JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19

Similar documents
An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois

ARTICLE 18 WIND ENERGY CONVERSION SYSTEMS

SHIAWASSEE COUNTY ZONING ORDINANCE Article 4 Specific Use Regulations

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES

TITLE 7, CHAPTER 3 TAZEWELL COUNTY

1. Assure that any development and production of wind-generated electricity in Boone County is safe and effective.

Howard County Checksheet for Large Wind to Energy Facilities (WEF)

EXHIBIT A SHIAWASSEE COUNTY ZONING ORDINANCE ARTICLE 4 SPECIFIC USE REGULATIONS RECOMMENDED AMENDMENTS TO SECTION (REVISED MAY 11, 2018)

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS

WIND ENERGY CONVERSION SYSTEM (WECS) APPLICATION

Wind Energy Conversion System Ordinance No. 467

ORDINANCE NO. 41. PRIVATE ROAD ORDINANCE As Amended Through April 10, 2008

KOSSUTH COUNTY ORDINANCE #310

Chapter 9 Wind Energy

CHAPTER 3 PRELIMINARY PLAT

TOWN OF RUTLAND Ordinance No. 12.5

Memorandum: October 13, 2008 REVISED To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance

This is a conditional use permit request to establish a commercial wind energy conversion system.

KOSSUTH COUNTY ORDINANCE #310 - A

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS

COMMUNICATION TOWERS ORDINANCE No. 31

MONTGOMERY COUNTY BOARD OF COMMISSIONERS

SOLAR ENERGY FACILITIES ORDINANCE #17-07 KOCHVILLE TOWNSHIP

TENTATIVE PARCEL MAP APPLICATION GUIDE TENTATIVE PARCEL MAP APPLICATION REQUIREMENTS

CABLE TELEVISION FRANCHISE AND REGULATIONS

CHAPTER 154 RIGHTS OF WAY

DALLAS TOWNSHIP CLINTON COUNTY, MICHIGAN ORDINANCE NO

CHAPTER XVIII SITE PLAN REVIEW

CHARTER TOWNSHIP OF SUPERIOR WASHTENAW COUNTY, MICHIGAN PRIVATE ROAD ORDINANCE ORDINANCE NO. 163

ARTICLE XI CONDITIONAL USE PERMITS

DENMARK TOWNSHIP, TUSCOLA COUNTY, MICHIGAN ORDINANCE NO

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER

This Ordinance is adopted under the authority and provisions of the General Statutes of North Carolina, Article 6, Chapter 153A 121.

WAYNE COUNTY, UTAH SUBDIVISION ORDINANCE

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

Waseca County Planning and Zoning Office

TOWN OF WATERVILLE VALLEY NEW HAMPSHIRE SITE PLAN REVIEW REGULATIONS

Residential Major Subdivision Review Checklist

ARTICLE II: CELLULAR ANTENNA TOWERS

CONDOMINIUM REGULATIONS

1. Approval of Plans and Specifications/Architectural Review Procedure.

ORDINANCE NO. 20,q/.g

P a g e 1. DRAFT August 31, 2018 Version

WATAB TOWNSHIP, BENTON COUNTY, STATE OF MINNESOTA. ORDINANCE #4 (Amended November 2014) AN ORDINANCE REGULATING TOWN ROAD RIGHTS-OF-WAY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

NEWPORT CODE DRAFT latest revision 11/11/13 APPENDIX A. SPECIAL USE and CONDITIONAL USE PERMITS

ORDINANCE NO.: Adopted: August 2, 2005 Amended: March 27, 2007 Amended: September 23, Fillmore County Rural Addressing Ordinance

Township of Collier 2418 Hilltop Road Presto, PA 15142

Model Wind Energy Facility Local Law for St. Lawrence County Municipalities. Local Law No. of 20

Short Title: Performance Guarantees/Subdivision Streets. (Public) April 28, 2016

KASSON TOWNSHIP PRIVATE ACCESS ROAD ORDINANCE ORDINANCE NO (EFFECTIVE: MAY 12, 2007)

TITLE 33 REGULATION OF WIRELESS TELECOMMUNICATIONS FACILITIES

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

Local Law No. 2 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Jasper as follows:

ARTICLE V PRELIMINARY PLAN SUBMISSION

ARTICLE 1 GENERAL PROVISIONS

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

WASCO COUNTY PRELIMINARY SUBDIVISION APPLICATION

EXHIBIT A TRI-COUNTY ELECTRIC COOPERATIVE, INC INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

SUBDIVISION APPLICATION

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

DEVELOPMENT PLAN ORDINANCE

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

ADUs and You! Common types of ADUs include mother-in-law suite, garage apartments and finished basements.

Chapter 137 WIND ENERGY CONVERSION SYSTEMS

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison

MODEL WIRELESS TELECOMMUNICATIONS ORDINANCE for Siting of "Small Cell" Telecommunication Infrastructure in Public Rights-Of-Way

DRAFT PARK COUNTY US HIGHWAY 89 SOUTH EAST RIVER ROAD OLD YELLOWSTONE TRAIL ZONING DISTRICT REGULATIONS

DOUGLAS COUNTY SUBDIVISION RESOLUTION Article 4 Preliminary Plan 10/13/2015

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

Preliminary Subdivision Application (Major) (Four (4) lots or more)

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

CHAPTER County of Alameda Onsite Wastewater Treatment Systems Ordinance

I. Requirements for All Applications. C D W

13-2 SUBDIVISION PLANS AND PLATS REQUIRED EXCEPTIONS Subdivision Plats Required To be Recorded

TOWNSHIP OF HARTLAND ORDINANCE NO. 57-1, AN ORDINANCE AMENDING THE LAND DIVISION ORDINANCE

Purchasing Division Finance Department 44 E. Downer Place Aurora, Illinois (630) FAX (630)

BYRON TOWNSHIP ZONING APPLICATION

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

ARTICLE 20 SIGNS. SIGN, AREA: The entire area of all sign faces, cumulatively, including sign faces on which no copy is currently displayed.

