Please consider my architectural firm, Thomas McInerney Architect, for design services of the Slater Hall Renovations.

Similar documents
w m V 7826 Eastern Avenue, NW, Suite 405 Washington, DC 20012

k e v i n k. c h e a 17 prospect hill avenue somerville, ma ATTN: Human Resources November 2011

1 Asil Adil Al-Baghdady - CV

Executive Director Search

1 Devonshire Place, Apt 1407, Boston, MA Cell:

Through multiple real estate cycles and in diverse physical settings, CUSA, LLC has helped

SOMEDAYS THE BEST HAT TO WEAR IS A HARD HAT!

Transforming places and spaces with inspired results.

Jorge F. Pérez-Barroso

Stockton Port District Job Description

SAMIR SHAIKH AIIA, IGBC TM AP ARCHITECT & URBAN DESIGNER

Gorham Street Proposal

DMITRI J. KAPALIS AIA, LEED AP

An Established Authority On New Jersey Real Estate

Exercises direct supervision over assigned professional and technical personnel.

SAMER NESSIEM P O T F O L I O SAMER NESSIEM P O R T F O L I O. Architecture is creation of balanced environment for human ARCHIECT

Design Collaboration

Bachelor of Science Architectural Engineering University of Kansas 1968 Master of Business Administration Western Michigan University 1978

HOUSING TECHNICIAN I HOUSING TECHNICIAN II

PUBLISHER S NOTE. Careers in Green Energy contains twenty-three alphabetically arranged chapters

LITHUANIAN HOUSING MODERNIZATION PROGRAM. valius serbenta housing energy efficiency agency

Design-Architecture Workshop

Property Management through the eyes of an owner - A Better Solution for your Property Management Needs

Equivalent User Table

PART ONE - GENERAL INFORMATION

Portfolio. Alexander Goessler

Dr. Jaser Khalaf Mahasenh

EASTGATE VILLAGE OLD SPARTANBURG ROAD

Appraiser Associate Temporary/Seasonal/Full-time

Tom Waggoner, AIA, is a Senior Vice President and Managing Principal for HOK s Kansas City office.

Introduction to Architecture Prep. Course

Columbia Land Trust is seeking a Conservation Lead to join its passionate team!

Project 1106 Space Frame

Experience. Firm Experience General. University of Colorado - As Needed Services

1205 Jenny St. Longview, TX (337) Louisiana Tech University Bachelor of Architecture May 2009

The History Of Quest. A Track Record of 30 Years

My name is Nicolas Martinez; I am a architectural designer with two years of experience looking for an intern architect position.

CRAIG NEWNHAM. Independent Property Specialists. 30 years of transforming property CAPABILITY STATEMENT

Anna Sobczak. Summary. Experience. Project Manager

Alaska State Capitol TEAM COMPOSITION

2 Bedroom Apartment For Sale The Whitehouse Apartments, 9 Belvedere Road, London SE1 Offers in excess of 899,950.

Fluent in Arabic, English and Czech

Waverley Elementary School Feasibility Study

Facilities Construction

BRENDEN D. FREDERICK AIA LEED AP

LUXURY CANAL FRONT LIVING

ABBOT STUDIOS. architects + planners + designers, LLC

Michael Harrison, Architect

Emirates Real Estate Solutions COMPANY PROFILE

ADRIANNA MORENO

Property. Management. Performance.

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

THE RIGHT ANGLE ON WORK

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service

Appraiser Associate. Date. Name. Mailing Address. Phone Number. Address

CURRICULUM VITAE ALBENA YORDANOVA, D.T.

