July 31, Filed Electronically. National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, AB T2R 0A8

Similar documents
ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT

Appraiser. Third-Party Service Provider Program. Canadian Government Services Division

Negotiating Competition Act and Investment Canada Act Terms in M&A Agreements

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

Proponent s Guide to the NCC s Federal Land Use, Design and Transaction Approvals Process

Number Same. This document provides procedural direction to implement Policy PL Onshore Windpower Development on Crown Land.

Service Level Agreement

Standard for the acquisition of land under the Public Works Act 1981 LINZS15005

PUBLIC TRANSPORTATION VEHICLE LEASING

Public Lands Formal Disposition Application Process

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority

The University of Texas System Rules and Regulations of the Board of Regents Rule: 70301

Realtor /Broker. Third-Party Service Provider Program. Canadian Government Services Division

NEM GENERATOR TRANSFER GUIDE

Change of Control Guide

Consolidated as of May 14, 2012

FOR DISCUSSION PURPOSES ONLY

SUBDIVISION BY-LAW MUNICIPALITY OF THE COUNTY OF INVERNESS

SURFACE ADMINISTRATION ROADMAP (February, 2010)

Land Procedure: Land Exchange Indian Reserve Lands APPROVED AMENDMENTS: Summary of Changes: /Approval

SAFETY DEPOSIT BOX LEASE AGREEMENT NUMBER: 001/2015

PART 2.7 DEPARTMENT OF GOVERNMENT SERVICES REAL ESTATE REGULATION

Public Lands Formal Disposition Application Process

REQUEST FOR PROPOSAL (RFP) for SALE OR LEASE OF HOMEVALE PROPERTY (PARCELS 1 AND 2)

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

DOCUMENT TRANSFERS Job Aid for Document Custodians

CLAYTON COUNTY WATER AUTHORITY. Sewer System Evaluation Surveys

REQUEST FOR PROPOSALS Professional Engineering Services for Lift Station In the Rural Municipality of Wellington

BUREAU OF RECLAMATION PROCESS FOR ABANDONMENT AND RELOCATION OF IRRIGATION LATERALS

5.0 Permit Applications

JURISDICTIONAL RUNOFF MANAGEMENT PROGRAM ENFORCEMENT RESPONSE PLAN

DUE DILIGENCE PROCEDURE

DISTRICT OF SICAMOUS REQUEST FOR EXPRESSIONS OF INTEREST MAIN STREET REDEVELOPMENT

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

Documents Required to Accompany Expression of Interest

KISD T-TESS APPRAISAL GUIDELINES School Year:

KISD T-TESS APPRAISAL GUIDELINES

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland)

Special Council meeting

DRAFT. Article I Background and Purpose

Assigning your NewCo Shares to the joint account holder or a third party(ies) - updated deadline

Chapter 14 Technical Safety Authority of Saskatchewan Inspecting Elevating Devices 1.0 MAIN POINTS

TOWN OF AURORA SUBDIVISION AND/OR CONDOMINIUM APPLICATION GUIDE

Change of Control Guide

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM

REQUEST FOR PROPOSAL RFP # TOC17-001

APPRAISAL MANAGEMENT COMPANY

BUILDINGS, LAND AND LAND IMPROVEMENTS

APPLICATION FOR SITE PLAN CONTROL for applying under Section 41 of the Planning Act, R.S.O. 1990, CHAPTER P. 13 (as amended)

Crown Land Use Policy: Industrial - General APPROVED AMENDMENTS: Summary of Changes: /Approval

VOLUNTARY SALES ASSISTANCE PROGRAM CONSISTING OF TWO OPTIONS:

Notice H Cross References: Handbook REV.1

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 12, 2011

ALBERTA GRAZING LEASE 2005 IN-KIND COST SURVEY RESULTS

JOB DESCRIPTION MANAGEMENT EXCLUSION

Closing at Noon, Mountain Time on May 17, 2005

GENERAL TERMS AND CONDITIONS

Union procedure on the preparation, conduct and reporting of EU pharmacovigilance inspections

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS

Greenfield Development Requirements

Appendix 9-1. Towerbirch Receipt Meter Station Process and Instrumentation Diagram

AGENDA REPORT. Susan Healy Keene, AICP, Director of Community Development

CROSSRAIL INFORMATION PAPER C10 - LAND DISPOSAL POLICY

Submission Instructions and Requirements for a FINAL DEVELOPMENT PLAN

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES

Ocean Hammock. Property Owners Association. Single Family Residence Rental Procedures. And Rules for 2017