NET METERING INTERCONNECTION AGREEMENT FOR CUSTOMER-OWNED RENEWABLE GENERATION SYSTEMS

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

Instructions to the Applicant

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

RESOLUTION NO ORDINANCE NO. 02-1

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018.

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

ORDINANCE NO. 875 (AS AMENDED THROUGH 875

MINOR BOUNDARY LINE ADJUSTMENT PROCESS GUIDE

Local Law No. 1 of Wind Energy Facilities. Be it hereby enacted by the Town Board of the Town of Hartsville as follows:

THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

Guide to Combined Preliminary and Final Plats

HEAVY-HAULING AGREEMENT. THIS HEAVY-HAULING AGREEMENT amended by Resolution #1, January 2010,

VERGENNES TOWNSHIP, KENT COUNTY, MICHIGAN ORDINANCE AMENDMENT Ordinance Adopted May 17, 2004

PENINSULA TOWNSHIP DONATION of DEVELOPMENT RIGHTS ORDINANCE (DDR, No. 45)

Transcription:

JERSEY COUNTY ORDINACE REGULATING DEVELOPMENT OF COMMERCIAL SOLAR ENERGY SYSTEMS AND WIND ENERGY COVERSION SYSTEMS ADOPTED ORD # 01-19 AN ORDINANCE REGULATING RENEWABLE ENERGY SYSTEMS DEVELOPMENT IN JERSEY COUNTY WHEREAS, the County of Jersey has adopted the Ordinance regulating wind and other renewable energy systems development in Unincorporated Jersey County on ; WHEREAS, the County of Jersey also deems it necessary to adopt regulations regarding Solar Farms (also known as solar parks or solar fields), Wind Farms (also known as wind parks or wind fields) Development for commercial use in Jersey County. By the authority given by the Illinois State Statutes (55 ILCS 5/ Div. 5-29), and (55 ILCS 5/5-12020). NOW, THEREFORE, BE IT ORDAINED by the County Board of Jersey County, Illinois as follows: The purpose of this Ordinance is to facilitate the commercial construction, installation, and operation of solar wind farms or other renewable energy technologies in Unincorporated Jersey County that promote economic development and ensure the protection of health, safety, and welfare while also avoiding adverse impacts to important areas such as agricultural lands, endangered species habitats, conservation lands, and other sensitive lands. This Ordinance does not apply to residential construction and is not intended to replace safety, health, or environmental requirements contained in other applicable codes, standards, or Ordinances. The provisions of this Ordinance shall not be deemed to nullify any provisions of local, state or federal law. 1. Definitions. a) Applicant. The entity of person who submits to the county an application for the siting of any WECS or SES including substations. b) Active Solar Energy System. A solar energy system whose primary purpose is to harvest energy by transforming solar energy into another form of energy or transferring heat from a collector to another medium using mechanical, electrical, or chemical means. c) Grid-interim Solar Energy System. A photovoltaic solar energy system that is connected to an electric circuit served by an electrical company. d) Off-grid Solar Energy System. A photovoltaic solar energy system in which the circuits energized by the solar system are not electrically connected in any way to electric circuits that are served b y an electric utility company. 1

e) Operator. The entity responsible for the day-to-day operation and maintenance of the development project, including any third party subcontractors. f) Owner. The entity or entities with an equity interest in the SES(s), including their respective successors and assigns. Owner does not mean (a) the property owner from whom land is leased for locating the project (unless the property owner has an equity interest in the project); or (b) any person holding a security interest in the C or SES solely to secure an extension of credit, or a person foreclosing on such security interest provided that after foreclosure, such person seeks to sell the or SES(s) at the earliest practicable date. g) Photovoltaic System. A solar energy system that converts solar energy directly into energy. h) Renewable Energy Easement, Solar Energy Easement. An easement that limits the height or location, or both, of permissible development on the burdened land in terms of a structure or vegetation, or both, for the purpose of providing access for the benefited land to wind or sunlight passing over the burdened land. i) Solar Farm. A commercial facility that converts sunlight into electricity, whether by photovoltaic (PV), concentrating solar thermal devices (CST), or other conversion technology, for the primary purpose of wholesale sales of generated electricity. A solar farm is the principal land use for the parcel on which it is located. Utility scale solar must be bigger than 2 MW AC. j) Solar Garden. A commercial solar-electric (photovoltaic) array that provides retail electric power (or financial proxy for retail power) to multiple households or businesses residing or located off-site from the location of the solar energy system. A community solar system may be either an accessory or a principal use. k) Solar Collector. A device, structure or a part of a device for structure for which the primary purpose is to transform solar radiant energy into thermal, mechanical, chemical, or electrical energy. l) Solar Collector Surface. Any part of a solar collector that absorbs solar energy for use in the collector s energy transformation process. Collector surface does not include frames, supports and mounting hardware. m) Solar Energy System. As used in this section, a Solar Energy System ( SES ), also known as a solar power, solar park, solar field, and a solar farm, means an alternative energy facility that consists of one or more groundmounted or free-standing solar collection devices, solar energy related equipment, and other associated infrastructure with the primary intention of generating electricity or otherwise converting solar energy to a different form of energy for primarily commercial or other off-site use. n) Solar Storage Unit. A component of a solar energy device that is used to store generated electricity or heat for later use. 2. SOLAR FARM The term "Solar Farm" shall not be construed to include, so as to prohibit, or have the effect of prohibiting, the installation of a solar collector that gathers solar radiation as a substitute for traditional energy for water heating, active space heating and cooling, passive heating, or generating electricity for a residential property. Further, notwithstanding anything to the contrary contained herein, the term "Solar Farm" shall not be construed in such a way that would cause a person to be denied permission by Jersey County to install a solar collector that gathers solar radiation as a substitute for traditional energy for water heating, active space heating and cooling, passive heating, or generating electricity for a residential property. 2

