On Site Sewage Facility Information Sheet PROPERTY OWNER INFORMATION

Similar documents
Tri County Septic Wastewater Recycling Specialists PO Box 283 Royse City, TX

OSSF Permit Application

Collin County Development Services OSSF CONSTRUCTION INFORMATION SHEET

SEPTIC PERMIT APPLICATION

SEPTIC PERMIT APPLICATION

MILAM COUNTY HEALTH DEPARTMENT 209 SOUTH HOUSTON CAMERON, TEXAS PHONE (254) FAX (254)

SEPTIC PERMIT INFORMATION

JOHNSON COUNTY PUBLIC WORKS 2 North Mill Street/Suite 305, Cleburne, TX (817)

TOWN OF ARGYLE APPLICATION FOR ON-SITE SEWAGE FACILITY NEW CONSTRUCTION TCEQ REGION NUMBER COUNTY OF INSTALLATION. (Last) (First) (Middle)

ON-SITE SEWAGE FACILITY PERMIT APPLICATION

WILSON COUNTY Health & Public Safety Office

FALLS COUNTY APPLICATION FOR PERMIT

CONTINUED USE AUTHORIZATION (REINSPECTION) PROCESS

SEPTIC PERMIT CHECKLIST

Onsite Wastewater Treatment System Remediation Project

House Bill 2140 Sponsored by Representative BOONE (Presession filed.)

SELLER S PROPERTY DISCLOSURE STATEMENT

TOWN OF ST. PAUL 2505 Butscher s Block St. Paul, TX (Fax)

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

Certificate of Occupancy Application

City of Columbia ENgiNEEriNg regulations Part 12: application For NEW WatEr service table of CoNtENts Paragraph Description Page No.

Irrigation Permit Requirements FOR OWNER/BUILDER

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

EL DORADO COUNTY PLANNING SERVICES 2850 Fairlane Court, Placerville CA 95667

Septic Tank / Drainfield / Holding Tank Permit Application

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

S.T.E.P./GRINDER SEWER SYSTEM City of Lacey

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

ARTICLE II SEWAGE TREATMENT. Sec Purpose and intent. Sec Applicability. Sec Authority. Sec Administration.

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

FREQUENTLY ASKED QUESTIONS about on-site wastewater (septic) systems. I want to build a new home served by a septic system. What do I need to do?

SELLER DISCLOSURE STATEMENT UNIMPROVED PROPERTY

MARIJUANA FACILITY CONDITIONAL USE PERMIT APPLICATION File No.

BUILDING PERMIT APPLICATION

OREGON SELLER S PROPERTY DISCLOSURE STATEMENT

REZONING APPLICATION COVER SHEET

Septic Tank / Drainfield / Holding Tank Permit Application

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

ORDINANCE NO IT IS HEREBY ORDAINED AND ENACTED by the Board of Supervisors of Buckingham Township, Bucks County, Pennsylvania, as follows:

Effingham County Health Department Environmental Health Division. Business Hours

CONDITIONAL USE PERMIT APPLICATION COVER SHEET

CITY OF ADA, PURCHASING 512 North Stockton Street Ada, Oklahoma / x256 Fax 580/ BID NOTICE.

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

Note to the Owner, Applicant & Agent:

VILLAGE OF PLAINFIELD

DEMOLITION PERMIT APPLICATION

Name: Address: City/State Phone: *Please include the Commercial/Industrial/Other Establishment Sheet with permit

SELLER DISCLOSURE STATEMENT IMPROVED PROPERTY

OnlineRME Reporting Pierce County User Guide

PROPERTY OWNER NOTICE AND CONSENT FORM (for Home Charging Station and/or Surge Protector Installation)