BROWNFIELD CLEANUP PROGRAM (BCP) APPLICATION FORM

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

GENERAL POLICIES GOVERNING LAND USE AND CITY LAND SALES IN WAUSAU WEST BUSINESS AND INDUSTRIAL PARK

(2) An identification of the municipality, area, or facility to be served by the proposed system;

TOWN OF PARRY SOUND NOTICE POLICY

Real Property Assets Policy and Procedures

CONTRACTOR EMPLOYER

Staff Report. November 16, 2016 Page 1 of 6

RFQ INDEFINITE DELIVERIES CONTRACT - LAND SURVEYING SERVICES MAY

ADMINISTRATIVE GUIDANCE

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

Terms and Conditions

Spatial Data Warehouse Ltd. Cadastral Mapping INITIATIVE 1: CADASTRAL MAPPING. Version Spatial Data Warehouse Ltd. & AltaLIS Ltd.

DoD American Indian/Alaskan Native Policy: Alaska Implementation Guidance. 11 May 2001

WASHINGTON COUNTY BUFFER ORDINANCE TABLE OF CONTENTS

Form 10 APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDITION. Section 127, Resource Management Act 1991

Request for Proposal to Develop a Land Use Master Plan

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

COUNTY GOVERNMENT OF LAMU Department of Land, Physical Planning, Infrastructure & Urban Development

COURT FILE NUMBER COURT COURT OF QUEEN S BENCH OF ALBERTA JUDICIAL CENTRE CALGARY APPLICANTS

City of Kitchener & Region of Waterloo. Brownfields Financial Incentive Program: Joint Tax Increment Grant (TIG) Application Package

AGREEMENT TO ACQUIRE LANDS BETWEEN THE DEPARTMENT OF THE ARMY ST. PAUL DISTRICT, CORPS OF ENGINEERS AND. THE CITY OF City, State

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

Appendix 4 Agency Approval Letters

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

SOUTH TIPPERARY COUNTY COUNCIL

1. Introduction. 1. Formal Disposition 2. Authorization 3. Approval. ESRD, Public Land Management, 2014, No.2. Effective Date: January 30, 2014

PROVINCIAL SUBDIVISION REGULATIONS. Municipal Government Act

DATE: April 26, 2017 REPORT NO. CD Members of the City of Brantford Committee of Adjustment

Scheme of Service. for. Housing Officers

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 17, 2017

Township Asset Naming Policy

HOME INSPECTION BUSINESS REGULATION

2 Adoption of Agenda and Emergent Issues. 3 Adoption of Minutes 2-10 a) Minutes of the Municipal Planning Commission meeting on May 6, 2015

Transcription:

450 1 Street SW Calgary, Alberta T2P 5H1 July 31, 2018 National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, AB T2R 0A8 Tel: (403) 920-7470 Fax: (403) 920-2347 Email: matt_quail@transcanada.com Filed Electronically Attention: Ms. Sheri Young, Secretary of the Board Dear Ms. Young: Re: (NGTL) Albersun Pipeline Asset Purchase (Project) (Certificate) Update to Condition 4: Notification of Closing and Correction to : s Tracking Table File OF-Fac-Gas-N081-2016-04 01 In accordance with Condition 4 of the Certificate, NGTL advised the National Energy Board (Board) on June 28, 2018 that the anticipated Closing date of the Project is August 1, 2018. 1 NGTL writes to advise that the parties have postponed Closing, to provide additional time to complete pre-closing items. NGTL will file a new 30-day notice at a future date in accordance with Condition 4. NGTL would also like to clarify the project phase listed for commitment number 28 in the Project s s Tracking Table filed with the Board in accordance with on June 28, 2018. 2 Prior to Close, specific conveyances assigning the required land rights will be prepared. At Closing, these conveyances will be signed by the parties to effect assignment of the required surface rights to NGTL. Post Close, transfer documents will be registered at Alberta Land Titles to convey the registered land right instruments to NGTL, and the assignment of land rights on provincial Crown-owned lands will be accomplished electronically through the Alberta Energy Electronic Transfer System. Notifications will be provided to third parties affecting the land rights to address the assignment of any third-party agreements by way of an Assignment agreement or an Assignment and Novation agreement, as contractually required. Post Close, freehold surface owners will be notified of the completion of the assignment of the surface rights affecting their lands. An updated blackline copy of the s Tracking Table is attached and will be posted on the Project website. 1 NEB Filing ID: A92743-1. 2 NEB Filing ID: A92744-1.

