Section 106 Consulting Parties Meeting July 16, 2015, 8:30 am to 11:00 am Coppin State University, Talon Center, Room 210.

Similar documents
CRITERIA FOR EVALUATION

Potential Property Impacts Lawrence to Bryn Mawr Modernization

Policy and Standards for Public Local Residential Streets And Private Streets

Applying NRHP Criteria to Architectural Properties and Assessing Effects

1816, Independence Hall 1850, Washington s Headquarters

106?! WHAT IS THAT? Elizabeth L. Davoli, R.P.A. DOTD Environmental Section 2007 LTEC

Land Development Code Update Workgroup AGENDA

Key for Understanding Integrity Rating and Architecture Rating used in the Showplace Square / Northeast Mission Historic Resources Survey

TRANSBAY JOINT POWERS AUTHORITY

Historic Preservation 1

5. Land Acquisition and Displacement

Planning Justification Report

NATIONAL REGISTER OF HISTORIC PLACES

Staff Report PLANNED DEVELOPMENT. Salt Lake City Planning Commission. From: Lauren Parisi, Associate Planner; Date: December 14, 2016

7. IMPLEMENTATION STRATEGIES

MOTION NO. M Property Exchange Agreement with the University of Washington for the Northgate Link Extension

HISTORIC PRESERVATION OVERLAY DISTRICTS

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Donna S. VanderClock, Town Manager Town of Weston Steven Cecil AIA ASLA

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

Executive Summary (updated) Inner Mission North Survey and Mission Dolores Neighborhood Survey Historic District Themes and Boundaries

Generic Environmental Impact Statement. Build-Out Analysis. City of Buffalo, New York. Prepared by:

Ann Item # AGENDA MEMORANDUM

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

The Zoning Committee voted 4-2 to APPROVE this petition.

CITY OF WEST PARK PROPOSED TRANSIT ORIENTED CORRIDOR (TOC) EXPANSION WORKSHOP JUNE 15, 2016 FREQUENTLY ASKED QUESTIONS (FAQ)

A. Land Use Relationships

CULTURAL RESOURCES CULTURAL PROPERTIES AND HISTORIC PRESERVATION REVIEW OF PROPOSED STATE UNDERTAKINGS THAT MAY AFFECT REGISTERED CULTURAL PROPERTIES

Section 4(f) Why don t we build the road through this green space over here?

MOTION NO. M Capitol Hill Transit-Oriented Development Purchase and Sale Agreement and Ground Lease

Northern Branch Corridor DEIS December Appendix D: Local Tax Base

ADMINISTRATIVE HEARING STAFF REPORT

TROWBRIDGE & WOLF. August 21, 2002 WEST CAMPUS RESIDENTIAL INITIATIVE DEIS ADDENDUM THREE

Reviewing Mixed Use Proposals

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

TRANSIT-ORIENTED DEVELOPMENT PLAN EXISTING CONDITIONS REPORT LAWRENCE TO BRYN MAWR MODERNIZATION

MAXIMIZING THE VALUE OF PROJECT-LEVEL PROGRAMMATIC AGREEMENTS IN SECTION 106 CONSULTATION

Architectural Inventory Form

Hillsboro Airport Compatibility Study Technical Conference Land Use Technical Advisory Group Meeting #1 June 23, 2005-Hillsboro Civic Center

Public-Private Partnerships: A P3 Overview. bae urban economics

M-43 CORRIDOR OVERLAY ZONE

East Link Extension -- Bel-Red Segment Completion of Final Design Open House. September 16, 2014

Summary Report on the Economic Impact of the State Center Project Baltimore, MD

Mammoth Lakes Town Council Agenda Action Sheet. Council Meeting Date: August 17, 2016 Date Prepared: August 8, 2016

GO Rail Network Electrification Transit Project Assessment Process

Texas Land Trust Conference March 6, 2015

ZOCO CHAIRMAN S PROPOSED DISCUSSION ISSUES PROPOSED ZONING ORDINANCE AMENDMENT ON SIGNS (SECTION 34)

Economic Non-Viability Application

HOUSING ELEMENT GOALS, OBJECTIVES, & POLICIES

APPENDIX D: DEFINITIONS

Welcome to the Location Public Hearing for Highway 89 Improvements

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan

Downtown Meridian Urban Renewal Area URBAN RENEWAL ELIGIBILITY REPORT. Prepared for The City of Meridian and The Meridian Development Corporation

TENANT RELOCATION POLICY

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

Poverty Rates by Census Tracts

3.3 Acquisitions and Displacements/Relocations

DESIGN PUBLIC HEARING

MONTGOMERY COUNTY PLANNING DEPARTMENT

DESIGN PUBLIC HEARING JANUARY 12, 2017 TOWN HALL SULLIVAN MEETING ROOM 558 SOUTH MAIN STREET RAYNHAM, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Los Angeles Department of City Planning RECOMMENDATION REPORT

