RESOLUTION NO

Similar documents
City of High Point Development Fee Schedule

Planning&Development Fee Standards

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

FEE SCHEDULE Construction Services and Permitting

The City of Daytona Beach Fee Schedule

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

Commissioners to enact, amend, and enforce technical construction and building codes; and,

Permitting Fee Schedule

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

THE BOARD OF COUNTY COMMISSIONERS

1. Areas within perimeter boundary of city No fee. 2. Annexation agreements $100.00

Fees--Commercial Development (includes Residential 3 units or more) Effective August 1, 2017

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

APPLICATION FOR SMALL SCALE AMENDMENT

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

APPLICATION FOR REZONING

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Meeting Date: February 26, 2018 Agenda Item No:

BUILDING PERMIT FEE SCHEDULE

ORDINANCE NO (revised by Ordinance )

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

El Paso County Development Review System Adopted Fee Schedule (2005)

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

NEW SINGLE FAMILY RESIDENTIAL

CODIFIED ORDINANCES OF GRANVILLE PART THIRTEEN - BUILDING CODE. Chap Building/Zoning Permit Fees. Chap Building Department.

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

Meeting Date: December 3, 2018 Agenda Item No:

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

APPENDIX A 2018 FEE SCHEDULE

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

RESOLUTION PERMIT FEE SCHEDULE

Worcester Township Fee Schedule

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

Chapter 6 - BUILDINGS

APPENDIX A BUILDING PERMIT AND RELATED FEES

Fee Resolution

ORDINANCE NUMBER

BY THE CITY COMMISSION ORDINANCE NO.:

Planning, Zoning and Building Fee Schedule

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Greenbrier County Building Code Administrative Policy Manual

Fees--Residential Development (1 or 2 units) Effective January 1, 2014

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

GENERAL OFFICE & MISC. REQUESTS

Fees--Residential Development (1 or 2 units) Effective August 1, 2017

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

Community Development Fees (as of March 2015)

AGENDA REPORT SUMMARY. Resolution No : 2017/18 Community Development Fee Schedule

City of Pleasant Hill. Master Fee Schedule

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

City of Georgetown. Inspection Services

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

APPLICATION FOR RIGHT-OF-WAY VACATION

Stroh Ranch Apartment Sites

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

10% of Building Permit in addition to the full Building Permit Fee

APPLICATION FOR EASEMENT VACATION

City of Wausau Building, Housing and Zoning Fee Schedule 2019

and ORDINANCE NO. ----

5755 Country Club Road * Shorewood, MN * / City of Shorewood MASTER FEE SCHEDULE

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

City of Altamonte Springs Developer s Guide

THE TOWN OF Angier N O R T H C A R O L I N A

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

City of Philadelphia

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS, THAT:

Appendix G Fee Schedule

ZONING COMPLIANCE PERMIT APPLICATION

Fee Schedule for Zoning, Building Permits, and Plan Review Services

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

Development and Other Services Fee Schedule"

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Community Development Department Fee Schedule

Town of Sylva Fee Schedule FY

ORDINANCE NO. Be it ordained by the City Council of the City of Abilene, Texas:

Schedule of City Fees & Charges

BUILDING PERMIT INSTRUCTIONS CONTRACTOR

CITY OF ALTAMONTE SPRINGS DEVELOPER S GUIDE

DISCLAIMER FOR ALL CITY OF KISSIMMEE DEVELOPMENT REVIEW APPLICATIONS

Transcription:

RESOLUTION NO. 11-2018 A RESOLUTION OF THE CITY OF TITUSVILLE, FLORIDA AMENDING RESOLUTION NO. 31-2016 BY AMENDING THE SCHEDULE OF FEES FOR COMPREHENSIVE PLAN AMENDMENTS, ZONING/REZONING, CONDITIONAL USE PERMITS, DEVELOPMENT REVIEW COMMITTEE, AND MASTER PLANS; LAND DEVELOPMENT; SITE DEVELOPMENT; BUILDING INSPECTION AND DEVELOPMENT; BOARD OF ADJUSTMENT AND APPEALS; DEVELOPMENT AGREEMENTS/ VESTED RIGHTS APPLICATION/BENEFICIAL USE DETERMINATION/ TRANSFER OF DEVELOPMENT RIGHTS/ADMINISTRATIVE WAIVER; VACATING RIGHTS-OF-WAY AND EASEMENTS/STREET RENAMING; CONCURRENCY REVIEW/ZONING CONFIRMATION LETTER; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Titusville offers a number of significant services to its residents, businesses owners and visitors for which it charges fees that should be commensurate with the cost incurred by the City to perform the services, and WHEREAS, these fees were removed from the Code of Ordinances and adopted by the Titusville City Council in Resolution 31-2016; and WHEREAS, the Titusville City Council desires to periodically review and update fees in order to accurately reflect City costs to provide services; and WHEREAS, land development fees were last reviewed and updated in 2006, and costs for the City to provide services have risen significantly during the intervening twelve (12) years. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF TITUSVILLE that Resolution No. 31-20016 is hereby amended to read as follows: The Titusville City Council establishes the following fees related to the development of land. Where not in conflict with State law, fees and costs may be adjusted, deferred or waived at the discretion of the City Manager or designee, on a case by case basis, to the extent provided for by City Council Policy to encourage the development of affordable housing; or during a declared emergency; or due to staff error. (a) Section 1. Comprehensive Plan Amendment, Zoning/Rezoning, Conditional Use Permits, Development Review Committee and Master Plan Fees. Comprehensive Plan Amendment (CPA).........$ 1,575.00 Plus $8.00 per acre, Plus legal advertisement cost (b) Comprehensive Plan Amendment (Text Amendment)...$ 735.00 Plus legal advertisement cost (c) Land Development Regulations Amendment advertisement cost $ 1,575.00 Plus legal Fee Resolution Page 1 of 9

(d) Zoning/Rezoning (when not accompanied by a CPA).$ 1,575.00 Plus $8.00 per acre, Plus legal advertisement cost (e) Conditional Use...............$ 1,575.00 Plus $8.00 per acre, Plus legal advertisement cost (f) Planned Industrial Park, Planned Unit Development, Urban Village Zoning and other Master Plan approval or amendment.$ 1,575.00 Plus $8.00 per acre and $8.00 per lot / dwelling unit, Plus legal advertisement cost (g) Development Review Committee $ 250.00 Section 2. Land Development Fees (a) If additional reviews beyond the initial three (3) are required, the applicant must submit an additional fifty (50) percent of original review fee. (b) Class I Improvement Review Fees: 1. Residential - Single-Family Lot............$ 105.00 2. Nonresidential Lot $ 265.00 3. Right of Way Reviews...... $ 210.00 4. Lot Split..$300.00 5. Non-residential Minor Division (max 5 lots)...... $ 525.00 (c) Class II Site Plan Review Fees: 1. Site Plan Pre-Application Review, plus $10.00 per acre...$ 265.00 2. Site Plan Engineering Review, plus $100.00 per acre $ 1,050.00 3. Site Plan Multifamily Engineering Review, plus $10.00 per unit...... $ 1,050.00 4. Site Plan Marina Facilities, plus $10.00 per slip $ 1,050.00 5. Late Resubmittal Reinstatement Review Fee Prior to 90 days from delinquent response date $ 525.00 After 90 days new review fees required 6. Amendments to Approved Site Plans: Minor Changes (less than 10%) $ 265.00 Major Changes (greater than 10%) 1/2 original review fee (d) Class II Subdivision Review Fees: 1. Subdivision Pre-Application Review, plus $10.00 per acre $ 265.00 2. Subdivision Sketch Plat Review, plus $15.00 per lot............$ 525.00 3. Subdivision Preliminary Plat w/engineering, Plus $30.00 per lot.......$ 2,100.00 4. Subdivision Final Plat, plus $20.00 per lot $ 1,050.00 5. Small Scale Plat (maximum 10 lots) $ 1,050.00 6. Late Resubmittal Reinstatement Review Fee Prior to 90 days from delinquent response date $ 525.00 After 90 days new review fees required. Fee Resolution Page 2 of 9