TORONTO DISTRICT Organizational Overview

Metro Architects Elected to 2013 AIA Iowa Board

Europass Curriculum Vitae

ANDREW MCMAHAN. About Me. Other Skills. References. Work Experience. Education. Volunteer Intern Co-Op Intern

Executive of the Month: Mavros, CFO of Case Real Estate Capital; Knows the numbers and deals inside and out

Stanley Heights. Senior Independent Living. Overland Park, Kansas

A N E W P E R S P E C T I V E

Christopher Pennell. Model Making hand-made + laser cutter

WOODLAND VILLAGE BOG AND MOUNTAIN ROAD GOFFSTOWN, NH 03045

Wolf Creek Plaza S 15th St, Bellevue, NE W. Dodge Rd., Ste 270 Omaha, NE (p)

1.1.1 The Role of. the Architect

2011 AMAZING TRANSFORMATIONS ISSUE

WORKSHOP SCHEDULE. APT NORTHWEST CHAPTER BOARD Mark Liebman Stantec Consulting, Inc Kellogg Lake Road Sultan, WA 98294

and Solutions for FQHC Leaders Maximizing Value in Uncertain Times

An Architect s View of Product Warranties. Albuquerque CSI Continuing Education Conference Paul Simonsen, FCSI, NCARB, CCS, CCCA, LEED AP

LILLIAN RODRÍGUEZ SIMS

Economic Non-Viability Application

VICTOR ALEXANDER VIZCARRA VELARDE

Campus Master Plan. Board of Trustees Meeting. December 10, 2004

CHAD HOUSE SUNDERLAND ROAD, GATESHEAD, NE8 3HY INTRODUCING HIGH-PERFORMING, LOW-COST UK RESIDENTIAL PROPERTY INVESTMENT OPPORTUNITIES

Roger Williams University USGBC Student Group Completed a sustainable design workshop as a prerequisite to the LEED Green Associate Exam.

Certified Crisis Management Professional. Contents are subject to change. For the latest updates visit

QUANTITY SURVEYING DIVISION ASSESSMENT OF PROFESSIONAL COMPETENCE FINAL ASSESSMENT 2014 PRACTICE PROBLEMS / PART II WRITTEN TEST DAY 1

Masterpiece: Tree of Life (Art Glass Window), 1904 by Frank Lloyd Wright for the Darwin D. Martin House

Philippine Capabilities 2013

CHARTER TOWNSHIP OF OSHTEMO KALAMAZOO COUNTY, MICHIGAN AMENDED AND RESTATED WATER CONNECTION FEES EFFECTIVE: JANUARY 1, 2019 CONNECTION FEES

Development Activity: 4th Quarter 2016*

Introduc*on of the Team. Planning Considera*ons. Site Selec*on Considera*ons. Due Diligence Considera*ons. Next Steps and Ques*ons / Answers

NOTICE OF PROPOSED CLASSIFICATION ACTIONS BY THE HUMAN RESOURCES DIRECTOR

Subchapter 5 Zoning Districts and Limitations

AIA DC and Washington Architectural Foundation Sponsorship Opportunities

O F A R T, entertainment and culture

A COMPLETE REDEVELOPMENT - A NEW NORTH. Plaza North. 90th & Fort St. - Omaha,NE

As the natural gas industry continues

CLASS A OFFICE SPACE FOR LEASE 3333 RICHMOND ROAD, BEACHWOOD, OHIO 44122

Nada Mohamed Mohsen. Dear Sir,

Appraisal and Market Analysis of Indoor Waterpark Resorts

A RESIDENTIAL REDEVELOPMENT COMPANY. Home Selling Guide. Company Overview

STATE COLLEGE AREA SCHOOL DISTRICT

AIR RIGHTS TOWER FOURTH YEAR

FOR SALE $3,900, MCGOVERN ST HIGHLAND PARK, IL Jameson Commercial Real Estate 425 W. North Ave Chicago, IL jamesoncommercial.

