Fifth & Walnut Parking Garage Redevelopment Competitive Proposal Review. Council Work Session Friday, March 24, 2017

Similar documents
WHEREAS, on July 13, 2015, by Roll Call No , the City Council received and

BUSINESS INCENTIVES POLICY June 17, 2008

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

CITY OF CHICAGO COMMUNITY DEVELOPMENT COMMISSION March 9, 2004 SUMMARY SHEET

701 WALNUT (FORMERLY YOUNKERS) 701 WALNUT STREET DES MOINES BLACKBIRD INVESTMENTS 23 SEPTEMBER 2016

REDEVELOPMENT AGENCY

RFQ Questions and Answers Mercer Island Commuter Parking & Town Center Mixed-Use Project

The Dallas City Code ARTICLE XI. HISTORIC PRESERVATION TAX EXEMPTIONS AND ECONOMIC DEVELOPMENT INCENTIVES FOR HISTORIC PROPERTIES.

RFQ Questions and Answers Mercer Island Commuter Parking & Town Center Mixed-Use Project

HABITAT FOR HUMANITY OF GREATER NEW HAVEN, INC. AND SUBSIDIARY Consolidated Financial Statements December 31, 2009

Subject to change as finalized by the City Clerk. For a final official copy, contact the City Clerk s office at (319)

Williamson County INVESTMENTS CORPORATION

Saskatchewan Municipal Financing Tools

Foundry Project/Final Approval

CITY OF TACOMA HOUSING & COMMUNITY DEVELOPMENT 2012 APPLICATION SUPPLEMENTAL FORM

Tompkins County Industrial Development Agency Industrial Application for Incentives Applicant Information Date: 11/12/13

Moorhead,, Minnesota

Foundry Project/Preliminary Review

Building Livable Communities with Transit. Introduction to Financing Livable Communities. Portland Lindbergh City Center Case Study

Urban Redevelopment Through Adaptive Reuse: From Blight to Bright

CLASS-A OFFICE SPACE IN BOULDER S NEWEST TRANSIT-ORIENTED DEVELOPMENT Bluff Street and 3390 Valmont Road Boulder, Colorado

4 LAND USE 4.1 OBJECTIVES

CITY OF PITTSBURG, KANSAS COMMUNITY IMPROVEMENT DISTRICT POLICY I. PURPOSE

Request for Qualifications Construction of Multi-Family Housing at the Mill Avenue and State Street Intersection Union Grove, Wisconsin 5/20/15

City of Dallas Historic Development Program Your guide to incentives for rehabilitating historic buildings

EXHIBIT A. City of Corpus Christi Annexation Guidelines

QUARTERPATH COMMUNITY DEVELOPMENT AUTHORITY CITY OF WILLIAMSBURG, VIRGINIA SPECIAL ASSESSMENT REPORT. Prepared By: MuniCap, Inc.

2. The estimated value of the interest to be conveyed or leased, determined at the highest and best use permitted under the redevelopment plan;

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

REQUEST FOR PROPOSALS

Goals and Policies Concerning Use of MELLO-ROOS COMMUNITY FACILITIES ACT OF 1982

BASTROP COUNTY TAX ABATEMENT POLICY. (Guidelines and Procedures)

Rainier Square - Approve Ground Leases and Development Agreement and Delegate Execution of Documents

Report by Capital Program, Procurement and Real Estate Committee (C)

FOR SALE > 5265 FOUNTAIN AVENUE LOS ANGELES, CA 90029

1 H. 4702, 190th Gen. Ct (Mass. 2018). 2 H. 4297, 190th Gen. Ct (Mass. 2018).

COLUMBIA COUNTY EVENTS CENTER PLANNING COMMITTEE REPORT (FINAL)

CITY OF BATAVIA. Historic Preservation Commission: July 11th Committee of the Whole: July 12th Committee of the Whole: July 19 th

S 2001 S T A T E O F R H O D E I S L A N D

BILL H.3653: An Act Financing the Production and Preservation of Housing for Low and Moderate Income Residents

Polk/Des Moines Assessor - Photograph

ARLINGTON COUNTY, VIRGINIA

California Statewide Communities Development Authority Open PACE Program Report March 15, 2018 (Updated) 1. Introduction

