PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING February 2, 2017 REGULAR AGENDA ITEM 7

Similar documents
RESOLUTION NUMBER 2017-

RECITALS. Page 1 of 9

THREE RIVERS PARK DISTRICT BOARD OF COMMISSIONERS

RESOLUTION NO WHEREAS, CR 466A Road is recognized by Lake County and the Lake Sumter

CITY OF YUBA CITY STAFF REPORT

RESOLUTION NO

GLADES COUNTY, FLORIDA RESOLUTION NO

-REQUESTED: Approve the Resolution of Necessity for the acquisition and condemnation of parcels required for the Matlacha Park Expansion Project.

RESOLUTION 5607 (10) NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lompoc as follows:

KANE COUNTY AGRICULTURE COMMITTEE AGENDA

AGENDA ITEM SUMMARY January 2, 2018 City Council

Bridle View Annexation Interlocal Agreement Regarding Water Facilities

M E M O R A N D U M. DATE: January 14, Planning and Zoning Board. Alaina Ray, AICP, Director Planning, Zoning and Building Department

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

Board Agenda Wednesday, Dec. 13, 2017 LCRA Board Room Austin

A Resolution of the Governing Board of the South Florida Water Management District authorizing eminent domain proceedings for the

Administration and Projects Committee STAFF REPORT July 3, 2014 Page 2 of 3 Changes from Committee B. CT 208 Historical Summary of Contract s. C. Reso

ENCROACHMENT AGREEMENT

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT

RELEASE OF EASEMENT AGREEMENT AGENDA ITEM AND RESOLUTION

Harbour Island Force Main Replacement Design Build Project. South Neighborhood Association October 22, 2018

NATIONAL PURCHASING COOPERATIVE INTERLOCAL PARTICIPATION AGREEMENT I. RECITALS

SALT LAKE CITY COUNCIL STAFF REPORT

RESOLUTION NUMBER 4678

CITY OF PUNTA GORDA ORDINANCE NO.

TOWN OF PALM BEACH Information for Town Council Meeting on: July 12, 2017

RESOLUTION R EAST COUNTY MIDDLE SCHOOL SCHOOL SITE PLAN SSP DTS

FINANCE DEPARTMENT M E M O R A N D U M

Mayor and City Council, as and constituting The Board of Contra Costa County Sanitation District No. 6 (Board)

INTERDEPARTMENTAL M E M O R A N D U M. Preliminary Water Control District Rate Resolution

ORDINANCE NO

WATER AND WASTEWATER AGREEMENT (Individual)

HILLCREST COMMUNITY DEVELOPMENT DISTRICT BROWARD COUNTY REGULAR BOARD MEETING APRIL 19, :00 P.M.

BOARD MEETING AGENDA January 17, 2018

AGENDA ITEM Public Utilities Commission City and County of San Francisco

COST/FUNDING SOURCE: Potential future Income of approximately $300,000

LEE COUNTY ORDINANCE NO

=================================================================== =======~===========================================================

AGENDA ITEM FORM INFORMATION ONLY PRESENTATION DISCUSSION ONLY ACTION ITEM

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

City Council Information Form

FLORIDA DEPARTMENT OF TRANSPORTATION

Lee County Board Of County Commissioners Agenda Item Summary Blue Sheet No

CITY OF MOUNTLAKE TERRACE ORDINANCE NO.

Metro. Board Report. File #: , File Type: Policy Agenda Number: 60.

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

-ii~ ADAMS COUNTY. &,.ee8.& PUBLIC HEARING AGENDA ITEM

UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION

5' PROVIDING THAT THE NORTHEAST HERNAmO

Right-of-Way Acquisition and

AVENIR COMMUNITY DEVELOPMENT DISTRICT CITY OF PALM BEACH GARDENS SPECIAL BOARD MEETING MARCH 27, :00 P.M.

Temporary Housing Ordinance Attachment. Draft 3, 11/05/10 ORDINANCE NO.