Flood Plain Administration. Oil & Gas

Instructions for Residential Building Permit Application

Construction Permit for Onsite Sewage Treatment System

CHAPTER 15 PRIVATE SEWAGE SYSTEM ORDINANCE

SPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

COMMERCIAL BUILDING PERMIT APPLICATION

NATIONAL TRAIL LOCAL SCHOOL DISTRICT

REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

Requirements for New Service

Grinder Pump & Greywater Systems Policy May 2016

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

Doors & Windows Package

Lot Split Application

PERMITS & PLANS APPROVALS ADVANCED MODULE INTERNET

HERNANDO COUNTY PERMIT APPLICATION PACKET DEMOLITION PERMIT

Application for Licensure. as a. Chapter 87 Corporation. to practice limited engineering and/or surveying services in North Carolina

Pavers, Concrete Driveways, Sidewalks, Patio and Pads Permit Requirements FOR OWNER/BUILDER

FLORENCE COUNTY CODE OF GENERAL ORDINANCES CHAPTER 12. Adopted May 15, 2001 Revised August 19, 2003 July 21, 2009 Amendment December 16, 2014

SPECIAL SERVICE AREA DISCLOSURE

ALLEN COUNTY CODE TITLE 17 ON-SITE WASTE WATER MANAGEMENT DISTRICT ARTICLE 2 FINANCIAL

VILLAGE OF WEST HAVERSTRAW BUILDING DEPARTMENT RENTAL PROPERTY CODE 186. In-Person: Property Address City Zip

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

Polk County Private Onsite Wastewater Treatment System (POWTS) Ordinance

Non-Plumbing Sanitary Permit Application

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

EASEMENT ACCESS INSTRUCTION SHEET

RESIDENTIAL ADDITION/ALTERATION PERMIT APPLICATION

NEW SINGLE FAMILY RESIDENTIAL

BOUNDBROOK CONDOMINIUM ASSOCIATION, INC FLORIDA MANGO ROAD WEST PALM BEACH, FLORIDA (561)

Chapter 32 Sanitary Code Page 1 of 10

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Dallas Sloan General Manager Barron Area Phone: (715) Toll Free: Fax: (715) NEW SERVICE PROCESS

Before I can issue a permit, I need the following items:

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

OWNER-BUILDER STATEMENT/AFFIDAVIT

Residential Re-Roof Permit Requirements FOR CONTRACTORS

Private On-Site Wastewater Treatment System (POWTS) HOLDING TANK COMPONENT. General Submittal Information Check List:

KINGSLAND MUNICIPAL UTILITY DISTRICT Schedule of Wastewater Rates, Fees and Charges and Service Policies Effective January 1, 2018

Downtown Sewer and Water Connection Overview

CHAPTER 15 PRIVATE SEWAGE SYSTEMS INTRODUCTION GENERAL REQUIREMENTS PERMITS AND APPLICATIONS

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES Equal Opportunity Provider and Employer RESIDENTIAL WATER/SEWER USER AGREEMENT

PRIVATE SEWAGE DISPOSAL ORDINANCE Henry County Health Department

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

22 History Note: Authority G.S ;

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

Transcription:

On Site Sewage Facility Information Sheet PROPERTY OWNER INFORMATION : Name: Site Address: City: Zip: Current Mail Add.: City: Zip: Email Address: Home Ph#: Work Ph#: Cell Ph#:_ Referred By: Address: City: Zip: BILLING INFORMATION Name: Mailing Address: City: Zip: Email Address: Phone Number: Payment Option: Personal Check: Credit Card (add 4% to bid price): Cash: Purchase Order #: Notes:

Customer instructions for completing septic system paperwork. 1 - County application. Fill out owner information 2 - Norweco Contract - Customer Signature and required 3 - Affidavit - Sign and print name of property owner. NOTE: A copy of your property survey needs to be returned with papers (preferably a plot plan). 4 - Installation Contract - Read notes, sign and date. NOTE: Duplicate copy is for your records Please return all originals along with property survey to our office. The brochure is for your records. If you have any questions or require additional information please feel free to call us anytime at 1-800-841-3447. CUSTOMER CHECKLIST: 1. Survey of Property or Plot Plan 2. Tax Receipt or Deed for legal description and proof of ownership 3. Well Log (if requested) 4. Correct 911 Address (Required for Floodplain) 5. Floodplain Signoff Below for office use only. Before the application is submitted to the D.R. the following is needed. 1. Survey of property. 2. Legal description is to be filled out on all paperwork. 3. Affidavit to the public filed in the county clerk's office 4. Well log. 5. Maintenance contract. 6. Check for permit. 7. Site Evaluation. 8. Engineered design 9. Proposal Sheet 10. Flood Plain Signoff.