Funding Public Capital Projects

GWINNETT COUNTY, GEORGIA TAX ALLOCATION DISTRICT POLICIES AND GUIDELINES SECTION I. TAD POLICY AND GUIDELINES

FY 2019 Notice of Funding Availability (NOFA) for Federal and Local Loan Funds

Capital Program, Planning and Real Estate Committee. Item III - A. February 9, Grosvenor-Strathmore Metro Station Joint Development Agreement

Downtown & East Town CRA Expansion Plan City of Eustis

MODERATE INCOME RENTAL HOUSING PILOT PROGRAM: APPLICATION PROCESS, PROJECT REQUIREMENTS AND AVAILABLE INCENTIVES

GREENHEART VILLAGE. growing an adaptive community

Real Estate Development and Reuse

Shawnee Landing TIF Project. City of Shawnee, Kansas. Need For Assistance Analysis

Planning Commission Report

APPLICATION INSTRUCTIONS ECONOMIC DEVELOPMENT AD VALOREM TAX EXEMPTION PROGRAM

Village Board of Trustees Workshop November 28, 2018

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

ECONOMIC DEVELOPMENT AUTHORITY[261]

Exhibit A Project Specifications

This unofficial copy was downloaded on Jul from the City of Fort Collins Public Records Website:

DATE: June 25, 2014 TO:

CITY OF PARIS, ILLINOIS

CHAPTER CAPITAL FACILITIES, FEES, AND INCENTIVES RELATED TO FEES. B. Fire Combat and Rescue Service Impact Fee Study and Modifications

RETAIL SPACE IN BOULDER S NEWEST TRANSIT-ORIENTED DEVELOPMENT Bluff Street and 3390 Valmont Road Boulder, Colorado

FLORIDA HOUSING FINANCE CORPORATION Tax Credit Assistance Program Project Selection Process and Criteria

February 1, City of Verona Planning & Development 111 Lincoln Street Verona, WI 53593

Amendment to White Flint Development Agreement

GUIDELINES AND CRITERIA. For Granting Tax Abatement in the North Killeen Revitalization Area. Designated by the City of Killeen, Texas

DATE: August 9, 2017 TO:

GREEN STREET GARAGE PROPERTY RFP MIXED USE REDEVELOPMENT OPPORTUNITY DOWNTOWN ITHACA, NY DUE DATE: FEBRUARY 23, 2018 (3:00 PM, EST)

Issue Date: Friday, January 26, Submission Deadline: Friday, March 9, 2018 at 5:00 p.m. CST OVERVIEW:

ACT 381 BROWNFIELD PLAN

Request for Proposals For Village Assessment Services

The Miramar Santa Monica

Office for Sale or Lease

PART 1 - Rules and Regulations Governing the Building Homes Rhode Island Program

Marina 87 Developer's Resumes

COLERAIN TOWNSHIP ZONING COMMISSION Regular Meeting Tuesday, September 19, :00 p.m.

DV Urban Realty Partners I LP REAL ESTATE PORTFOLIO OVERVIEW

City of Boerne, Texas Incentives Policy

VILLAGE OF MT. HOREB, WISCONSIN TAX INCREMENTAL FINANCE DISTRICT #5 PROJECT PLAN. April 8, Prepared By: MSA Professional Services, Inc.

City of Stockton. Legislation Text AUTHORIZE ACQUISITION OF REAL PROPERTY LOCATED AT 501 AND 509 WEST WEBER AVENUE

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 SESSION LAW HOUSE BILL 436

OFFICE OF THE CITY ADMINISTRATIVE OFFICER

County Lot C Redevelopment

City of Winnipeg Housing Policy Implementation Plan

An implementation document is forthcoming. - A1-1 -

Mercantile Ground Lease Parcel Acquisition. Briefing to the Economic Development and Housing Committee June 27, 2006