ORDINANCE NO WHEREAS, in Chapter 166 Municipalities, Florida Statutes, the Florida State

yjryly AGENDA REPORT Meeting Date: November 20, 2018 Item Number: To: From:

WATER RIGHTS LEASE AGREEMENT. This water rights lease agreement ( Agreement ) is made and entered into this day of

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board

ACTION ITEM #3 WSU Pullman, Approval of Pullman Moscow Regional Airport s

SARASOTA COUNTY GOVERNMENT

6. Consideration of Res , Interlocal Agreement between Pinellas County and the City of Treasure Island for Water Line Relocation

PROPERTY; PROVIDING FOR EXPENDITURE OF REVENUE; PROVIDING FOR REIMBURSEMENT

RESOLUTION NO. CONTAINING APPROXIMATELY 587 SQ.FT. RD:EEH:LCP

IC Chapter 15. Public Safety Communications Systems and Computer Facilities Districts

BLUEPRINT REAL ESTATE POLICY

City of Titusville "Gateway to Nature and Space"

RESOLUTION NO. R To Acquire Real Property Interests Required for the Federal Way Link Extension

THIS CONVEYANCE IS SUBJECT TO

INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY

Anatomy Of An Appraisal

PUBLIC WORKS DEPARTMENT

ORDINANCE NO BE IT ENACTED BY THE CITY COUNCIL OF THE CITY OF OVIEDO, FLORIDA, AS FOLLOWS:

ARLINGTON COUNTY, VIRGINIA

CHIEF REAL ESTATE OFFICER, 1949

TOWNSHIP COUNCIL AGENDA REGULAR MEETING 7:00 P.M. September 17, 2018 Municipal Building, 600 Bloomfield Avenue

Request for Proposals

ORDINANCE NO

QUIT CLAIM DEED (Pursuant to F. S )

BOARD OF COUNTY COMMISSIONERS SARPY COUNTY, NEBRASKA

AGENDA ITEM SUMMARY GLADES COUNTY BOARD OF COUNTY COMMISSIONERS

Property Owner/Address: Holiday Partners, LLC & Dawson-AZ, LLC 168 N. 9 th Street, Suite 200, Boise, ID 83702

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: CONSENT PRESET: TITLE: ACCEPTANCE OF A DRAINAGE EASEMENT FROM CASA PISCES, LLC (CASA)

AGENDA DANIA BEACH CITY COMMISSION SECOND PUBLIC HEARING AIRPORT SETTLEMENT AGREEMENT MONDAY, OCTOBER 03, :00 P.M.

PRIVATE PROPERTY PUBLIC PURPOSE

THE BOARD OF SUPERWSORS OF THE COUNTY OF STANISLAUS ACTION AGENDA SUMMARY. DEPT: Publ~c Works & BOARD AGENDA # *C-1 May 1,2007

TEMPORARY CONSTRUCTION EASEMENT JEA SEWER SYSTEM CUSTOMER OWNED, OPERATED AND MAINTAINED

RECITALS STATEMENT OF AGREEMENT. Draft: November 30, 2018

AGREEMENT. among BROWARD COUNTY. and CITY OF FORT LAUDERDALE. and DOWNTOWN DEVELOPMENT AUTHORITY OF THE CITY OF FORT LAUDERDALE.

SCHOOL BOARD OF BREVARD COUNTY, FLORIDA BOARD AGENDA ITEM October 10, 2017

RESOLUTION NO. RD:EEH:LCP

RESOLUTION NO. R To Acquire Real Property Interests Required for the Lynnwood Link Extension

OWNERS, BUSINESSES AND TENANTS PARTICIPATION AND RE-ENTRY RULES

RECITALS. WHEREAS, the GMA requires counties to adopt county-wide planning policies in cooperation with cities within the County; and

RESOLUTION NO

ARLINGTON COUNTY, VIRGINIA

ORDINANCE NO. WHEREAS, the inclusion of real estate investments in the. assist in improving investment performance, resulting in a

Section 4.1 LAND TITLE

AGENDA ITEM 3. R Meeting May 14, 2014 AGENDA ITEM

ARLINGTON COUNTY, VIRGINIA

BOROUGH OF CARLISLE CUMBERLAND COUNTY, PENNSYLVANIA ORDINANCE NO. 2324

BID PROPOSAL FORMS FOR THE SALE OF REAL PROPERTY LOCATED IN THE CITY OF CORONA IN THE COUNTY OF RIVERSIDE

Transcription:

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING February 2, 2017 REGULAR AGENDA ITEM 7 Regional Integrated Loop System Phase 1 Interconnect Project [U.S. 17 to Punta Gorda] Presenter - Ford Ritz, Project Engineer Recommended Action - Motion to approve Resolution 2018-02; A Resolution Determining the Necessity to Construct a Transmission Pipeline and Appurtenant Facilities Connecting The Terminus of the Peace River Manasota Regional Water Supply Authority Delivery System, On U.S. 17, Near the DeSoto/Charlotte County Line To The City of Punta Gorda Shell Creek Water Treatment Plant On South Washington Loop Road In Charlotte County ( Regional Integrated Loop System, Phase 1 ) Motion to approve Resolution 2018-03; A Resolution Authorizing the Acquisition of Certain Real Property Located Within Charlotte and DeSoto Counties, Florida, To Be Used For The Public Purpose Of Constructing, Operating, and Maintaining the Transmission Pipeline And Appurtenant Facilities On U.S. 17 Near the DeSoto County/Charlotte County Line, To The City of Punta Gorda Shell Creek Water Treatment Plant On South Washington Loop Road In Charlotte County ( Regional Integrated Loop System, Phase 1 ) a. Phase 1 Interconnect Project Update This project will interconnect the Regional system along U.S 17 in DeSoto County with the City of Punta Gorda s Shell Creek Water Treatment Plant. Staff will review the project and progress to-date. b. Resolution 2018-02 Phase 1 Interconnect Alignment This is a resolution affirming the need for the project and the recommended alignment. Staff will review the alignment, project benefits and need. c. Resolution 2018-03 Necessity for Acquisition of Certain Properties Along the Phase 1 Alignment This is a resolution authorizing acquisition of certain easements required for construction and operation of the project. Staff will discuss the required easements. Budget Action: None (Project funded by State and SWFWMD grants and City of Punta Gorda funds) Attachments: Tab A Presentation Tab B Phase 1 Status Report Tab C Resolution 2018-02 and supporting materials Tab D Resolution 2018-03 and supporting materials

TAB A Presentation Materials

1/24/2018 February 2, 2018 Phase 1 Interconnect Presentation Overview Update on Project Status Resolution 2018 02; A Resolution Determining the Necessity to Construct a Transmission Pipeline Resolution 2018 03; A Resolution Authorizing the Acquisition of Certain Real Property to Construct a Transmission Pipeline 1

1/24/2018 Phase 1 Interconnect Phase 1 Connects the Regional System directly to City of Punta Gorda s Shell Creek Water Treatment Plant 6 Miles of 24 inch diameter Pipe Includes a 3,500 LF Horizontal Directional Drill under Shell Creek Co Funded by SWFWMD/State and the City of Punta Gorda Budget $12 Million 2

1/24/2018 Shell Creek HDD Crossing Phase 1 Interconnect Project Status Design currently at 90% complete All major permits applications submitted and under review, including FDOT, FDEP & ACOE Project is on time and on budget Anticipate bringing Prequalified Contractors to the Board in April 2018 Based on favorable permit review expect to bring Construction Contracts to the Board for Approval in August 2018 3

1/24/2018 Phase 1 Project Schedule Phase 1 Interconnect U.S. 17 to Punta Gorda FY 2017 FY 2018 FY 2019 FY 2020 Task J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J Final Design Permitting Completion Target Property Procurement Contractor PreQualification Bidding Phase Contractor Selection Construction Phase 60% Design Submittal 90% Design Submittal Indicates Board Approval February 2, 2018 4

1/24/2018 Phase 1 Interconnect Purpose Deliver Regional Water to the City of Punta Gorda Provide a back up supply to DeSoto County Provide a means for Punta Gorda to deliver water to the Regional System Provide water to the developing U.S. 17 Corridor in Charlotte County Improve regional supply availability/reliability Phase 1 Interconnect Route Selection Six Routes were considered Route 2 was selected based upon consideration of the following factors: Evaluation of Constructability Analysis of Environmental Factors Long Term Planning/Future Projects Property/Easement Acquisition Public Input Cost 5

