Renovation Progress. May 5 11, Week 31

Similar documents
Renovation Progress. Apr , Week 29

Renovation Progress. June 2-15, Weeks 35 & 36

Renovation Progress. July 21 Aug 3, Week 42 & 43

Renovation Progress. Nov. 4 9, Week 57

Renovation Progress. July 7-13, Week 40

Renovation Progress. Sep , Week 51

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

THE TEN AT LAKE FORREST. FROM THE $850's

10' - 0" 6' - 0" Bedroom 2 99 SF 12' - 7" Master Bedroom 287 SF. 3' - 4" 3' - 4" Living / Hall 294 SF 35 SF 6' - 0"

Contemporary villas Panoramic view 3 minutes from Bonita Beach

SMITH DOUGLAS H OMES P RE SENT S HIGHLANDS AT MADISON PARK BASE PRICE SHEET. The Benson 3 Beds / 2.5 Baths Approx 1,801 Sq. Ft.

AREA AND COMMUNITY HIGHLIGHTS

MULTI-USE COMMERCIAL PROPERTY

Green Valley s premier builder, enhancing the Southwest s natural beauty for over 40 years.

Attic Floor Bedrooms 1 & 2 Family Dwellings

Saint Cloud Business Center

General Information RETAIL AND RESTAURANT

HIGHLANDS AT MADISON PARK

GENERAL INFORMATION. Landlord s Tenant Coordinator

20294 E. Maplewood Pl. Centennial, CO List Of Custom Property Features & Amenities

HIGHLANDS AT MADISON PARK

VILLAGES AT WALNUT CREEK

FOR LEASE MID-CITY RETAIL SPACE ON THE LAFITTE GREENWAY

Smith Douglas Homes Presents ESCALADES

GENERAL INFORMATION * EXISTING UNITS IMMEDIATELY AVAILABLE AND MEETING THE MINIMUM REQUIREMENTS, OR

01 RESIDENCE FLOORPLAN

1. PRESENTATION OF THE PROJECT

2.1 Alarm Source How was the alarm reported? UCT 911/ Phone, ERS, Class-3, BARS, Verbal.

Positano Waterfront Residences. Copyright 2016, Miromar Development Corporation.

Mountside, Lowe Hill, Leek, ST13 7LY

Feature Package Option

A space for every lifestyle. PROPOSED BIKE RACK (TYP)

Smith Douglas Homes Presents MORGAN S RUN

GENERAL INFORMATION * EXISTING UNITS IMMEDIATELY AVAILABLE AND MEETING THE MINIMUM REQUIREMENTS, OR

SITEMAP. (775)

Luxury Lives Here And you can too

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

For Sale by Owner Photos Historic Curry Derr House 405 East Cambridge Avenue in Greenwood, SC Built between 1936 & square feet

BEFORE

Property ID: Englantilaisaukio 10, Helsinki

SECOND FLOOR 1134 sq. ft.

Highland Park. Under construction 945 Rollingview. 232 Mill Valley Pkwy Sq.Ft. 2-Car 4/2.5 $466, Mill Valley Pkwy.

Campbell 508 OPTIONAL BASEMENT DEVELOPMENT SQ.FT. 3 BED 2.5 BATH 2012 FINISHED SQ.FT. FRONT GARAGE HOME TWO STOREY FOR 34 LOTS. MAIN FLOOR 789 sq. ft.

SINGLE STORIES PLANS 4, 4X AND 5

Property Details 916 Youngs Road

Walthwaite Howe, Pennington, Ulverston, Cumbria, LA12 0JP

Reservation Agreement 10ARROS. A Townhouse-Style Condominium Community

REA COURT ~ 10 UNITS ~ 6 FLOOR PLANS. Priced from the high-$500 s. 1,955 to 2,789 sq. ft. 2, 3 & 4 Bedrooms. valerie mitchener KEVIN GOULET

THANK YOU FOR VIEWING!

Welcome to HeatherBrook

SDA APARTMENTS AT ARATI INTRODUCTION

For Additional Information:

The Benezet House. 13 Penn Center Circle E Director-Walter Mack Emergency contact Robert Lee Johnson

GARTREE DRIVE, MELTON MOWBRAY Asking Price Of 225,000

L U X U R Y H O M E S

Shoreview Corporate Center

294 Carling Avenue Dows Lake

3-4 bedrooms, 2.5 baths, 2,778 sq. ft.

