Irene x 80 PUBLIC MEETING Date:25 June 2009 Project No :

Similar documents
INVITATION TO PUBLIC MEETING GAUTENG REF NOs: GAUT 002/08-09/N0918 & GAUT 002/08-09/N0865

Cape Environmental Assessment Practitioners (Pty) Ltd

Public Participation Report

BACKGROUND INFORMATION DOCUMENT (BID)

& Rezoning. Estate Agency Affairs Board Continuing Professional Development. What is. Subdivision, Consolidation

CASTLES OF CALEDON URBAN DESIGN REPORT

MEMORANDUM THE RIGHTS OF LAND OWNERS IN RELATION TO THOSE OF HOLDERS OF RIGHTS IN TERMS OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT

Update on the Avenues and Mid-Rise Buildings Action Plan

A Guide to the Municipal Planning Process in Saskatchewan

STAFF REPORT PLN September 11, 2017

Hutt River City Centre Upgrade Project Preliminary Integrated Design

CENTENNIAL NEIGHBOURHOODS SECONDARY PLAN STUDY. City of Hamilton

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

MOTIVATIONAL MEMORANDUM: REZONING

Regional Open Space Study

Community Development Committee

RESIDENTS MEETING: PROPOSED BEACHWOOD RESIDENTIAL AND HOTEL DEVELOPMENT MEETING HELD AT THE BEACHWOOD GOLF CLUB (VIRGINIA) ON 20 June 2018 AT 17H00

Refer to our Deed of Option Offer from Winten Lyon Pty Ltd

PUBLIC RIGHTS OF WAY. Guidance for Planners and Developers

CITY OF WEST PARK PROPOSED TRANSIT ORIENTED CORRIDOR (TOC) EXPANSION WORKSHOP JUNE 15, 2016 FREQUENTLY ASKED QUESTIONS (FAQ)

York Neighbourhood Area Structure Plan

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

REZONING, SUBDIVISION, REMOVAL OF RESTRICTIONS & DEPARTURE APPLICATIONS: ERF 1692, RESERVOIR STREET EAST, FRANSCHHOEK

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

March 9, Planning Commission. Benjamin J. Ziskal, AICP, CEcD Planning Office

If projects are received at the counter to be submitted without prior draft review, the project will be deferred to the next meeting.

Link Housing s Tenant Engagement and Community Development Strategy FormingLinks

South African Council for Town and Regional Planners

City of Medford HISTORICAL COMMISSION. City Hall Room George P. Hassett Drive Medford, Massachusetts 02155

REQUIREMENTS FOR AN APPLICATION FOR DIVISION

Newlands Planning Application - Public Consultation Frequently Asked Questions

Zoning By-law and Zoning By-law Amendments to Permit Short-term Rentals

ENVIRONMENT CANTERBURY S WEB-BASED CONTAMINATED LAND INFORMATION TRANSFER SYSTEM

SINGLE FAMILY LOT SIZE POLICY MANUAL

TINIE BEZUIDENHOUT AND ASSOCIATES Town Planning Consultants March

STATEMENT OF PROPOSAL FOR CONSULTATION. Options to Fund the Grant for the Maniototo Community Healthcare Facility Project

Fig. 4.1 Showing Initial Concept Drawing of Inversion of Site BLOCK AND CONCEPT DEVELOPMENT04

SOLE MANDATE. We, the undersigned, Name: Registration Number: VAT number:

INFORMATION DOCUMENT NO 1 STELLENBOSCH MUNICIPALITY ZONING SCHEME BY-LAW

CASEY PLANNING SCHEME AMENDMENT C219

ADMINISTRATION RECOMMENDATION(S) 2017 May 04. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

CONDITIONAL USE PERMIT Application Packet

NELSON MANDELA METROPOLITAN MUNICIPALITY

Kensington Legion redevelopment: a case of NIMBY versus YIMBY

Infrastructure, Development and Enterprise Services

68 Marine Parade Drive Zoning By-law Amendment and Site Plan Control Applications Lifting of the Holding (H) Symbol

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

From: Gerard Reiter, EGM/Asset Management Date: 14 April 2015 Peter McIntyre, Managing Director

New M5 AQCCC Meeting 2

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton

IN THE MATTER OF THE Municipal Government Act being Chapter M-26 of the Revised Statutes of Alberta 2000 (Act).