1/24/2018 Route 2 Recommendation for Resolution 2018 02 Motion to approve Resolution 2018 02; A Resolution Determining the Necessity to Construct a Transmission Pipeline and Appurtenant Facilities Connecting The Terminus of the Peace River Manasota Regional Water Supply Authority Delivery System, On U.S. 17, Near the DeSoto/Charlotte County Line To The City of Punta Gorda Shell Creek Water Treatment Plant On South Washington Loop Road In Charlotte County ( Regional Integrated Loop System, Phase 1 ) 6

1/24/2018 February 2, 2018 Phase 1 Interconnect Key Points The project is in the public interest The project increases water system reliability and sustainability for Charlotte County, DeSoto County, the City of Punta Gorda and the Region The project is necessary to implement the Regional Vision The selected route was chosen after careful consideration 7

1/24/2018 Property 6.3 miles of pipeline Pipes placed within Right of Way or public easement where possible (more than 90% of total length) A short amount of pipe necessarily falls on private easements Two Types of Easements: Permanent non exclusive Temporary construction This figure identifies private property easements needed for the project. 8

1/24/2018 Recommendation for Resolution 2018 03 Motion to Approve Resolution 2018 03; A Resolution Authorizing the Acquisition of Certain Real Property Located Within Charlotte and DeSoto Counties, Florida, To Be Used For The Public Purpose Of Constructing, Operating, and Maintaining the Transmission Pipeline And Appurtenant Facilities On U.S. 17 Near the DeSoto County/Charlotte County Line, To The City of Punta Gorda Shell Creek Water Treatment Plant On South Washington Loop Road In Charlotte County ( Regional Integrated Loop System, Phase 1 ) 2007 questions? 1991 1991 2007 1999 9

TAB B Project Status Report

TAB C Resolution 2018-02 and supporting information

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY RESOLUTION NO. 2018-02 A RESOLUTION TO BE ENTITLED: A RESOLUTION DETERMINING THE NECESSITY TO CONSTRUCT A TRANSMISSION PIPELINE AND APPURTENANT FACILITIES CONNECTING THE TERMINUS OF THE PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY DELIVERY SYSTEM, ON U.S. 17, NEAR THE DESOTO COUNTY/CHARLOTTE COUNTY LINE, TO THE CITY OF PUNTA GORDA SHELL CREEK WATER TREATMENT PLANT ON SOUTH WASHINGTON LOOP ROAD IN CHARLOTTE COUNTY ( REGIONAL INTEGRATED LOOP SYSTEM, PHASE 1 ). WHEREAS, Peace River Manasota Regional Water Supply Authority ( Authority ) is an interlocal governmental agency whose member governments and customers are Charlotte County ( Charlotte ), DeSoto County ( DeSoto ), Manatee County ( Manatee ), Sarasota County ( Sarasota ), and the City of North Port; and WHEREAS, The Authority is authorized by Section 373.1962(2)(b), Florida Statutes, to acquire water and water rights; to develop, store and transport water; and to provide, sell, and deliver water for county or municipal purposes and uses; and WHEREAS, The Authority is authorized and required by Section 373.1962, Florida Statutes, to design, construct, operate, and maintain facilities in the locations and at the times necessary to ensure an adequate water supply will be available to all member governments and customers within the Authority s geographic territory; and WHEREAS, The Authority has developed the Integrated Regional Water Supply Master Plan 2015 (the Master Water Plan ) that includes the construction and development of new sources of potable water, pipelines and appurtenant facilities; and WHEREAS, The Authority s development of these potential water sources as regional supplies will benefit from construction of a regional integrated loop transmission system (the Regional Integrated Loop System ) to move water from existing and new sources to the areas of demand; and WHEREAS, The Authority has adopted the Regional Integrated Loop System Feasibility / Routing Study that identifies pipeline capacity, routes, connections and appurtenant facilities needed for Peace River Authority purposes; and 1/23/2018

