Subject : Design and Land Compensation of Expressway E 35

Similar documents
PAK: National Trade Corridor Highway Investment Program (NTCHIP)

Land Acquisition and Resettlement. PAK: National Trade Corridor Highway Investment Program (NTCHIP) Tranche-II

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

PAK: National Trade Corridor Highway Investment Program Tranche 2 (Package-I: Burhan Interchange Dingi)

Land Acquisition and Resettlement Plan. PAK: National Highway Development Sector Investment Program, Tranche 3

I U B Reddy The World Bank New Delhi, India

ERRA S RURAL LANDLESS PROGRAMME (PHASE - II FOR VIRTUALLY LANDLESS PEOPLE)

NO.632/ (29)2004

Land Acquisition Rehabilitation and Resettlement Act, 2013

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

Global Witness submission on Myanmar s draft national land policy

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

DRAFT EXECUTIVE SUMMARY

Impact of amendment to Act No 330/1991 Coll. on exercising ownership rights

Urban Land Policy and Housing for Poor and Women in Amhara Region: The Case of Bahir Dar City. Eskedar Birhan Endashaw

Vietnam Land Administration - the Past, Recent and for the Future

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

LAND ISSUES AND GEO-INFORMATION: RESPONDING POST DISASTER EARTHQUAKES IN NEPAL

General terms for supply of goods (without erection) to the public sector ALOS 05

LAW ON EXPROPRIATION (Official Gazette of the Republic of Montenegro, No 55/00, 12/02, 28/06)

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

IAS Revenue. By:

White Paper of Manuel Jahn, Head of Real Estate Consulting GfK GeoMarketing. Hamburg, March page 1 of 6

VOLUNTARY LAND DONATION FRAMEWORK

Quality management system. of supplies and services

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

Resettlement Planning Document

Mini-Thesis Siam University (International Master of Business Administration), Bangkok, Thailand 2015 CHAPTER IV

LIMITED-SCOPE PERFORMANCE AUDIT REPORT

Your property and compulsory purchase

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

MEMORANDUM THE RIGHTS OF LAND OWNERS IN RELATION TO THOSE OF HOLDERS OF RIGHTS IN TERMS OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT

Acquisition of Italian On-going Business within the frame of Group to Group. Cross-Border Acquisition Projects, the. - Selected Issues -*

Cork Planning Authorities Joint Housing Strategy. Managers Joint Report on the submissions received and issues raised.

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

Tax Strategies for Purchasing Going Concern Properties

The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013

GENERAL SALES CONTRACT no.

KPLC/ADM/CR/196/15-16 Date:

LAND CONVERSION DURING THE

Revised translation by legal affairs Department CIB/CDC

Land Consolidation Thesaurus finding common ground. 9 th International LANDNET workshop 3-5 October 2017 Budapest, Hungary

Digitalization Crucial for Team Based Work and Production Distribution at the National Land Survey of Sweden

Social Safeguards Due Diligence Report

TOWN OF PICTOU REVENUE COLLECTIONS POLICY. 2.0 General Statement of Principle Guiding Principles... 2

Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions

Regulation Reform on Land Procurement for the Development of Public Interest

Islamabad, a town planning example for a sustainable city

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority and Home Ownership Committee. Motion Debate on the Tenants Purchase Scheme

Decree on State Land Lease or Concession

NATIONAL LAND POLICY ON AGRICULTURE DEVELOPMENT

RIGHT TO FAIR COMPENSATION AND TRANSPARENCY IN LAND ACQUISITION, REHABILITATION AND RESETTLEMENT ACT, 2013 ABSTRACT

CHAMBER OF REAL ESTATE & BUILDERS' ASSOCIATIONS INC. Pomjof!Mjcsbsz! A Proposed LGU Program for Affordable Housing.

