Engineering Load sheet for New Residential Services

Similar documents
New Service Application

Septic Tank / Drainfield / Holding Tank Permit Application

SWIMMING POOL PERMIT APPLICATION PACKET

CITY OF NAPERVILLE Transportation, Engineering, & Development (T.E.D.) Business Group

Residential New Construction Procedures

Subdivision Backbone Application Packet

Septic Tank / Drainfield / Holding Tank Permit Application

Requirements for New Service

OSSF Permit Application

CITY OF CAPE CANAVERAL SPECIAL EXCEPTION PACKET

Application Instructions for: Type I Replacement Dwelling in EFC

Dallas Sloan General Manager Barron Area Phone: (715) Toll Free: Fax: (715) NEW SERVICE PROCESS

SUBDIVISION BACKBONE COVER LETTER

New Commercial Service Application

APPLICATION FOR SUBDIVISION APPROVAL Summary of Application Review & Approval Process and Application Form April 1, 2009

Onsite Wastewater Treatment System Remediation Project

New Hanover County Health Department Application for Improvement Permit and/or Authorization to Construct

APPLICATION FOR LOT SPLIT

VILLAGE OF ASHVILLE DEPARTMENT OF PUBLIC UTILITIES DIVISION OF STORMWATER MANAGEMENT STORMWATER MANAGEMENT PROGRAM STORMWATER CREDIT MANUAL

Tenant application form.

Declaration. Copy of previous Phone, Electricity, Gas accounts Current Motor Vehicle Registration papers

(Note: The bond is equal to 6 weeks rent if more than $251 per week or 4 weeks rent if $250 per week or less) Term of tenancy: (please select one)

SPECIAL USE PERMIT FOR TEMPORARY DEPENDENT HOUSING

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Retail and Medical Marijuana Facility License Application

ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

STEP 1: SOIL EVALUATION

Notice of Use for Transferable Development Rights

COMMERCIAL SITE BUSINESS TAX RECEIPT (formerly known as Business Occupational License) FACT SHEET AND APPLICATION PROCESS

GIS After the Conversion. Mid West ESRI Utility Users Group 2007

GUIDELINES FOR THE PERMITTING PROCESS NONPUBLIC WATER SYSTEM NONPUBLIC WATER SYSTEM DEFINED PERMIT PROCESSING FEES

Remember, PA One-Call before excavating. Simply dial 811 or

~ Please Detach and Save This Page ~

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Waterford Owners Association Construction Guidelines

Effingham County Health Department Environmental Health Division. Business Hours

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

PROFESSIONAL RESIDENTIAL BUILDER PROGRAM

Septic Tank / Drainfield / Holding Tank Permit Application

NEW SINGLE FAMILY RESIDENTIAL

APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. POLICY BULLETIN NO. 3-4

Home/Out-of-Town Contractor Business Registration Fee $35.00 per year

PLANNING CLEARANCE. Planning Clearance is required prior to the submittal of most building and development permit applications.

County of San Bernardino Department of Public Health Environmental Health Services

CHAPTER IV. ELECTRIC

APPLICATION TO: PLANNING COMMISSION ZONING BOARD OF APPEALS

The City of MIDWEST CITY 100 N. Midwest Blvd * Midwest City, Oklahoma (405) *TDD (405) * FAX (405)

Before I can issue a permit, I need the following items:

INFORMATION HANDOUT FOR CONDITIONAL USE PERMIT APPLICANT S

APPLICATION FOR CONSENT NEW LOT (SEVERANCE)

MARIJUANA FACILITY CONDITIONAL USE PERMIT APPLICATION File No.

AFFIDAVIT FENCE OFFICE OF THE JACKSON TOWNSHIP ZONING DEPARTMENT P. O. BOX 517 GROVE CITY, OH 43123

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

Spring City Municipal Corporation

HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES Equal Opportunity Provider and Employer RESIDENTIAL WATER/SEWER USER AGREEMENT

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

Irrigation Permit Requirements FOR OWNER/BUILDER

RENTAL APPLICATION FORM

SAN ANTONIO WATER SYSTEM Guide to Development

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

Home Millcreek Business License Application 3330 S E. Millcreek, UT Phone: For more information please visit

SHORT PLAT Information

Collin County Development Services OSSF CONSTRUCTION INFORMATION SHEET

ALAMANCE COUNTY ENVIRONMENTAL HEALTH APPLICATION FOR SERVICES SERVICES REQUESTED

Site Development Review for

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

Construction Permit for Onsite Sewage Treatment System

Overview of Online Notary and ALTA s Principles

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

APPLICATION FOR CONDITIONAL USE PERMIT

TENANT APPLICATION INFORMATION

TENANT APPLICATION INFORMATION

Certificate of Occupancy (CO) Application (DO NOT FAX OR APPLICATION)