WHERAS, Charlotte and Desoto Counties have provided consent for the Phase 1 Interconnect Project which provides a regional water transmission main connecting the terminus of the Authority s 20-inch diameter regional transmission main on U.S. 17, near the Desoto County/Charlotte County line to the City of Punta Gorda, Shell Creek Water Treatment Plant on South Washington Loop Road; and WHEREAS, The Phase 1 Interconnect Project of the Regional Integrated Loop System includes a transmission pipeline, flow metering facilities and appurtenant facilities (the Pipeline Facilities ) which connect the terminus of the Authority s Regional Transmission System on U.S.17 to the Punta Gorda Shell Creek Water Treatment Plant (the Project ); and WHEREAS, the Regional Integrated Loop System is intended to expand the capacity and enhance the reliability of the Authority s regional water utility system to ensure an adequate water supply will be available to all members, customers and partners of the Peace River Authority; and WHEREAS, an interconnection of the City of Punta Gorda municipal water supply system to the Peace River Authority regional supply system through the Regional Integrated Loop System, Phase 1, will provide valuable back-up and emergency supply capacity to the City and the Region; and WHEREAS, The Authority has determined that the construction of the Pipeline Facilities for the Regional Integrated Loop System, Phase 1, are necessary to enable Peace River Authority to meet projected water needs of the Authority s public water utility system; and WHEREAS, the construction of the Pipeline Facilities for the Regional Integrated Loop System, Phase 1, is in the public interest, for the public benefit, and necessary for carrying out the Authority s purposes; and WHEREAS, The Authority has determined an appropriate route for the Pipeline Facilities for the Regional Integrated Loop System, Phase 1, and in determining the route of the Pipeline Facilities, and the land rights needed for the construction, operation, and maintenance of the Pipeline Facilities, Peace River Authority has given great consideration to, and has weighed the availability of alternative routes, environmental impact, safety factors, long range planning and costs of the Project; and WHEREAS, The Board route study and preferred route for the Regional Integrated Loop System Phase 1 Interconnect were presented to the Authority s Board of Directors at the regular Board meetings on December 7, 2016 and February 1, 2017; and WHEREAS, The Authority has caused to be surveyed the line and area of construction by map or survey and location for the Project; and 2

WHEREAS, the necessary approvals from the appropriate governmental agencies to construct, operate, and maintain the Pipeline Facilities have already been obtained or it is reasonably anticipated that they will be obtained; and NOW, THEREFORE, BE IT RESOLVED by Peace River Authority s Board of Directors that those matters set forth in the foregoing recitals are hereby adopted, ratified and found; and further RESOLVED, that the route for the Project is that which is shown on Exhibit A, attached hereto, and which is described as Route 2 in the January 2017, Regional Integrated Loop System Phase 1 Interconnect [U.S. 17 to Punta Gorda] Basis of Design Report ; and further RESOLVED, that this Resolution shall take effect immediately upon being passed and adopted; and further RESOLVED, that if any phrase, portion or part of this Resolution is found to be invalid or unconstitutional by a court of competent jurisdiction, such phrase, portion or part shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remainder of the Resolution. NOW, THEREFORE, BE IT RESOLVED, the Pease River Manasota Regional Water Supply Authority authorizes Resolution No. 2018-02. ADOPTED at a meeting of the Board of Directors at the Peace River Facility in Desoto County, Florida, this second day of February, 2018. Attest: Peace River Manasota Regional Water Supply Authority Patrick J. Lehman, Executive Director Chair Approved as to Form: Douglas Manson, General Counsel for Peace River Manasota Regional Water Supply Authority 3