MOTIVATIONAL MEMORANDUM: REMOVAL OF RESTRICTIONS AND SIMULTANEOUS REZONING. Erf 44 MELROSE ESTATE

Belmead Neighbourhood Structure Plan

Short Street l Hawthorn Village. Short Street Hawthorn Village, On-Site

City of Grande Prairie Development Services Department

1.1 INTRODUCTION TO TOWNSHIP DEVELOPMENT AND ESTABLISHMENT

Highland Green Estates Neighbourhood Area Structure Plan

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-20 Habitat for Humanity Evans Road Town Council Meeting October 16, 2014

Consolidated as of May 14, 2012

WHAT DOES NoMa LACK? NoMa TODAY:

15 July Ms E Young Team Leader Protected Area Establishment Department of Environment and Natural Resources Adelaide

REZONING SEDGEFIELD ERF 429 CLIENT: PREPARED BY: WANDA VANDYK MARIKE VREKEN URBAN & ENVIRONMENTAL PLANNERS

NELSON MANDELA BAY M U N I C I P A L I T Y

Proposed Framework for Multi-Residential Rental Property Licence. Tenant Issues Committee Licensing and Standards Committee

CONSENT TO RESALE OF PROPERTIES ADJACENT TO THE THATCHFIELD GOLF COURSE AND GOLF DRIVING RANGE A P P L I C A T I O N

Request for Development Land in the Palm Springs Subdivision to be Granted Special Housing Area Status under the Tauranga Housing Accord

CYNGOR SIR POWYS COUNTY COUNCIL. CABINET. 6 th October Application to suspend the Right to Buy across Powys

DRAFT REPORT. Boudreau Developments Ltd. Hole s Site - The Botanica: Fiscal Impact Analysis. December 18, 2012

KROSA MINING PERMIT INFORMATION DOCUMENT

Strathcona County Municipal Policy Handbook. Last Review Date: May 21, 2013 Next Review Date: 05/2016

CITY COUNCIL OCTOBER 15, 2018 LEGISLATIVE

Re: Justification to support the creation of two survey-strata lots at Lot 156 (#44) High Street, Sorrento.

CITY OF TSHWANE COMPILED BY:

HARLEM AVENUE REDEVELOPMENT PROJECT

DOWNTOWN BEAUMONT CENTRE-VILLE: PARKING MANAGEMENT REPORT

Prt. NE W5. Prepared for: Municipal District of Foothills #31. Prepared by:

MEMORANDUM. SUBJECT: Status Report DATE: April 21, 2016

Frequently Asked Questions

LAND USE PROCEDURES (LUP) BYLAW NO. 1235, 2007

POLICY AMENDMENT AND LAND USE AMENDMENT RICHMOND (WARD 8) RICHMOND ROAD SW AND 24 STREET SW BYLAWS 10P2018 AND 52D2018

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

Land at Sheldon Heath Road and Platt Brook Way, Sheldon, Birmingham, B26 2DS

Wigan Core Strategy Examination Additional Hearing Sessions

MIDWAY CITY Municipal Code

City of Terrace. Request for Proposals Update of Downtown Plan & Downtown Design Guidelines. Issue Date: November 3, 2017

Absent: Major Chris Hanson, Volk Field John Ross, Jackson County Emergency Management; Paul Wydeven, Wisconsin Department of Transportation

RESPONSE TO MOTION PASSED BY COUNCIL ON 18 OCTOBER 2017 (VILLAGE GREENS)

WELCOME! TO THE UNIVERSITY ENDOWMENT LANDS BLOCK F PUBLIC OPEN HOUSE

Town of Cary, North Carolina Rezoning Staff Report 12-REZ-27 Morris Branch Town Council Public Hearing January 24, 2013

Urban Design Brief. Italian Seniors Project 1090, 1092, 1096 Hamilton Road City of London

PENINSULA TOWNSHIP PLANNING COMMISSION MINUTES Center Road Traverse City, MI (Township Hall) February 27, :30 pm - amended time

Planning Justification Report

SUBURBAN AND URBAN RESIDENTIAL LAND USE

RED HEAD VILLAGES ASSOCIATION (Inc) North Bendalong, Bendalong, Berringer, Cunjurong, Manyana

TOWN OF PARRY SOUND NOTICE POLICY

NOTICE OF COMPLETE APPLICATION AND PUBLIC MEETING ZONING BY-LAW AMENDMENT APPLICATION PUBLIC MEETING

Flinders Avenue, Lara Planning Scheme Amendment Combined Application for Rezoning and Multi-Lot Subdivision Reference : Decembe

Build Over Easement Guidelines

IFA submission to the Law Reform Commission of Ireland s review of the current law on compulsory acquisition of land.