As used herein, "residential property" means property where the predominant use is for residential purposes. Further, notwithstanding anything to the contrary contained herein, the term "Solar Farm" shall not be construed in such a way as to prohibit the installation or mounting of a series of one or more solar collectors upon the roofs of residential and/or commercial structures regardless of whether the said series of one or more solar collectors collectively has a total nameplate generation of at least 15 kilowatts (kw) direct current (DC) or more when operating at maximum efficiency. Solar Energy Setbacks. A ground-mounted SES shall have a setback for all equipment, excluding fences, a minimum of seventy five (75) feet from the front property line and thirty five (35) feet from side and rear property lines. The SES shall be set back a minimum of three hundred (300) feet from the property line of a platted subdivision or other residence. Setbacks for inverters and transformers shall be no less than two hundred (200) feet from any residence that is not on the property that has acquired the Solar Development Permit from the Jersey County Code Administrator. OR Every Solar Farm shall be setback at least 100 feet from all property lines of the parcel land upon which the Solar Farm is located or to be located. Every Solar Farm shall be setback at least 100 feet from the margin of any public road. Every Solar Farm shall be setback at least 100 feet from the high water mark of any lake available for public use. Every Solar Farm shall be setback at least 100 feet from the stream banks of any navigable stream. Design Standards. a) Facility Equipment - Shall conform to applicable International Code Council building codes and to other industry standards including the International Code Council Energy Provisions. Applicants shall submit certificates from equipment manufacturers that the equipment is manufactured in compliance with industry standards. b) Compliance with Additional Regulations - It shall be the responsibility of the applicant to coordinate with the FAA or other applicable federal or state authority to attain any additional required approval for the installation of a solar energy generation facility. The applicant shall submit with the Special Use application an approval letter from any federal or state authority requiring permit or approval. c) Power and Communication Lines - Power and communication lines ( lines ) running between banks of solar panels shall be buried underground except from point of interconnection to existing utility-owned, aboveground electrical wires. The applicant shall submit with the Special Use application a copy of a letter from the electric utility company confirming the review of the application for interconnection has started. d) Minimum Acreage - No SES shall be erected in any lot less than twenty (20) acres in size. e) Height - Systems, equipment, and structures shall not exceed twenty (20) feet in height when ground mounted. Excluded from this height requirement, however are electric transmission lines, utility poles, and other poles and equipment used in connecting a ground-mounted piece of equipment to an electric transmission line. f) Floodplain - No SES shall be permitted to be located in the designated Jersey County Floodplain determined by the current FEMA FIRM maps or as determined by the Jersey County Certified Floodplain Manager. g) Security - Knox boxes and keys shall be provided at locked entrances for emergency personnel access. 3

h) Lighting - If lighting is provided at the site, lighting shall be shielded and downcast so that the light does not spill onto adjacent parcels. i) Noise -Noise levels measured at the property line shall not exceed fifty (50) decibels (not including background noise) when located adjacent to an existing residence. j) Glare - Solar collectors shall be placed such that concentrated solar radiation or glare does not project onto nearby structures, roadways or other areas accessible to the public. The applicant has the burden of proving that any glare produced does not have significant adverse impact on neighboring or adjacent uses either through siting or mitigation. k) Fire Safety - It is the responsibility of the applicant to coordinate with the local fire protection district. The applicant shall submit with the Special Use application an approval letter from the local fire protection district. l) Warning Signage - A visible warning sign of High Voltage shall be posted at all points of site ingress and egress and along the perimeter fence of the facility, at a maximum of three hundred (300) feet apart. A sign that includes the facility s 9-1-1 address and a 24-hour emergency contact number shall be posted near all entrances to the facility. m) Endangered Species and Wetlands - Applicant shall seek natural resource consultation with the Illinois Department of Natural Resources (IDNR). The applicant shall submit with the Special Use application the results of the IDNR EcoCAT consultation. The cost of the EcoCAT consultation shall be paid by the applicant. n) County Highway and Township Road Agreements - Each solar energy facility shall have written agreement with the County Engineer and respective Township Highway Commissioner(s) regarding use of county/township road, bridges and right-of-way. Performance/surety bonds or other financial assurance documents may be required to guarantee the performance of the road agreements before a Special Use permit can be issued. The applicant shall submit with the Special Use application an approval letter from the road jurisdiction(s). o) Foundations - A qualified Structural Engineer licensed in the State of Illinois shall certify that the foundation and design of the solar panels is within accepted professional standards, given local soil and climate conditions. p) Other Standards and Codes - All solar farms shall be in compliance with all applicable local, state and federal regulatory standards, including the National Electric Code, as amended. q) AIMA - A copy of the Standard Agricultural Impact Mitigation Agreement between the Landowner and The Department of Agriculture approving the development of a SES. Application. The provisions of the Ordinance shall be administered and enforced by personnel of the Jersey County Code Administrator office (herein referred to as Code Official ). The applicant must submit the following information ten (10) business days prior to the submittal of the Special Use application for a solar farm. The applicant is required to submit twenty-five (25) copies of all required documentation, including ten (10) full size copies of exhibits and fifteen (15) reduces size copies of all exhibits, with the Code Official, together with the appropriate filing fee. The application shall include the following: a) Site plan with existing conditions showing the following: 1) Existing property lines and property lines extending one hundred (100) feet from the exterior boundaries, including the names of adjacent property owners and current use of those properties. 4