Land. For further information, please contact: M (360) (800) FAX (360)

Abu Dhabi, UAE. Phone: (Cell)

404BORDER. urban living downtown arlington

Transcription:

Page1 September 9, 2010 Hello, Please consider my architectural firm,, for design services of the Slater Hall Renovations. Our office is only 2 miles from the project site. We will bring trust, honesty, knowledge, and creative value to you. Thank you for this opportunity to help, Sincerely, Thomas McInerney, AIA, CSI, CCS, CCCA, NCARB, LEED AP 1208 Marcy Street Iowa City, Iowa 52240-3331 319-331-0365 ************************************************

Page2 provides professional architectural design services for clients which manage, maintain, and plan for residential, commercial, and industrial type buildings. is a full-service architectural design firm. Type of services available include: design and feasibility studies, planning and zoning services, building code review and recommendations, building plans and specification production, construction administration, building forensic investigation. Mission Statement: Provide clients across Iowa with architectural design services for all types of buildings, from conceptual planning through project completion. http://thomasarchitect.com/

Page3 Building: Core Fitness Center Location: 1395 Jordan Street, North Liberty, IA 52317 Size: 35,000 sq ft Cost: $5,000,000 or $142/sq ft Started: Spring 2007 Completed: Winter 2008 Description: The Core Fitness Center s program includes a five-tiered spinning room, an aerobics gym, a supervised child s exercise room, and yoga instruction area. The building s central atrium houses cardio vascular and the weight lifting equipment. Other complimentary areas include a 12-bed tanning salon and physical therapy clinic. The building also contains 5,000 square feet of leased commercial and retail space. Business Owners: Brett Mangold (319) 631-5150 Tracy Davis (319) 631-0461

Page4 Building: Sigma Nu Renovations Third Floor Location: 630 Dubuque Iowa City, Iowa Size: 3,450 sq ft Cost: $170,000 Started: June 2009 Completed: August 2009 Description: Built in the 1920's, the fraternity house is having its first major renovation since it was constructed. The project is comprised of 3 different phases. The first phase consisted of the extensive redesign of the room layout on the third floor for 20 students. The next phase occurred in this summer. A new color scheme was provided on the main floor. Please go to our website to view the animation of the new color scheme: http://www.thomasarchitect.com/sigma-nu-renovation---2010.html Client Contact: Jon Wilson (402) 936-1258

Page5 Building: City Tractor of North Liberty Location: 625 Penn Court, North Liberty, Iowa Size: Sales/Service Building 14,242 square feet Storage Building 4,825 square feet Cost: $1,500,000 or $79/square foot Started: August 2009 Completed: January 2010 Contact: Sylvan Schlabach (319) 656-2305 John Conrads (319) 625-3107 Description: City Tractor of North Liberty, Iowa began construction in August 2009. The company is a John Deere dealership with a sales floor, repair shop and storage facility. They also sale Honda and Stihl brand equipment. Download additional documents at: http://thomasarchitect.com/citytractorproject.html

Page6 Building: Wildwood Smokehouse and Saloon Location: Dolphin Drive SE, Johnson County, Iowa Size: 8,000 sq ft Cost: $1,200,000 or $150/square foot Started: Summer 2008 Completion: July 2009 Description: Currently under construction, the 2-story restaurant and dance hall will feature a stage and balcony seating. Utilizing structural insulated panels and tinted low-e glazing, this building will surpass energy compliance standards by 17%. Construction Manager: David Moore (319) 631-1283

Page7 Quality Control At, our quality control is managed as an on-going process where everyone is responsible to contribute ideas on the firm s ultimate commitment in improving and maintaining client satisfaction. No one enjoys wasting money on poor value. With team-building and creativity, Thomas McInerney encourages participation from each team member. Quality is a journey and not a destination. When beginning a project, we tenaciously identify clear objectives, team aspirations and role assignments. By acknowledging key attributes of the project (budget limitations, site characteristics, scheduling of deadlines and client expectations throughout the project), we plan schedule contingencies for reworking specifications and drawings where needed. Quality management is one ever-iterating process where continuous improvement is the foremost objective. We measure and review during the process the status of the following: Variances from project time and cost budgets Response time within the project team and firm Team coordination and review time Contractor Requests for Information Change Orders and the reasons for them By using automated schedules and smart objects (with AutoCAD Architecture 2010), coordinated construction is characteristic from project to project. It gives us quantities for estimating and quick assessment in materials selection. With effective quality control, provides clear, concise, correct and complete construction documents. This is essential element in providing sound estimates, effective communication and timely procurement of construction materials.

