LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA

Similar documents
COMMISSION ACTION FORM SUBJECT: ZONING TEXT AMENDMENT FOR LINCOLN WAY CORRIDOR PLAN DOWNTOWN GATEWAY COMMERCIAL ZONING DISTRICT STANDARDS

ITEM # 42 DATE: COUNCIL ACTION FORM

Phase III. Proposed Plan. SEA Consultants, Inc. Desman Associates Bonz & Company, Inc. Webster Block Planning & Urban Design Study

LILLIAN WEBB PARK DEVELOPMENT PROPOSAL. City of Norcross, Georgia 2034 Comprehensive Plan

Staff Report REZONING BOUNDARY OPTIONS FOR NEW DOWNTOWN GATEWAY COMMERCIAL ZONING. April 24, 2018

County Lot C Redevelopment

Chapter 7 Riverfront District

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

City of South San Francisco Page 1 of 5

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Broadway Corridor Framework Plan Pearl District Business Association November 10, 2015

RETAIL REFINEMENT PLAN

Understanding the Development Review Process in the City of Minneapolis

2) COMPREHENSIVE PLAN AMENDMENT

Accepting Development Proposals

Bike/Pedestrian Connection at Street Level. Project Underway. Illustrative Master Plan: Traditional Downtown VISION DOWNTOWN STATE COLLEGE MASTER PLAN

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

Staff Report. Street Vacation. Salt Lake City Planning Commission. Ashley Scarff, (801) or Date: April 10 th, 2019

THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE

School Without Walls Partnership District of Columbia Public Schools and The George Washington University

NICKEL PLATE DISTRICT DOWNTOWN FISHERS, INDIANA. Fishers Community Meeting

Library Park Apartments Development Request for Proposal CML#

FINAL Public Meeting for the Downtown District Vision Plan. Mebane Arts and Community Center Tuesday, July 31, p.m.

UPPER ALBANY NEIGHBORHOOD PLAN. Sheldon Oak Central, Inc.

Downtown Brampton and Queen Street Corridor: Residential and Commercial Projects

Evolution of the Vision for NE 181st Street Study Area

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

MEMORANDUM Main Concepts

2015 Downtown Parking Study

DOWNTOWN BEAUMONT CENTRE-VILLE: PARKING MANAGEMENT REPORT

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES PLANNING COMMISSION

Downtown Brampton and Queen Street Corridor: Residential and Commercial Projects

City of Westminster

7. IMPLEMENTATION STRATEGIES

E. 90TH & CHESTER AVENUE CLEVELAND, OHIO

In your opinion, what opportunities do you think should be considered in this process? (Describe up to 3)

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

Borough Council January 28, 2010

3.1 PZ / 20 W. Northwest Highway / Nicholas & Associates / Plat of subdivision and conditional use for a final planned unit development

Fact Sheet Downtown Wasaga Beach Community Improvement Plan

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

ARLINGTON COUNTY, VIRGINIA

PUBLIC NOTICE* Studies Requested: Parking analysis. Other Required Permits: Building Permit, Site Development Permit

3.0 Project Description

Downtown & East Town CRA Expansion Plan City of Eustis

4 LAND USE 4.1 OBJECTIVES

Ann Arbor Downtown Zoning Evaluation

ii. Project description

PLANNING COMMISSION REPORT Regular Agenda -Public Hearing Item

Delano Central Business District Parking Study and River Street Reconfiguration Concept

PLANNING ANALYSIS ZONING CASE 18-TOD-Z-026 NAK S CROSSING PUD AMENDMENT. GC-3-A (General Commercial) GC-3-A (General Commercial)

The Miramar Santa Monica

Town of Clinton, Connecticut Action Plan for the Historic Unilever Property and Area. Steering Committee Meeting #5 Implementation Strategies

CALL FOR OFFERS / REQUEST FOR PROPOSAL

Coding For Places People Love Main Street Corridor District

We contacted all RNOs in the area to come to their meetings and personally explain the draft, and take questions. Four RNOs took us up on the offer,

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Building Livable Communities with Transit. Introduction to Financing Livable Communities. Portland Lindbergh City Center Case Study

ARTICLE 4: SCHEDULE OF DISTRICT, USE AND SETBACK REGULATIONS

City Council Agenda Item #14_ Meeting of Oct. 8, Concept plan for Marsh Run Two Redevelopment at and Wayzata Blvd.