WHARTON COUNTY PERMIT & INSPECTION DEPARTMENT APPLICATION FOR ON-SITE SEWAGE SYSTEM PERMIT RECEIPT* ISSUED PERMIT# ISSUED APPLICANT'S NAME MAILING ADDRESS (number and street or P.O. box) (city) (zip) (home phone) (work phone) PROPERTY DESCRIPTION PHYSICAL ADDRESS LEGAL DESCRIPTION (include lot size and/or acreage) WATER SUPPLY IF PUBLIC WATER SUPPLY (name of water system) IF PRIVATE WELL ( ) existing ( ) proposed CASING CEMENTED ( ) yes ( ) no FACILITY INFORMATION ( ) NEW ( ) EXISTING ( ) RESIDENTIAL ( ) SINGLE FAMILY ( ) MULTI FAMILY sq.ft. of structure number of bedrooms water saving devices? yes no ( )COMMERCIAL. (type of business) (# of persons served) DESIGNED FOR GALLONS PER DAY TYPE OF SYSTEM TO BE INSTALLED ( ) SURFACE APPLICATION ( ) PUMPED EFFLUENT ( ) LOW PRESSURE DOSING ( ) STANDARD ( ) OTHER SITE EVALUATOR SYSTEM DESIGNER (name, license #, and phone #) (name, license #, and phone #) SYSTEM INSTALLER (name, license #, and phone #) AUTHORIZATION IS HEREBY GIVEN TO WHARTON COUNTY, TEXAS AND TO ITS AGENTS, OR DESIGNEES, SINGULARLY OR JOINTLY TO ENTER UPON THE ABOVE DESCRIBED PROPERTY DURING DAYLIGHT HOURS FOR THE PURPOSE OF INSPECTION OF SEWAGE FACILITIES. (signature of property owner) (date) 1/28/11

WHARTON COUNTY PERMIT & INSPECTION DEPARTMENT NOTICE TO OWNER/OPERATOR OF AN AEROBIC TREATMENT UNIT Chapter 285.7 of the TCEQ regulations requires a maintenance contract for an on-site sewage facility utilizing an aerobic treatment unit. A copy of the signed maintenance contract between the property owner and the approved maintenance company shall be provided to the permitting authority (Wharton County). The initial maintenance contract must be valid for a minimum of two years. After the initial two-year contract, on-going maintenance is required by either a licensed maintenance provider or a homeowner who has met the requirements to perform maintenance on their own system. The maintenance contract after the initial two-year period is not required to be with the original maintenance provider. The owner of each aerobic unit shall continuously maintain a signed written contract with a valid maintenance company and shall submit a copy of the contract to the permitting authority at least 30 days prior to expiration of the previous contract or submit a contract agreement with Wharton County showing the homeowner will be performing maintenance on their own unit. If the property owner or maintenance provider desires to discontinue the provisions of the maintenance contract, the maintenance provider shall notify, in writing, the permitting authority at least 30 days prior to the date service will cease. If a maintenance provider discontinues business, the property owner shall within 30 days of the termination date, contract with another approved maintenance provider and provide the permitting authority with a copy of the newly signed maintenance contract. I understand that as the property owner of an OSSF system consisting of an aerobic treatment unit I am required to have in force an on-going maintenance contract for the life of my system. Should I fail to have a contract in place, I am aware I am in violation of the Order Adopting Rules of Wharton County, Texas for On-Site Sewage Facilities, Health and Safety Code 341.014, 366.0515 and Texas Administrative Code, 30 TAG 285.7. Failure to have a current maintenance contract in effect will cause the permit issued for said system to be considered void and a complaint to be issued in the Justice of the Peace Court. Printed name Property owner signature IMPORTANT NOTICE - READ BEFORE SIGNING 1/28/11