2) Existing public and private roads, showing widths of the roads and any associated easements. 3) Location and size of any abandoned wells or sewage treatment systems. 4) Existing buildings and any impervious surfaces. 5) A contour map showing topography at two (2) foot intervals. A contour map of surrounding properties may also be required. 6) Existing vegetation (list type and percent coverage, i.e., cropland/plowed fields, grassland, wooded areas, etc.). 7) Waterways, watercourses, lakes, and public water wetlands. Also any delineated wetland boundaries. 8) A copy of the current FEMA FIRM map that shows the subject property, the one hundred year flood elevation and any regulated flood protection elevation, if available. 9) Surface water drainage patterns. 10) The location of any subsurface drainage tiles. b) Site plan with proposed conditions showing the following: 1) Location and spacing of solar panels. 2) Location of access roads and access points. 3) Planned location of underground or overhead electric lines connecting the solar farm to a building, substation or other electric load. 4) New electrical equipment other than at the existing building or substation that is to be the connection point to the solar farm. 5) Sketch elevation of the premises accurately depicting proposed solar energy conversion system and its relationship to structure on adjacent land. c) A preliminary map and plan showing the roads and right-of-ways that will be utilized for both the construction and operation of the solar farm. The applicant shall submit an executed agreement between the solar farm owner/operator and all road district authorities with infrastructure affected by the solar farm to the County. This agreement shall include, at a minimum: 1) A final map identifying the routes that will be used. 2) A plan for repairing and/or restoring the affected roads. 3) Other inclusions as specified by the County Board or affected road authority. d) Manufacturer s specifications and recommended installation methods for all major equipment, including solar panels, mounting systems and foundations for poles or racks. e) An itemized cost estimate for the entire construction of the project. f) A description of the method of connecting the array to a building or substation. g) An interconnection agreement must be completed with the electric utility in whose service territory the system is located. Off-grid systems are exempt from this requirement. h) Decommissioning Plan A decommissioning plan shall be required to ensure that solar farm facilities are properly removed after their useful life. 1) Decommissioning of solar panels must occur in the event they are not in use for twelve (12) consecutive months. 2) The owner/operator will have six (6) months to complete the decommissioning plan after operation of a solar farm stops being operational, or the County will take the necessary decommission steps. 3) The plan shall include provisions for removal of all structures (including equipment, fencing and roads) and foundations, restoration of soil and vegetation, and a plan ensuring financial resources will be available to fully decommission the site. 5

4) The Jersey County Board may require the posting of a bond, letter of credit or establishment of an escrow account to ensure the proper decommissioning. The posting of a bond may be required prior to the issuance of a solar farm permit for the facility. 5) Jersey County reserves the right to require additional information or components to the plan as the county deems necessary to ensure that an adequate proposal is in place to decommission the facility in its entirety and that adequate funds are available. In the event that the State of Illinois enacts a law with regards to the decommissioning of a solar farm, the strictest requirements shall prevail. i) Complaint Resolution The Applicant shall develop a process to resolve any complaints that may arise from neighboring property owners during the construction and operation of the solar farm. The process shall use an independent mediator and shall include a time limit for acting on a complaint that is received. The process shall not preclude the local government from acting on a complaint. The Applicant shall provide to the nearby residents a toll-free phone number for complaints during the construction of the facility if a problem should arise. Applicant will respond to all complaints from persons directly affected by the solar farm project within 48 hours, will attempt to resolve all complaints in a prompt and responsible manner, will keep a log of all complaints and the method of resolution, will make the log available to the County, and will agree to participate in a nonbinding mediation for complaints that are not resolved with the cost of such to be paid directly by the Applicant. Applicable Fees Upon submittal of the application for a solar farm, the Applicant shall submit a non-refundable filing fee as listed in the Jersey County Fee Schedule that will be utilized to review and assess the application. Should the actual costs to the County exceed the current fee, the Applicant shall be responsible for those additional costs, including, but not limited to the costs of outside attorneys, hearing officer, and consultants (e.g. noise engineers, traffic engineers, and environmental consultants), and shall remit additional funds to the County within 15 days of receipt of request from the County. a) County Code Administrator Responsibilities: 1) Accept and date stamp the application was filed. The date stamp should be considered the official filing date for all time purposes. Receipt and acceptance of an application by the Code Official is pro forma, and does not constitute an acknowledgment that the Applicant has complied with the County ordinance. 2) The Code Official shall forward the application to the County Engineer for a determination of completeness. 3) Code Official shall make available a copy of the application and public record concerning the application for public inspection during the normal business hours of the County offices. Additionally, the Code Official shall provide to any person so requesting, copies of the application or the public record, upon payment by such persons for the actual cost of reproduction. Public Hearing. After the filing of an application the Code Official shall make a preliminary determination of completeness of the application. If, in the Code Official s opinion, the application has addressed the required elements of an application, it will be forwarded to the County Engineer and the Subdivision and Land Use Committee to conduct a public hearing on the application. If the application is incomplete, the Applicant will be notified and the application will not proceed to hearing unless good cause is shown for the incompleteness. a) Notice The Applicant must provide a complete list of all properties adjacent to a proposed solar farm. The Applicant shall have a notice issued to every owner of those properties by certified mail, registered mail, or personal service at the last known address of such owner of a property as identified by the County tax records. The notice will identify the nature of the proposed use and the date that a public hearing shall occur on the 6