2 Holiday Drive - Zoning Application - Preliminary Report

Downtown Plano. Creating a Transit Village

SELLWOOD MORELAND IMPROVEMENT LEAGUE 8210 SE 13th AVENUE, PORTLAND, OR STATION CHURCH

LETTER OF INTENT. NOW, THEREFORE, the parties hereby mutually intend as follows:

Rick Noll Commercial Realtor Direct (813)

Re: Item No THE WILLOW TREE TOWER Landmark Building. Landmark Site.

Watkinsville First Baptist Church Building and Parking Masterplan Norton Road & Simonton Bridge Road Oconee County Georgia

RETAIL SPACE FOR LEASE

Request Conditional Use Permits (Craft Brewery & Open-Air Market) Staff Recommendation Approval. Staff Planner Bill Landfair

ARLINGTON COUNTY, VIRGINIA

OCEANSIDE DEVELOPER S CONFERENCE

SPIKOWSKI PLANNING ASSOCIATES

Old Town Lewisville. Intelligent. Urban. Community. January Old Town Lewisville TOD Master Plan Update

3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study

66 Isabella Street Rezoning Application - Preliminary Report

Old Town Lewisville. Intelligent. Urban. Community. January 2017 Transit Oriented Development (TOD) Plan Update Adopted September 11, 2017

The summary of zoning regulations for each site is provided in the same order (and using the same names for each site) as the RFEI.

Exhibit A Project Specifications

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

Main Street Parking Area Strategy. Borough of South River Middlesex County, New Jersey

VILLAGE CENTER ARLINGTON, VIRGINIA ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/

8.5.1 R1, Single Detached Residential District

Director, Community Planning, Etobicoke York District

Draft University of Kentucky College Town Study Update

ST CATHARINES PERFORMING ARTS CENTRE. A story of community, partnership and revitalization

UPDATE Board of Selectmen June 20, 2017

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

TRANSFER OF DEVELOPMENT RIGHTS

Galloway Road and 4097 Lawrence Avenue East - Zoning Amendment Application - Preliminary Report

Sound Transit s Office of Land Use Planning & Development Transit Oriented Development Quarterly Status Report Q2 2018

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report

6040 Bathurst Street and 5 Fisherville Road Zoning Bylaw Amendment Application Preliminary Report

City of Coral Gables Planning and Zoning Staff Report

ARTICLE 10 SPECIAL PURPOSE DISTRICTS

EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

The Forecaster Building Notice of Project Change

Tree-lined streets, multilevel

Offering Memorandum for the Subject Property located at: th Avenue, San Diego 92103

Transcription:

ITEM: 51 BACKGROUND: Staff Report LINCOLN CORRIDOR REDEVELOPMENT PROJECT UPDATE FOR DOWNTOWN GATEWAY FOCUS AREA March 27, 2018 The City has been working for two years to develop, adopt, and implement the Lincoln Way Corridor Plan. The City Council identified the Downtown Gateway Focus Area as the first priority for implementation. The Downtown Gateway area is generally described as the area south of the railroad tracks and bounded by Grand Avenue to the west and Duff Avenue to the east. The City is in the process of reviewing new zoning standards for the area and staff has been in discussion with a variety of private development interests over the past 6 months. City Council specifically referred to staff in September 26, 2017 a request from a developer for staff to engage in a discussion on the feasibility of a redevelopment project on the north side of Lincoln Way between Clark Avenue and Kellogg Avenue. The potential developer for this initial Gateway project is the Argent Group. Argent is about to proceed to acquire a number of properties needed to accomplish their proposed mixed-use redevelopment project. Since this first step requires a sizable investment, the developer would like to determine if there is general support for the concept that is being proposed and a willingness to provide a city financial incentive for the project before moving ahead with this project. It should be noted that the current concept has been refined from the initial project depicted in September. The September concept included a broader development project that included a shared public/private parking structure north of the railroad with a pedestrian bridge connection to the redevelopment project south of the railroad tracks. The current concept, however, now includes properties along Lincoln Way and does not contemplate including construction of a parking garage and bridge north of the railroad tracks. The current concept includes redevelopment of approximately 4 acres between Lincoln Way and Gilchrist at the corner of Clark Avenue. (Attachment A-Location Map) The development concept includes a centrally located outdoor courtyard/plaza area bordered by a mixed-use building and a boutique branded hotel. The hotel, residential, and commercial uses would be served by privately owned parking structures. The current Starbucks would be relocated to the Clark Avenue corner as a freestanding establishment. Attachment B includes massing diagrams and schematic building layouts 1

