBATE APPLICATION. Applicant No. Date Received

ARTICLE 13 CONDOMINIUM REGULATIONS

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916)

Condominium Unit Requirements.

August 8, Letter of Findings # 1, WSSC Project No. DA6198Z16, 4820 Auburn Ave.

Land Development Policies and Pricing Manual Applicable to applications received subsequent to 1 July 2014

Zoning Permit Application

ACCESSORY DWELLING UNITS

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS

RURAL SETTLEMENT ZONE - RULES

RM-1 and RM-1N Districts Schedule

KINGSLAND MUNICIPAL UTILITY DISTRICT Schedule of Wastewater Rates, Fees and Charges and Service Policies Effective January 1, 2018

Preliminary Subdivision Application (Major) (Four (4) lots or more)

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT

Servicing Dual Occupancy and Other Two-Dwelling Developments

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

New Commercial Service Application

DECLARATION OF RESTRICTIONS AND EASEMENTS OF OAKWOOD MEADOWS SUBDIVISION

I Harris. Melbourne. John Quirk, Member. Merits Review of Refusal

Temporary Sign By-law

Pre-purchase Building Inspection Agreement Page 1 of 10

Non-Conforming Approach Application Overview

ACCESSORY DWELLING UNITS

Your Guide to First Time Sewerage for Existing Properties

ARTICLE 7 UTILITIES AND EASEMENTS

VILLAGE OF BAWLF. The Utility Services Bylaw Bylaw No. 587/13

Septic Tank / Drainfield / Holding Tank Permit Application

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

SECTION 10.7 R-PUD (RESIDENTIAL PLANNED UNIT DEVELOPMENT) ZONE

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

EL DORADO COUNTY PLANNING AND BUILDING DEPARTMENT ZONING ADMINISTRATOR STAFF REPORT VARIANCE

FORM 1 Building Act 1993 Building Regulations 2018 APPLICATION FOR BUILDING PERMIT Regulation 26

Strata Plan Fast Facts

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

UMATILLA COUNTY DEPARTMENT OF PUBLIC WORKS 3920 WESTGATE PENDLETON, OREGON 97801

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

PLANNING SERVICES FORM 3.3 SUBDIVISION APPLICATION COMMERCIAL OR BUSINESS PURPOSES

Licence to Construct Works (Bore) for a Licensable Purpose

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

LOCATION: LAND ADJOINING 10 BEDWELL CRESCENT CROSS LANES WREXHAM LL13 0TT

MAGELLAN PIPELINE COMPANY, L.P.

Land Development Manual March Land Development Manual. March newater.com.au

Complies with Australian Standard AS Inspection of Buildings Part 1: Pre-Purchase inspections Residential buildings Appendix C

Pre-Purchase Building Inspection Agreement to AS

THE CORPORATION OF THE TOWN OF INGERSOLL BY-LAW NO

Approved 58 Unit Residential Condo Development for Sale. For Sale: Price Upon Request

Transcription:

GUIDELINES FOR BUILD OVERS 2018

Table of Contents 1 Introduction... 3 2 Definitions... 4 3 Application Process... 6 3.1 Pre Application... 6 3.2 Assessment (2 weeks)... 6 3.3 Final Approval... 6 3.4 Change of ownership... 6 4 Unapproved Build Over... 8 5 Dwelling Or Habitable Structure... 9 6 Commercial And Industrial Building... 12 7 Garages And Sheds >9m2... 15 8 Small Sheds And Other Lightweight Structures < 9m2... 17 9 Carport Or Pergola... 19 10 Eaves And Cantilevers On A Building... 22 11 Swimming Pools, Spas & Rainwater Tanks (Above Ground)... 23 12 Swimming Pools & Rainwater Tanks (In-Ground)... 25 13 Tennis Courts... 27 14 Excavation And Landscaping... 29 15 Decking... 31 16 Fences And Retaining Walls... 33 16.1 Driveways And Paving... 35 17 Figures... 38 Figure 1 Maintenance Hole Offset... 38 Figure 2 Maintenance Shaft Offset... 38 Figure 3 Industrial/Commercial PCB & Sewer Main Offset... 38 Figure 4 Clearances Required from Assets... 38 Figure 5 Demountable Lightweight Structures... 38 Figure 6 Adjoining Property Sewer Branches Residential Only... 38 Figure 7 Swimming Pool or Rainwater Tank (in-ground)... 38 Figure 8 Excavation, Cut & Fill... 38 Figure 9 Retaining Walls... 38 Figure 10 Driveways - IS... 38 Figure 11 Driveways - MHs... 38 Approved: 01/11/2018 Page 2 of 38 Revision: 01 HPRM: 101/014/003