South Stoke Housing Development Open Day Introduction 1

Transcription:

Africa (Pty) Ltd Reg. No. 2002/007104/07 PRETORIA PO Box 13776, Hatfield, 0028 South Africa Ditsela Place, 1204 Park Street cnr Duncan and Park Street, Hatfield, 0083 Tel + (27) (0)12 366 0100 Fax + (27) (0)12 366 0111 www.golder.com Irene x 80 PUBLIC MEETING Date:25 June 2009 Project No : 1226612266 1. Present Name & Surname Representing Postal Address Tel / Cell Fax E-mail Eddie Bielfeld Robert Hartman Loubser de Kock Wim Terblanche Peter Cownie Jan Snyman Sonja Semmelink Jon Busser Deshi Bhaktawar Carlo Machine Rob Jonker CH College CHHOAss. Urban Dynamics resident resident Box 621, Irene, 0062 Box 717 Box 185 Box 210 Box 365 Box 1 CWH 0178 Box 12480 Hatfield 0028 Box 291803 Melville Box 45 Noordwyk 1687 Box 350 Box 308 Irene 012 667 1360 083 305 5473 012 667 1367 ebielfeld@cornwall. co.za 083 414 4197 Robert@multi.cat.co.za 082 823 4574 082 786 7970 083 676 3796 082 655 9102 083 417 7818 082 653 4155 082 956 0496 082 521 1115 012 672 63115 012 667 3091 011 849 8886 011 522 5508 012 343 5128 011 482 9959 012 667 4575 086 589 4868 Loubser.dekock@za.sabb group.com Win.terblanch@eon.co.za peter@hat.co.za Jan.snyman@sasol.co.za lci@global.co.za jon@urbandynamics.co.za bakwatar@mweb.co.za carlomach@absamail.co.z a 082 804 7032 enerkim@telkomsa.net Olivia Fox M&T 082 445 4911 livyfox@gmail.com Wim Lotz M&T wim@mtdevelopment.co.z a Cobus M&T cobus@mtdevelopment.co.za Gwen Theron GAA Box 13776 Hatfield 0028 083 302 2116 012 366 0111 gtheron@golder.co.za 2. Apologies None

BA - 2-12266 3. Opening, welcome and introduction Prof. Theron introduced herself and welcomed those present at the meeting. The meeting was noted as part of a formal environmental process and therefore a formal opportunity for I&AP s to give inputs into the Environmental Impact Assessment () process. The agenda for the meeting was read and accepted by those present at the meeting. GT introduced the other members of the professional team: - Olivia Fox M&T - Wim Lotz M&T - Cobus M&T - Jon Busser Urban Dynamics - townplanner 4. Purpose of the key stakeholder meeting The meeting sought to achieve the following: Provide an opportunity for I&APs to obtain clear and accurate information regarding the proposed activity; Provide I&APs with an opportunity to indicate their viewpoints, issues and concerns regarding the planned activity; Inform I&APs about their role and responsibility in the process; and Discuss the way forward. 5. Background Information The meeting took the format of an informal discussion with questions from the attendees. The description and location of the area where the proposed development is intended was discussed: Irene x80 the remaining extend of Portion 330 Doornkloof 391JR application. This portion forms part of a larger development on portion 330 Doornkloof, which is being addressed under another application. Site is approximately 16.32 ha and falls within Tshwane Metropolitan Municipality The site was bought by M&T from Centurus and the Basic Assessment process as registered under the previous submission will be continued. Ref No GAUT 002/08-09/N0112 The development proposal are being amended from a sport and recreation oriented facility to an office development. 6. Discussion Wim Lotz from M&T developments presented to the proposal is that are currently on the table as being at the following: direct entrance from Nelmapius Road as indicated on the plan office development on all the portions of land a small canteen located central to the development a 0.5 FAR which translates into a 50%footprint located closest to be existing residential areas