7. Amendments to Approved Site Plans: a. Minor Changes (less than 10%)......$ 265.00 b. Major Changes (greater than 10%).1/2 original review fee (e) Landscape Review Fees (Class I and Class II) 1. Landscape Review Subdivision, plus $10.00 per lot $ 525.00 2. Landscape Review Non-Subdivision, plus $50.00 per acre $ 525.00 Note: All fees calculated on acres/lots are based on total acres/lots including fraction thereof. Section 3. Site Development Permit Fees A permit fee of all improvements required by Chapter 34, Procedures, Article IV Site Plans shall be paid to defray the cost of inspection by the City. (f) Class I Site Development Permit Fees* 1. Land Alterations/Clearing, plus $50.00 per acre $ 315.00 2. Stormwater Improvements, plus $10.00 per acre $ 315.00 3. Residential Driveway Connection, each $ 105.00 4. Commercial Driveway Connection, each $ 265.00 5. Parking Lot Restriping/Resurfacing, plus $2.00 per stall.$ 105.00 6. Parking Lot New Construction, plus $5.00 per stall $ 315.00 7. ROW - Open Cuts/Directional Drill, each $ 210.00 8. Utility Construction, percent of cost ($100.00 minimum) 2.5 9. Road Repairs, plus $50.00 per L.F $ 105.00 10. Sidewalks, plus $1.00 per L.F.........$ 55.00 11. Single-Family Lot Final Inspection $ 105.00 12. Trash Enclosure, each $ 210.00 13. Utility Service Connection, each. $ 105.00 14. Tree removal, plus $20.00 per tree...$55.00 (g) Class II Site Development Permit Fees 1. Pre-Construction Conference.........$ 525.00 2. Subdivision Permits, percent of site construction cost* 2.5% 3. Non-Subdivision Permits, percent of site construction cost* 2.5% (h) Class I and Class II Site Development Miscellaneous Fees 1. Permit Extension Request*, percent of original permit fee ($50.00 minimum) 10% 2. Expired Permit Reinstatement*, percent of original permit fee ($ 105.00 minimum)...35% 3. Permit Reinspections, each reinspection $ 105.00 4. Permit Transfers*, each...$ 105.00 5. Permit Modifications*, each $ 375.00 6. Work without a permit*......... Double Permit Fee 7. After Hours Inspection Fee, per hour (2 hour minimum) $ 75.00 Fee Resolution Page 3 of 9

(i) Land Development Closeout Review Fees 1. Potable Water Clearance $ 105.00 2. Sanitary Sewer Clearance $ 105.00 3. Reclaimed Water Clearance $ 105.00 4. Stormwater Management Systems Clearance $ 105.00 5. Utility Service Request..$ 105.00 6. Final Closeout and Site CO Request $ 160.00 (j) Miscellaneous Fees 1. Public Record Recording Fee, plus Brevard County filing charges $ 55.00 2. Flood Zone Determination/Certification, each $ 75.00 3. Fire Hydrant Flow Test, each................$170.00 4. Force Main Pressure Test (existing tap), each............$150.00 5. Force Main Pressure Test (new tap), each $525.000 6. Any permit not listed.........2.5 percent of approved site development construction cost, but not less than $100 *A surcharge shall be assessed on each permit fee in the amount of 0.3 mil per dollar valuation. The fee is to be charged on all permits regardless of type, rounded to the nearest cent including fees required under this chapter and the provisions of the Land Development Regulations. The funds generated by the surcharge shall be used exclusively for the training of department personnel and the purchase of technological tools and equipment for the department. Section 4. Building Inspection and Permit Fees (a) Payment. No permit required under Chapter 6 of the City of Titusville Code of Ordinances shall be issued unless all permit fees and permit fines established by resolution of the City Council are paid in full. (b) Revision of permit or plans. Any revision to a permit or plans shall not be approved or issued unless and until any additional revision fees are paid in full. (c) Refund. No refund of any permit fees shall be issued after the expiration of 90 calendar days from the date of issuance as stated on such permit. Administrative, application submittal and plan review fees shall not be subject to refund. (d) Travel, Training and Technology Fund. A surcharge shall be assessed on each building or inspection permit fee, in the amount of 0.03 mil per dollar of construction valuation. Fee to be charged on all permits issued regardless of type, rounded to the nearest cent including fees required under the provisions of the Land Development Regulations. The funds generated by the surcharge shall be used exclusively for the training of department personnel and the purchase of technological tools and equipment for the department. (e) Plan review fee. The plan review fee shall be fifty percent (50%) of the building permit fee. The following construction activities shall be exempt from plan review fees: re-roof, A/C change-out, duct replacement, window/door replacement, electrical service change-out (not upgrade), electrical panel change out (not upgrade), patio slab/pavers, garage door replacement, driveway/sidewalk, pool demolition, water heater change-out, one (1) and two Fee Resolution Page 4 of 9