Important Comments I. Request concerning the proposed new standard in general 1.1 The lessee accounting proposed in the discussion paper is extremely

Replies to Queries of the Bidders

National Land Use Policy

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

DRAFT PROPERTY TRANSFER OR CLOSURE STATUTES

De Jure. September 3, Rajani Associates simple solutions

Examination into Cheshire East Local Plan

Frequently Asked Questions on Sustainable & Long-Term Leases in Minnesota

TIMOR-LESTE EXPROPRIATIONS LEGAL FRAMEWORK APPROVED

FREQUENTLY ASKED QUESTIONS ON LAND REGISTRATION

In December 2000, the Ministry of Civil Aviation advised the Maharashtra government to carry out detailed studies on the Navi Mumbai location.

Route des Morillons Grand-Saconnex Geneva Switzerland

BIOMASS-BASED DISTRICT HEATING PROJECT

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

RE: Notice 246 of 2017, Gazette No: PROPERTY PRACTITIONERS BILL, 2016: INPUT FROM REAL BUSINESS ESTATE OWNERS OF SOUTH AFRICA

The Characteristics of Land Readjustment Systems in Japan, Thailand, and Mongolia and an Evaluation of the Applicability to Developing Countries

By: Barney I. S. Laseko Programme Coordinator Prime Minister s Office TANZANIA

Land and the New Urban Agenda EGM June 2016

TABB LAKES HOMES ASSOCIATION

Brief Overview Diamir Bhasha Dam and Mohmand Dam

Leases (Topic 842) Proposed Accounting Standards Update. Narrow-Scope Improvements for Lessors

May Ms. Leslie Seidman Chairman Financial Accounting Standards Board 301 Merritt 7 P.O. Box 5116 Norwalk, CT

Legal Q & A. Unpaid Water & Sewer Bills: What Can and Cannot Be Done? By Roger Huebner, General Counsel, IML and Jerry Zarley, Paralegal, IML

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47

Assessment of mass valuation methodology for compensation in the land reform process in Albania

MFF 0005 PAK: Renewable Energy Development Sector Investment Program Tranche 3

we apply for the necessary searches you make your mortgage application (if applicable)

Financing a farm can be a challenge. It is one thing to dream of farming, quite another to make it a reality. It is important to be realistic in

UPGRADING OF THE PROPERTY RIGHTS RECORDING SYSTEM OF AFGHANISTAN

Economics of Leasing. Introduction

QUEENSTOWN-LAKES DISTRICT HOUSING ACCORD

IFA submission to the Law Reform Commission of Ireland s review of the current law on compulsory acquisition of land.

Consumer Protection Act

WISCONSIN RELOCATION RIGHTS BUSINESS, FARM WISCONSIN AND NONPROFIT ORGANIZATIONS

MERGERS ACQUISITIONS! C onsider this: you have worked for years to build a BNA, LAW REPORT. Earn-Outs: Bridge the Gap, With Caution INC.

Current Law Legislation for Land Consolidation in Turkey

Bylaw No. (85) of Regulating the Real Estate Brokers. Register in the Emirate of Dubai1

Suite Metering Provisions Under the Residential Tenancies Act, 2006 and the Energy Consumer Protection Act, Consultation Paper

LAND ADMINISTRATION IN CENTRAL EUROPE AFTER TEN YEARS OF MARKET ECONOMY. Jerzy Gaździcki*

CITY AND COUNTY OF HONOLULU DEPARTMENT OF BUDGET & FISCAL SERVICES ADMINISTRATIVE GUIDELINES FOR COMMUNITY FACILITIES DISTRICTS

The relationship between the civil juristic document and the contract

PALAIS DES NATIONS 1211 GENEVA 10, SWITZERLAND

Transcription:

1 To : The Special Project Facilitator, ADB 6 ADB Avenue, Mandaluyong City 1550, Metro Manila Philippines Coy to : Mr Werner E. Liepach Country Director Pakistan, ADB Level 8, North Wing, Serena Business Complex Khyaban-e-Suhrawardy, G-5 Islamabad, GPO Box 1863 Pakistan Subject : Design and Land Compensation of Expressway E 35 Dear Special Project Facilitator ADB, I take this opportunity to draw your attention to a project which you have very graciously sanctioned for the development of communication infrastructure in Pakistan. E 35, commonly known as Expressway in Pakistan,being constructed to improve bilateral trade with China, provide China additionally an easy access to our ports like Karachi and Gwador in times to come and link north of the country with the Federal Capital / South. The length of this road reportedly is about 110 kms but its aim, planning parameters and design is a jealously guarded secret for reasons best known to NHA, revenue staff involved in the acquisition of land and elite of our nation, the local politicians. Being victims of this gruesome conspiracy, we were able to dig out certain facts which we earnestly want to bring to your kind notice. If ignored, these would compromise the basic spirit of assistance provided by ADB in the light of Involuntary Resettlement Safeguards, increase the existing distance between Mansehra to Rawalpindi by over 30 kms due to fault design / alignment, enhance the cost of the project manifold by acquiring rich agricultural land and lead to huge displacement of people with little relief. Loss of rich agricultural land would be an ecological disaster for the area in particular and Pakistan in general. I would deliberate over each of these

2 points in some length to apprise you of the gravity of situation, nature of urgency and the likely fallout. Objectives, scope and policy principles for the Involuntary Resettlement Safeguards (copy attached) have been very carefully drafted by your esteemed Bank, preventing realization of any project which is detrimental ecologically, economically and aimed at exploitation of the helpless farmers in the name of development. The Safeguards clearly state that before commencement of the project its design would be made known to the people; owners and farmers would be involved in fixing compensation, provided alternate land and rehabilitated through equally beneficial enterprises. You would be horrified to know that not one of the 12 policy principles have been even vaguely considered for realization of E35. Despite repeated appeals highlighting misdeeds in the survey of the road and its demarcation no heed was paid by either the NHA or the local revenue staff. A letter addressed to Commissioner Hazara Division, NHA and the ADB dated 26 August 2010 and another letter dated 13 June 2011 sent to NHA through Federal Minister for Communication are attached for your perusal. Roads serve as arteries, linking the people through cheapest, shortest and fastest links. A cursory look at the proposed design raises queries which are hard to justify. Some observations on the proposed design/ alignment of E 35 and land compensation aspects are as under:- Alignment / Design. The bulk of light and heavy traffic from China, Gilgit Baltistan and Hazara Division of Khyber Pakhtunkhwa Province is south bound passing through Islamabad / Rawalpindi. E 35 should therefore emanate from Motorway M1 between interchanges of Bahatar and Fatehjang and connect Taxila with Haripur remaining on the eastern side of Railway Line and Road Taxila Hattar Haripur instead of Burhan Interchange. This would accrue following advantages:- This option would afford more than 30 Kms shorter distance to the communities served by E 35 on regional and local basis. Acquisition of land in this option would cost much less as this part of land is far cheaper, especially between Taxila and Haripur compared to rich fertile / commercial land between Hassanabdal and Haripur. This option would also suit the heavy traffic of Industrial complexes between Haripur and Taxila / Wah and reduce its load on GT Road. Over 30 Kms shorter distance would not only save travelling expense / time of communities served by E 35, but would also save on fuel expense for all times to come. This factor alone makes the current design highly uneconomical in the long run.