ASSEMBLY BILL No. 199

The Economic & Fiscal Impacts of the Blanche Hotel Redevelopment Project

Abatement and Management Office Demolition at Parks Place IFB Number

ORDINANCE NO. _ _

SCOPE AND POSSIBLE EFFECTS OF THE FEDERAL AVIATION ADMINISTRATION S (FAA) ONE ENGINE INOPERATIVE POLICY

Washington County CDBG/HOME Application for Funds

APPLICATION FOR TAX INCENTIVES. Town of Clarence Industrial Development Agency

Community Redevelopment Agency Meeting Minutes August 4, Draft. City of Clearwater. City Hall 112 S. Osceola Avenue Clearwater, FL 33756

Common July 24, 2017 PROJECT

WASHTENAW COUNTY BROWNFIELD REDEVELOPMENT AUTHORITY BROWNFIELD PLAN FOR: NORTH MAIN STREET, ANN ARBOR, MICHIGAN

U.S. Housing Act of 1937

2011 AICP Review Course

Fact Sheet Downtown Wasaga Beach Community Improvement Plan

Transcription:

Fifth & Walnut Parking Garage Redevelopment Competitive Proposal Review Council Work Session Friday, March 24, 2017

Timeline February 13, 2017 By Roll Call No. 17-0233, City Council approved the competitive bid process for sale and redevelopment of the Fifth and Walnut Parking Garage, the receipt of redevelopment proposal from 5 th & Walnut Parking, LLC (represented by Justin Mandelbaum) and set the date of hearing for March 20 th. March 17, 2017 Blackbird Investments submitted a competitive proposal that met the requirements set forth in Roll Call 17-0233. March 20, 2017 Resolution approved to receive competitive proposal and continue hearings on the sale of property to April 3, 2017. 2

Project Summary Project Cost: $136.8M 200,000SF Co-Operative Housing tower on Walnut 35-stories planned (minimum of 26 in development agreement) Ground floor restaurant and retail space on Walnut 700-stall parking garage facing 5 th 150-room hotel on Court Indoor/outdoor music venue on Court 3

Phase 1: Parking Garage Parking Garage $42M privately financed Price includes: Demolition of existing parking facility New 700 stall garage constructed to allow for future conversion Re-establishing former skywalk connections and vertical access facility Pedestrian pathway that links the skywalk to hotel building on Court Avenue 4

Phase 1: Parking Garage continued Up to $500,000 for intersection improvements at 5 th & Mulberry Up to $500,000 for intersection improvements at 5 th & Court Architectural façade along 5 th Street at a cost not to exceed $2M Developer will work with the Des Moines Public Art Foundation for design recommendations Additional private participation in the repayment of the shortfall loan: $1M plus interest from sale of land to the Hotel Approximately $6.5M plus interest for the estimated 100 parking spaces within the podium parcel that the co-operative will purchase at the full stipulated price per stall Funds shall be paid to the City prior to the expiration of the Permanent Loan (year 20) upon the approval of the bond holder s and the City Sustainability Elements: Storm water collection system & LED lighting Stores and redistributes water to green roof, with overflow to storm water system at a reduced rate Prevailing wage or higher requirement on labor for garage construction Completion Date: November 1, 2018 5

Hotel Cost: $21.7M Approximately 150 lodging rooms Shall contain indoor/outdoor music venue on Court 2 nd vertical access facility linking the hotel, pedestrian pathway to the skywalk and the parking garage Commence construction June 1, 2018 Complete construction August 1, 2019 6

Tower Cost: $69M Cooperative Housing Co-Op Minimum LEED Certification or equivalent Minimum 200,000SF above the podium The Co-Op shall purchase the podium parking spaces at the full Stipulated Price per stall 20% of final unit configuration allocated for affordable housing through a partnership with Polk County Housing Trust Fund Prevailing wage or higher requirement on labor for tower construction Commence Construction: December 1, 2019 Complete Construction: December 1, 2021 7

Additional items in Development Proposal Garage podium shall have parking on the 3 rd, 4 th, 5 th, and 6 th floor Ground level shall have a restaurant space in the northwest corner, and a retail space in the northeast corner. The 2 nd level shall have the skywalk and a stair accessing the main lobby on the ground level Office space for Operation Downtown and the Des Moines Farmer s Market shall also be provided. All expenses associated with the space (rent, utilities, taxes, etc.) shall be provided by the developer at no cost to the user for the duration of the agreement 8