1 Introduction South Gippsland Water (SGW) owns, operates and maintains assets providing water and wastewater services to communities in the region. As part of these services, we operate and maintain underground pipeline assets which are often located within easements within private properties. Construction of structures and features over easements and assets can impede and prevent access to such pipelines during emergency operations, maintenance and replacement activities. This in turn can have significant impacts to customer s water supply and sewerage services. As such, South Gippsland Water needs to effectively manage and control any proposed structure or construction activity proposed within the vicinity of our assets and easements. Build over approval is required from the Corporation for any structure to be built, or any filling to be placed within 1 metre of any of the assets owned and operated by the Corporation. This approval also applies for any structure to be built over any easements set aside for the purposes of sewerage and/or water (Water Act 1989, Clause 148). These requirements assist in protecting sewer and water assets from damage while ensuring that customers avoid the cost and inconvenience of removing structures (possibly at very short notice) that may impede access to a Corporation asset for maintenance. It is the landowner s responsibility to ensure that any proposed works adhere to legislative obligations and confirm the actual location of the assets prior to any work proceeding. These guidelines will inform landholders of the application process and what activities/structures SGW will consider near our assets and easements. Approved: 01/11/2018 Page 3 of 38 Revision: 01 HPRM: 101/014/003

2 Definitions Definitions Access 24 hour access is required for maintenance purposes and unrestricted entry to the sewer is to be maintained. This may be achieved by having a structure open on a minimum of two sides. Unlocked roller doors etc. are not acceptable. Angle of Repose For the purpose of these requirements, the angle of repose means a 45 degree angle from the invert level of an asset which is used to determine the depth to which a footing must extend to ensure no additional load is placed on the asset. Line defining the zone of influence below a load placed by soil by a structure or footing (generally taken to spread at an angle of 45 degrees). Water and sewer assets must be above this zone of influence Asset Cantilever Cut Decommissioned Asset Deed of Agreement & Consent Demountable Easement Fill Gravity Sewer Habitable Height Clearance Assets include, but are not limited to, sewerage pipes/ mains, water mains and access pits or manholes that South Gippsland Water owns or has a responsibility to maintain and operate. Also includes pressure sewer pump units and property service lines for Poowong, Loch, Nyora or Alberton townships. Cantilever construction allows for overhanging structures without external bracing, in contrast to constructions supported at both ends with loads applied between the supports, such as a simply supported beam found in a post and lintel system. Removal of any soil, rock or other matter that supports, protects or covers any works of the Corporation. An asset that is not currently in active use but is still located within the ground. A document which owners complete to indemnify the Corporation against all legal actions/ claims and costs arising out of the construction or retention of a building and or structure. Any structure or roof that can be manually dismantled and removed from its current position by two people within a four hour period. Is a right attached to a piece of land which allows a person to use the land of another person in a particular manner. An easement can either be stated and visible on the certificate of title plan or it can be implied. Easements may be provided over a lot to enable access for maintenance and repair or to provide water or sewerage services (Refer Section 12 Subdivision Act 1988). Any filling to be placed within 1 metre laterally of any of the works of the Corporation. A system wherein flow and/or pressure are caused by the force of gravity. Any structure constructed or that can be readily converted to be suitable or fit to live in. Height of structure above finished ground level required to allow unobstructed access by machinery to water or sewer assets. Information Statement A statement as set out in Section 158 of the Water Act 1989. Approved: 01/11/2018 Page 4 of 38 Revision: 01 HPRM: 101/014/003

