Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

Similar documents
LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II

ARM: Water Supply and Sanitation Sector Project Phase II

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

Social Safeguards Due Diligence Report

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

ARM: Sustainable Urban Development Investment Program Tranche 2

THE REPUBLIC OF ARMENIA YEREVAN MUNICIPALITY

NORTH-SOUTH ROAD CORRIDOR INVESTMENT PROGRAM TRANCHE 3 (Talin-Lanjik and Lanjik-Gyumri), SUBSECTION 2

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

YEREVAN MUNICIPALITY

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Republic of Azerbaijan: Water Supply and Sanitation Investment Program (Tranche 2)

ARM: Proposed Armenia Georgia Border Regional Road (M6 Vanadzor Bagratashen) Improvement Project

CONTRACT ON SUBSURFACE USE No PV-245 FOR THE PURPOSE OF MINERAL EXTRACTION. Yerevan 26 September, 2012

REPUBLIC OF MACEDONIA

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

Resettlement Planning Document

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

Resettlement Policy Framework

KALPATARU POWER TRANSMISSION LIMITED BRANCH OFFICE: PIAZZA GRANDE, AREA 108, V. SARGSYAN STR., YEREVAN, REPUBLIC OF ARMENIA. PHONE:

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

Due Diligence Report for Land Acquisition and Resettlement. KAZ: CAREC Corridor 2 (Mangystau Oblast Section) Investment Program Tranche 2

How Swaziland Is Upgrading Its Slums

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

Resettlement Planning Document

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment

FINANCING SUPPORT OF HOUSING CONSTRUCTION IN RURAL AREAS AND DEVELOPMENT OF MORTGAGE CREDITING SYSTEM IN UZBEKISTAN

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Tajikistan: Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project

Replacement of 110kV Noyemberyan and Lalvar Overhead Transmission Lines. Abbreviated Resettlement Action Plan

Dhaka Water Supply and Sanitation Project

VOLUNTARY LAND DONATION FRAMEWORK

Transmission Line Reconstruction Project Hrazdan to Shinuhayr Corridor. Resettlement Action Plan

Montebello Land & Water Co.

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Azerbaijan Second National Water Supply and Sanitation Project (SNWSSP) Resettlement Policy Framework (RPF) Land Acquisition

Land Acquisition and Resettlement Plan. Uzbekistan: Water Supply and Sanitation Services

BIOMASS-BASED DISTRICT HEATING PROJECT

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

AZE: Road Network Development Investment Program, Tranche 4

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

Transmission Line Reconstruction Project Hrazdan to Shinuhayr Corridor. Abbreviated Resettlement Action Plan. Section 4: Vayk line

B. Justification of project design and alternative analysis:

COMPLIANCE APPRAISAL: SUMMARY OF RESULTS

Rural Land Market in Armenia: Formation Peculiarities and Development Trends

Transmission Line Reconstruction Project Hrazdan to Shinuhayr Corridor. Resettlement Action Plan. Section 1: Noraduz line

Draft Land Acquisition and Resettlement Plan (LARP)

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

LAND ACQUISITION AND COMPENSATION

Transmission Line Reconstruction Project Hrazdan to Shinuhayr Corridor. Abbreviated Resettlement Action Plan

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

PRC: Fujian Soil Conservation and Rural Development II Project

Results Framework for LAPs Household-level Impacts

Due Diligence Report on Social Safeguards. IND: Rural Connectivity Investment Program Projects I and II

Land Acquisition and Resettlement Plan. Uzbekistan: Water Supply and Sanitation Services

Draft Land Acquisition and Resettlement Plan (LARP) TAJ: CAREC Corridors 2, 5 and 6 (Dushanbe-Kurgonteppa) Road Project

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

Land Acquisition and Resettlement Framework

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

Land Acquisition and Resettlement Framework. UZB: Western Uzbekistan Water Supply System Development Project

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

I U B Reddy The World Bank New Delhi, India

Transmission Line Reconstruction Project Hrazdan to Shinuhayr Corridor. Abbreviated Resettlement Action Plan. Section 4:Vayk line

Land Acquisition Rehabilitation and Resettlement Act, 2013

India: Madhya Pradesh Irrigation Efficiency Improvement Project. Subproject: Pipeline Distribution System for 500 Hectares of Command Area

Ex-Ante Evaluation (for Japanese ODA Loan)

UN-HABITAT: Philippines - Overview of the Current Housing Rights Situation and Related Activities

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

Land Acquisition and Resettlement Plan Compliance Report. ARM: Sustainable Urban Development Investment Program Tranche 2

Resettlement Plan. May 2011

Land Acquisition and Resettlement Plan (LARP) UZB: Tashkent Province Water Supply Development Project

Proposed Multitranche Financing Facility Georgia: Georgia Sustainable Urban Transport Investment Program

COLOMBIA MINISTRY OF ENVIRONMENT, HOUSING AND TERRITORIAL DEVELOPMENT WATER AND SANITATION SECTOR SUPPORT PROJECT RESSETLEMENT POLICY FRAMEWORK

Land Acquisition and Compensation Plan. Lao PDR: Small Towns Water Supply and Sanitation Sector Project

People s Republic of China: Xinjiang Changji Integrated Urban-Rural Infrastructure Demonstration Project

H-POLICY 1: Preserve and improve existing neighborhoods. Ensure that Prince William County achieves new neighborhoods with a high quality of life.