APPENDIX A BUILDING PERMIT AND RELATED FEES

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

SEPTIC PERMIT APPLICATION

Service Rules and Regulations

Permit No: SPR CUP MHR AgLD IPM PUD MP - (Circle one)

2 3 2 U n l e y R o a d, U n l e y, S A,

SEPTIC PERMIT APPLICATION

REQUIREMENTS FOR COMPLETING TEMPORARY LAND USE PERMIT APPLICATION COBB COUNTY, GEORGIA

Policy: Owner-occupier permits may be obtained for a single-unit dwelling in the following circumstances:

Tenancy Application Form

Tenancy Application Form

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

LAND USE APPLICATION

COMMUNITY DEVELOPMENT DEPARTMENT 655 North 1250 West Centerville, Utah Phone: (801) Fax: (801)

WALLS: PERIMETER / RETAINING

-PLUMBING- BUILDING PERMIT APPLICATION PACKET

horton APARTMENTS MAROOCHYDORE Telephone: Facsimile: ABN:

Type II Replacement Dwelling (EFC) Packet updated 07/07/16

Important Information For New Tenants

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

Subdivision FAQ s. Prepared by the Sitka Planning Office, Sara Russell, Planning Assistant Wells Williams, Planning Director

Transcription:

Engineering Load sheet for New Residential Services *Please print clearly* Note: THIS FORM IS NOT AN APPLICATION FOR ELECTRIC SERVICE Full Name*: Date: Email Address*: Mobile Phone*: Mailing Address*: Home Phone*: City, State, Zip*: Work Phone*: *Note: Your information is used for Official UCEMC functions only. Address of Requested New Service: City, State, Zip code: General Contractors Name: Electrical Contractors Name: Assessment Questions Are you the Property Owner? Yes. No. Is there already a power line on the property? Yes. No. Will you be living at this location for at least 10 Yes. No. months out of each year? Will you have a septic or sewer system installed? Yes. No. What is the square footage of the Building? : (Opt) What is your nearest neighbors address? : Service size and type Service Size 200Amp 400Amp 600Amp Other - explain: ft² Type of Service Residential & Double Wide Single Wide Mobile Home Commercial/Industrial Other Will the Secondary service be Overhead (OH) or Underground (UG) OH UG Will the Primary Service be Overhead (OH) or Underground (UG) OH UG Loading Information (List all of the below that applies to you) Load type Electric Gas Electric Load Details Heater kw Including heat pump heat strips Air Conditioning Ton Vehicle(s) # Quantity of Electric vehicles Stove Water Heater kw Notes: For Commercial and Industrial Customers, fill out the Commercial and Industrial Load sheet. Please Initial to signify you have received the New Services Info Packet. Initials:

Information Packet for New Residential Services The purpose of this packet is to explain the process of getting a new electric service installed at a new location. This document explains the process and the requirements at each milestone and gives you the contact information of the individuals who you need to notify upon completion of each requirement. The district office s contact information is displayed in the map below. Upper Cumberland Electric Membership Corporation (hereafter UCEMC) has proudly provided members in Clay, DeKalb, Jackson, Macon, Overton, Pickett, Putnam, Smith, Trousdale, White, and Wilson Counties with electric service for over 80 years.

