North Campus Master Plan

Similar documents
Visit 4 Clarifying Priorities

Campus Master Plan. Board of Trustees Meeting. December 10, 2004

The University of Texas at Dallas Campus Master Plan Update Town Hall Meetings. September 6-7, 2018

2015 Limited Campus Master Plan Update NSHE Board of Regents Informational Update October 23, 2015

The University of Texas at San Antonio Campus Master Plan. Barnes Gromatzky Kosarek Architects with Michael Dennis & Associates


Long Range Development Plan (LRDP) Mission Bay Community Workshop #2

A NEW AMERICAN UNIVERSITY. West Campus.

University Village. October 23, 2014

EAST CAMPUS DEVELOPMENT UPDATE Board of Trustees January 20, 2011

Purpose of Workshop. Scope project to be included in a Design Build RFP Review Program Needs Site Analysis Concept Plans

2026 Campus Plan PRINCETON UNIVERSITY APPENDIX A. CPUC March 2016

UW Bothell + Cascadia College Campus Master Plan Update

UCSF Mission Bay Community Task Force Meeting #1

DeKalb County Jail History

Overview. Foundation: Physical Design Framework 2011 Phase 2 Study

A New College Living Experience East Village, Manhattan, New York City

BUILDING HEIGHTS. The following diagram depicts the maximum allowable building height in a +3 zone.

174 North King Street Workforce Housing Development Downtown Jackson, Wyoming

N o v e m b e r 9, Concept Alternatives. J o i n t C i t y C o u n c i l a n d P l a n n i n g C o m m i s s i o n W o r k s h o p

Richardson s TOD Experience From ULI Panel Report to Breaking Ground. September 8, 2011

2. Selection of Preliminary Physical Master Plan

River Glen Apartments

Agenda. 1. Purpose of the Master Plan 2. Master Plan Drivers Campus Master Plan

Jasper 115 Street DC2 Urban Design Brief

HILLTOWN TOWNSHIP 2009 PARKS, RECREATION & OPEN SPACE SURVEY RESULTS

Approval of Takoma Amended Joint Development Agreement

Downtown Salt Lake City Proposed Arts and Cultural District

Circle 75 Windy Ridge Pkwy

Supplemental Feasibility Study for Ravenswood, Oak Grove, Glenwood and Encinal Avenues Grade Separation. for the. City of Menlo Park

DOWNTOWN DURHAM HIGH-DENSITY DEVELOPMENT OPPORTUNITY. 510 E. PETTIGREW STREET Durham, NC FOR SALE WOODFIELD APARTMENTS 305 UNITS

BLUE ASH COMPREHENSIVE LAND USE PLAN PHASE 3 DECEMBER, 2014

Brand New Class A Office Building on Libbie Mill Lake Delivering 2020

City Avenue District Rezoning. Regional Center Area & Bala Cynwyd Retail District December 14, 2011 Public Hearing

MEMORANDUM Main Concepts

LAKE MERRITT STATION AREA PLAN

Draft University of Kentucky College Town Study Update

Westgate Entertainment District

DOWNTOWN ORLANDO. What s Up Downtown November 3, 2016

Building & Land Summary Single Family Houses Excluded 17-AUG-17

464 & 510 E. PETTIGREW STREET Durham, NC 27701

Infill Development Panel. Presented By:

Town of Clinton, Connecticut Action Plan for the Historic Unilever Property and Area. Steering Committee Meeting #5 Implementation Strategies

UrbanFootprint Place Types. Urban Mixed Use. Urban Residential. Urban Commercial. Residential 1% SF Large Lot 0%

McCLATCHY FACILITY SUMMARIES

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Bike/Pedestrian Connection at Street Level. Project Underway. Illustrative Master Plan: Traditional Downtown VISION DOWNTOWN STATE COLLEGE MASTER PLAN

REPORT TO THE BOARD OF GOVERNORS

BYLAW NO. 15/026 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO AMEND THE LAND USE BYLAW NO. 99/059

Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006

Ithaca College Accessibility Guide

Off-Campus Living at UConn.