proposed use at the Subdivision and Land Use Committee, and that any person may make an appearance to participate in that hearing. Those notices must be served at least fifteen (15) days before the public hearing. The Applicant shall provide evidence of notification or evidence of a good faith effort to contact the property owner prior to the hearing if requested by the Code Official. The hearing notice shall also be published in a circulation of general publication at least three (3) times before the hearing commences with the first publication occurring at least thirty (30) days before the hearing and at least one publication occurring between seven (7) and fifteen (15) days before the hearing commences. b) Subdivision and Land Use Committee- The committee members shall preside over the public hearing; establish a record of the proceedings, make decisions concerning the admission of the evidence and the manner in which the hearing is conducted. The Chairman of the committee will make a recommendation and proposed findings to the full board at the next regular scheduled meeting. At the commencement of the public hearing people wishing to provide a public comment will be identified by a sign in sheet. c) Committee and County Board Action The Subdivision and Land Use Committee will consider the following facts: 1) Whether the application and proposed solar farm project substantially complies with the solar farm ordinance. 2) Whether the proposed solar farm project is sufficiently protective of the public health, safety and welfare of the residents of Jersey County. 3) The Subdivision and Land Use Committee shall tender its findings and recommendations to the County Board. The committee may recommend approval, approval with request for additional information or clarification, approval with conditions, or denial. Within thirty (30) days of the conclusion of the public hearing the County Board will meet in public session and render its decision. The County Board may approve, approve with conditions, or deny the application. d) Re-filing Any Applicant, owner or operator whose solar farm project application is denied may not re-file a substantially similar application for one year. If the County Code Official determines an application is substantially similar to one the Applicant filed within one year it will not be forwarded to the Subdivision and Land Use Committee or the County Board for review. Building Permit Procedure. Building applications shall be submitted to the Code Official. The application shall be on a form approved by the Code Official and must be accompanied by two (2) copies of the following: a) Address of property, date of application (9-1-1 address required). b) Applicant s name and address, contact information. c) Property owners name and address, phone number, email. d) Company name (if different from Applicant), contact information, mailing address, email. e) Site drawing that shows the proposed location and distance of the solar energy facility with reference to property lines of the parcel; right-of-way of any road; residence; business; or public building. f) Construction plans prepared and sealed by a structural engineer licensed In Illinois. g) Building permit fee payable by check to Jersey County (referred to as the Jersey County Fee Schedule). 7

h) The applicant shall provide standard manufacturer s specifications and recommended installation methods for all major equipment, including solar panels, mounting systems and foundations for poles and rack. Specifications for the actual equipment to be used in the SES shall be required before a building permit is issued. The Illinois Power Agency Act (20 ILCS 3855/1-1) requires that all systems (utility scale, distributed and community solar) are installed by qualified installers. This requirement is regulated by the Illinois Commerce Commission. i) A description of the method of connecting the SES to a building or substation. j) FFA requirements - For any SES to be located within five hundred (500) feet of an airport or within approach zones of an airport, the applicant shall complete and provide the results of the Solar Glare Hazard Analysis Tool (SGHAT) for the Airport Traffic Control Tower cab and final approach paths, consistent with the Interim Policy, FAA Review of Solar Energy Projects on Federal Obligated Airports, or most recent version adopted by the FAA. k) Land habitat - A landscape plan shall be submitted which shall incorporate native grasses, flowers, plants which will provide wild life and pollinator habitat, soil erosion protection and/ or aid in strengthening the soil structure. This plan shall be for all other areas of the SES that will not interfere with the solar arrays. Gates and Locks. Perimeter chain linked fencing having a minimum height of six (6) feet shall be installed, maintained, and secured around the boundary of the SES. The fence shall contain appropriate warning signage that is posted such that it is clearly visible on the site. a) All gates to the fences of Solar Farms shall be at least 6 feet in height and which shall additionally have at least three strands of barbed wire run above such six feet. b) All gates to the fences of all Solar Farms shall be equipped with locks and shall be remain locked at all times except for those times when the owner and/or operator, or their respective agents is/are using the gate for ingress and /or egress or is/are otherwise present and monitoring the Solar Farm(s). c) All gates to fences o fall Solar Farms shall be constructed so as to substantially lessen the likelihood of entry into a Solar Farm by unauthorized individuals. d) The gates and barbed wire required hereunder shall be maintained in good condition. Failure to maintain the gates required hereunder shall constitute a violation of this Ordinance. e) The gate, barbed wire and lock requirements specified hereunder shall continue notwithstanding the fact that a Solar Farm is no longer operational and/or falls into disuse unless and until such Solar Farm is dismantled and removed from the parcel or parcels of land upon which it was constructed. Enforcement and Inspections. The provisions of this Ordinance shall be administered and enforced by personnel of the Jersey County Code Administrator Office through an inspection of the solar farm every year. The Code Official and his/her designee are hereby granted the power and authority to enter upon the premises of the solar farm at any time by coordinating a reasonable time with the operator and/or owner of the facility. Any person, firm, or corporation who violates, disobeys, omits, neglects, refuses to comply with, or resists the enforcement of any provisions in this section may face fines of not less than one hundred ($100) dollars nor more than seven hundred fifty ($750) dollars for each offense. A separate and distinct offense shall be regarded as committed each day the violation remains uncorrected. Road Use Agreements. All routes on either County or Township roads that will be used for construction or maintenance purpose shall be identified on the site plan. The routing shall be approved by the Jersey County Highway Engineer and the Township Road Commissioners. The applicant shall provide a preconstruction baseline survey for determining existing road conditions 8