Requirement Definitions Easement (ROW): To fulfill legal requirements on any job where Upper Cumberland Electric Membership Corporation is installing powerlines onto private property, a signed and notarized easement is required. This easement must be recorded at the local county Register of Deeds before any construction can begin. The member is responsible for collecting all required signatures and delivering the easement ( s) to a district office. Additionally the member must pay the local recording fee ( s). Aid-In Construction Charge and Agreement: This is the cost that you as a member are required to pay to cover your portion of the costs to extend the power lines. This charge is calculated by UCEMC engineering with regards to each construction type and circumstance using approved board policies. Under no circumstances are these policies individually amendable or discriminatory in nature. UCEMC will require an Aid-in Construction Agreement be signed at the time when you pay the aid charge. Vegetation Right of Way (R.O.W.): For any job where an additional overhead electric power line is installed, a pathway for the overhead power line extension must be cut and cleared of all vegetation capable of growing into the power lines or falling onto the power lines. UCEMC requires that the pathway meet the UCEMC adopted RUS specifications of 20 feet from the center line to the sky on each side of the power line. This requirement is in addition to any Dangerous trees or branches that could be reasonably capable of falling onto the power lines despite being outside of 20 feet. Ask an engineer for the R.E.A. specification that visually represents this requirement. UCEMC can clear the right of way for an additional aid of construction charge that is calculated on a per foot basis and set by board policy. Electrical Permits & Inspections: In order for UCEMC to connect your temporary or permanent electric service, you must have an electrical permit and a subsequent electrical inspection performed. After the electrical inspector has applied a seal signifying a passed inspection on the meter base UCEMC can install a meter in the base. All temporary and permanent electric services must be built in accordance with the UCEMC specifications, and you may request a copy of the specification from the engineer. Septic Permit/Sewer Application: Any member wishing to qualify a new electric service as a Residence will need to provide a ground water protection (septic) permit or a letter from the city/municipal stating that you have applied for sewer service as a verification. 911 Address: UCEMC requires a 911 address for any new residential location. We have included for your convenience the location and a contact number for many of the 911 Addressing offices for each area in the back of this document. Please note that many counties require septic/sewer permits and building permits prior to receiving a 911 address. Deposit: UCEMC s deposit policy is based on a (no cost to the member) credit evaluation. Anything less than a green result signifying good credit will result in a deposit requirement. For residential services the deposit covers two months of electric services that could potentially be used prior to final disconnect and is calculated by engineering. All non-residential services have a $150 minimum deposit. Application for Membership: Visit your local UCEMC district office to meet with a customer service representative in order to establish an account and pay the UCEMC membership fee of $5. Due to new identity theft protection guidelines enacted by the Federal Trade Commission, UCEMC now requires two forms of identification when opening a new residential account. The preferred ID s include a government issued photo ID (drivers license, military ID or Passport) and a Social Security card to verify your social security number.

General Process for a new Electric Services 1 Obtain a septic or sewer permit and a 911 address. This requirement only applies if you are building a new residential building. Generally you may obtain your new address at your county s local E-911 center. To get a 911 address, you may be required to apply for a septic permit or a sewer application, and/or a building permit. When you have completed the items that apply for your area, you will be ready to request electric service from UCEMC. 2 Visit your nearest district office. a. Speak with a UCEMC Engineer. You can contact them over the telephone by calling the district office number and asking the customer service representative to speak with engineering or if you would like to meet in person you can come by the Carthage district office or the Cookeville district office between the hours of 2-3 PM Monday through Friday excluding holidays and days when we have large scale power outages. Carthage District Cookeville District Phone#: (615) 735 2940 Phone #: (931) 528 5449 Address: 138 Gordonsville Hwy Address: 1794 W Broad Street Carthage, TN 37030 Cookeville, TN 38501 Our engineers will meet with you to discuss your options like overhead or underground and may plan a site visit with you to discuss your situations particularities. b. Complete an application for service. You must fill out the application for service, and pay the membership fee ($5). This will get your information in our software system be sure to use the same name throughout this process. 3 Conduct the first site visit. The initial site visit is to plan out a route for the new power lines, identify who we will need easements from, explain the requirements and answer any questions you might have. The work flow varies for each situation so the engineer will guide you through the steps of the project. To expedite this process you will need to show evidence of construction such as poured footers/slabs, a staked out floor plan, and septic permit or sewer application in hand for residential buildings etc. Please note that you cannot build underneath an existing powerline. If the above requirements are completed, or inapplicable to your situation then the engineer can stake the job and create the work order on their first visit. 4 After the site visit. a. Cut the tree(s). You must clear the right of way, of all vegetation that could grow into or fall onto the power lines. Depending on the job the engineer may ask for the trees to be cut prior to the job being designed. You may opt for UCEMC to cut the vegetation right of way based on a per foot charge. UCEMC requires that all easements be signed and recorded before we will clear the vegetation. UCEMC requires 40 feet of right of way for primary overhead line extensions, 20 feet on each side. b. Collect Easement(s) and deliver them to UCEMC. It is your responsibility to get the easements for both your property, and all of the other required properties. They must be notarized. The easements give UCEMC legal right to be on the property in order to construct and to maintain our electrical distribution facilities.