TASK 2 INITIAL REVIEW AND ANALYSIS U.S. 301/GALL BOULEVARD CORRIDOR FORM-BASED CODE

Downtown Brampton and Queen Street Corridor: Residential and Commercial Projects

E HOLLY STREET PASADENA, CA 91105

CHARLOTTESVILLE, VIRGINIA

Approval of Takoma Amended Joint Development Agreement and Compact Public Hearing

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

MARC RAIL COMMUNITIES

1111 N 13th St Omaha, Nebraska 68102

2.0 LAND USE FRAMEWORK

NEW JERSEY TRANSIT CORPORATION SPECIAL TELEPHONE BOARD OF DIRECTORS MEETING JUNE 25, 2013 ACTION ITEM

The Park at High Crossing. vitality proximity value

Truax Park Apartments

E HOLLY STREET PASADENA, CA 91105

University Housing. Welcome Home

MONTROSE GREEN 1819 WEST MONTROSE CHICAGO, IL

Land Use and Zoning Changes for Land Development Code Update

Commuting to UConn Off-Campus Student Services

Sydney Regional Environmental Plan No 28 Parramatta

EXHIBIT 1 PROJECT DESCRIPTION AND DESCRIPTION OF REQUESTED AREA VARIANCES REDEVELOPMENT OF 201 ELLICOTT STREET


Downtown Brampton and Queen Street Corridor: Residential and Commercial Projects

See more at CitylineAustin.com. MIXED-USE DEVELOPMENT ON THE RED LINE 134,000 SF of Creative Office Located on Austin s MetroRail CONNECTION

Transit Oriented Development - Trip Generation & Mode Split in the Portland Metropolitan Region

RECOMMENDATION BACKGROUND INFORMATION

OPPORTUNITY TO ACQUIRE AN INDUSTRIAL BUILDING PART OF THE SOUTH HILL SAP

CENTENNIAL NEIGHBOURHOODS SECONDARY PLAN STUDY. City of Hamilton

NOVATION CAMPUS Madison, WI

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES PLANNING COMMISSION

GENERAL ASSEMBLY OF NORTH CAROLINA Session Legislative Fiscal Note

JUDGE DOYLE SQUARE. Interview Presentation. JDS Development, LLC A Joint Venture of: Hammes Company and Majestic Realty

DRAFT. Transit Oriented Development Design Guidelines. Introduction. Path Forward

University Housing. Welcome Home

WORLD TRADE CENTER GARAGE 1245 Fifth Avenue

COMMERCE SQUARE. Philadelphia, PA

BILL & MELINDA GATES CENTER FOR COMPUTER SCIENCE & ENGINEERING UNIVERSITY OF WASHINGTON

smap features: Development Priority Site Sites that you feel should be developed or redeveloped in the near term.

Approved Multi-Family

2026 Campus Plan. September 19, 2016

PUBLIC MEETING TABLE DISCUSSION CASE /01/19 MIDTOWN NORTH DEVELOPMENT 1

Broadway Corridor Framework Plan Pearl District Business Association November 10, 2015

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

10. BUILDINGS. PREDICTED TOTAL AREA (THECB), 2006 e&g sf 810,794. ACTUAL (THECB), 2006 e&g sf 551,516. DEFICIT (THECB), 2006 e&g sf [259,278]

THE NEW URBAN OFFICE EXPERIENCE

Calgary Green Line North 64 Ave N Charrette Ideas Session

Housing Vancouver Strategy

EXISTING EDUCATIONAL & ANCILLARY PLANT

Guide to Combined Preliminary and Final Plats

Residences at Grove Park 425 Hillsborough St. Chapel Hill, NC

Transcription:

North Campus Master Plan November 29, 2011

Concept Plan Respect the site s natural features Reinforce vibrant campus anchors Connect campus destinations 2

Sketch Plan: core shifts east 3

Sketch Plan: core shifts north 4

Refined Plan 5

North Campus; Existing Pulpit Rock University Village Austin Bluffs Parkway 6

Transit and Pedestrian Spines: Auto Access Pulpit Rock University Village Austin Bluffs Parkway P Daily access (car, service, shuttle, bike) Limited Access (service, shuttle, bike) Pedestrian Spine (1-20) Pedestrian Spine (1-12) 7

Transit and Pedestrian Spines: Shuttle Pulpit Rock Local only University Village Express Express (long-term) Austin Bluffs Parkway Express Shuttle and bike lane on limited access street Shuttle and bike lane with daily traffic Pedestrian Spine Shuttle stop 5 minute walking radius 8

Refined Plan Pulpit Rock University Village Austin Bluffs Parkway 9

Alpine Village - 7 new 4-story residence halls (900 beds) - Dining hall (19,000 GSF footprint) with the residential on upper levels - Rec center expansion - Parking garage with recreational field on top level - (300 cars per level, 900 cars at 3 stories) 10

