1. The meeting was called to Order with Roll Call by Chairman Richard Hemphill.

SUMNER COUNTY PLANNING COMMISSION MINUTES NOVEMBER 27, :00 P.M.

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Section SKETCH PLAN REVIEW

Charter Township of Garfield Grand Traverse County

1. Consider approval of the June 13, 2017 Regular Meeting Minutes

Group Sewer Only** 80 Ft Frontage* 20,000 Sq. Ft. (.46 acre) Minimum** 120 Ft Frontage* 20,000 Sq. Ft. (.46acre) Minimum** 150 Ft Frontage*

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

CHAPTER 14 SPECIAL DEVELOPMENTS

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

TOWN OF OCEAN ISLE BEACH

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

MINUTES PARK TOWNSHIP PLANNING COMMISSION Park Township Hall nd Street Holland, MI Regular Meeting September 12, :30 P.M.

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

Currituck County Phone: Planning and Community Development Fax: Courthouse Road, Suite 110 Currituck, NC 27929

APPLICATION PROCEDURE

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & PLANNING APPROVAL STAFF REPORT Date: February 1, 2007

I. Requirements for All Applications. C D W

ARTICLE 24 SITE PLAN REVIEW

LAURENS COUNTY MOBILE HOME PARK ORDINANCE ARTICLE 1 GENERAL

PLANNED UNIT DEVELOPMENT (PUD)

DEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH

MINUTES JOINT MEETING LINCOLN COUNTY and SIOUX FALLS PLANNING COMMISSIONS 7:00 pm July 14, 2010

TOWN OF WELLS, MAINE PLANNING BOARD

ATTENDING THE MEETING Robert Balogh, Vice-Chairman Sonia Stopperich, Supervisor Marcus Staley, Supervisor Bob Ross, Supervisor

MINOR SUBDIVISION INFORMATION

ADA TOWNSHIP PLANNING COMMISSION MINUTES OF THE JUNE 15, 2017 MEETING

Planning Department Oconee County, Georgia

Waseca County Planning and Zoning Office

CITY OF OAK HARBOR Development Services Department

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

PLANNED UNIT DEVELOPMENTS

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

VILLAGE OF EPHRAIM FOUNDED 1853

BETHLEHEM TOWNSHIP PLANNING COMMISSION REGULAR PUBLIC MEETING September 25, 2006

(if more than one, give square footage for each) ANNEXATION LOT LINE Adjustments PRE/FINAL PLAT SPECIAL USE PERMIT

APPLICATION REVIEW CHECKLISTS

CONDITIONAL USE PERMIT APPLICATION FOR AN EXCAVATION/BORROW PIT INSTRUCTIONS

REVISED # Federal Drive Milestones Therapy Project Review for Planning and Zoning Commission

Article 6: Planned Unit Developments

1. #1713 Hovbros Stirling Glen, LLC Amended Final Major Subdivision

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete:

FRANKLIN COUNTY PLANNING BOARD. April 12, 2016

Section Preliminary Plat Checklist and Application Forms

TOWN OF LERAY PLANNING BOARD Minor Subdivision Application Packet

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

A REGULAR MEETING MINUTES PLANNING AND ZONING BOARD JANUARY 05, 2009

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

Initial Subdivision Applications Shall Include the Following:

RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS

Application for Preliminary Plat Checklist

PRELIMINARY SUBDIVISION PLAN APPLICATION INSTRUCTIONS

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

PLANNING COMMISSION MINUTES OF MEETING Wednesday, December 12, :00 p.m.

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

Application CUP : Application CUP :

A REGULAR MEETING MINUTES PLANNING AND ZONING BOARD FEBRUARY 5, 2007

DEER RIVER COMMERCIAL PARK SUBDIVISION

LINCOLN COUNTY PLANNING & INSPECTIONS DEPARTMENT

SECTION 4: PRELIMINARY PLAT

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

Community Dev. Coord./Deputy City Recorder

Cover Letter with Narrative Statement

HAYS AREA BOARD OF ZONING APPEALS MEETING AGENDA CITY COMMISSION CHAMBERS 1507 MAIN, HAYS, KS July 13, :15 A.M.