MEMORANDUM Date: February 2, 2018 To: From: Through: RE: Patrick Lehman, P.E., Executive Director Ford Ritz, P.E., Project Engineer Mike Coates, P.G. Deputy Director Board Approval of Regional Integrated Loop System Phase 1 Pipeline Alignment Resolution 2018-02 Background & Recommendation: Property acquisition for this Project will require formal Board action on the preferred alignment for the Phase 1 Interconnect. Based upon information provided by the design consultant in their Phase 1 Interconnect Basis-of-Design-Report (BODR) and acceptance of the BODR, which included the preferred route, by the Board in February 2017, Authority staff recommends Board approval of Resolution No. 2018-02, A RESOLUTION DETERMINING THE NECESSITY TO CONSTRUCT A TRANSMISSION PIPELINE AND APPURTENANT FACILITIES CONNECTING TERMINUS OF THE PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY DELIVERY SYSTEM ON U.S. 17 NEAR THE DESOTO COUNTY/CHARLOTTE COUNTY LINE, TO THE CITY OF PUNTA GORDA SHELL CREEK WATER TREATMENT PLANT ON SOUTH WASHINGTON LOOP ROAD IN CHARLOTTE COUNTY ( REGIONAL INTEGRATED LOOP SYSTEM, PHASE 1 ). Project Description and Background: The Integrated Regional Loop Phase 1 Project will provide a plant-to-plant connection between the Peace River Facility and the City of Punta Gorda Water Treatment Facility. The Phase 1 Project will extend approximately 6.3 miles from the terminus of the of the PRMRWSA Regional Transmission System on U.S. 17, south along U.S. 17, east along Washington Loop Road North, south along Three Rivers Road and across Shell Creek to the City of Punta Gorda Water Treatment Facility. The project includes approximately 33,000-ft of 24-inch diameter pipeline including a 3,500-lf subaqueous crossing of Shell Creek by horizontal directional drilling west of the Punta Gorda reservoir Hendrickson Dam, metering assemblies and has connection points at the Desoto County South Booster Pump Station on U.S. 17 and the Punta Gorda Water Treatment Facility. The Phase 1 Project will provide emergency water supply backup to Desoto County should there be an interruption in service from the Peace River Facility, provide water service to support future development along the U.S. 17 corridor in Charlotte County, deliver regional water to the City of Punta Gorda and will enhance water system reliability and supply options for the Region. The project is scheduled for completion in 2020. February 2, 2018 Phase 1 Pipeline Alignment

Discussion and Board Acceptance of Preferred Alignment The project will provide a critical regional interconnection between the Regional water supply system, Desoto County and the City of Punta Gorda municipal water systems. This interconnection allows the Region to supply the City with drinking water in case of emergency with the City s water treatment facilities, and allows the City to support the Region and Desoto County in times of need as well. The project design consultant, King Engineering Associates, analyzed multiple alternative alignments for the Phase 1 pipeline project in their Phase 1 Interconnect Basis of Design Report (BODR). King presented the draft Phase 1 Interconnect BODR at the December 7, 2016 Board Meeting. Route evaluations involved analysis of factors including but not limited to; environmental impacts; safety factors; long range planning; and costs for each alternative route. Route alternatives were ranked based on the results of these analyses, and the highest ranked alignment was Route 2 (preferred alignment) as discussed above. At the Authority s February 1, 2017 Board Meeting, King Engineering presented the final version (January 2017) of the Phase 1 Interconnect BODR, which included the preferred Route 2. With Board action to receive and file the January 2017 BODR for the Phase 1 Interconnect, Route 2 became the basis of the ongoing design of the project. A figure of Route 2 is attached, and the route is more completely described in the BODR. The project is currently at approximately 90% design completion. February 2, 2018 Phase 1 Pipeline Alignment

TAB D Resolution 2018-03 and supporting information

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY RESOLUTION NO. 2018-03 A RESOLUTION TO BE ENTITLED: A RESOLUTION AUTHORIZING THE ACQUISITION OF CERTAIN REAL PROPERTY LOCATED WITHIN CHARLOTTE AND DESOTO COUNTIES, FLORIDA, TO BE USED FOR THE PUBLIC PURPOSE OF CONSTRUCTING, OPERATING, AND MAINTAINING THE TRANSMISSION PIPELINE AND APPURTENANT FACILITIES ON U.S. 17, NEAR THE DESOTO COUNTY/CHARLOTTE COUNTY LINE, TO THE CITY OF PUNTA GORDA SHELL CREEK WATER TREATMENT PLANT ON SOUTH WASHINGTON LOOP ROAD IN CHARLOTTE COUNTY ( REGIONAL INTEGRATED LOOP SYSTEM, PHASE 1 ). WHEREAS, Peace River Manasota Regional Water Supply Authority ( Authority ) by Resolution 2018-02 did determine the necessity to construct a transmission pipeline and appurtenant facilities connecting the Authority s regional transmission system on U.S. 17, near the Desoto County/Charlotte County line, to the City of Punta Gorda Shell Creek Water Treatment Plant on South Washington Loop Road in Charlotte County ( Regional Integrated Loop System, Phase 1 ), and WHEREAS, to accomplish the construction, operation and maintenance of the Regional Integration Loop System, Phase 1, the Authority must acquire permanent easements identified on: Berkman JA & Siegal Jackowitz Pin#402420151002 and containing 0.533 acres; BK Properties LLC Pin#402420300001 and containing 0.775 acres; Charles Wesley Ryan Revocable Trust Pin#202420151007 and containing 0.007 acres; Three Rivers Subdivision Property Owners Association, Inc. Pin#402420151008 and containing 0.093 acres; William J. Smith and Betsy J. Smith Pin#402420300005 and Pin#402420300006 and containing 0.682 acres; and Wal-mart Stores East, LP Pin#31-39-14-0000-0012-0000 and containing 0.013 acres in Desoto County, Florida and temporary construction easements identified on: Berkman JA & Siegal Jackowitz Pin#402420151002 and containing 0.781 and 0.816 acres;