3 The current alignment involves a number of un-necessary interchanges due to meandering alignment of E 35, criss crossing GT Road time and again. Less number of interchanges in our proposed option would considerably reduce the cost of road development. As per existing proposal, the alignment of E 35 between Haripur and Mansehra has also been made longer via Dhamtor instead of Tabathar beyond Havelian without any justifiable reasons. Land Acquisition Flaws. Land compensation aspect for the affectees also suffers from serious legal and procedural flaws as mentioned below:- The project as a whole has not yet been conceived / planned in totality because of unresolved design and land issues. Phase wise, piecemeal payment of land compensation as planned would make the design inflexible in case of any later change and would make the recoveries from land affectees almost impossible. The land Revenue Act of Pakistan safeguards the interests of land owners in line with ADB Involuntary Resettlement Safeguards, whereby due cognizance is given to the yearly average of land sales, present market value and future potential of land. On the contrary, Revenue Department is basing compensation cost on the yearly average alone disregarding other aspects to make the project look less expensive and more palatable to NHA and ADB. Here it may be noted that the yearly average rate is generally far less than the market value because mostly land owners have not sold their ancestral land for decades. Besides, sale deeds are normally under quoted by both seller and buyer to save on taxes. Agricultural land is required to be categorized twice a year by the Revenue Department as per policy to determine the yield and tax to be levied. Revenue Department of Haripur District has not carried out this review since long; as a result the category of land today is far higher than what is registered with them. The compensation of land assessed as per their record therefore is outdated and much lower than the actual category and value of land. It may also be noted that most fertile and irrigated land serving as food basket for Haripur District is being acquired which is not only discouraged by the Land Acquisition Act but also makes the project far costlier besides causing huge resettlement issues. No plan has been made for rehabilitation of land affectees, a serious violation of the ADB Involuntary Resettlement Safeguards.

4 Acquisition of fertile irrigated land for a fenced E 35 would divide the land of small land owners on both sides thus making it inaccessible for approach and irrigation by the farmers. This would also divide the community leading to social and economical problems. The area left inside the loop of interchanges and in their immediate proximity cannot be used for any meaningful purpose by the land owners. This aspect has been ignored by the land acquisition department. Gross violation of human rights as a consequence of aforementioned observations would lead to serious law and order situation, inordinately delaying the project and undermining the image of ADB. Recommendations. Following sequence of action is suggested :- ADB must immediately stop the acquisition process including disbursement of compensation to the land affectees. This would obviate subsequent complications owing to any change in the alignment and design. E35 be re-aligned as per aspirations of the people of Hazara Division and seeing the volume of public and cargo traffic from Gilgit Baltistan and Hazara Division via Haripur towards Taxila and areas down south vis- a- vis Burhan. A statistical survey on this account by an independent body will prove our view point. E 35 should therefore be re-aligned along route - Dhok Jhandu (between Bhatar and Fatehjang interchanges on M1) Taxila Museum Hattar Chachian Sarai Saleh Havelian Tabathar Abbottabd Public School instead of present alignment emanating from Burhan on M 1. This will make the route shorter by more than 30 Kms. Map showing proposed and existing alignment is enclosed. Cost benefit analysis of a lengthy road via Burhan instead of Taxila in the long run be carried out by an independent body. Number of interchanges due to meandering alignment of E 35 criss crossing GT Road time and again be minimized by making it almost straight. Interchanges as in case of Jari Kas and Hattar should not be planned in rich irrigated agricultural land or commercial areas to safeguard rights of the land affectees in line with Land Revenue Act and ADB policy guidelines.

5 Land compensation to the land affectees be made with mutual consultation on existing market rates also considering the future potential of land to prevent lengthy litigation, subsequent additional cost and delay of the project. ADB must protect the rights of land affectees by implementing instructions on Involuntary Resettlement Safeguards. To resolve the disputes and arrive at a consensus on design of E35 and land compensation, a high power commission comprising representatives of ADB, NHA, Revenue Department, land affectees and communities be constituted. Having knocked at all doors and failed, ADB is being approached as a last hope for redressing our grievances. I have taken this initiative on behalf of a large community, kept hostage by a callous and greedy political elite, Revenue Department and NHA. With regards, Sincerely yours, Brigadier Retired Sardar Sohrab Alam, Postal Address : H.No 3, Street 37, F-6/1, Islamabad, Pakistan Email: sardarsohrabalam@yahoo.com, Cell : 0092-3365592113 Dated : 5 October 2011. Names of other APs were deleted per complainants request.