STANDARD DEVELOPMENT REVIEW PROCESS

Similar documents
SUBDIVISION APPLICATION

1 S Central Ave, PO Box 2286 Umatilla, FL (352) Fax# (352)

GUIDE TO THE CITY OF ANN ARBOR ANNEXATION PROCESS

MUNICIPALITY OF THE DISTRICT OF CLARE BUILDING BY-LAW NO. 25 AMENDMENT NO

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

CRITERIA FOR DETERMINATION OF ELIGIBILITY

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

ZONE TEXT AMENDMENT APPLICATION TITLE 12 ZONING, SECTION

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Water and Sewer. Article I. Connections, Application for Service, Rates.

COUNTY OF ALBEMARLE. ZONING INFORMATION PACKET (For building permits for a structure on a property with a site plan)

Residential Certificate of Occupancy and Temporary Certificate of Occupancy

APPENDIX C CITY OF OVERTON - SCHEDULE OF FEES

Delinquent Tax Certificate Sale

APPLICATION FOR SPECIAL USE

RESOLUTION NO

Effective Date: July 21, 2017 Page 1 of 8. Reference: DBC Admin 132.9, IEBC 407.1, Ordinance No , Series of 2017

RFP BIDDING INSTRUCTIONS

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

STEP 1: SOIL EVALUATION

ADMINISTRATIVE PROCEDURES. For WATER DEMAND OFFSET REQUIREMENTS

CERTIFICATE OF OPERATION

DENTON Developer's Handbook

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

THE EVESHAM MUNICIPAL UTILITIES AUTHORITY RATE SCHEDULE

REQUIREMENTS FOR FINAL SITE PLAN Final Site Plan must be submitted within 12 months of a Conceptual Site Plan approval

TITLE 14 ZONING AND LAND USE CONTROL CHAPTER 1 MUNICIPAL PLANNING COMMISSION

CITY OF LAKE MARY, FLORIDA NON-RESIDENTIAL DEVELOPMENT FEE ESTIMATE PACKET

Application for Demolition Permit City of Kirkwood

Ordinance Page 1

ECONOMIC DEVELOPMENT AUTHORITY[261]

City of Urbana POLICIES & PROCEDURES Administrative Regulation 30 Water Division Effective January 1, 2019

City of Aspen Community Development Department

EL DORADO COUNTY BUILDING SERVICES

RULES AND REGULATIONS OF MARTIN COUNTY WATER AND SEWER DISTRICT NO. 1. C. Metering Individual Trailers in Mobile Home Parks

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

Revised June 2016 SIDE LOT & VACANT LAND TRANSFER PROGRAM GUIDELINES

Town of Harrisburg, Lewis County, New York Land Use Permit Application Instructions

THE TOWN OF Angier N O R T H C A R O L I N A

ADUs and You! Common types of ADUs include mother-in-law suite, garage apartments and finished basements.

CITY OF PITTSBURGH Department of Permits, Licenses and Inspections (PLI)

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Appendix G Fee Schedule

City of Altamonte Springs Developer s Guide

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Section SKETCH PLAN REVIEW

1. Areas within perimeter boundary of city No fee. 2. Annexation agreements $100.00

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

Greenbrier County Building Code Administrative Policy Manual

NYE COUNTY, NV PAHRUMP REGIONAL PLANNING COMMISSION REGULAR MEETING December 14, 2016

City of High Point Development Fee Schedule

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

Office of the Zoning Administrator and Planner. Saugatuck Township Planning and Zoning Applicants. Notice of Information for PC and ZBA Applicants

City of Jacksonville Development Guide Zoning. A publication to help people understand the Zoning process in the City Jacksonville.

N.J.S.A. 40:27-1 et seq. APA-NJ Professional Planners Review Course Saturday, April 2, 2011

KAMAS CITY FEE & RATE RESOLUTION NO

ADMINISTRATIVE PERMIT FOR TEMPORARY MOBILE HOME APPLICATION

How to Adopt an Affordable Housing Advisory Committee (AHAC) Report

Ferry County Ordinance #89-04 BINDING SITE PLAN ORDINANCE

This Ordinance is adopted under the authority and provisions of the General Statutes of North Carolina, Article 6, Chapter 153A 121.

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

Special Use Permit Application & Process See Unified Development Code

GUIDELINES to SITE MANAGEMENT PROGRAM (Effective: August 15, 2006, Revised 08/2007, 05/2014, 12/2014)

Consolidated as of May 14, 2012

2018 FEE SCHEDULE Exhibit A PLANNING COMMISSION. Land Use Fee Schedule Land Use Application and Hearing Fees. $250 + recording fee.