Selection Criteria Roll Call No. 17-0233 H. If a competing proposal is received, the following Selection Criteria shall be applied to judge the relative merits of the proposals: 1. The extent to which the project will advance and encourage further private investment to advance the redevelopment of the Court Avenue Area in conformance with the Metro Center Urban Renewal Plan, the Des Moines comprehensive plan titled PlanDSM: Creating our Tomorrow, and the Court Avenue Design Standards. 2. The potential return on investment to the City over a 40 year period from the project and from further private investments anticipated to be attracted by the project. 3. The extent to which the Applicant has demonstrated the experience and capacity to successfully complete its plans for the redevelopment of the Property. 9

Summary Project Summary: Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Tower 200 premier market rate apartments + minimum 50 room hotel 200,000SF co-operative housing + street level commercial on Walnut Garage 564 stalls 700 stalls 2-story, 12,000SF each floor w/ 20,000SF for Approximately 150 room hotel Commercial use on Court Ave movie theater Total project cost estimates: $110,847,924 $136,771,398 10

Skywalk Reconstruction of Skywalk Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Conditions to construction Will be constructed in Phase 2 or Phase 3 as part of residential building. See conditions for construction on the residential building under Will be constructed in Phase 1 as part of the construction of the new garage / podium parcel "Housing" below Skywalk extending south to building on Court No Yes Deadline for completion February 19, 2025 if Phase II, and August 19, 2028 if Phase III. November 1, 2018 11

Parking Garage Parking Garage Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Number of parking stalls 564 Stalls 700 Stalls Garage financing $39,345,946 privately financed bond w/ City Guarantee (land price inlcuded in bond financing) $46,029,969 Stipulated Price (includes land price that will not be financed as part of bond backed by the City) $42,029,969 privately financed bond w/ City Guarantee All in financed cost/stall $69,762 $60,043 Price adjustment for over/under promised spaces For each parking space in excess of of 564, the Stipulated Price shall be increased by $46,547. For each space less than 564, the Stipulated Price shall be reduced by $46,547 For each parking space in excess of of 700, the Stipulated Price shall be increased by $43,838. For each space less than 700, the Stipulated Price shall be reduced by $43,838 Deadline for completion August 19, 2020 November 1, 2018 TIF incentive 100% TIF / 20 years 100% TIF / 20 years 12

Parking Garage continued Parking Garage Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Developer's operating shortfall loan estimate (years 1-20) CASH basis: Developer's shortfall loan payoff estimate $26,574,712 ($196/stall/month) Year 33 $28,488,666 ($170/stall/month) Year 20 or a date prior that aligns with the elimination of non-appropriation risk to the bond holders Other garage incentives: 3 Hours free parking for Theater Customers None - all users pay full parking rates Shortfall loan repayment sources 80% Net Operating Revenues beginning year Paid off in year 20 (80% Net Op Revenues Shortfall loan repayment - debt forgiveness 21 $6,826,779 plus interest for extraordinary development costs in year 20 listed as backup) $6,826,779 plus interest for extraordinary development costs in year 20 13

Parking Garage continued Parking Garage Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Shortfall loan repayment sources $1,000,000 plus 1% interest from hotel land sale Shortfall loan repayment sources $6,575,710 plus 1% interest from podium conversion (a ratio of the total parking spaces removed from public use of the total Parking Garage parking stalls, multiplied by the Stipulated Price =100/700*46,029,969). Shortfall loan repayment sources Vertical Access Facilities (ADA Accessible) 1 total - 5th & Walnut If any parking spaces are converted to commercial or residential over the terms, the same forumula above applies to convert spaces. 2 total - 5th& Walnut and vicinity of 5th & Court (hotel/garage connection) 14

Parking Garage continued Parking Garage Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Option to convert from parking to TBD - none committed in development Yes commercial/residential agreement Public Improvements TBD - none committed in development agreement Project will pay up to $500k for 5th and Mulberry intersection Public Improvements TBD - none committed in development agreement Project will pay up to $500k for 5th and Court intersection Public Improvements TBD - none committed in development agreement Project will pay up to $2M for art façade on garage facing 5th Sustainability TBD - none committed in development agreement Robust storm water collection system (green roof) Sustainability TBD - none committed in development agreement Shall solely utilize LED lighting 15