July 31, 2018 Ms. Young Page 2 If the Board requires additional information with respect to this filing, please contact me by phone at (403) 920-7470 or by email at matt_quail@transcanada.com. Yours truly, Original signed by Matt Quail Regulatory Regulatory, Canadian Gas Pipelines Enclosure cc: Heather Dodds, National Energy Board

To Category Description of Source 1 NEB Condition Compliance NGTL shall comply with all of the conditions contained in this Certificate, unless the Board otherwise directs. 2 NEB Facilities Construction and Operation 3 NEB Implementation of Environmental Protection NGTL shall cause the approved Project to be carried-out in accordance with the specifications, standards and other information referred to in its Project Application and its related submissions. NGTL shall implement or cause to be implemented all of the policies, practices, programs, mitigation measures, recommendations, procedures and its commitments for the protection of the environment included in or referred to in its Project Application or in its related submissions 4 NEB Notification of Closing NGTL shall provide the Board with a notice of the anticipated Closing Date at least 30 days before the anticipated Closing Date and again, immediately upon actual Closing. 5 NEB Effective Date of the The Certificate shall come into force at the Closing Date. Certificate 6 NEB s Tracking Table NGTL shall file with the Board and post on file with the Board and post on its Project website, at least 30 days before the Closing, a s Tracking Table listing all commitments made by NGTL in its Project Application, and in its related submissions, including reference to: a) the documentation in which the commitment appears (for example, the Application, responses to information requests, hearing transcripts, permit requirements, condition filings, or other); b) the accountable lead for implementing each commitment; and c) the estimated timelines associated with the fulfillment of each commitment. Condition 1 Condition 2 Condition 3 Condition 4 Condition 5 A90519-3 Ongoing Pre-Closing through Post-Closing A90519-3 Ongoing Pre-Closing through Post-Closing A90519-3 Ongoing Pre-Closing through Post-Closing Regulatory Environmental Planner A90519-3 Planned Pre-Closing Regulatory A90519-3 N/A Closing N/A A90519-3 Planned Pre-Closing Regulatory 7 NEB Aboriginal Engagement Report NGTL shall file with the Board 12 months from the effective date of the Certificate, a report summarizing its engagement activities with all potentially affected Aboriginal groups identified in the Application including Bigstone Cree Nation. This report shall include: a) a summary of the concerns raised by Aboriginal groups; b) a description of how NGTL has addressed or will address the concerns raised; c) a description of any outstanding concerns; and d) a description of how NGTL intends to address any outstanding concerns, or an explanation as to why no further steps will be taken. NGTL must provide a copy of the report to those Aboriginal groups identified in the Application including Bigstone Cree Nation no later than three days after the filing of the report with the Board, and file with the Board confirmation of that within one week after providing the copies. Condition 7 A90519-3 Planned Post-Closing Aboriginal Relations Engagement Lead June 2018 July 31, 2018 Page 1 of 7

To Category Description of Source 8 NEB In-line Inspection NGTL shall conduct the following Pipeline inspections on the piggable pipeline sections of the Albersun pipeline at the times indicated: a) a high-resolution in-line caliper inspection (i.e., a GEOPIG inspection) for the pipelines with a diameter of NPS 10 within 12 months from the effective date of the Certificate to establish accurate pipeline position and to detect pipe deformations; b) a high-resolution in-line caliper inspection (i.e., a GEOPIG inspection) for the pipelines with a diameter of NPS 10 within 48 months from the effective date of the Certificate to characterize and assess any ongoing pipe deformations due to slope movement; and c) an in-line corrosion inspection for pipelines with a diameter of NPS 10 within 12 months of the effective date the Certificate. NGTL must file with the Board, within 6 months after completing each inspection, a report that includes a summary of the inspection results and mitigation measures undertaken, if any are required, for the anomalies detected through any of the inspections. For all unpiggable pipelines with a diameter of NPS 4 or greater, NGTL will confirm they have been incorporated into the TransCanada s Corrective Action Plan (CAP) for unpiggable lines within 12 months of the effective date of the Certificate. Condition 8 A90519-3 Planned Post-Closing Operations June 2018 July 31, 2018 Page 2 of 7

To Category Description of Source 9 NEB Repair and Installation of Slope Indicator Casings and Geotechnical Evaluation of Slope stability NGTL shall perform a geotechnical assessment in accordance with TransCanada s Integrity Management Plan (IMP) within 90 days of the effective date of the Certificate and shall file with the Board, a report of the results. All slope indicators identified for replacement or repair in the geotechnical assessment report, if any, shall be replaced or repaired within 12 months of the report being submitted to the Board. Condition 9 A90519-3 Planned Post-Closing Pipe Integrity June 2018 July 31, 2018 Page 3 of 7