BK Properties LLC Pin#402420300001 and containing 1.162 and 1.162 acres; Martin L. Rietveld and Penny S. Rietveld Pin#402420152002 and containing 0.538 acres; Three Rivers Subdivision Property Owners Association, Inc. Pin#402420151008 and containing 0.041 and 0.42 acres; and William J. Smith and Betsy J. Smith Pin#402420300005 and Pin#402420300006 and containing 2.471 acres; in certain lands in Charlotte and Desoto Counties, Florida, as more fully described in composite Exhibit A attached hereto, and the basic terms for permanent easement and temporary construction easements both described in Exhibit B, attached hereto, for the construction, operation, and maintenance of the Pipeline Facilities which are part of a regional water supply system serving the members, customers and partners of the Authority, and WHEREAS, the Authority is authorized by Sections 163.01 and 373.1962, Florida Statutes, to exercise the power of eminent domain as provided by law for the condemnation of private property for public use, and to acquire title to such interests in real property as is necessary to the exercise of the Peace River Manasota Regional Water Supply Authority s powers and to accomplish Authority purposes; and WHEREAS, The Authority shall comply with the pre-suit negotiation requirements set forth in Section 73.015, Florida Statutes; and NOW, THEREFORE, BE IT RESOLVED by Peace River Manasota Regional Authority s Board of Directors that those matters set forth in the foregoing recitals are hereby adopted, ratified and found; and further RESOLVED, that after consideration of the factors described in the foregoing recitals, the selection of the properties described in Exhibit A, attached hereto, and the basic terms for permanent easement and temporary construction easements both described in Exhibit B, attached hereto, be and the same is hereby ratified and confirmed and found to be necessary for the construction, operation and maintenance of the Pipeline Facilities to enable the Authority to meet projected demands upon its public water utility system, to enhance the capacity and reliability of that system; and further RESOLVED, that the Authority, its officers, employees, contractors and attorneys are hereby authorized and directed to acquire by negotiation, contract or legal proceedings, including eminent domain proceedings pursuant to Chapters 73 and 74, Florida Statutes (and specifically including the quick take procedure provided in Chapter 74, Florida Statutes) as may be necessary to acquire the permanent easements and temporary construction easements in certain lands located in Charlotte and Desoto Counties, Florida, described in Exhibit A ; and further 2

RESOLVED, that the Authority s Executive Director or his designee is authorized to revise the construction plans and specifications during the course of the Project. Further, the Executive Director or his designee is authorized to bind the Authority as to its construction plans and specifications for such purposes as the Executive Director or his designee deem necessary in his or her professional judgment, including but not limited to reducing or eliminating the estimated damage to any adjacent or remaining property that could be caused by the taking; and further RESOLVED, that this Resolution shall take effect immediately upon being passed and adopted; and further RESOLVED, that if any phrase, portion or part of this Resolution is found to be invalid or unconstitutional by a court of competent jurisdiction, such phrase, portion or part shall be deemed a separate, distinct and independent provision and such holding shall not affect the validity of the remainder of the Resolution. NOW, THEREFORE, BE IT RESOLVED, the Peace River Manasota Regional Water Supply Authority authorizes Resolution 2018-03. ADOPTED at a meeting of the Board of Directors at the Peace River Facility in Desoto County, Florida, this second day of February, 2018. Attest: Peace River Manasota Regional Water Supply Authority Patrick J. Lehman, Executive Director Chair Approved as to Form: Douglas Manson, General Counsel for Peace River Manasota Regional Water Supply Authority 3