FICO Realty Group Presents 485 Washington Street Woburn MA 01801

Plan A. 1,573(A2) -1,587(A1) Square Feet Three-Story 2 bedrooms 2.5 bathrooms Bedroom Downstairs Great Room Kitchen with Breakfast Island 2-Car Garage

Alley Load Garage Plans

Understanding Accessibility Features to Meet Housing Needs

Housing Authority of the City of Columbia, Missouri. Board Report Staff Memo

~ Farms & Estates Realty ~ Premier Properties. The Cuckoo s Nest

8 Pound Meadow, Fornham All Saints, Bury St Edmunds, Suffolk, IP28 6JL Guide 350,000

GENERAL INFORMATION * EXISTING UNITS IMMEDIATELY AVAILABLE AND MEETING THE MINIMUM REQUIREMENTS, OR

129 Washington Street, Woburn, MA

48 MALVERN WALK (LOT 12) GreenBuilt and EnergyStar Home by JAG Construction

1,600+/- Acres Macon County, Missouri

Allegra Features List

Smith Douglas Homes Presents RAINHILL

Jefferson County, Arkansas

Please note: This Elk Garden, WV address is in GRANT COUNTY, WV, NOT Mineral County, WV.

Community Map J ACKSON IEW. JACKSON VIEW Active Adult Community Thomas Drive & Emerald Court Jackson, CA 95642

House, Bldgs. & 3.97 Acres m/l, Linn Co., IA. Clark Farm. 417 Day Road, Mount Vernon, IA Seller Irvin P. and Louise M.

BUILDING CODE COMMISSION

LET US MAKE OUR HOUSE YOUR HOME

8 LAUREN LANE Newly Remodeled Home with Lower Level Apartment

Foxwood 2048 Cardwell Road, Crozier, VA 23039

~ Sabot Hill ~ 1281 & 1283 Flat Rock Crossing, Manakin-Sabot, VA 23103

Stansted Road Bishop's Stortford Hertfordshire 650,000

46 WOODS AMMONS ROAD Adorable 1960 s Historic Bungalow Mars Hill

THE VILLAGE COLLECTION

6 EVIAN COURT Custom-Built Tudor Style The Thoms Estate

291 MONTFORD AVENUE Renovated Craftsman-Style Bungalow Montford

A Safe Community for New Beginnings

Smith Douglas Homes Presents WOODY FARMS

2-STORIES. Our 2-Story. American traditional WINSTON A. designed homes. boast of modern. spectacular floor. plans that create an.

SKYLINE HOMES OF ARKANSAS CIT Y, KANSAS 24' 28' 32' SERIES

Understanding Accessibility Features to Meet Housing Needs

RIDDLE RIDDLE ASSOCIATES, INC.

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

CUSTOM BUILT HOME $160, SQ. FT. CUSTOM BUILT IN 2006 THREE BED- ROOMS TWO BATHS 14 X40 DECK Vista Ave. Crane, OR BONUS ROOM

MEDICAL OFFICE PORTFOLIO SALE

Yew Tree House, The Square, Allithwaite, Grange-Over-Sands, Cumbria, LA11 7QF

29 Beekman Road. Summit New Jersey. Karen Bigos. Daniel Cannizzo. Direct: (201) Office: (973) x 222

Castle Gate Towers. Windsor s Newest Luxury Condo. Our vision of what maintenance free living should be

PLANS 1-3

FEMA National Floodplain Insurance Program (NFIP) Substantial Improvement/Substantial Damage Determination

AREA AND COMMUNITY HIGHLIGHTS

Transcription:

Renovation Progress May 5 11, 2012 Week 31

May 5 A Saturday work day for these men tying rebar and building wood framing for the north porch slab

May 5 New Infirmary hallway on 1 st Ottilia with most of the sheetrock in place

May 5 Bedrooms on 2 nd & 3 rd Ottilia with exposed subflooring have a new plywood layer to match the level of the hallway

May 5 Rebar system completed for the north porch

May 7 HVAC condensing units for Ottilia Hall waiting for installation

May 7 HVAC ductwork progress beneath the new kitchen

May 7 Getting the last layer of bricks in for 3 rd floor steel joists in Ottilia s elevator and stairwell tower