that assesses potential future road damage and provide a letter of credit or other financial security as required by the Jersey County Highway Engineer. Decommissioning Security Costs. The plan shall ensure financial resources equal to 125% of the entire cost of decommission, and approved by the Code Official and the State s Attorney, either through cash, a surety performance bond, irrevocable letter of credit or credit or other instrument readily convertible into cash at face value, either with the County or in escrow with a financial institution designated as an official depository of the County. This surety shall be retained by the County to cover the cost of the decommissioning requirements herein. Following initial submittal of the surety, the cost calculation shall be reviewed annually, and adjusted accordingly based upon an updated estimate of an Illinois licensed engineer under seal, of the estimated decommissioning costs; provided however, any such periodic adjustment must be approved by the County Board. Failure to comply with any requirement of this paragraph shall result in the immediate termination and revocation of all prior approvals and permits; further, County shall be entitled to make immediate demand upon, and/or retain any proceeds of, the surety, which shall be used for decommissioning and/or removal of the Solar Energy Facility, even if still operational. Remedial Costs. Applicants and /or owners of solar farms shall pay all costs associated with the remedy of any complaints deemed necessary and factual by the Jersey County Code Administrator or the Jersey County Board. Liability Insurance. The owner or operator of the solar project shall maintain a current and general liability policy covering bodily injury and property damage with limits of at least two million dollars per occurrence and twenty million dollars in the aggregate. The owner or operator of the solar project shall maintain this policy for the lifetime of the solar project and submit a copy of the same to the Jersey County Board at each renewal. The County of Jersey and its officials shall be named as additional insured s. Severability. If any section, clause, or provision of this Ordinance is declared unconstitutional or otherwise invalid by a court of competent jurisdiction, said declaration shall not affect the validity of the remainder of the Ordinance as a whole or any part thereof, other than the part so declared to be unconstitutional or invalid. Indemnification The applicant, owner and/or operator of the solar project shall defend, indemnify, and hold harmless the County of Jersey and its officials from and against any and all claims, demands, losses, suites, class of action, damages, injuries, costs, expenses and liabilities whatsoever, including attorney s fees, without limitation arising out of acts of omissions of the applicant, owner and/or operator associated with the construction and/or operator associated with the construction and/or operation of the solar project. Public Nuisance Any solar project declared to be unsafe by the Code Official by reason of inadequate maintenance, dilapidation, obsolescence, fire hazard, damage, or abandonment is herby declared a Public Nuisance and shall be abated by repair, rehabilitation, demolition, or removal in accordance with the procedure set forth in the Ordinance. Effective Date. This Ordinance is an ordinance necessary for the health and safety of the people of Jersey County, Illinois, and shall be in full force and effect from and after its passage. 9

3. WIND ENERGY SYSTEM Definitions. a) Applicant. The entity or person who submits to the County, an application for the siting of any WECS or Substation. b) Fall Zone. The area defined as the farthest distance from the WECS Tower base, in which a WECS Tower will collapse in the event of a structural failure. This area is the total height of the structure plus length of blade. c) Feeder Line. Any power line that carries electrical power from one or more wind turbines or individual transformers associated with individual wind turbines to the point of interconnection with the electric power grid. d) Operator. The entity responsible for the day-to-day operation and maintenance of the WECS, including third party subcontractors. e) Owner. The entity or entities with an equity interest in the WECS(s), including their respective successors or assigns. Owner does not mean (1.) the property owner from whom land is leased for locating the WECS, unless the property owner has an equity interest in the WECS; or (2.) any person holding a security interest in the WECS(s) solely to secure an extension of credit, or a person foreclosing on such security interest provided that after foreclosure, such person seeks to sell the WECS(s) at the earliest practicable date. f) Public Conservation Lands. Land owned in fee title by the state or federal agencies and managed specifically for conservation purposes, including but not limited to state and federal parks, state and federal wildlife management areas, state scientific and natural areas, and federal wildlife refuges and waterfowl protection areas. Public conservation lands do not include private lands upon which conservation easements have been sold to government agencies or non-profit conservation organizations for conservation. Public conservation lands also do not include private lands for which the owners have entered into contractual relationships with government or non-profit conservation organizations for conservation purposes. g) Rotor Diameter. The diameter of the circle created by rotating turbine blade tips. h) Shadow Flicker. The phenomenon that occurs when rotating wind turbine blades cast moving shadows upon stationary objects. i) Substation. The apparatus that connects the electrical collection system of the WECS(s) and increases the voltage for connection with the utility s transmission lines. j) WECS System Height. The distance from the rotor blade at its highest point to the top surface of the WECS foundation. k) WECS Tower. The support structure to which the nacelle and rotor are attached. l) Wind Energy Conversion System (WECS). As used in this section, a Wind Energy Conversion System ( WECS ) is also known as a Wind Farm, Wind Park, or Wind Fields means all necessary devices that together convert wind into electricity, including the rotor, nacelle (i.e. generator and related components enclosure), generator, WECS Tower, electrical components, WECS foundation, transformer, and electrical cabling from the WECS Tower to the Substation(s) and which has a rated capacity of over 100 kw. 10

m) WECS Project. The support structure to which the nacelle and rotor are attached. n) Wind Farm. A wind farm or wind park is a grouping of two or more wind turbines in the same location used to produce electricity for commercial purpose. Applicability This Ordinance governs the siting of WECSs and Substations that generate electricity to be sold to wholesale or retail markets, except that owners of WECSs with an aggregate generating capacity of 3MW or less who locate the WECS(s) on their own property are not subject to this Ordinance. No WECS or substation governed by this section of the Ordinance shall be constructed, erected, installed, or located within Jersey County, unless prior siting approval has been obtained for each individual WECS and substation pursuant to this Ordinance. Procedure. a) Filing of an Application - To obtain a Special Use Permit, the applicant must first submit for an approval twentyfive (25) copies of an application, including ten (10) full-sized copies of exhibits and fifteen (15) reduced copies of all exhibits, with the County Code Administrator (herein referred to as the Code Official ), together with the appropriate site review application fee. b) Fee Schedule- Upon submittal of the application for a WECS, the Applicant shall submit a non-refundable check to Jersey County in an amount as indicated in the Jersey County Fee Schedule which funds will be utilized to review and assess the application. Should the actual costs exceed the fee amount, the Applicant shall be responsible for those additional costs, including, but not limited to the costs of outside attorneys, committee meetings, and consultants (e.g. noise engineers, traffic engineers, and environmental consultants) and shall remit additional funds to the County within fifteen (15) days of receipt of a request from the County. The County will provide itemized records detailing fund distributions upon request by the Applicant. Such requests may not occur more than one time per calendar month. c) Code Official Responsibilities: 1) Accept and date stamp the application was filed. The date stamp should be considered the official filing date for all time purposes. Receipt and acceptance of an application by the Code Official is pro forma, and does not constitute an acknowledgment that the Applicant has complied with the County ordinance. 2) The Code Official shall forward the application to the County Engineer for a determination of completeness. 3) The Code Official shall make available a copy of the application and public record concerning the application for public inspection during the normal business hours of the County offices. Additionally, the Code Official shall provide to any person so requesting, copies of the application or the public record, upon payment by such persons for the actual cost of reproduction. d) Determination of Completeness After the filing of an application to the County Official and the County Engineer a preliminary determination of completeness of the application will be made. If, it is determined to be 11