(2) family home renovation without reconfiguration, accessory structure (720 square feet or less), accessory to one (1) and two (2) family residences, pergola accessory to one (1) and two (2) family residences, temporary signs, fences, low voltage wiring ($5000 and less in value), plumbing water/sewer line replacement, siding, manufactured buildings (except for foundations and modifications of the building site), and other minor electrical, plumbing and mechanical repairs. Plan review requirements for other minor construction activities shall be at the discretion of the Building Official or designee. When a plan review fee is required, or a preliminary review of construction plans is requested, a non-refundable Application Fee shall be paid upon submittal: This fee shall be assessed as per the schedule shown below. Application fee shall be credited back as payment towards the building permit/plan review fee at permit issuance. Application Fee Schedule: Construction cost estimate provided by applicant Construction Cost Estimate Fee: One & Two Family Fee: All Others 5,000.01-100,000.00 $50.00 $100.00 100,000.01-200,000.00 $250.00 $500.00 200,000.01-300,000.00 $375.00 $750.00 300,000.01-400,000.00 $500.00 $1,000.00 400,000.1-500,000.00 $625.00 $1,250.00 Over $500,000.00 $750.00 $1,500.00 (g) (h) State mandated Fee. Building Code Administrators and Inspectors Board (BCAIB) and the Construction Industry Licensing Board (CILB) Homeowners Recovery Fund, both part of the Department of Business and Professional Regulation (DBPR) is 2.5% fee on all building permits. The minimum amount collected on any permit is $4.00. (FS 468.631, FS 553.721) Re-inspection fee. When extra inspection trips are necessary due to, wrong address, third call on failed work, additional work done after inspection has been made, permit card not posted, Notice of Commencement not posted, approved plans not on site or work not ready for inspection when called, a charge of $100.00 shall be paid prior to final inspection or issuance of a certificate of occupancy or completion. At the discretion of the building official, the re-inspection fee may be waived due to extenuating circumstances. Off-premises signs and billboards. A permit shall be required for the erection, alteration or repair of any existing or new billboard. Changes to the advertising message shall not require a permit. Fees shall be as follows: 1. Building plan review $250.00 2. Building permit.$500.00 3. Annual license/inspection.........$200.00 Fee Resolution Page 5 of 9

Table A - Permit fees by total valuation: Valuation Fee $0.00 to and including $1,000.00 $80.00 $1,000.01 to and including $2,000.00 $2,000.01 and up to $100,000.00 $100,000.01 and up to $500,000.00 $500,000.01 and up to $2,000,000.00 $100.00 $100.00 for the first $2,000 and $6.00 for each additional $1,000 in construction value. $688.00 for the first $100,000 and $5.00 for each additional $1,000 in construction value. $2,688.00 for the first $500,000 and $3.00 for each additional $1,000 in construction value. $2,000,000.01 and higher $7,168.00 for the first $2,000,000 and $2.00 for each additional $1,000 in construction value Permit fees shall be based upon the actual construction cost provided by the applicant. If, in the opinion of the building official, the value of construction cost provided is underestimated on the application, the applicant may provide sufficient evidence in the form of a valid contract or professionally certified construction cost estimate. Otherwise, the building official shall set the valuation of construction cost in accordance with the latest Building Valuation Data as published by the International Code Council (I.C.C.) and/or other published source(s). (i) Additional Fees and Charges. Table B - Additional Fees and Charges: "BOV" Based on value of work Administrative fee for clerical processing of permits (Non-refundable) Billboards Building Department Travel, Training and Technology Fund (See paragraph (d) above.) Certificate of Occupancy - Permanent (Paid at time of permit issuance) Certificates of Occupancy - Temporary (Paid at time of TCO issuance) Certificate of Occupancy Per dwelling/condo unit Certificate of Occupancy All others(including apartment buildings) Construction Plan Copies (Over 11" x 17") (One hour minimum) Demolition of Building Driveway Permits $25.00 per permit See paragraph (h) above $0.03 per $100.00 of construction value $75.00 $150.00 $50.00 per hour plus cost of duplicating. BOV BOV Duplicate or Revised Permit Card $ 25.00 Electrical Permit (Stand Alone) BOV Fee Resolution Page 6 of 9