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program

UZB: Second CAREC Corridor 2 Road Investment Program, Project 3

(2) An identification of the municipality, area, or facility to be served by the proposed system;

RESSETTLEMENT POLICY FRAMEWORK

Urban Land Policy and Housing for Poor and Women in Amhara Region: The Case of Bahir Dar City. Eskedar Birhan Endashaw

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

LAND REFORM IN MALAWI

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

PAK: Multitranche Financing Facility Central Asia Regional Economic Cooperation Corridor Development Investment Program

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework

Mongolia: Western Regional Road Corridor Investment Program

Transcription:

Involuntary Resettlement Due Diligence Report Loan 2860 (SF) July 2015 ARM: Water Supply and Sanitation Sector Project Additional Financing Prepared by the Armenian Water and Sewerage Closed Joint Stock Company (AWSC) for the Asian Development Bank.

The involuntary resettlement due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

INVOLUNTARY RESETTLEMENT DUE DILIGENCE REPORT UPDATED VERSION SUBPROJECT IV, KOTAYK MARZ, ARMENIA WATER SUPPLY AND SANITATION SECTOR PROJECT- ADDITIONAL FINANCING Project Number: L2860-ICB-1-03 YEREVAN July 2015

ABBREVIATIONS ADB PC GoA RA AMD LAR LARP LARF WSS WTP AWSC SCWE LA DRR Asian Development Bank public consultation Government of Armenia Republic of Armenia Armenian Dram Land Acquisition and Resettlement Land Acquisition and Resettlement Plan Land Acquisition and Resettlement Framework Water Supply and Sanitation Water Treatment Plant Armenian Water and Sewerage Company State Committee for Water Economy local authorities daily regulating reservoir 2

TABLE OF CONTENT I. INTRODUCTION... 4 A. Project Background 4 B. Scope of the Project 4 C. Design Features of Subproject IV 4 D. Objective and Scope of the Report 5 II. LAND ACQUSITION AND RESSETLEMENT REQUIREMENTS FOR THE PROJECT... 5 III. MINIMIZING OF LAND ACQUISITION AND RESSETLEMENT IMPACTS... 6 IV. SCOPE OF POTENTIAL LAND ACQUISITION AND RESSETLEMENT IMPACTS... 8 V. CONCLUSION... 9 3

I. INTRODUCTION A. Project Background 1. On the back of the successful implementation of the Water Supply and Sanitation Sector Project, Phase I, the Government of Armenia (GoA) through the State Committee for Water Economy (SCWE) has requested Asian Development Bank (ADB) to support the funding of the new project. ADB agreed to provide GoA with the loan of 40 mln USD to rehabilitate and extend of the water supply and sanitation (WSS) systems across 10 subprojects and improvements in operational efficiency and financial management of Armenia Water and Sewerage Company (AWSC) 1. The additional financing project of the WSS Sector, Phase II includes 18 towns and 92 villages in order to implement the above-mentioned procedures. Within the scope of 10 Subprojects it is foreseen to make investments in 10 regions. This due diligence report concerns to Subproject IV in the absence of any land acquisition and consequently, no resettlement impacts. B. Scope of the Project 2. The Project is aimed (a) to rehabilitate and upgrade water supply infrastructures, (b) to improve the performance of water supply services, and (c) to improve the management and operational efficiency of the water utility company. 3. As a result, Project will ensure further public health and environmental improvements by providing potable and reliable water supply to beneficiary households. It will also support poverty reduction by (i) reducing the incidence of waterborne diseases and costs of medical care; (ii) improving the time poverty of women due to labor intensive housework such as water collection, which may allow them to participate more in social and economic activities; (iii) providing safer and more reliable water supply; and (iv) improving the quality of life of households in all the project towns and villages by improving their access to safe and sustainable drinking water. 4. The Project will establish safe, reliable piped water supply for 112 communities: 18 towns and 94 villages within 10 Marzes (Aragatsotn, Ararat, Amavir, Gegharqunik, Tavush, Lori, Kotayq, Shirak, Syunik, and Vayotz-Dzor). The Project will be implemented through subprojects. The following villages and towns from Kotayq marz are the beneficiaries of the Subproject IV: Hrazdan, Tsaghkadzor, Abovyan and Charentsavan towns, Qaghsi, Akunq and Solak villages. C. Design Features of Subproject IV 5. The network in beneficiary communities is mostly built in the 1960s-70s. In Hrazdan, Tsakhadzor, Abovyan and Charentsavan towns as well as Qaghsi, Akunq and Solak villages some waterlines and water metering units were built in the frame of the World Bank financed Municipal Water and Wastewater Project and Municipal Water and Wastewater Project -Additional financing projects. In Qaghsi village daily regulating reservoir was constructed in 2010-2011 in the frame of ADB WSSP. 6. The following elements are designed for Subproject IV: i) reconstruction and construction of polyethylene pipes, ii) replacement of the entry lines for the private houses, iii) installation of water metering units in reinforced concrete wells as well as construction and reconstruction of buried valve junctions in the following communities Hrazdan, Tsaghkadzor, Abovyan and Charentsavan towns, Qaghsi, Akunq and Solak villages. In Akunq community the exiting pumping station with 1 AWSC a government-owned commercial company that is managed and operated through a management contract by an international water utility company. 4