Housing Housing Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Housing type High-Rise Luxury Market Rate Apartments (rental) High-Rise Cooperative Housing (owner occupied) Number of stories Plans for 32 (agreed to a minimum of 25) Plans for 35 (agreed to a minimum of 26) Estimated number of units / SF 200 units 200,000 SF Conceputual Plan must include The fixtures, furnishings and common area amenities for the apartments and hotel must distinguish the apartments and hotel as being among the premier apartments and hotel in the Des Moines Metropolitan Area. Furnishings, fixtures and common area amenities shall allow for the attraction and support of a variety of housing options, including both luxury and entry-level units. 16

Housing continued Housing Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Deadlines to commence and complete construction Must commence construction by February 19, 2022 if built as Phase II and August 19, 2025 if Phase III. Complete construction February 19, 2025 if Phase II, and August 19, 2028 if Phase III. Must commence construction by December 1, 2019, Complete construction by December 1, 2021 Abatement Incentive 10-year Abatement (100% years 1-8, 60% year 9, 40% year 10) Developer will forego any tax abatement Percent of TIF years 1-20 100% TIF / 20 years 100% TIF / 20 years 17

Housing continued Housing Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Construction labor TBD - none committed in development agreement The residential building shall be constructed with all labor compensated at the prevailing wage or higher for their respective trades per Davis-Bacon Wage Act Sustainability TBD - none committed in development Shall pursue and make full effort to obtain a Affordability agreement TBD - none committed in development agreement minumum of LEED-Certification or equivalent The residential building shall have approximately 20% of final unit configuration allocated for affordable housing in collaboration with Polk County Housing Trust Fund 18

Hotel Hotel Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Hotel size and type/style minimum 50 lodging room botique style approxmiately 150 lodging room (upscale comparison to Hyatt Place) Deadlines to commence and complete construction Included in the residential building. Must commence construction by February 19, 2022 if built as Phase II and August 19, 2025 if Phase III. Complete construction February 19, 2025 if Phase II, and August 19, 2028 if Phase III. Must commence construction on hotel by June 1, 2018 and complete construction on the hotel by August 1, 2019 Additional items agreed to in Hotel shall have indoor/outdoor music venue development agreement on Court Percent of TIF years 1-20 100% TIF / 20 years 90% TIF / 20 years 19

Other Commercial Uses Other Commercial Uses Development Agreement Items: Mandelbaum Properties (5th and Walnut LLC) Blackbird Investments Use / SF Movie Theater Building: shall contain a multiscreen movie theater located on the southern portion of the Property. The Theater Building shall occupy at least 12,000 square feet on at Ground level shall have a restaurant space in the nortwest corner, and retail space in the northeast corner. Until Residentail Building is constructed, the retail space shall contain the least two floors. The Theater Building shall have pre-sale and model unit display for the a total height of at least 50 feet. At least Residential building. Office space for 20,000 square feet of the Theater Building shall 'Operation Downtown' and the 'Des Moines be devoted to a movie theater with multiple Farmer's Market' shall also be provided. screens. Deadlines to commence and complete construction Must commence construction by February 19, 2022 if built as Phase II and August 19, 2026 if Phase III. Complete construction February 19, 2024 if Phase II, and August 19, 2028 if Phase III. Commence construction 30 days after closing on the sale of land. Complete construction November 1, 2018. Percent of TIF years 1-20 100% TIF / 20 years 100% TIF / 20 years 20

Summary and Recommendation The staff recommendation is to proceed with the Blackbird Investments, LLC proposal for the following reasons: Tower and Hotel financial contributions towards parking shortfall; $4M Land sale is not included in the garage bond financing backed by the City; 150 room hotel versus minimum of 50 room hotel; Timing for hotel completion to maximize Reinvestment District benefits; 90% TIF on the hotel component versus 100% TIF; Financial contribution of up to $1M for intersection improvements; Timeframe for the re-engagement of the street level at Walnut; Timelines for the reconstruction of the permanent skywalk; Timelines for completing construction for the entire project. 21

Next steps: March 28, 2017 7:30AM Recommendation from the Urban Design Review Board April 3, 2017 5:00PM Public Hearing City Council Meeting 22