Failure to schedule a final inspection prior to permit expiration $100.00 plus the permit renewal fee Fence Permits BOV Fire Alarm Permit Per valuation table "A" Fire Department Fire Suppression and/or Fire Alarm Plan Review 50% of fire permit fee Fire Department Life Safety Plan Review 10% of building permit fee Fire Department Re-inspection Fire Line Test (Underground) $225.00 See paragraph (g) above Fire Suppression Permit Per valuation table "A" Fuel Gas Permit (Stand Alone) BOV Landscape Review Fee (Single Family Lot) $80.00 Mechanical Permit (Stand Alone) BOV Mobile/Manufactured Home BOV Moved Building BOV Permit Renewal/Extension $50.00 Permit/Plan Revision Re-review and re-stamping of plans Plumbing Permit (Stand Alone) BOV Pools/Spas BOV Re-inspection (See paragraph (g) above.) $100.00 Sewer Tap BOV Signs (Permanent) BOV Signs (Temporary)(Maximum of 10 days) See Titusville LDC 39-155 $50.00 Special Inspection (after-hours, weekend, holiday, arranged two days in advance). Minimum three-hour charge for weekends and holidays Temporary Power Pole $80.00 $50.00 per line item revision, up to but not to exceed original plan review fee $75.00 per hour Temporary Storage Units (Per LDR) $50.00 per unit Temporary Storage Units Expired / unpermitted $35.00 per day per unit Tents/Temporary Structures (Over 120 sq. ft. and 10 or more occupants) BOV Unauthorized work started prior to issuance of permit. Double permit fee Water Service BOV Fee Resolution Page 7 of 9

Fees Not Otherwise Classified: If a fee is not specifically provided for in this ordinance, a reasonable fee shall be set by the Building Official. Section 5. Board of Adjustment and Appeals Fees (a) Appeals from decision of an administrative... $ 475.00 plus advertisement fee. (Should the Board sustain the appeal, $ 475.00 fee and advertisement fee is refunded.) (b) Variances: (1) Single-family, multifamily zoning districts and non-profit organization properties:................................. 265.00 plus legal advertisement fee. (2) All commercial, industrial, mixed use and any other district/uses not listed in subsection (b) (1) above'............$ 525.00 plus legal advertisement fee. (3) Subsequent items processed at the same time as the first item: $100.00 per additional request. Section 6. Development agreement/vested rights application/beneficial use determination/transfer of development rights/ administrative waiver. (a) Development Agreement $ 1,575.00 plus $8.00 per dwelling unit/1,000 square feet nonresidential plus legal advertisement cost. (b) Vested Rights Application $ 1,575.00 plus $8.00 per dwelling unit/1,000 square feet nonresidential plus legal advertisement cost. (c) Beneficial Use Determination $ 1,575.00 plus $8.00 per dwelling unit/1,000 square feet nonresidential plus legal advertisement cost. (d) Transfer of Development Rights $ 475.00 plus $8.00 per dwelling unit. (e) Administrative Waiver of Setbacks/Minimum Lot Size...... $ 105.00 Fee Resolution Page 8 of 9

Section 7. Vacating rights-of-way and easements/street renaming. (a) Vacating and Abandoning Rights-of-Way (ROWs) Streets and Alleys:...$ 935.00 plus legal advertisement cost. (b) Vacating Easement: legal advertisement cost..$93500 plus (c) Street Renaming' $ 630.00 Section 8. Concurrency review/zoning confirmation letter. (a) Concurrency assessment for site plan/subdivision submittals:...... $ 105.00 (b) Independent general update on capacities $ 55.00 (c) Proportionate Share Program and Application $ 510.00 (d) Zoning confirmation letter.$ 50.00 Section 9. This resolution shall take effect July 1, 2018. PASSED AND ADOPTED, this 22nd day of May, 2018. Walt Johns Mayor ATTEST: Wanda F. Wells, City Clerk Fee Resolution Page 9 of 9