Inspection Opening Inspection Shaft Maintenance Hole (also now known as a Manhole) Maintenance Shaft Pressure Sewer (Rising Main) Property Connection Branch/Sewer Property Connection Point (PCB) Property Service Readily Removed Redundant Asset SGW Structure Relocatable Unit Works In relation to sewerage works, means an access opening in a pipe or pipe fitting, installed to facilitate inspection, testing or the clearing of obstructions, and fitted with a threaded cap or plug or an access cover. In relation to a sanitary drain, means a shaft constructed in the line of the drain for the purpose of locating, inspecting and clearing the drain A structure with a removable cover that allows human and machine access to a sewer main. A structure that provides for inspection and maintenance equipment access but not human entry to a sewer. The section of the sewerage system where the flow is under pressure from a pumping station. A short sewer, owned and operated by the Water Agency, which connects the main sewer and the customer sanitary drain; it includes a junction on the main sewer, a property connection fitting, in some cases a vertical riser, and sufficient straight pipes to ensure the property connection fitting is within the lot to be serviced Point of connection between the property connection sewer and the customer sanitary drain. Means the water supply pipe connecting the water main of a water corporation to the outlet of any fixtures installed on a serviced lot. This refers to small items that can be easily removed from an area when immediate access is required. Removing these items must not affect the integrity of any structure and must allow sufficient access to the Corporation asset. They will also not be reinstated by the Corporation. These items include: Small garden beds Play houses etc. with no floor Paving stones Assets that are no longer in use by the Corporation. They are typically water or sewer mains that have been replaced by new infrastructure, but remain in their original below ground location. Means South Gippsland Region Water Corporation Something built or constructed and includes, but is not limited to, houses, sheds, walls and fences. Any structure designed or capable of being removed or relocated. Includes any change to the natural or existing condition or topography of land including the removal of any soil, rock or other matter that supports, protects or covers any works of the Authority Approved: 01/11/2018 Page 5 of 38 Revision: 01 HPRM: 101/014/003

3 Application Process 3.1 Pre Application Prior to designing any structure or carrying out works, establish whether the proposed structure or works will be located over an easement or within 1.0 metre of an SGW asset; Request an asset location plan (Size, Depth & Offset) from Dial Before You Dig. Alternatively, you can contact SGW and request a copy of our asset information on your property. SGW will then provide a plan showing the boundaries of your property and all assets held within; Note: It is the applicant s responsibility to confirm the actual location of assets prior to lodging an application; Download an application to build over from our website http://www.sgwater.com.au/wp- content/uploads/2014/03/fte-001-application-to-build-or-retain-a-structure-over-assets-and-or- Easements-Form-1.pdf; The completed application, together with the fee and all supporting documentation, is then lodged with the Corporation for its assessment. 3.2 Assessment (2 weeks) Submission of an application does not constitute approval. Each application is subject to assessment on its own merits. SGW will assess the documents provided. If these are not sufficient to make an assessment you may be asked to provide additional information; If the proposal meets the requirements set out in these guidelines, a preapproval letter will set sent to you along with SGW s standard Deed of Agreement and Consent for signing; If the proposal does not meet the requirements of these guidelines, the application will be refused and you will receive a letter outlining the reasons for the declined application. 3.3 Final Approval Upon receiving the completed Deed of Agreement and Consent, SGW will issue final approval for your proposed works over the easement or asset; SGW will keep a record of the Deed and the agreement will be recorded against your property; The Deed requires that upon sale of your property that you must notify any prospective purchaser of this Deed and that the agreement will be incumbent upon such future owners; Refunds will not be given for declined applications; A Build over Consent is valid for 12 months from the date of issue. The Build over Consent will expire if the approved work has not commenced in that time and a new application is required. 3.4 Change of ownership Where a Deed already exists for an approved structure the terms and conditions subject to which the Corporation consented are binding on the successors in title of the person who applied for the consent (Section 148(5) of the Water Act 1989). A copy of the Deed will be supplied to any new landowners on purchase of land. Approved: 01/11/2018 Page 6 of 38 Revision: 01 HPRM: 101/014/003