BA - 3-12266 a maximum of two stories along the boundary located closest to the existing residential areas the "park component" of the development will exclusively provide for the office park and the communal facilities. the erven adjacent to Nellmapius may include a slightly wider commercial spectrum of rights such as showrooms etc. Mr. de Kock from the residents association and then presented the meeting with a list of issues to be addressed during the meeting. It was agreed that the responses will be given as the questions are listed, and an open discussion will follow as part of the proceedings. Comments from CWH residents a. Constitution of this meeting Where does this meeting fit into the Process? Was the roadside and newspaper advertisements being done to make anybody other than CHHA aware of this development? Is this the only public meeting regarding the current definition to be held. What is the project schedule and estimated time before the first soil is turned and construction will commence When can we expect the Draft Scoping Report for comment. b. Specific Zone definition What is the land use zoning application that are currently being sought in terms of town council definitions, commercial, light industrial, etc? Response The meeting forms part of the public participation process that is required by the NEMA legislation. This is a key stakeholder meeting, and other discussions or meetings may be held with the concerned parties, if it is found to be necessary. The process will again be advertised as required by NEMA. Notices will be placed in the newspaper as well as along the roadside. However, the previous process is still in place and the interested and affected parties that took part in that process are automatically added onto the list for this revived process. Not necessarily, as required additional meetings will be held with key stakeholders. The environmental and town planning processes will be completed in an approximately 6-9 nths. Construction may commenced in 12 to 18 nths. Hopefully by mid 2010. There will not be a draft scoping report. This is a basic assessment process since the land is smaller than 20 hectares. The draft basic assessment document will be made available in the first or second week of July 2009. The original map that was sent out with the invitation to participate in the meeting indicated that the land uses included light industry, office, hotel, restaurant, and commercial facilities. However, that land use was changed and the revised land use will be for a high-end office development, with limited restaurant facilities. Application is made for the following activities: direct entrance from Nellmapius Road as indicated on the plan office development on all the portents of land a small canteen located central to the development a 0.5 FAR which translates into a 50% footprint located closest to be existing residential areas a maximum of two stories along the boundary

BA - 4-12266 Are you aware that there was a landfill area next to stand 368. What is the alternatives that will also be evaluated under the process if the zone application is unsuccessful How can the Estate entrench itself in this zoning application to protect us against future changes in zoning. c. Traffic Impact on Nellmapius Drive to Irene The current traffic on Nellmapius Drive is already a huge problem during peak hours. Takes 30-40min in the rning from Estate Entrance to the Irene 4 way stop depending on whether there is pointsman on duty or not. Olivenhoutbosch Road is currently proclaimed as the saveall for the developments in this area but the realisation of it is pretty sketchy and only promises are made. Will the traffic impact study only address the impact of this development or the collective impact of all M&T activities in this area to guarantee that Olievenhoutbosch Road will suffice Traffic Impact Study to address increased traffic during located closest to the existing residential areas all the infrastructure and services associated with the land uses The final application for the specific zoning will be presents as part of the Development facilitation Act () application. A thorough geotechnical investigation has been completed for the entire site. The area is indicated, by the spatial development frameworks for the area, as a development node surrounding the R21 intersection and the alternatives will be selected according to the appropriate land uses for such a node. The alternatives will include some of the original land use activities planned such as light industrial and commercial. It will be indicated that these land uses are not economically viable at this time and therefore will not be considered. There are two processes that allows the estate land owners to take part. One being the environmental process The second be the process Both of these processes allows participation and interaction between the applicant, consultants, and the residents. Both processes are advertised and the stakeholder list that is being put together in both processes are used by the consulting teams to interact with the stakeholders. Both processes are open and transparent and allow for interaction at various stages of the process. The traffic in the area is noted as a concern. There are plans for a full upgrade of the major access routes in the area with Olievenhoutbosch Road being extended to link Nellmapius Road into Alexander Road. The regional road network will be implemented as development occur in the area. Historically the local authority was responsible for the upgrades of the infrastructure, however, developers in the area are now implementing the majority of these required upgrades. Agreements are made with the local authority to implement the upgrades rather than to pay the services contributions. It is anticipated that the road upgrades for the area will occur in a similar manner. The TIA will address the impact of the proposed development on the road network, considering existing development and latent land use rights. While doing so, the existing road network is considered and while considering upgrades, if any, to accomdate new development, the authorities planned network is taken into consideration. The traffic impact study will address the impact of the development on the existing road network and will