complete, the application will be forwarded to the Subdivision and Land Use committee to conduct a public hearing on the application. If the application is incomplete, the Applicant will be so notified and the application will not proceed to a hearing unless good cause is shown for the incompleteness. e) Notice The Applicant must provide a complete list of all properties adjacent to a proposed WECS or within one-half mile of a property upon which a proposed WECS is to be located. The Applicant shall have a notice issued to every owner of those properties by certified mail, registered mail, or personal service at the last known address of such property owner as identified by the County tax records. Said notice will identify the nature of the proposed use and the date that a public hearing shall occur on the proposed use in front of the Subdivision and Land Use committee and that any person may file an appearance to participate in that public hearing at least five (5) days before the hearing commencement date. Those notices must be served at least fifteen (15) days before the public hearing shall commence and no earlier than thirty (30) days before the hearing shall commence. The Applicant shall provide evidence of notification or evidence of a good faith effort to contact the property owner prior to the hearing if requested by the County. Said hearing shall also be published in a circulation of general publication at least three times before the hearing commences with the first publication occurring at least 30 days before the hearing and at least one publication occurring between 7 and 15 days before the hearing commences. f) Committee and Board Action The Subdivision and Land Use committee will consider the following facts: 1) Whether the Application and proposed WECS Project substantially complies with the WECS ordinance. 2) Whether the proposed WECS Project is sufficiently protective of the public health, safety and welfare. With the conclusion of the public meeting the Subdivision and Land Use Committee shall tender its findings and recommendations to the County Board. The committee may recommend approval, approval with request for additional information or clarification, approval with conditions, or denial of the application. g) Re-filing - Any Applicant, owner or operator whose WECS project application is denied may not re-file a substantially similar application for one (1) year. If the County Engineer and Code Official determines an application is substantially similar to one the Applicant filed within one year it will not be forwarded to the Subdivision and Land Use Committee for review. Special Use Application a) Form of Applications: 1) All applications shall be on paper with the pages consecutively numbered and all exhibits shall be fullsized, clearly marked, and identified. 2) The application including exhibits or graphic presentations shall also be furnished in an electronic format suitable for reproduction for public dissemination and for posting on the Jersey County Website. b) The Special Use Application shall contain or be accompanied by the following information: 1) An executed Host Agreement must be appended to, and included as a part of, any WECS application filed with the County. The content of said Host Agreement will be discussed and negotiated between the Applicant and the County s appointed counsel or representatives and will address issues including, but not limited to economic issues, renewable energy credit sharing, reimbursement of County expense including consultants, experts and outside attorneys fees. 2) A WECS Project Summary, including: (1) a general description of the project, include, i. its approximate overall name plate generating capacity, ii. the potential equipment manufacturer(s), iii. type(s) of WECS(s), 12

iv. number of WECSs, and name plate generating capacity of each WECS, v. the maximum height of the WECS Tower(s) and maximum diameter of the WECS(s) rotor(s), and the general location of the project; and a description of the Applicant, Owner and Operator, including their respective business structures. 3) The names, addresses, and phone numbers of the Applicants, Owner and Operator, and all property owners, if known, and documentation demonstrating land ownership or legal control of the property. 4) A Site Plan for the installation of WECS(s) showing the planned location of each WECS Tower, substation, anchor bases, and service roads, primary structures, property lines (including identification of adjourning properties), all proposed structures, public access roads and turnout locations, electrical cabling from the WECS Tower(s) to the Substation(s), ancillary equipment, and third party transmission lines. 5) The Site Plan information shall also be supplied in an electronic format suitable for incorporation into the Jersey County Geographic Information System database (GIS). Information to be provided should include but not limited to: tower locations and heights, road easements, substation locations, and other nonproprietary information. 6) The legal description of each proposed tower and substation location. 7) All proposed setback dimensions. 8) Topographic site information for the subject property and the adjacent properties within one-fourth (1/4) mile of the property line of the subject property indicating contours in ten (10) foot intervals. 9) Existing structures on properties within one-fourth (1/4) mile of the property. 10) All existing and proposed underground and aboveground utilities and identification of all communication towers within two (2) miles of the proposed WECS. 11) All right of of way, wetlands, floodplains, drainage ditches, scenic and natural areas and wooded areas on properties under contract with the Applicant, and public conservation lands on properties within 1,500 feet of a proposed WECS. 12) Ingress and egress from the site as proposed during construction and thereafter, which indicates: i. Proposed road surface and cover. ii. Dust control. iii. Width and length of access route and location of ingress/egress. iv. Road maintenance progress or schedule for proposed use of land. 13) Certified easements, contracts, waivers, and option agreements for proposed use of the land. 14) Notice by registered mail or certified mail to residential and commercial microwave communication users within a 2.5 mile radius of the subject property informing them of the proposed WECS. 15) Utility connections details and a copy of written notification to the utility company requesting the proposed interconnection. 16) Fire protection plan for the construction and operation of the facility. 17) Revegetation plan of the areas that will be disturbed. 18) Description of the hours of operation for construction and maintenance of the facility, numbers of employees and type of traffic expected to be generated from the site. 19) Public road routes. 20) A permit application filed with the Federal Aviation Administration (FAA) and Federal Communication Commission (FCC), including necessary approvals for installations near airports. Copies of the permit to be included. 21) All required studies, reports, certifications, and approvals demonstrating compliance with the provisions of this ordinance. 22) Endangered species and wetlands - Applicant shall seek natural resource consultation with the Illinois Department of Natural Resources (IDNR). The applicant shall submit with the Special Use application the results of the IDNR EcoCAT consultation. The cost of the EcoCAT consultation shall be paid by the applicant. 13