For further information, please refer to our website sgwater@sgwater.com.au or call us on 5682 0444 to discuss your queries. Approved: 01/11/2018 Page 7 of 38 Revision: 01 HPRM: 101/014/003

4 Unapproved Build Over Any work, including structures of a permanent nature, carried out or located in contravention of Section 148 of the Water Act 1989, are classified as unapproved work. Unapproved Build Overs are likely to result in: The issue of a notice under Section 151 of the Water Act 1989 advising the owner of the contravention and requiring them to remove the relevant structure, reinstate or repair any damage to the property or the Corporation s asset caused by the particular works; Details of any unapproved Build Overs will be disclosed to any potential purchasers by way of an Information Statement; Any costs incurred by the Corporation as a result of damage caused to its assets due to unapproved works may result in action being taken against the property owner or person who undertook the unapproved works to recover damages. Non-compliance with Section 148 of the Water Act 1989 is an offence which may result in legal proceedings and direction to remove a structure or repair any damage caused by works. Approved: 01/11/2018 Page 8 of 38 Revision: 01 HPRM: 101/014/003

5 Dwelling Or Habitable Structure The following criteria applies to Residences (Building Code of Australia - Class 1 to 4 Habitable Structures). a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval will not be given if the development site and surrounding properties are not yet fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Dwelling / habitable structures are not permitted to be constructed over sewer mains. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Dwelling / habitable structures are not permitted to be constructed over sewer rising mains, vacuum lines and pressure mains. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. Dwelling / habitable structures are not permitted to be constructed over property connection branches. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). Approved: 01/11/2018 Page 9 of 38 Revision: 01 HPRM: 101/014/003

e Inspection Shaft/Opening Construction over Inspection Openings are not permitted as it creates an unacceptable risk to SGW s obligations in providing a sewerage service to our customers. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Refer to Figures 1 & 2. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Structures over water mains of any size is not permitted. Figure 1 Approved: 01/11/2018 Page 10 of 38 Revision: 01 HPRM: 101/014/003

Figure 2 Approved: 01/11/2018 Page 11 of 38 Revision: 01 HPRM: 101/014/003

6 Commercial And Industrial Building The following requirements apply to construction of Commercial or Industrial Buildings near a South Gippsland Water asset listed below: a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval will not be given if the development site and surrounding properties are not yet fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater) Refer to Figure 3. With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). Approved: 01/11/2018 Page 12 of 38 Revision: 01 HPRM: 101/014/003

e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater) - Refer to Figure 3. f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Refer to Figures 1 & 2 Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 13 of 38 Revision: 01 HPRM: 101/014/003

Figure 3 Approved: 01/11/2018 Page 14 of 38 Revision: 01 HPRM: 101/014/003

7 Garages And Sheds >9m2 The following requirements apply to construction of enclosed Garages or Sheds greater than 9m 2 in area near a South Gippsland Water asset listed below: a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval will be considered if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. c Sewer rising mains, vacuum lines and pressure sewers Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. d Property connection branch (either servicing an adjoining property or customer s own property) Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). Approved: 01/11/2018 Page 15 of 38 Revision: 01 HPRM: 101/014/003

e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 16 of 38 Revision: 01 HPRM: 101/014/003

8 Small Sheds And Other Lightweight Structures < 9m2 The following requirements apply to construction of small Sheds and other lightweight structures less than 9m 2 in area near a South Gippsland Water asset listed below: a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size will be considered on a case by case situation. c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Approved: 01/11/2018 Page 17 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Figure 5 Approved: 01/11/2018 Page 18 of 38 Revision: 01 HPRM: 101/014/003