To Category Description of Source 10 NEB Geotechnical Evaluation of Slope Stability NGTL shall file with the Board a geotechnical evaluation report within 12 months of the date of the completion of all slope indicator replacements or repairs, if any, conducted pursuant to Condition 9 for the Albersun pipeline, providing an assessment of the current stability of the slopes. Condition 10 A90519-3 Planned Post-Closing Pipe Integrity 11 NEB Pipeline Geographic Information System (GIS) Information NGTL shall file with the Board, within 12 months of the effective date of the Certificate: a) Geographic Information System data in the form of Esri shape files that contain pipe segment centre lines, where each pipe segment has a unique outside diameter, wall thickness, maximum operating pressure (MOP), external coating, field-applied girth weld coating, and pipe manufacturing specification. If the above values of the pipe change at any point along the length of the Pipeline, the Pipeline should be segmented at that point. NGTL must also provide Geographic Information System locations and names for the Pipeline, all custody transfer meters, and all mainline block valves as applicable. The datum must be NAD83 and projection must be geographic (latitudes and longitudes). Spatial information related to this condition will be provided to the NEB as loaded and maintained in NGTL s GIS repository; and b) information on the right of way boundaries and location and names of the launchers and receivers for the Pipeline. Condition 11 A90519-3 Planned Post-Closing GIS Services June 2018 July 31, 2018 Page 4 of 7

To Category Description of Source 12 NEB Emergency Response NGTL shall, within 18 months from the effective date of the Certificate: a) conduct a full-scale emergency response exercise for the Pipeline. The objective of the emergency response exercises shall be to test the effectiveness and adequacy of the: i. Emergency Procedures Manual; ii. training of company personnel; iii. communications systems; iv. coordination of emergency response activities with responders, mutual aid partners and other agencies; v. response equipment; vi. safety procedures; and vii. exercise debrief process. b) notify the Board in writing, at least 45 days prior to the date of the emergency response exercise referred to in a), of the following: i. location of the exercise; ii. exercise coordinator; iii. date of the exercise; iv. duration of the exercise; v. the name and organization of each individual invited to participate in the exercise including first responders, stakeholders and Aboriginal group; and vi. the goals (for example, focus of exercise, scope, scale, extent of play, format, evaluation method), and how success is measured c) file with the Board, within 90 days of completion of the emergency response exercise referred to in a), a report that documents the results of the exercise including: i. how the exercise achieved the stated goals; ii. participant feedback and areas for improvement; and iii. a corrective action plan to address the findings from the exercise. 13 NEB Facility Signage NGTL shall file with the Board, no later than 90 days from the effective date of the Certificate, confirmation that all Pipeline signage has been changed to reflect new ownership and include current emergency response numbers. 14 NEB Emergency Response s NGTL shall file with the Board, no later than 45 days from the effective date of the Certificate, confirmation that all agencies that may be involved in an emergency response on the Pipeline have been notified of the change of ownership. Condition 12 Condition 13 Condition 14 A90519-3 Planned Post-Closing A90519-3 Planned Post-Closing A90519-3 Planned Post-Closing Community Relations 15 NEB Transfer of Records NGTL shall file with the Board, no later than 150 days from the effective date of the Certificate, confirmation that all records in Suncor s possession pursuant to CSA Z662 and paragraphs 56(e) to 56(g) of the National Energy Board Onshore Pipeline Regulations have been received from Suncor Energy Logistics Corporation Condition 15 A90519-3 Planned Post-Closing Regulatory 16 NEB Condition Compliance by a Company Officer Within 30 days of the effective date of the Certificate, NGTL shall file with the Board a confirmation, by an officer of the company that the approved Project is in compliance with all applicable conditions in this Certificate. If compliance with any of these conditions cannot be confirmed, the officer of the company shall file with the Board details as to why compliance cannot be confirmed. The filing required by this condition shall include a statement confirming that the signatory to the filing is an officer of the company. Condition 16 A90519-3 Planned Post-Closing Regulatory June 2018 July 31, 2018 Page 5 of 7