ARTICLE III. ABANDONED AND VACANT BUILDINGS

ARTICLE 8: SPECIAL LAND USES

DISTRICT ADMINISTRATIVE RULE

RECOMMENDED FORM PROMISE TO PURCHASE IMMOVABLE

MINOR PLAT AMENDMENT APPLICATION CHECK APPLICABLE PERMIT ATTACHMENT:

THE BOARD OF COUNTY COMMISSIONERS

REQUEST FOR QUALIFICATIONS/PROPOSALS

City of Shenandoah Development Package

Item No Harbour East - Marine Drive Community Council May 4, 2017

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

Retail Leases Amendment Act 2005 No 90

Name Name Address Address. Telephone Telephone. Name Address. Telephone

IC Chapter 7. Taxation of Mobile Homes

BIDDING INSTRUCTIONS FOR SALE

Village of Lake Zurich Zoning Application Guide

ZONING & LAND USE APPLICATION

ORDINANCE NUMBER

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

SHIP Affordable Housing Advisory Committee

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW 2016-

Commissioners to enact, amend, and enforce technical construction and building codes; and,

Schedule of City Fees & Charges

TABLE OF CONTENTS SUPPLEMENT TO RATES & RULES (Updated July 1, 2017)

Water System Master Operating Agreement. for the. Marion, Howell, Oceola and Genoa. Sewer and Water Authority

2 Janesville - Index

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

ST. JOSEPH TOWNSHIP RESOLUTION CITY OF ST. JOSEPH RESOLUTION 2018-

CERTIFICATE OF DEMOLITION CERTIFICATE OF RELOCATION

CITY OF ALTAMONTE SPRINGS DEVELOPER S GUIDE

WELLS SANITARY DISTRICT POLICY FOR DISPOSITION OF SEWER LIEN FORECLOSURE ACQUIRED PROPERTY

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

Transcription:

STANDARD DEVELOPMENT REVIEW PROCESS The following steps, with accompanying time estimates, reflect the standard review process for new development in the City of Durand. Certain special uses or development requiring zoning changes may require additional time. To learn more about the expected individual timeline for your project please consider scheduling a Conceptual Review meeting. 1. Conceptual Review (Optional) a. Pre-submittal: Meeting with Building and Zoning Administrator, City Manager, and/or City Planner to discuss project, timeline for submissions, and project-specific zoning and building regulations. If requested, staff may perform preliminary research and provide feedback; feedback may take up to five (5) business days from the time of the meeting. 2. Site Plan Review a. Application for Site Plan Review i. Site plan review requests should be submitted at least thirty (30) business days prior to a regularly scheduled Planning Commission meeting (first Tuesday of the month). ii. A staff person will contact you within three (3) business days if your application is missing any detail. iii. The applicant will typically receive notification from the City Planner with recommended changes at least seven (7) business days prior to that meeting. At that time the applicant may elect to defer review until the next month s meeting or prepare changes for the scheduled meeting. b. Planning Commission Approval i. The Commission will meet publically to review/approve your site plan. Depending on the request, the Commission may apply certain contingencies or stipulations to their approval. c. Note on properties currently located outside of city jurisdiction: Site plan approval can be issued conditionally upon annexation of property into the City of Durand and performed regardless of where the applicant is in the annexation request process. 3. Permits and Applications a. Building Permit Request: Once the Planning Commission has approved the site plan, applicants can acquire a Building Permit. Depending on the nature of the project additional permits may be required. These permit applications may be submitted in advance of site plan approval but we do recommend that applicants wait until they

receive approval to ensure the final submission most accurately reflects the work to be completed. i. Staff will review the permit application and request any missing detail. Processing and issuing a permit may take between five (5) and ten (10) business days depending on the number of pending permit applications. If changes are required, the applicant will be notified in writing. b. Water and Sewer Tap-In Request: Water and sewer tap-in requests should be submitted and paid at the same time as an applicant s building permit application. Fees are based on the size of the line. Please allow at least five (5) business days for the city to process your request. Note: These fees must be paid for prior to any permit issuance. c. Other Permits: The city also issues trade permits but separate applications must be submitted for Plumbing, Mechanical, and Electrical (if applicable). Those may be submitted at the same time as a building permit application and applicants can expect a similar timeline. 4. Construction and Inspection a. Applicants may begin construction any time after receiving their required permits. Permits and approvals typically have a time limit associated with them. If additional time is required for construction please request so in writing before the permit expiration date to avoid having to re-file. The city will do its best to alert you as to when this date is approaching. Ultimately, it is the responsibility of applicants to ensure all permits are up-to-date. b. Just prior to project completion please contact the City of Durand to schedule any necessary inspections and final water and sewer connections. i. Inspectors schedules vary so we recommend you provide at least ten (10) business days advance notice for scheduling. ii. Water and sewer connections require seven (7) business days advance notice for scheduling. c. Once all inspections have been passed and appropriate utility connections are made, the city will issue a Certificate of Occupancy. 5. Feedback Request (Optional) a. After completion of your project the City of Durand may send the primary contact an online survey request. This five-minute survey is intended to give you the opportunity to provide feedback on your experiences during our development process. Occasionally other factors may dictate the order and length of time required to complete a project. Additional guidance is available for projects with these special considerations. Examples include: 1. Annexation 2. Use of Local, State, or Federal grants and tax incentives 3. Special Use Requests 4. Zoning Change Requests 5. Extension of Public Utilities (beyond tap-ins) 6. Road Assignment or Abandonment Requests