9 Carport Or Pergola The following requirements apply to construction of Carport or Pergolas in area near a South Gippsland Water asset listed below: Asset Criteria a Easements reserved for sewerage /water purposes containing no assets Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size will be considered on a case by case situation. Must be independently supported, or demountable when attached to another structure. A structurally independent roof is to be provided when attached to dwelling. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. c Sewer rising mains, vacuum lines and pressure sewers Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. d Property connection branch (either servicing an adjoining property or customer s own property) Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). Approved: 01/11/2018 Page 19 of 38 Revision: 01 HPRM: 101/014/003

e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 20 of 38 Revision: 01 HPRM: 101/014/003

Figure 6 Approved: 01/11/2018 Page 21 of 38 Revision: 01 HPRM: 101/014/003

10 Eaves And Cantilevers On A Building Asset Criteria a Easements reserved for sewerage /water purposes containing no assets Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size is not permitted c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over sewer mains of any size is not permitted. Construction over property connection branches is not permitted. e Inspection Shaft/Opening Construction over property connection branches is not permitted. f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 22 of 38 Revision: 01 HPRM: 101/014/003

11 Swimming Pools, Spas & Rainwater Tanks (Above Ground) a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size is not permitted. c Sewer rising mains, vacuum lines and pressure sewers Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. d Property connection branch (either servicing an adjoining property or customer s own property) Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Approved: 01/11/2018 Page 23 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 24 of 38 Revision: 01 HPRM: 101/014/003

12 Swimming Pools & Rainwater Tanks (In-Ground) a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval will not be given for any construction over sewerage / water easements. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains In-ground swimming pools or tanks are not permitted to be constructed over sewer mains. Refer to Figure 7 c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Approved: 01/11/2018 Page 25 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Figure 7 Approved: 01/11/2018 Page 26 of 38 Revision: 01 HPRM: 101/014/003

13 Tennis Courts a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size will be considered on a case by case situation. c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Approved: 01/11/2018 Page 27 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 28 of 38 Revision: 01 HPRM: 101/014/003

14 Excavation And Landscaping a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size will be considered on a case by case situation. Refer to Figure 8 c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over pressure sewer mains of any size will be considered on a case by case situation. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. Construction over property connection branches will be considered on a case by case situation. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches will be considered on a case by case situation. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Approved: 01/11/2018 Page 29 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes will be considered on a case by case situation. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Figure 8 Approved: 01/11/2018 Page 30 of 38 Revision: 01 HPRM: 101/014/003

15 Decking a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size is not permitted. c Sewer rising mains, vacuum lines and pressure sewers Construction over sewer mains of any size is not permitted. Works adjacent to a sewer main require: A minimum 1.0m horizontal clearance from the outside edge of the sewer main. Footings / foundation must extend to a minimum depth to the that no additional load will be placed on the sewer by structure. d Property connection branch (either servicing an adjoining property or customer s own property) Construction over property connection branches is not permitted. Works adjacent to a property connection branch require: located outside the easement (whichever is greater). With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to agreement by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Approved: 01/11/2018 Page 31 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size is not permitted. Approved: 01/11/2018 Page 32 of 38 Revision: 01 HPRM: 101/014/003