for the project. The following tables summarize the primary uses shown in Attachment B. Mixed Use Building Ground Floor Retail Ground level commercial plaza 17,000 sq. ft 25,000 sq. ft. with outdoor seating and video screen 2 nd Floor Office/Flex space undefined Apartment units/bedrooms 187 Apartments totaling 550 beds Residential Amenity Ground Floor Residential Amenity 2 nd Floor 2,700 sq. ft. Outdoor pool deck Hotel Building Ground Floor Retail 3,500 sq. ft. Restaurant Bar area undefined Hotel Rooms 106 Starbucks Freestanding Drive-Through 2,500 sq. ft. Development of the site will include access from Lincoln Way and Gilchrist. The number of driveways along Lincoln Way will be reduced from the current eight to two driveways. Included in this proposal is the reconstruction of Lincoln Way to include parallel parking simliar to street frontages in Campustown. Gilchrist frontage improvements will also occur to help create a more inviting approach to the project and connection to Kellogg Avenue. Since the City owns a water well that is situated on the site of the proposed Mixed Use building, the developer will need to acquire the property and provide compensation for replacement of the well capacity as part of the redeveloment project. STAFF COMMENTS: The proposed development concept includes many elements identified within the Corridor Plan as important for the area. The project includes design features intended to make it a destination commercial area with the central plaza lined with commercial uses, a boutique hotel to diversify lodging options in the City and promote visitors to Downtown, frontage improvements to Lincoln Way, and new high amenity millennial housing apartments. In addition, the scale and elements of the project will establish a notable presence along Lincoln Way and set the tone for other redevelopment projects in the future. Due to the conceptual nature of the development as it has been presented to staff, it is imperative that as the concept evolves that it maintains consistency with the vision of 2

the Corridor Plan. Points of emphasis for the final project approval include providing apartments types designed for wide appeal and not as student housing, configuring apartments primarily as smaller units (2 bedrooms or less), focusing commercial space along the plaza to create an active and interesting environment, establishing preferences for commercial uses unique to Ames as a destination draw to the area, providing second floor office, and incorporating high quality building design materials and architectural treatments. The developer realizes that a number of formal approval steps are needed before the project can receive final approval from the City Council. Before initiating the land acquisition phase of the project, the developer is seeking an indication that the Council embraces the project concept and is willing to provide a TIF incentive to assist in bringing this project to fruition. With this level of preliminary support from the from Council, the developer will continue to refine details and prepare financial information. Ultimately, the City would need to complete the rezoning process and enter into a development agreement for the project to become a reality. The developer believes they can further develop their concept and its feasiblity over the next two months. It appears that the Argent development could serve as the catalyst project for the Downtown Gateway Focus Area. Therefore, staff believes it is worthwhile to continue to work with the developer to fashion a final project that is consistent with the priorities described in this report and Corridor Plan. If the Council ultimately agrees that the final concept results in a catalyst project, it would seem appropriate to consider the same incentive philosophy as was utilized in Campustown for the Kingland project. 3