installation of the new pumping aggregates will be repaired. In Tsaghkadzor a new 1000 m 3 DRR will be constructed. The following measures are proposed by the detailed design for the improvement of water supply of the settlements. Details are presented below in the Table 1. Table 1: Works to be implemented VI.1 Package IV.2 Package IV.3 Package Works to be implemented Unit t. Hrazdan v. Qaghsi t.tsaghkadzor v. Akunq t. Charentsavan V.Solak t. Abovyan Total Reconstruction of DRRs km - - 3.227 0.905-1.250-5.382 Replacement of waterlines with de315 - de40 polyethylene pipes km 23.774 9.940 3.050 9.220 12.552 6.410 3.630 46.366 Installation inlet lines of private houses with de32 de20 polyethylene pipes Installation of inlet lines of apartment buildings km - - 0.300 3.116 0.132 1.624 0.335 22.592 km - - - - 6.6825 0.040 0.402 7.297 Construction of buried valve node piece - - - - 7 12 1 20 Construction of water supply chambers Construction of fire hydrant Replacement of water metering chambers piece - - - - 49 4 5 58 piece - - - - 5 2 3 10 piece 631 295 30 460 13 180 30 1639 D. Objective and Scope of the Report 7. The objective of this due diligence report (DDR) is to review the Subproject IV land acquisition and resettlement (LAR) impacts based on the detailed design and propose mitigation measures, if necessary in accordance with ADB Safeguard Policy Statement (2009). This Report has been developed according to the project of Water Supply and Sanitation Sector - Additional financing Resettlement framework (2012). II. LAND ACQUSITION AND RESSETLEMENT REQUIREMENTS FOR THE PROJECT 8. In terms of safeguard categories, the Project is defined as B category for involuntary resettlement impact (limited impacts). The preliminary design and later on the detailed design shows that the rehabilitation and construction will be conducted on property owned by the AWSC, on municipal/community land, or within the rights-of-way assigned to municipal/community infrastructure. So, there is no land acquisition and no LAR requirement. 9. Land Acquisition and Resettlement Framework (LARF) for AWSS Project (Phase II) has been prepared by the AWSC and was endorsed first by the SCWS under the RA Ministry of Territorial Administration 5

and then by the Government of Armenia in March 2012. The document details mechanisms, procedures and compensation entitlements to be applied in the planning and implementation of Land Acquisition and Resettlement (LAR) activities. III. MINIMIZING OF LAND ACQUISITION AND RESSETLEMENT IMPACTS 10. One of the main preconditions of the detailed design was the avoidance of the LAR impacts as LARF states that subprojects involving acquisition of private properties and/or cause significant involuntary resettlement impacts are ineligible for project financing and thus must be drop from the project. 11. Therefore, prior to each section detailed design, the cadastral maps for each community were examined to understand if there are any overlaps between the private or used lands and the existing water pipes. Verification of the cadastral maps was done also in the field based on the survey and measurement where applicable. After the exercise, impact on the legally/ illegally used lands/structures was avoided in the detailed design. 12. Main principals followed during the detailed design: i. Pipes were located on sites that were already used for the same purpose and/or were owned by the community authorities; ii. New lines were selected on the community streets, which helped to avoid the LAR as well as usage of the used lands by community members in the future. Also it will ensure easier maintenance of the infrastructure as well as prohibit illegal use of water from the pipes network. iii. Where the private usage of the land was identified a new design solution was given to avoid the impact. Figure 1, 2 and 3 below have shown construction works of Hrazdan, Tsakhadzor and Abovyan communities. All the designs were presented, reviewed, agreed and confirmed by Local Authorities (LAs). LAs also confirmed minor replacements of the water pipes. The design was also reviewed and confirmed by the owners of the public utilities such as Armentell CJSC, GazProm Armenia CJSC, Electric Networks of Armenia CJSC,etc. i. In case of the reinstallation of the water pipes on the community lands, it is envisaged in the design, that the pavement of the road/land will be replaced with the same type of the pavement. 6