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

TURTLE CREEK SUBDIVISION, PHASE THREE

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 5, 2009

CITY OF SPRINGDALE, OHIO SPRINGDALE BUILDING DEPARTMENT SPRINGFIELD PIKE SPRINGDALE, OHIO TELEPHONE: (513)

ALPINE TOWNSHIP PLANNING COMMISSION REGULAR MEETING June 15, 2017

Medical Marijuana Special Exception Use Information

The ARCHITECTURAL REVIEW PROCESS

ARTICLE 5 GENERAL REQUIREMENTS

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

EDGERTON CITY HALL PLANNING COMMISSION MEETING REGULAR SESSION March 12, 2019

Preliminary Plat Application & Submittal Checklist

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2011

Subdivision and Land Development Regulations. Jefferson County, West Virginia

BOARD OF ADJUSTMENT MEETING CITY OF ST. PETE BEACH

LINCOLN COUNTY PLANNING & INSPECTIONS DEPARTMENT

Dan Barusch, John Carr, Dennis MacElroy, Kristen DePace Chris Navitsky and others.

SUBDIVISION CONTROL of Madison County

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

Salem Township Zoning Ordinance Page 50-1 ARTICLE 50.0: PUD PLANNED UNIT DEVELOPMENT

MINUTES OF THE LAKE COUNTY PLANNING COMMISSION July 31, 2007

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

Residential Minor Subdivision Review Checklist

2015 Planning and Zoning School Town of Hyde Park July 15, Site Plan Review and Special Use Permits

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO

Lincoln County Board of Commissioner s Agenda Item Cover Sheet

Transcription:

TOWN OF MINNESOTT BEACH PLANNING BOARD MEETING August 6, 2009 MEMBERS PRESENT: Tim Fowler, Buddy Belangia, Bill Schmidt, Dave Gaskins, and Mac Rubel via telephone. Valerie Calcavecchia arrived after the meeting started. MEMBERS ABSENT: Paul Melson OTHERS PRESENT: Larry Whorton, Rich Skreba, Mike Gallant, Tom Ward, Eber Warren, Ron Brammer and Phil Hedrick There being a quorum, Chairman Fowler called the meeting of the Planning Board to order at 7:00 pm. Chairman Fowler introduced the proposed agenda and recommended adding approval of the last meeting to the agenda. Bill Schmidt made a motion to accept the agenda as revised. All ayes. Motion passed The minutes for July 9 and 22, 2009 were presented. the minutes. All ayes. Motion passed. Buddy Belangia made a motion to accept Chairman Fowler opened the floor to public comments. Rich Skreba asked to have an environmental impact study done on the Lakes at Wayfarers Cove Property. Mr. Skreba also asked to have county water on his property as he is the only home in the immediate area on a well system. Chairman Fowler stated the Planning Board would not be able to address Mr. Skreba's specific concerns about getting water. Issues under old business were as follows: Chairman Fowler addressed the final review the Lakes at Wayfarers Cove plat and noted that in accordance with the Unified Development Ordinance (UDO), the Planning Board needed to make 1 of 3 determinations and forward their recommendation to the Board of Commissioners: 1. Recommend approval of the [mal plat. 2. Recommend approval of the [mal plat with conditions and listing these conditions. 3. Recommend disapproval of the [mal plat, sending a letter to the developer with the issues stated. At that time the developer can address these issues, resubmit another [mal plat or bring the final plat to the Board of Commissioners. Chairman Fowler then presented a matrix he had compiled which reflects the concerns and questions of the Planning Board Members. (Copy attached). Chairman Fowler proceeded to go over the matrix with the Planning Board, Tom Ward (attorney for the Lakes at Wayfarers Cove), and Mike Gallant (engineer for the Lakes at Wayfarers Cove) where the Planning Board addressed their concerns with the requirements not met in accordance with the UDO. Mac Rubel motioned to recommend disapproval of the final plat. All ayes. Motion passed Chairman Fowler noted no new business. 10f2