16 Fences And Retaining Walls a Asset Easements reserved for sewerage /water purposes containing no assets Criteria Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Construction over sewer mains of any size will be considered on a case by case situation. Refer to Figure 9 Driven piles are not permitted c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (either servicing an adjoining property or customer s own property) Construction over sewer mains of any size will be considered on a case by case situation. Refer to Figure 9 Driven piles are not permitted Works over a property connection branch is permitted subject to the following requirements: Minimum cover over the property connection branch is to be 600mm or greater. No additional load is to be placed on the property connection branch by the works. With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Construction over property connection branches is not permitted. Works adjacent to an Inspection Opening requires: located outside the easement (whichever is greater). Refer to Figure 9 Approved: 01/11/2018 Page 33 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Construction over maintenance holes are not permitted as 24 hour access is required. Works adjacent to a MH require: 1.0m horizontal clearance from the outside edge of the MH cover. Footings / foundations must extend to a minimum depth to the that no additional load will be placed on the sewer by the structure. Maintenance holes can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. h Water Mains Construction over water mains of any size are not permitted. Figure 9 Approved: 01/11/2018 Page 34 of 38 Revision: 01 HPRM: 101/014/003

16.1 Driveways And Paving Residential driveways, including cross overs, made of concrete or paved material above gravity sewers do not require Buildover Consent provided a minimum height clearance of 750 mm from the top of the gravity sewer is maintained. Asset Criteria a Easements reserved for sewerage /water purposes containing no assets Approval may be given if the development site and surrounding properties are fully serviced by existing water supply and sewerage assets. Note: Where an easement is no longer required for the provision of sewer / water purposes, SGW may consider an application to expunge or amend the easement. b Gravity sewer mains Works over a gravity sewer main is permitted subject to the following requirement: Minimum clearance to the top of the gravity sewer main is to be 750mm (residential) or 900mm (commercial). c d Sewer rising mains, vacuum lines and pressure sewers Property connection branch (servicing customer s own property or an adjoining property) Works over a pressure sewer main is permitted subject to the following requirement: Minimum clearance to the top of the sewer main is to be 600mm. Works over a property connection branch is permitted subject to the following requirements: Minimum cover over the property connection branch is to be 750mm or greater. No additional load is to be placed on the property connection branch by the works. With SGW s consent, property connection sewers within the property concerned can be relocated at the customer s expense to achieve required clearances. Property connection sewers servicing neighbouring properties can be relocated at the customer s expense to achieve required clearances with SGW s consent. This is subject to written consent by the neighbouring property owner(s). e Inspection Shaft/Opening Works over an Inspection Shaft/Opening is permitted subject to the following requirements: The Inspection Opening/Shaft is likely to be subject to trafficable load, therefore the cap must be installed below surface level and covered by a heavy duty trafficable cover which must be supported so that no load can be transmitted onto the inspection shaft Refer to Figure 11. The Inspection Opening/Shaft must match new surface levels. Approved: 01/11/2018 Page 35 of 38 Revision: 01 HPRM: 101/014/003

f Maintenance Shaft or Maintenance Hole Works over a MS or MH is permitted subject to the following requirements: Maintenance shaft/hole cover levels must match new finished surface levels Refer to Figure 11. Alterations to maintenance shafts/holes must be done by SGW or an Accredited Contractor, at the owner s expense. Where maintenance shafts/holes exist in commercial driveways/ paving, heavy covers (Class D) to comply with SGW requirements are to be fitted. Note: Maintenance holes/shafts can only be opened by SGW authorised personnel. g Pressure Sewer Pump Unit No structures are permitted to be constructed over a Pressure Sewer Pump Unit. Note: This includes the boundary kit. h Water Mains Construction over water mains of any size are not permitted. Note: This also includes ferrule, valves, meters. Figure 10 Approved: 01/11/2018 Page 36 of 38 Revision: 01 HPRM: 101/014/003

Figure 11 Approved: 01/11/2018 Page 37 of 38 Revision: 01 HPRM: 101/014/003

17 Figures Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Maintenance Hole Offset Maintenance Shaft Offset Industrial/Commercial PCB & Sewer Main Offset Clearances Required from Assets Demountable Lightweight Structures Adjoining Property Sewer Branches Residential Only Swimming Pool or Rainwater Tank (in-ground) Excavation, Cut & Fill Retaining Walls Driveways - IS Driveways - MHs Approved: 01/11/2018 Page 38 of 38 Revision: 01 HPRM: 101/014/003