FEE SCHEDULE FY 2018-2019 Water and Sewer Rates Ready to Serve Fees (monthly rates): Water Sewer ¾ Meter Residential $17.34 $24.57 1 Meter $30.30 $55.21 1 ½ Meter $54.17 $103.78 2 Meter $82.57 $162.02 3 Meter $157.49 $318.17 4 Meter $243.58 $492.60 Water Rates: $4.65 per 1000 gallons Sewer Rates: $5.57 per 1000 gallons Refuse Senior Citizens: $12.05/mo Regular: $15.00/mo Permits Building Permit Cost is based on construction value: up to $1,000 is $65.00 each add l $1000 is +$7.00 Mechanical Permit Electrical Permit Plumbing Permit Sign Permit $100.00 Fence Permit $25.00 Winter Parking Permit (Dec. 1 st April 1 st ) $15.00 per vehicle Garage Sale Permit $2.00 (three days) Bike Permit $3.00 Pool Permit: Above Ground $50.00 Pool Permit: In Ground $100.00 Demolition Permit $100.00 Moving a Structure Permit $100.00

Site Plan & Zoning Reviews Lot Split Consolidation single split $150 Lot Split Consolidation two or more parcels $150 plus any necessary engineering consulting fees Commercial or Industrial $440 + $40 per acre Apartment/Townhouse $550 + 4.50 per unit Mobile Home Park $675 + 5.00 per unit Subdivision Preliminary $550 + 4.85 per lot Subdivision Final $500 + 2.80 per lot Re-zoning $400 + 6.00 per acre Special Land Use $400 + 6.00 per acre Use Variance Fee $400 + $40 per acre Planned Unit Development/Mixed Use Development $550 + $40 per acre Preliminary Site Plan Review 75% of Site Plan Fee Site Plan Revision/Review 75% of Site Plan Fee The site plan reviews listed above DO NOT include the cost of the City s Consultant Planner to review submitted plans. The cost of the Planner is in addition to these costs and must be paid before the Site Plan meeting is held. Planning/Engineering Review Fees for Site Plan Approval In addition to the above fees, a cash deposit of One Thousand Dollars ($1,000) shall be placed with the City of Durand. All fees, as determined by agreement with the City s planning and/or engineering consulting firm or other fees as adopted by the City of Durand may be deducted by the City and the balance remitted to the depositor. Any fees in excess of the deposits shall be paid, in full, immediately to the City of Durand by the owner and/or agent. The City may withhold all approvals until receipt of such payment. A schedule of current consultant fees is included with this packet. Supplemental Reviews Site Plan requiring review by Planner/Engineer Special meetings with Planner/Engineer All costs paid by owner/applicant All costs paid by owner/applicant Request for Special Planning Commission Meeting All special request $500.00 Zoning Board of Appeals Request for Ordinance Variances Residential $250.00 Commercial $500.00 Zoning Permits Residential One & Two Family: $ 50.00 All Other Classifications $100.00

Costs of these permits will become part of the total applicable Building Permit fee unless a building permit is not issued. Certificate of Occupancy Residential One and Two Family $ 50.00 All Other Classifications $100.00 Performance Guarantees Work performed in the right of way or where road contact is made requires the following performance guarantees: Residential $2,000 Non-residential $2,000 Additional funds may be required for work done in right-of-way, dependent upon work performed. Temporary Construction Building/Trailer Permits A cash deposit of Five Hundred Dollars ($500.00) shall be required for all temporary trailer permits issued under the provisions of the City of Durand Zoning Ordinance. Capital Recovery Fee Schedule (Sewer) Meter Size Fee ¾ Residential $ 2,100 1 Commercial/Industrial $ 5,150 1 ½ $ 10,250 2 $ 16,500 3 $ 32,750 4 $ 52,000 6 $102,350 Manpower, equipment, and materials are additional costs; including inspection fee of $50. The City can offer an estimate upon request. Capital Recovery Fee Schedule (Water) Meter Size Fee ¾ Residential $ 1,700 1 $ 4,200 1 ½ $ 8,400 2 $ 13,500 3 $ 27,000 4 $ 42,000 6 $ 84,000 Manpower, equipment and materials are additional costs; including $300 meter charge and $50 inspection fee. The City can offer an estimate upon request.