KELLOGG AVE CLARK AVE CLARK AVE Attachment A 500500 00 500 13 101 319 317 MAIN ST 315 MAIN ST 412 404 406 400402 414 406 400 424 2NDEL 102 406 101 340 340 330 330 101 330 110 324 328 328 316 MAIN ST 300 312 310 308 300 300 314 201 306 312 308 1/2 202 100 312310 308 302 307 314 1 1/2 305 2 304 300 200312 308 2 312 101 308 303 301 308 1/2 2A MAIN ST 236 236 234 238 201 KELLOGG AVE 205 C 501 509 301 GILCHRIST ST CLARK AVE 204 403 403 116 407 B 116 116 319 116 A C 401 319 319 419 319 319 335 403 403 1 327 415 335 403 2 329 3 401 323 334328 322 320 203 312 307311 KELLOGG AVE KELLOGG AVE 215 GILCHRIST ST 121 119 117 113 111 109 105 103107 105 303 303 1/2 122 118 118 102 118 118 101 103 114 Alley 110 120 2 11 10 104 118 105 414 WASHINGTON AVE 402 Subject Site 326 316 S KELLOGG AVE 302 222 101 22 222 10 103 428 112 302 101 302 102 222 114-116 120 119 117 113 115 115 F Attachment A- Location Map 4

LINCOLN WAY MIXED-USE MASSING STUDY ARGENT GROUP / BAXTER CONSTRUCTION DLR Group Architecture Engineering Planning Interiors 23 MARCH 2018

LINCOLN WAY MIXED-USE BUILDING VIEW 23 MARCH 2018 PAGE 2

LINCOLN WAY MIXED-USE BUILDING VIEW 23 MARCH 2018 PAGE 3

LINCOLN WAY MIXED-USE BUILDING VIEW 23 MARCH 2018 PAGE 4

LINCOLN WAY MIXED-USE BUILDING VIEW 23 MARCH 2018 PAGE 5

LINCOLN WAY MIXED-USE BUILDING VIEW 23 MARCH 2018 PAGE 6

MILLENNIAL HOUSING SUMMARY - LEVEL 01 MILLENNIAL HOUSING PARKING APPROX. 137 STALLS RESIDENTIAL LOBBY/FITNESS 2,700GSF RESIDENTIAL BUILDING RETAIL 16,925 GSF MILLENNIAL HOUSING SITE AREA 80,240 SF 8 30 31 14 19 23 8 SITE AREA BOUNDARY STARBUCKS HOTEL BUILDING MILLENNIAL HOUSING LINCOLN WAY MIXED-USE SITE PLAN - LEVEL 01 23 MARCH 2018 PAGE 7

SUMMARY - LEVEL 02 MILLENNIAL HOUSING PARKING APPROX. 198 STALLS 26 44 23 21 19 13 14 5 11 22 STARBUCKS HOTEL BUILDING MILLENNIAL HOUSING LINCOLN WAY MIXED-USE SITE PLAN - LEVEL 02 23 MARCH 2018 PAGE 8

SUMMARY - LEVEL 03 AMENITY SPACE 3,050 GSF MILLENNIAL HOUSING 44,460 GSF 1BR 3 UNITS (3) 2BR 14 UNITS (28) 3BR 9 UNITS (27) 4BR 11 UNITS (44) TOTAL BEDS - LEVEL 03 102 BEDS STARBUCKS HOTEL BUILDING MILLENNIAL HOUSING LINCOLN WAY MIXED-USE SITE PLAN - LEVEL 03 23 MARCH 2018 PAGE 9

SUMMARY - LEVEL 04 (05-07 SIMILAR) MILLENNIAL HOUSING 48,812 GSF 1BR 4 UNITS (4) 2BR 13 UNITS (26) 3BR 10 UNITS (30) 4BR 13 UNITS (48) TOTAL BEDS - LEVEL 04 112 BEDS GRAND TOTALS - RESIDENTIAL BUILDING MILLENNIAL HOUSING 239,708 GSF AMENITY SPACE/LOBBY 10,050 GSF 1BR 19 UNITS (19) 2BR 66 UNITS (132) 3BR 49 UNITS (147) 4BR 63 UNITS (252) TOTAL BEDS - LEVEL 04 550 BEDS RESIDENTIAL BUILDING PARKING APPROX. 335 STALLS STARBUCKS HOTEL BUILDING MILLENNIAL HOUSING LINCOLN WAY MIXED-USE SITE PLAN - LEVEL 04-07 23 MARCH 2018 PAGE 10