John P. Hurt -Norweco Certified Technician No. 5208134 PO Box 662, Ganado, Texas 77962 321 Hwy 172 1-800-841-3447 NORWECO SINGULAIR Initial Service Contract Owners Name: Address:. Effective : Per final inspection Street Expiration : City State Zip Telephone No: System Installed On: Directions: This initial two year service contract for the Singulair Bio-Kinetic wastewater treatment system located at the site described above is intended to enable the owner to economically obtain regular service inspections for the Singulair unit, as well as non-scheduled or special service that may be required by a qualified technician. When this contract is in force, the owner will not be charged for any routine service labor. Under the terms of this service agreement, a technician will regularly inspect, test, and report the plant at four month intervals. The site will be visited following each special owner service request within a 48-hour period. The contract shall remain in effect for a period of two years, as specified in the effective and expiration dates listed above. All components of the Singulair unit are covered for a full two years warranty as determined by the dates above. The components include: concrete tanks, aerator, discharge pump, all electrical components installed as part of the system, filter / chlorination assembly, sprinkler heads, and piping. This service contract does not include the pipe from the structure to the tanks or any necessary sludge pumping that may need to occur. It shall also be understood that the homeowner is responsible for maintaining the chlorine in the system. The Texas Commission on Environmental Quality rules requires a service policy to be in effect at all times or the on-site sewage facility permit is considered void. All commercial systems will have a BOD and TSS test performed annually. Additional charges will be billed to the owner for the BOD and TSS test. The homeowner agrees to provide Hurt's Wastewater Management Ltd. with all gate combinations, keys, etc. to gain access to the system for the purpose of conducting routine inspections or service calls and to immediately notify with any changes and provide the new combinations or keys. VIOLATION OF WARRANTY includes shutting off the electric current to the system for more than twenty-four hours, disconnecting the alarm system, restricting ventilation to the aerator, overloading the system above its rated capacity, or introducing excessive amounts of harmful matter into the system, or any other form of unusual abuse. Customer Signature

THE COUNTY OF WHARTON STATE OF TEXAS AFFIDAVIT According to Texas Commission on Environmental Quality Rules for On-Site Sewage Facilities (OSSFs), this document is filed in the Deed Records of Wharton County, Texas. I The Texas Health and Safety Code, Chapter 366 authorizes the Texas Commission on Environmental Quality (commission) to regulate on-site sewage facilities (OSSFs). Additionally, the Texas Water Code (TWC), 5.012 and 5.013, gives the commission primary responsibility for implementing the laws of the State of Texas relating to water and adopting rules necessary to carry out its powers and duties under the TWC. The commission, under the authority of the TWC and the Texas Health and Safety Code, requires owners to provide notice to the public that certain types of OSSFs are located on specific pieces of property. To achieve this notice, the commission requires a recorded affidavit. Additionally, the owner must provide proof of the recording to the OSSF permitting authority. This recorded affidavit is not any presentation or warranty by the commission of the suitability of this OSSF, nor does it constitute any guarantee by the commission that the appropriate OSSF was installed. II An OSSF requiring a maintenance contract, according to 30 Texas Administrative Code 285.91(12) will be installed on the property described as (insert legal description): The property is owned by: Printed name(s) This OSSF shall be covered by a continuous maintenance policy for the first two years. After the initial two year service policy, the owner of an aerobic treatment system shall obtain a maintenance contract within 30 days of expiration of said policy. Upon sale or transfer of the above-described property, the permit for the OSSF shall be transferred to the buyer or new owner. A copy of the planning materials for the OSSF may be obtained from Wharton County Permit & Inspection Dept. WITNESS MY/OUR HAND(S) ON THIS DAY OF, 20_ Owner(s) signatures) SWORN TO AND SUBSCRIBED BEFORE ME ON THIS DAY OF, 20 Notary Public, State of Texas Notary's Printed Name: My Commission Expires: 1/28/11