August 6, 2009 Mac Rubel motioned to adjourn the meeting. All Ayes. Motion passed. There being no further business, the meeting was adjourned. 20f2

Lakes at Wayfarer's Cove Final Plat July 2009 Submission Subdivision Requirement Lakes at Wayfarer's Cove Submission Complete Compliant Ordinance Article PbF 14.26.3 ~submittal Did not receive No No 14.26.7-C NCDOT Certification Street certification not found 7'<:1~\\S0:1..~1\~r-~rl\G-be No No 1-14.27.3.4 Name Address etc of Do not have on the Plat submission No No owners 14.27.3.10 Owners of adjoining Not found for South Lake No No properties 14.27.3.12 Setback Not compliant with PUD No 14.27.3.13 Zoning Classifications Not correct this is a PUD not R-15 No 14.27.3.19 FEMA flood hazard Not shown on map or indicated if appropriate No No 14.27.4.8 Street Names None provided No No 14.27.4.10-14 Street Dedication Not provided No No 14.27.5.8 Future ownership Not addressed No No 14.27.6.5 Location of Fire Not Found No Hydrants 14.27.6.5 Water/sewer line sizes Not found No No 14.27.6.7-8 Locations of telephone Not Found No No & electric lines 14.27.7.8 Deed restrictions Not Found No No Appendix A Water Supply No indication that County has agreed to provide No No Section 7 water Appendix A Street disclosure Not found No No Section 9 statement

Other Issues: 1. Street B ends at a dead end with no cul-de-sac. Must have a turn-around for fire, safety and garbage vehicles. 2. Town of Minnesott Beach Letter to Mr. Tom Hicks dated January 11,2008 had as a condition that the developer "obtain an impact study and opinion focusing on the hydrological impact on the ground water and lake prepared by independent environmental experts to be completed and furnish it to the town and property owner's association". An impact study and opinion were found to be incomplete. What was provided was an environmental screening. Name of privately owned lake was mis-identified seven times. Refers to lake as open water vice private lake/land holding. Refers to water quality of public vice private resources. The screening states that EciScience received no details from the developer regarding zoning regulations, lot size, development densities, required waste water and potable water utilities planned and permitted and thus "assumes that they will have no impact on the lake". See attached letter from the Board of Directors of South Lake Property Owners' Association dated July 28,2009 (specifically paragraph 2) 3. Wastewater Treatment - The plat submission has unspecified number of lots will have wastewater piped to the "packaged sewer treatment plant" located on Phase 1 of the project. The number of lots requiring sewage is unspecified, there is no bond for the sewage system, and the status of the "packaged sewer treatment plant" in phase 1 is part of a plot that is currently under several lawsuits. We are unable to accept the final plat submission without a bond for the sewage system. 4. The planning board feels that we need to review the Homeowners Association by-law to better determine who, how and when the maintenance of the infrastructure will take place. We would also like to see an estimate of the cost of the Homeowners Associations dues. 5. Identify any fundamental project changes from the Preliminary Plat to the Final Plat submission 2

6. Identify Wetland Lots and plan to assure regulatory compliancy 7. At the commissioners meeting on January 8,2008 that: "Mr. Hicks explained that there was a 60' buffer under the plan and a 15' foot rear yard setback behind the buffer. He also explained that under the project's restrictive covenants, trees wider than 4 inches and taller than 4 feet could not be cut outside the actual building footprint." Need to see this in the covenants. 3