Arroyos - Long-term node of development with an express bus stop when built out - Retain Archeological Mound as a feature - Transit and Bicycle spine built on top of existing utility easement - Handicapped accessible pedestrian spine to be confirmed - Buildings frame views of Front Range - Arroyo and prairie landscape integrated into the development - 12 new academic, admin, support or research buildings - 217,000 GSF combined footprint - 868,000 GSF total at 4 stories 11

Four Diamonds - Transit and pedestrian spine are integrated into urban street - Central green space connects University Village to preserved recreational fields - Visual and Performing Arts adjacent to underpass (160,000 and 145,000 GSF) - 7 apartment-style residence halls with active uses on the ground floor (840 beds at four stories) - Academic Health Sciences Center and additional academic/research facility (200,000 GSF) - 1,525 surface parking spaces 12

Athletics - Athletic facilities aligned on axis with Pulpit Rock, practice facilities east of arroyo - 150,000 GSF arena - 60,000 GSF natatorium - 126,000 GSF field house - Track and soccer stadium - Baseball stadium - Softball stadium - 625 surface parking spaces - Local bus stop only 13

North Campus Capacity A Pulpit Rock Athletics and Recreation Fields: - Existing fields (north campus): - 4 baseball/softball - 1 soccer - Proposed fields (north campus): - 3 baseball/softball (2 athletics, 1 rec) - 4 soccer (2 athletics, 2 rec) University Village E B C D Austin Bluffs Parkway F - Net gain/loss: - -1 baseball/softball - +3 soccer Parking - Existing parking north of Summit Village: 1,326 - Proposed parking north of Summit Village: - A: 625 - B: 275 - C: 325 - D: 375 - E: 550 - F: 900 - TOTAL: 3,050 spaces - Net gain: 1,725 spaces 14

North Campus Capacity University Village I A B D E Pulpit Rock C F G H J M K N L O P S Q R Austin Bluffs Parkway Athletic Facilities: - A: 150,000 gsf arena (2 levels) - B: 60,000 gsf natatorium (1 level) - C: 126,000 gsf field house (1 level) Visual and Performing Arts Facilities: - D: 160,000 gsf visual arts (2 levels) - E: 145,000 gsf performing arts (1.5 levels) Housing: - F: 568 apartment-style beds (241,000 gsf) - G: 276 apartment-style beds (117,000 gsf) Academic, Research, Support Facilities: - H: 80,000 gsf - I: 120,000 gsf (academic health sciences facility 3 levels) - J: 104,000 gsf - K: 100,000 gsf - L: 82,000 gsf - M: 70,000 gsf - N: 90,000 gsf - O: 110,000 gsf - P: 100,000 gsf - Q: 70,000 gsf - R: 55,000 gsf - S: 80,000 gsf -Total (west of Stanton Rd): 2,060,000 gsf *all 4 levels except where noted 15

Core and East Campus Capacity B A Housing and Recreation: - A: 750 beds (243,750 gsf) (4 levels) - B: 19,00 gsf dining and 150 suite-style beds (48,750 gsf) (4 levels) - C: 60,000 gsf rec center expansion - D: 200 suite-style beds (65,000 gsf) (4 levels) - J: 60 beds (20,000 gsf) (2 levels) - K: 60 beds (20,000 gsf) (2 levels) - L: 60 beds (20,000 gsf) (2 levels) - M: 65 beds (22,000 gsf) (2 levels) - N: 70 beds (24,000 gsf) (2 levels) C D E F G H I J K L M N O P Q R S T U Academic, Research, Support Facilities: - E: 110,000 gsf - F: 101,000 gsf (2 levels) - G: 57,000 gsf (2 levels) - H: 59,000 gsf - I: 90,000 gsf - O: 100,000 gsf (4 levels) - P: 75,000 gsf - Q: 65,000 gsf - R: 66,000 gsf - S: 37,000 gsf - T: 65,000 gsf - U: 14,000 gsf (2 levels) -Total (east of Stanton Rd): 1,429,000 gsf - *all 3 levels except where noted 16

Schedule Observations and Concepts July 13-14 Kick-off and Focus Groups September 8-9 Concept Plan Workshop Scenario Planning October 12-14 November 9-10 December/January North Campus Scenarios Workshop Open House Strategic Plan Working Group Plan Integration January/February March April Draft Plan Workshop and integration with Strategic Plan Draft Plan Presentation Strategic Plan and Master Plan Presentation to Board of Regents Process 17