P.O. Box 662, Ganado, TX 77962 (800) 841-3447- Fax (361) 771-3452 Installation Contract Installation Prices: Include appropriate trash and pump tank sizes. 600 gpd Norweco Aerobic Unit 750 gpd Norweco Aerobic Unit 1000 gpd Norweco Aerobic Unit 1500 gpd Norweco Aerobic Unit Site evaluation / Design / Permit: Total (Good for 60 days) This is a dry bid only. In the event the job site is not accessible due to the weather conditions, there will be an additional charge to mud the system in (either use of track hoe to dig and set tanks or use of mats to drive truck in). Additional amount charged is subject to severity of location. The above prices are based on the home having one stub out and the tanks being located within 15' of the stub out. If there is more than one stub out, there will be an additional charge per stub out to connect the pipe. In the event of multiple stub outs and the stub out being positioned such as to require the installation of a lift station, there will be additional charges. An additional charge of $250.00 for Risers will be added if stub outs are more than 24" Owner's electrician is responsible for bringing 30amp 110 circuit (for 600 gpd only) within 5' of stub out. Hurt's will provide 15' of electrical, however extra wire and conduit will be an additional charge. Excess dirt will be left stockpiled on job site. Hurt's will not responsible for damaging any unmarked underground lines. Homeowner or Builder is responsible for water supply to fill tanks, as well as the removal and/or replacement offences or structures. Hurt's not responsible for back filling around tanks after dirt settles. One load of sand provided by Hurt's to be used for 4" pad under tanks and filling around 4" pipe from house. Payment in full required day of installation. Contract is with Hurt's and homeowner. If payment is coming from the builder, the homeowner is responsible for making sure Hurt's receives that payment. Visa / MasterCard / accepted at Hurt's office only. If used, there will be an additional charge. Customer Signature

P.O. Box 662, Ganado, TX 77962 (800) 841-3447- Fax (361) 771-3452 Installation Contract Installation Prices: Include appropriate trash and pump tank sizes. 600 gpd Norweco Aerobic Unit 750 gpd Norweco Aerobic Unit 1000 gpd Norweco Aerobic Unit 1500 gpd Norweco Aerobic Unit Site evaluation / Design / Permit: Total (Good for 60 days) This is a dry bid only. In the event the job site is not accessible due to the weather conditions, there will be an additional charge to mud the system in (either use of track hoe to dig and set tanks or use of mats to drive truck in). Additional amount charged is subject to severity of location. The above prices are based on the home having one stub out and the tanks being located within 15' of the stub out. If there is more than one stub out, there will be an additional charge per stub out to connect the pipe. In the event of multiple stub outs and the stub out being positioned such as to require the installation of a lift station, there will be additional charges. An additional charge of $250.00 for Risers will be added if stub outs are more than 24" Owner's electrician is responsible for bringing 30amp 110 circuit (for 600 gpd only) within 5' of stub out. Hurt's will provide 15' of electrical, however extra wire and conduit will be an additional charge. Excess dirt will be left stockpiled on job site. Hurt's will not responsible for damaging any unmarked underground lines. Homeowner or Builder is responsible for water supply to fill tanks, as well as the removal and/or replacement offences or structures. Hurt's not responsible for back filling around tanks after dirt settles. One load of sand provided by Hurt's to be used for 4" pad under tanks and filling around 4" pipe from house. Payment in full required day of installation. Contract is with Hurt's and homeowner. If payment is coming from the builder, the homeowner is responsible for making sure Hurt's receives that payment. Visa / MasterCard / accepted at Hurt's office only. If used, there will be an additional charge. Customer Signature