To Category Description of Source 17 NEB Commercial Appendix 1-2 is an unexecuted copy of the First Amending Agreement to the Transfer Agreement. An executed copy will be subsequently filed with the NEB. 18 NEB Operations - IMP Implementation The inspection and maintenance of pressure equipment at Mildred Lake East Sales Meter Station will continue under the auspices of ABSA. Application A76613-1 Complete Regulatory Process Commercial NEB Filing ID: A78634-1. Application Section 7.1 A76613-1 Planned Closing and Operations Measurement Engineering Operations 19 NEB Operations - IMP Implementation, Engineering - Class Location Assessment and Geotechnical Assessment The Albersun Pipeline will be immediately incorporated into TransCanada s IMP upon Closing. NGTL will perform a class location assessment as part of its IMP after Closing to confirm the class location designations and reclassify, as may be necessary. NGTL will perform a geotechnical assessment after taking possession of the Albersun Pipeline and perform any necessary remediation in accordance with TransCanada's IMP. Application Sections 7.2.2 and 7.3.3 A76613-1 Planned Closing Operations, PM to coordinate 20 NEB Engineering - Meter Station Upgrades NGTL will assess the upgrades required to meet Measurement Canada requirements and will submit any filings as may be required with the Board, having regard to the term of Measurement Canada s approval. Application Section 7.4 A76613-1 Planned Post-Regulatory Approval 21 NEB Engineering - PC/OPP Where the possibility of pressurization above MOP exists on the Albersun Pipeline, PC and OPP systems will be installed or modified by NGTL to be compliant with CSA Z662-15 Clause 4.18 and 10.9.5 prior to Closing. 22 NEB Engineering - PC/OPP Prior to Closing, existing customers will be engaged per TransCanada s new customer process to verify the suitability of their PC and OPP, or the receipt connections to the Albersun Pipeline will be physically isolated in order to prevent flow from these sources from overpressuring the pipeline. 23 NEB Engineering - Pipe Integrity On the laterals, the data elements required for further analysis are currently incomplete; this will be addressed and managed through Internal Corrosion Threat Management Program and Gas Quality Monitoring Program. 24 NEB Operations NGTL will limit the operating pressure of the pipeline to 4,500 kpa until data quality and record issues are addressed through collaboration with Suncor. 25 NEB Public Awareness/Operations Existing pipeline marker spacing will be augmented and pipeline signage will be replaced with NGTL signage. 26 NEB Regulatory 30-days notification to the NEB and the AER of the anticipated Closing (Suncor to undertake AER notification) 27 NEB Emergency Management - Planning Before the Albersun Pipeline components are put into operation, TransCanada will develop new emergency management plans or update existing emergency management plans to incorporate the facilities as required. Application Section 7.5.2 Application Section 7.5.3 A76613-1 Complete Pre-Closing Operations All unknown taps have been physically isolated from the pipeline. A76613-1 Complete Pre-Closing All unknown taps have been physically isolated from the pipeline. Application Table 7-4 A76613-1 Planned Post-Closing Pipe Integrity Application Section 7.6 A76613-1 Planned Closing and Operations Until Addressed Operations Application Table 7-4 A76613-1 Planned Post-Closing Application Section 8.2 A76613-1 Planned Pre-Closing Regulatory Application Section 8.6.1 A76613-1 Planned Pre-Closing Emergency Management June 2018 July 31, 2018 Page 6 of 7

To Category Description of Source A76613-1 Planned Pre-Closing, Closing, and Post- Closing 28 NEB Land Prior to Close, Sspecific conveyances assigning the required land rights will be prepared. At Closing, these conveyances will be signed by the parties to effect assignment of the required surface rights to NGTL. Post Close, transfer documents will be registered at Alberta Land Titles to convey the registered land right instruments to NGTL, and the assignment of land rights on provincial Crown-owned lands will be accomplished electronically through the Alberta Energy Electronic Transfer System. and signed by the parties to assign the surface rights required by NGTL at Closing. Transfers of Alberta Land Title registrations regarding surface rights will be prepared, signed and registered with Alberta Land Titles. At Closing, assignment of land rights on provincial Crown-owned lands will be accomplished electronically through the Alberta Energy Electronic Transfer System. Suncor land rights could be affected by third-party activity or facilities. The consents addressing these situations will be transferred by Notifications will be provided to the third-partiesy affecting the land rights to address the assignment of any third-party agreements by way and/or execution of an Assignment agreement or Assignment and Novation agreement, as contractually required. by all Parties, as contractually required. At ClosingPost Close, the freehold surface owners will be notified of the completion of the assignment of the surface rights affecting their lands. Application Section 9.4.1 Project Letter: Update to Condition 4: Notification of Closing and Correction to : s Tracking Table Land 29 NEB Project Management/Records Management Upon Closing, the pipeline centerline will be integrated into TransCanada s GIS database and assigned chainages following TransCanada s data standard. Response to NEB 1.3(a) A80855 Planned Closing and Post- Closing June 2018 July 31, 2018 Page 7 of 7