Page8 Thomas McInerney, AIA, CSI, CCS, CCCA, NCARB, LEED AP Registered Architect of Iowa #05242 Thomas McInerney is a life-long Iowan. Following graduation in 1990, Thomas worked for Howard R. Green Consulting Engineers in Cedar Rapids on a variety of industrial and municipal projects. In 1996, Thomas moved to Iowa City to work with Neumann Monson PC as a Project Architect. Thomas gained valuable experience working on a host of community developments, educational facilities and commercial related projects. Thomas was with Neumann Monson PC for over 10 years before starting his architectural practice in 2006. Name of bonding company and name and address of agent: Holmes Murphy 500 1 st Avenue NE Cedar Rapids, IA 52406-2429 Contact: (319)896-7703

Page9 Mais Albagdagi Intern Architect Experience: Internship, Ministry of Oil, Baghdad, Iraq 2002-2003 Assistant architect on the master plan and details of the expansion of the Ministry of Oil in Baghdad, Iraq. University of Baghdad/Assistant to design manager March June 2002 Assisted design staff with architectural presentations and graphic and interior design projects. Provided supervisory oversight of students coursework. Shive-Hattery Consultants 2006-2010 Henry county Health Center, North Liberty, IA 2006 Assistant Architect (Intern Architect) Created unique architectural designs according to client's request. Putting an effort yielding good building design through a process of problem solving and innovative thinking. A process of synthesizing beauty, function and cost into a total working solution that will meet or exceed the client s expectations. Fort Lee, Kenner Army Health Center Clinic Renovations, VA 2007 Assistant Architect (Intern Architect) Developed or assisted in the coordination of plans, designs and flow of development activities needed to ensure completion of architectural work for new construction projects. Creating a complete instrument schedule using the VA code. Assisted in the programming process during the schematic design, design development, and construction documents of the project. DVA Renovate Main Entrance, Iowa City, IA 2008 Assistant Architect (Intern Architect) Prepare information regarding design, specifications, materials, and equipment to create a better space for the entry way at the hospital as well as adding a cafeteria, eye clinic and a reception desk and updating the mechanical system. Providing estimate costs and schedules and other elements associated with construction projects. Developing design ideas and create design presentations using Sketchup 3D modeling and designing the reception desk. Clear Creek Amana Elementary School, Tiffin 2009 Assistant Architect (Intern Architect) Participated in a Completed design work including schematics and cost estimates. Reviewing architectural documents for potential conflict with all disciplines (Shop drawings). Developing design ideas and create design presentations using Corel Shop Draw. West Liberty Middle School, West Liberty, IA 2009 Assistant Architect (Intern Architect) Conducted studies and special projects such as space planning, structural analysis, design feasibility and other related architectural engineering problems. Provide ideas and concepts for future development and addition. Analyzing the current facility s condition and understanding its strategic plan, and goals. Languages Spoken and Extra Skills: Bi-lingual capability. Excellent command over English. Fluent in Arabic

Page10 Martin L. Wenck Project Manager Education: Bachelor of Arts in Architecture, Iowa State University 1986 Bachelor of Science in Architecture, Iowa State University 1987 Relevant Experience: Burns & Burns Architects 1990-1992 Fmha Multi Family Housing Waverly Clarion Osage Tipton Hampton New Hampton Troy Mills West Union Tama Toledo CBDG Housing Renovate Press Citizen Bldg. Elderly Housing Villa Gardens Apts. Iowa City, Low Income Housing Vantage Point Architects 1993 324 East College Street Apartments (Jim Clark, owner) Pierce King, Architect 1994-2000 Larry Svoboda Apartments 511 Melrose House (Community House)Restroom Expansion and Renovation Camp IoDisECa New Restrooms and Bath House Renovation Delta Delta Delta Sorority Renovation 2009-2010 Lensing Funeral Services addition