5 Conduct the second site visit. (as required) A second site visit may be required if one of the requirements was not met on the initial site visit. Therefore to expedite the process, we recommend fulfilling all requirements prior to the first site visit. Call the UCEMC engineer when the requirements are fulfilled for the second site visit as needed. 6 Visit your district office. (again) a. Deliver the Easements signed and notarized. When you have the signed and notarized easement(s), bring them to a UCEMC district office. If needed you can ask your neighbors to come by the office and sign the easements with our notary. You must pay the recording fee for all easements which covers the county s fee to record. b. Pay the Aid of Construction Charge/Sign an agreement. If the job requires an Aid of Construction Charge, then this will be the time to pay that charge. An engineer will notify you of what the charge is after the work order has been created. Wait until you hear from the engineer to come by the district office to pay the charge. The customer service representative will require you to sign an Aid-In Construction Agreement at this time. c. Apply for the Meter. At this time, you will fill out the Meter Application form and pay a meter set fee. UCEMC will run a credit check, at no cost to you, to determine if you will be required to pay a deposit. d. Pay your deposit. (as required) Dependent upon the results of a no-cost-to-you credit check, you might be required to pay a deposit or increase your existing deposit. 7 Coordinate with the local District manager. District managers are responsible for scheduling jobs to be worked. The best way to contact them is by calling your local district office and asking to speak with them or by leaving them a voicemail with your name, the location of the job and your phone number should they be unavailable. If the district manager has not received your work order or isn t knowledgeable about your job, then you need to contact engineering to determine what requirement is holding up your job. a. Electrical Permits. You will need to acquire an electrical permit in order to have an inspection. b. Electrical Inspections. Electrical inspections must be passed before UCEMC can connect your service on both a temporary and a permanent meter base installation. You will need to call in and notify the district manager that this requirement has been met. Temporary service inspections are good for one year and must be renewed or disconnected by UCEMC at that time. A service release for a permanent meter base, installed on an unfinished home, is acceptable for 45 days and then it must be renewed or UCEMC must pull the meter. The renewal process must be completed until you have passed your final electrical inspection. c. Coordinate with UCEMC for underground installations. Schedule with the district manager when you plan to have your ditches opened. If you open the ditch without coordinating with the district manager, you will be required to drain any water or repair the ditch if it no longer meets the ditch Specifications. UCEMC will not drain the ditch.

Overton Pickett: 911 Addressing- Address: 255 Industrial Park Dr Livingston TN, 38570 Contact information (This information was last updated on 9/14/2018) Phone#:931-823-6277 (911 address requests) http://www.opecd.org/contact/contact.php Septic Tank Permits- Overton County Health Dept. Address: 5880 Bradford Hicks drive Livingston TN, 38570 Phone#: (931) 931-823-6260 Electric Permits- You can purchase an electrical permit at the E911 Center Monday through Wednesday 8:00 AM to 4:00 PM. Address: 255 Industrial Park Dr. Livingston TN, 38570 Phone#: (931) 823-8942 Fax#: (931) 403-3911 Electrical Inspection- To schedule your electrical inspection, talk with their secretary by calling in at Phone#: (931)823-8942

Putnam: 911 Addressing- Contact information (This information was last updated on 9/14/2018) Address: 700 County Services Dr. Cookeville, TN 38501 Phone#: 931-646-4357 (ask for Penny Foister- if it s outside of the city limits of Cookeville) Phone #: 931-520-5268 (if it s inside the city limits of Cookeville) https://putnamcountytn.gov/911-center If you look on the website, scroll down until you get to Addressing & Maps. You can find the most current information there. Septic Permits- State Environmental field office Lucas Hicks Address: 1221 S. Willow Ave Cookeville TN 38506 Phone#: (931) 520-6688 Electrical Permits- Putnam Planning & Codes 270 Carlen Dr. Cookeville (931)526-2285 Electrical Inspector s Office- Phone#: (931)528-8365

Dekalb & Smith: Contact information (This information was last updated on 9/14/2018) 911 Addressing and permits- are all handled out of the same location. E911 Headquarters Address: 303 High St N Carthage, TN 37030 Septic Permits- Talk with Mark Webster in the environmental department located in the same building as E911 Phone#: (615) 735-3785 Building Permits - Talk with Sonya King about getting your building permit Sonya s Phone#: (615) 735-3418 911 Addressing- Sonya typically directs people through the process of getting a 911 Address. If needed, contact dispatch. Dispatchers Phone#: (615)735-2121 Electrical Permits and Inspection- Most people pay for the permit and inspection at the same time as their other permits. You have to come by the E911 headquarters to purchase the permits. When you are ready for an electrical inspection, let the E911 dispatcher know and they will notify the electrical inspector to get you scheduled. Dispatchers Phone#: (615)735-2121

Jackson: Contact information (This information was last updated on 9/14/2018) 911 Addressing and permits- are all handled out of the same location. Sewer Permits & Percolation test Cookeville Environmental field office ask to talk to Mathew Harris. Address: 1221 S. Willow Ave Cookeville TN 38506 Phone#: (931) 520-6688 911 Addressing - Jackson County 911 Office Address: 316 N Murry St Gainesboro TN 38562 931.268.0180 Electrical permits You can purchase your electrical permits at Jackson County Court House. Address: 101 E Hull Ave Gainesboro TN 38562 Phone#: (931) 269-9888 Electrical Inspections Call the electrical permit office to let them know you are ready for inspection. Contact the electrical permit office to get scheduled for an inspection. The inspectors are Lynn McHenry and Tony Gulley