c) The Applicant shall notify the County of any changes to the information provided in the Special Use Application Section of this ordinance. Design and installation a) Design Safety Certification and Conformance to Codes and Standards. 1) WECSs and all components shall conform to all applicable industry standards, including those of the American National Standards Institute ( ANSI ) and the International Electrical Commission. The WECS shall comply with all applicable local and county codes for electrical, mechanical and structural components of the facility. All documents provided for review shall be stamped by a professional Illinois licensed engineer. 2) Following the granting of siting approval under this Ordinance, a Professional Illinois Licensed Engineer shall certify, as part of the building permit application that the foundation and tower design of the WECS is within accepted professional standards, given local soil and climate conditions. b) Controls and Brakes - All WECS projects shall be equipped with Manual and Automatic Controls and mechanical brakes to limit rotation of blades to a speed below the designed limits of a WECS. A Professional Engineer or Authorized Factor Representative must certify that the rotor and overspeed control design and fabrication conform to good engineering practices. No changes or alterations from certified design shall be permitted unless accompanied by a Professional Engineer s or Authorized Factory Representative s statement of certification. c) Electrical Lines All electrical wires and lines connecting WECS to other WECS or substation shall be installed underground to the greatest extent possible. d) Color, Finish and Appearance - The tower and the blades of the WECS shall be uniform in style and color and shall be white or gray or another unobtrusive color. The finish of the tower and the blades shall be matte and non-reflective. The towers and blades shall be uniform in direction of blade rotation. Any on site buildings shall be designed such that they are unobtrusive to minimize the industrial character of the project. All colors, finishes and design shall conform to all applicable FAA requirements. Except for required warnings and tower identification, no lettering, company insignia, advertising or graphics shall be on any part of the tower, hub or the blades. Standard company insignia may be placed on the nacelle of the WECS. e) Warnings and Tower Identification Signs warning of the high voltage associated with the WECS shall be posted at every entrance to the WECS, at the base of all pad mounted transformers and substations. Visible, reflective, colored objects such as flags, reflectors or tape shall be placed on the anchor points of guy wires, if any, and along the guy wires up to a height of not less than eight feet (8 ) from the ground. A sign that provides emergency contact information, such as phone number, shall be posted near the tower and the operations and maintenance building and each tower shall have posted a unique number for identification purposes. f) Setback Requirements 1) All WECS Towers shall be set back at least 1.1 times the WECS Tower Heights from any Primary Structure on a parcel of real property which is participating in a WECS project by leasing, contracting, owning, selling, or allowing any portion of said real property to be used for the placement of a WECS. The distance for the participating landowner setback shall be measured from the point of the Primary Structure foundation closest to the WECS Tower to the center of the WECS Tower foundation. All WECS shall be set back from a Primary Structure on non-participating lands by at least 1,320 feet. The owner of the Primary Structure may waive this setback requirement; but in no case shall a WECS Tower be located closer to a Primary Structure than 1.10 times the WECS Tower Height or within the Fall Zone of the WECS Tower. All WECS shall be set back at least 1,500 feet from school property lines unless waived by the school district. 14

2) All WECS Towers shall be set back a distance of at least 1.1 times the WECS Tower Height from public roads, third party transmission lines, and communication towers. The County may waive this setback requirement. 3) All WECS Towers shall be set back a distance of at least 1.5 times the WECS Tower Height or the Fall Zone, whichever is greater from adjacent Property Lines. The affected adjacent property owner may waive this setback requirement. 4) All WECS Towers shall be set back a distance of at least 1.1 times WECS Tower Height from the Property Line of any Public Conservation Lands, and a distance of at least 1500 feet from any river bluff located on public or private property. 5) The Applicant will need to obtain a variance from the County upon waiver by either the County or property owner of any of the above setback requirements. Any waiver of any of the above setback requirements shall run with the land and be recorded as part of the chain of title in the deed of the subject property. g) Compliance with Additional Regulations Nothing in this Ordinance is intended to preempt other applicable state and federal laws and regulations. h) Use of Public Roads 1) An Applicant, Owner, or Operator proposing to use any County, municipality, township or village road(s), for the purpose of transporting WECS or Substation parts and/or equipment for construction, operation, or maintenance of the WECS(s) or Substation(s), shall: i. Identify all such public roads; and ii. Obtain applicable weight and size permits from relevant government agencies prior to construction. iii. Adhere to any temporary postings due to weather conditions 2) To the extent an Applicant, Owner, or Operator must obtain a weight or size permit from the County, municipality, township or village to use a public road, the Applicant, Owner, or Operator shall: i. Enter into a road use and repair agreement with the County and respective municipalities, township or village. ii. Conduct a pre-construction baseline survey to determine existing road conditions for assessing potential future damage; Provide a road repair plan to ameliorate any and all damage, installation or replacement of roads, streets, bridges, intersections, culverts, storm sewers, or public rights of way iv. The Applicant shall provide a letter of credit or surety bond in an amount and type approved by the County Engineer and Township Road District Commissioner to assure compliance with the road repair plan and road agreement. d) Drainage Systems The Applicant shall be responsible for repairing, in a timely fashion, any damage caused to public drainage systems by the construction, operation or maintenance of WECS. Financial assurances in the form of cash or an escrow account, surety bond, or a letter of in a form and amount acceptable to the County Engineer shall be posted to assure compliance with this section. i) Height The maximum WECS Tower Height shall not exceed 550 feet. j) Power Lines All electrical control wiring and power lines less than 69kv shall be wireless or not aboveground to the extent possible except where wind farm collector wiring is brought together for connection to the transmission or distribution network, adjacent to that network. k) Access Roads The Applicant shall minimize the number and width of access roads, minimize cut and fill on sloping terrain and use natural terrain where feasible for these access points. 15