Figure 1. Hrazdan Community Note: Green lines: old pipes; Red lines: new pipes, Black lines: pipes taken out of operation Figure 2. Tsaghkadzor Community 7

Figure 3. Abovyan kentron district Note: Green lines: old pipes Red lines: new pipes Black lines: pipes taken out of operation Blue lines: existing pipes 13. Project design was implemented in close cooperation with beneficiary communities. i. Public awareness about the project and the design was ensured by the Public Consultations (PC) with Local Authorities (LA) representatives and the members of beneficiary communities during detailed design stage (see Table 2). ii. All the designs were presented, discussed and agreed with LAs. In a result of an agreement all the designs were sealed by LAs. Table 2. Public Awareness Campaign Implementation Status in Kotayk Subproject No. Community Date of meetings Place of meeting Approximate Time spent per meeting # of participants # of Female participants % of Female participants 1 t.charentsavan 23.12.2014 municipality 50min 24 11 45.8 2 t.abovyan 24.12.2014 municipality 30 min 12 7 58.3 3 v.solak 23.12.2014 village hall 40 min 22 11 50.0 4 t.hrazdan 25.07.2013 t.hrazdan Aarhus center 1h 40 min 17 11 64.7 5 t.qaghsi 25.07.2013 t.qaghsi municipality 1h 20min 14 9 64.3 6 t.tsaghkadzor 3.02.2014 AWSC Tsaghkadzor sector office 7 v. Akunq 3.02.2014 v. Akunq village hall 1 h 1h 21 14 18 2 Total 158 65 41.3 66.7 11.1 IV. SCOPE OF POTENTIAL LAND ACQUISITION AND RESSETLEMENT IMPACTS 14. The Subproject IV will not cause any permanent and/or temporary impacts, as the operation and maintenance activities will be mostly conducted on property owned by the AWSC, on municipal land, or within the rights-of-way assigned to municipal infrastructure. 8

15. Therefore, no impact is envisaged on privately owned land plots or community lands owned /used by community members. Construction of the water transmission pipeline will not cause any impact on the businesses as well. The roads and shoulders are wide enough so customers should not be impeded and there will be no loss of income. Additionally, constructors will provide temporary access during construction works. 16. No impacts on the water supply access to households and businesses is expected in the project areas during the reconstruction of the water supply pipes and reservoir. The following measures are foreseen to eliminate such impacts, despite these disturbances being rather short in duration: i. Informing all residents and traders about the nature and duration of work well in advance so that they can make necessary preparations; ii. Increasing the workforce and using appropriate equipment to complete the work in a minimum timeframe on these stretches; and iii. Ensuring that the connection to the new system is well coordinated before disconnecting households and business from the old system. 17. During implementation of construction works, temporary restriction of access or difficult pass ability situation may occur. The following provisions will be included in the construction Contractor s contract for the purpose mitigation or neutralization of the impact due to the above-mentioned issues. i. Before the commencement of civil works, the construction Contractor will ensure the alternative solution for the access of community members to their land or place of residence; ii. In case of unavailability of alternative solution for the access, the Contractor will have to arrange/plan his works so that they do not affect local residents. Contractor also should inform all residents and traders about the nature and duration of work well in advance so that they can make necessary preparations; iii. To maintain customer access to the acting businesses, Contractor will provide wooden walkways/bridges and appropriate vehicle access across trenches at intervals. iv. In certain unforeseen cases when the land user loses his crop due to the restriction of access to the land the contractor has to report to the supervision consultant and stop the civil work activities in the affected areas until the crop are compensated as indicated in the LARF provisions. 18. Consultant s environmental and social impact specialist will monitor Construction impact in terms of relevance to the described procedures and approaches. V. CONCLUSION 19. A final screening and due diligence for involuntary resettlement impacts for Subproject IV was implemented to ensure that the Subproject will not cause any LAR impacts. Both permanent and temporary impacts were considered and analysed during this process. 20. The Subproject IV includes upgrading and rehabilitation of existing physical facilities. The detailed design confirms that rehabilitation and construction will be done on property owned by the AWSC, on municipal land, or with the rights-of-way assigned to municipal infrastructure. i. The activities will not require permanent or temporary land acquisition irrespective of the ownership status and current usage of the land. ii. There are no any impact on businesses and/or any impact-generated activities. iii. No one will lose access to facilities, services, or natural resources. 21. During the construction phase AWSC will monitor the construction works in terms of any temporary/permanent impact, such as limitation of access to businesses or other livelihood resources etc. Any impact identified during construction works will be immediately reported to ADB and compensated based on the LARF provisions. 9