THIS IS THE SECTION THAT I THOUGHT WE WOULD PUT IN THE LETTER TO THE COMMISSIONERS. Attached as Appendix "A" please find our evaluation of the submission. We have worked hard to be complete in our evaluation according to the town's PUD ordinance as well as the relevant sections of the town's Unified Development Ordinance. We note where the submission is not in compliance with the towns ordinances and note also where there are items missing from the submission. There are several points that we considered that are not easily reduced for numbers and/or fall outside the normal requirements of the town's ordinances. Appendix B We are including the narrative of these items as Appendix "B". The following are some of the qualitative concerns that were voiced by various members of the Planning Board as well as the general public. The inclusion of these observations has the complete approval of the planning board except where otherwise noted. 1. Section 1 - PUD Ordinance: The first paragraph of the Minnesott Beach PUD ordinance says "The purpose of this Ordinance is to encourage comprehensive planning for sizeable tracts of land under single ownership or control, so as to promote the construction and use of the appropriate commercial, retail, institutional, industrial and recreational areas. To this end, the standards and requirements of this Appendix may be modified by the Board of Commissioners in the case of a plan and program for a group, cluster, or Planned Unit Development ("PUD"), which in the judgment of the Board of Commissioners, provides adequate public spaces and improvements for circulation, recreation, and service needs of the tract of land when fully developed and populated, and also provided such covenants, or other legal instruments, as will assure conformity to an achievement of such a development plan." It is the unanimous opinion of the planning board that the Lakes section, even when considered with the current approved final plat for the Marina phase of the project, does not conform to the spirit of this section of the PUD ordinance. As noted, the development is nothing but single family residential at a level that is twice the density intended by the ordinance and contains no amenities either public or private. 2. Section 4: Density of Development - "There shall be no more than one dwelling unit or separate unit of ownership, on average, for each acre of the PUD property utilized. The maximum density of development established hereunder may be waived by the Board of Commissioners, in its sole discretion, upon an affirmative finding that such waiver will not negatively impact the public health, safety and welfare." 4

a. There are 87 building lots on a parcel with a gross acreage of 47.2 acres. This means that there is one building lot per 0.53 acres of the development. There are 2.33 acres of the development classified as wetlands and therefore the total "utilized" acres is 44.87 acres, giving a housing density of 0.5 acres, or twice the allowable development density, on average. b. A density waiver was granted under the condition that an environmental study would be done to certify that the density would not effect either the groundwater or the water quality of South Lake. While an assessment has been done, it simply asserts that there should be no problem as the NCDENR had issued a storm water permit for the property. This report does not assure the health, safety, and welfare of the lake and its neighbors. 3. Section 5: Lot Size - "The average lot size for single family lots within the PUD with frontage on a naturally occurring body of water shall be three-quarters (3/4) of an acre; otherwise, the average size of all single family lots within the PUD shall be one-half (1/2) acre. a. There are 25 homes that border on South Lake. The average acreage for waterfront lots is 0.41 acres or 55% of the required minimum lot size. There are 64 lots that do not border on the lake. The average lot size for this class is 0.34 acres or 68% of the minimum lot size. 4. Section 6 - Wastewater Treatment: The submission notes that an undefined number of parcels will be served by the wastewater treatment facility that is to be located in the Marina portion of Wayfarer'S Cove. No number of plots is specified, even though this is a particularly important issue with the environmental impact of the development on South Lake. We also note that no bonding or permitting for the sewage treatment plant were provided in this submission, nor were any specific plans as to how this hook-up was to take place. All infrastructure must either be in place or a bond for completion must be provided. 5. Environmental Assessment: In the January 2008 meeting, where the preliminary plat for the Lakes section of Wayfarer'S Cove was approved, the density waiver was granted in part on the condition that "Mr. Hicks went on to inform the Board of the agreement reached by both parties that the developer will provide prior to final plat approval: (1) permits required by NC Division of Environmental and Natural Resources for the project, (2) an impact study and opinion focusing on the hydrological impact on the ground water and lake prepared by independent environmental experts to be completed and furnished to the town and property owners association." Instead of an environmental impact study, an environmental "assessment" has been provided to satisfy this requirement. The assessment is in no way a complete study of the property with a determination as to the impact of the combined septic systems on the groundwater and the health of South Lake and in no way constitutes the response promised to obtain the waiver on density. 5