BA - 5-12266 construction and the operational phase of the development. The available infrastructure for these aspects needs to be judiciously allocated. d. Visual Impact Properties looking down on the development is concerned about the aesthetics of the proposed development The roofing standard of the Route21 Park is not acceptable and would be a gleaming eye sore to the northern slope properties. Reflection from the afternoon on seas of glittering IBR is not acceptable. The Hotel along the lines of the Irene Country Lodge would be favourably considered. Backyard management by the potential new businesses is a concern, one has to just drive around the back of Irene Village Mall to appreciate the full effect of what it could become. e. Noise Impact Noise levels during the construction phase need to be assessed. Restaurants and nightclubs tend to create a problem in residential areas. Currently the noise from Irene Village Mall carries rather well at night to residents in that side on the Estate. Estate would like to insist that no Restaurants, clubs etc be allowed to close to the Estate Perimeter. Air-conditioning plants from the new development buildings at night will be a hindrance to Estate residents. Noise needs to be limited to office hours please. f. Security Impact The maintenance of Estate security during and after the construction phase needs to be secured. propose the required upgrades. The study will take into account public transportation such as taxis, as well as pedestrian vement in the area. Construction traffic will not be addressed as part of the TIA, but will be addressed in the EMP. It is proposed that the buildings immediately adjacent to the residential boundaries will be limited to two storey development with a green buffer introduced between the office development and the residences. Furtherre they will be very strict architectural control guidelines, to direct any development on the site. These guidelines will be presented as part of the submission, and will thus be available for scrutiny by the stakeholders. The comment is noted, and an attempt will be made to steer clear of similar architectural features. The intention is to create a high end office development with aesthetically pleasing architecture fitting into the architectural style of Irene. A hotel is no longer proposed for the property The buildings that are envisioned will not require backyard activities, and the entrances to the office buildings will st likely be located to face the residential units. A parking buffer strip will to include a green buffer will be implemented between the offices and the boundary. The environment management plan will address the times during which the construction activity may take place on the site. These times are usually limited to normal office hours. The environmental control officer will be required to nitor and report on the activities to GDACE. The current proposal excludes restaurants and nightclubs. Only a small canteen-type restaurant, to serve as the specific needs of be offices, is envisioned. This facility will be located away from the residential boundaries and will be located central to the development. The comment is noted and special care will be taken in the architectural designs to prevent the air-conditioning units from facing towards the residences. Activities will be limited to office hours. The office complex as a unit will have 24 hour security which will include a permanently manned security station, as well as fences with electrification. Surveillance cameras may also be implemented. It is thus envisioned that security will be increased on the residential boundary. The Estate s Security Rights and Currently the estate patrols the security boundary on the

BA - 6-12266 Guarantees needs to be entrenched in the title deeds of all future perimeter properties adjacent to the Estate. Parking areas next to the estate perimeter would go a long way to ensure no direct infringement on boundary properties. g. Environmental Management Red Data animals, birds and plants needs to be identified in addressed in the Scoping report. The affect of run-off water in this dolomitic sensitive area needs to be addressed Please ensure that the area is not subject to ridges. Applicability needs to be assessed. Light waste creation industries would not be preferred at all. h. Land Value Impact The Estate is concerned that the property values of its perimeter properties will be impaired and which to secure that this would not happen. The Estate provides a specific upmarket value to the area. The impact of this the development on the Estate needs to be minimalised. i. General Although upgraded the current water supply to the Estate do drop away during peak periods. The electricity supply from the substation is not sufficient and it regularly drops-out due to overloading or lightning strikes This development and the Northwest sloping side of Cornwall Hill is particularly prone to lightning strikes. Please keep it property of M&T. this may not be possible with the envisioned development, since M&T will not be willing to provide a 3m access road along the boundary. The intention would be to create a buffer between the office buildings and the residential areas by locating both a parking area as well as a green buffer immediately along the boundary. A thorough ecological investigation was completed for the site. A thorough geological investigation was completed for the site. There are no dolomitic conditions on the site. The GDACE policies was assess and will be presented as part of the basic assessment report. There will be no light industrial use on the site. The comment is noted, however, the area is indicated on the SDF as a development node, and the applicant is proposing a high-end office development on the property. The land value should thus not be affected. The same comment as above. It is the responsibility of the local municipality to provide adequate services for developments that are approved with in their jurisdiction. To provide upgraded services the municipality requires contributions from developers. The applicant will be contributing its fair share to the required upgrades of the services. The services report completed for the application will be included in the draft basic assessment for review. The same comment as above. However, the applicant M&T has secured sufficient electricity for the development to be serviced adequately. The comment is noted. in mind. j. Other comments that was not included in the written submission. The building aesthetics It was agreed that a aesthetic committee would be appointed to oversee the architectural designs for the property, since the applicant would not necessarily build all the buildings in the development. It would this be necessary to control the architectural styles for the various properties.

BA - 7-12266 Please explain in a flow chart how the and the fits together. The Cornwall residents requested to be represented on the aesthetic committee. See summarized steps below. Summarized steps 1-2 Register application to authority 3-4 5-6 7-8 9-10 11-12 13-14 15-16 Advertise for the process Hold public participation meeting Complete specialist studies Submit draft for review Finalise and submit to authority Hold prehearing Hold hearing Await authority decision Appeal decision Await appeal response 7. Way forward Minutes of the meeting will be distributed to registered I&AP s. Draft Basic Assessment report wil be put out for review for 30 days I&APs will be notified. Advertisements will be done. The I&APs will be notified of the process in due time by Urban Dynamics.

BA - 8-12266 SIGNATURE : GOLDER ASSOCIATES AFRICA (PTY) LTD