May 7 Wall construction in BSRC dining area and final touches of north porch preparations

May 7 Welding crew getting their materials and equipment in place for work outside the lower level s east wall

Welders at work May 7 Later in the day, the south wall of Passageway extension to BSRC Dining area begins to be seen

May 7 Back door to stage removed and doorway is widened for the new access between kitchen and Sisters serving area

May 8 New Infirmary hallway sheetrock nearing completion for painting

May 8 - Wiring and tubing for HVAC unit outside Sisters new gathering and dining area

May 8 Ceiling grid reaching toward the outer walls of the Sisters gathering and dining area

May 8 Masonry on kitchen elevator continues

May 8 Passageway south wall with various doorways to interior rooms once the ramp evens off

May 8 Sprinkler installation on 2 nd Annunciata begins

May 8 Welding crew making their way around the structure mounting support brackets

May 8 Insulation spraying machine and tubing set up for Ottilia Hall s long attic

May 8 Ottilia south stairwell sheetrock installation now complete on all three floors

May 8 Backboards in communications closets installed for equipment to be mounted on

May 8 3 rd floor joists for Ottilia tower being welded into place and other steelwork for cement getting aligned

May 8 Light fixtures being installed in 3 rd Ottilia bathrooms

May 8 Ceiling fans in 3 rd Ottilia bedrooms, smoke alarms also installed

May 8 Installation of Ottilia hallway baseboards on 3 rd floor to match original baseboards as close as possible re-used baseboards for new walls awaiting trim original

May 8 2 nd Ottilia bathroom cabinets arrive

May 8 More 2 nd Ottilia floors are sanded; repairs begin where needed

May 9 Private Retreatant bathrooms get showers and color-coded water feeds

May 9 Kitchen and BSRC Dining ductwork being assembled

May 10 Ottilia Hall attic insulation spraying continues

May 10 Preserved baseboards re-delivered to 3 rd Ottilia for hallway installation Sheetrock finishing in the Infirmary can be seen through the windows

May 10 In Robby s workshop painted frames will cover the alert system boxes in the chapel

May 10 Framing system for mini-slab on south wall of kitchen where delivery hallway will be added

May 10 Masons back at kitchen elevator

May 10 West wall of BSRC dining area shaping up nicely

May 10 Supports beneath BSRC Dining Room windows installed

May 10 Welders at Ottilia tower resume work on 3 rd floor slab supports, then masons erect more scaffolding

May 10 Kitchen west wall begins BSRC Dining Room west wall continues

May 10 Kitchen & BSRC ductwork

May 10 Wooden support structure beneath north porch to hold cement slab until it sufficiently hardens

May 11 Window framing for BSRC Dining Room windows continues

May 11 1 st Ottilia sheetrock gets mud applied (left); south stairwell has 1 st coat of paint on 2 nd and 3 rd floor levels (right)

May 11 Southeast rooms on 2 nd Ottilia being sanded for the first time; west bedrooms get sealer applied

May 11 Future mailroom progress from ceiling to floor

May 11 3 rd Ottilia hallway baseboards looking like they were always there

May 11 Closet painting underway on 3 rd Ottilia as shelving units arrive

May 11 Closet shelving being installed in 3 rd Ottilia west bedrooms

May 11 Sheetrock grid built around 3 rd Ottilia roll-down fire safety door

May 11 Sheetrock repair in 3 rd Ottilia Community Room

May 11 Robby at work on fire alert system ornamentation in chapel

May 11 Masons back at Ottilia stair tower and elevator shaft

May 11 Old 3 rd Ottilia emergency exit doorway completely bricked in

May 11 Kitchen west wall rises above previous passageway roof line; re-sized doorway between kitchen and serving area framed in

May 11 Construction of forms for the mini-slab along south wall that will eventually continue outward to a delivery walkway; this will allow the construction of the kitchen s south wall without impinging on delivery and work to Ottilia s elevator and stair tower

May 11 Adjusting rebar supports for north porch; slab pouring scheduled for Monday

May 11 Overhead view of upper level progress

Staff Dining Restrooms Passageway Dish Room BSRC Private Retreatant Dining Area BSRC Dining Area BSRC Serving Area Storage Kitchen elevator Kitchen Delivery hallway

May 11 2 nd Annunciata sprinklers nearly finished

Our strength and courage is the LORD, (Ps 118:14a)