York Neighbourhood Area Structure Plan

Air Rights Development Project Briefing August 6, Speakers: Tony Kinn, Director Sam Beydoun, Program Manager Jonathan Walk, Jones Lang LaSalle

DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

BROWNFIELDS MARKETABILITY SCORING TOOL

60. ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 14, DATE: July 13, 2018

Frequently Asked Questions From the Certification of R/W Training Sessions

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

Area regulations, height regulations, and off-street parking. Lot sizes, front, side and

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

ORDINANCE NO. 04- NOW THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF NAPLES, FLORIDA:

File Reference No Re: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements

Article 3. SUBURBAN (S-) NEIGHBORHOOD CONTEXT

Absent: Major Chris Hanson, Volk Field John Ross, Jackson County Emergency Management; Paul Wydeven, Wisconsin Department of Transportation

Regional Jail Planning Frequently Asked Questions

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Hennepin County Department of. Housing, Community Works and Transit. Transit Oriented Development (TOD) Guidelines

RESOLUTION PC NOW THEREFORE, the Planning Commission of the City of Duarte resolves as follows:

SUBJECT: CONSIDERATION OF CENTRAL PARK VILLAGE BREA ENTITLEMENT DOCUMENTS FOR A PROPOSED MIXED USE PROJECT AT W.

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

Allenspark Townsite Planning Initiative Community Meeting July 23, Boulder County Land Use Department

Leases & Proposed Guidance On Contributions Received/Made. September 18, 2017

Task Force on Kai Tak Harbourfront Development

U.S. Department of Housing and Urban Development Community Planning and Development TABLE OF CONTENTS

GENESEE COUNTY LAND BANK AUTHORITY POLICIES

Housing Commission Report

Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota (701)

CRE Residents Ballot Workshop

Update on the Avenues and Mid-Rise Buildings Action Plan

An implementation document is forthcoming. - A1-1 -

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

Robert Street Gateway, West St. Paul, Minnesota. A Premier Development Opportunity at the Gateway to West St. Paul and Dakota County

GUIDELINES FOR THE STATE HISTORIC PRESERVATION ACT. Introduction

ARLINGTON COUNTY, VIRGINIA

Tree-lined streets, multilevel

STAFF PRESENT: Community Development Director: Nathan Crane Secretary: Dorinda King

FINDING OF NO SIGNIFICANT IMPACT TENNESSEE VALLEY AUTHORITY DISPOSAL FEE OWNERSHIP OF YELLOW CREEK INDUSTRIAL PARK PROPERTIES

content chapter Section 4(f) Parks, Recreation Areas, Historic Sites, Wildlife and Waterfowl Refuges

Transcription:

Meeting Minutes Purpose of Meeting: To discuss historic properties identified within the B&P Tunnel Project Section 106 area of potential effects (APE) and to have preliminary discussions on project impacts to historic properties. The meeting began 8:30 am and ended 11:45 am. Attendees: Maryland Historical Trust Beth Cole, Tim Tamburrino Baltimore Heritage Johns Hopkins Baltimore National Heritage Area Jason Vaughan Preservation Maryland Margaret De Arcangelis Baltimore City Department of Planning Kyle Leggs Baltimore City Commission for Historical and Lauren Schiszik Architectural Preservation Mount Royal Improvement Association Steve Howard Amtrak William Prosser Federal Railroad Administration Laura Schick, Bradley Decker Maryland Department of Transportation Jacqueline Thorne Maryland Transit Administration Jean Wolfers Lawrence RK&K Ken Goon, Eric Almquist, Christeen Taniguchi, Ryan Snyder Rosborough Communications, Inc. Tori Leonard The following summarizes major topics discussed during the meeting: Introduction Meeting attendees were welcomed and asked to introduce themselves. The consulting parties were asked whether they had prior experience with the Section 106 process. An overview of the project and study area was provided. The B&P Tunnel is 1.4 miles in length and includes three separate tunnel segments, located along Amtrak s Northeast Corridor between Baltimore Penn Station and the West Baltimore MARC Station. Question: Mr. Hopkins of Baltimore Heritage asked if the problem with the existing tunnel is the size and curviness, rather than its structure/materials? Answer: The tunnel is currently safe but nearing the end of its useful life. The structure and materials require increasing amounts of maintenance as the tunnel ages. Question: Mr. Howard of the Mount Royal Improvement Association asked, if a new tunnel is built, what will happen to the old one? Answer: Disposition of the existing tunnel would be 1

included in consideration of any new tunnel build alternative. Specifics of the disposition are not yet determined. Information was provided on project funding, status, and schedule. Alternatives Overview Sixteen preliminary alternatives were evaluated and screened by the project team, with public input, based on the ability to feasibly meet the project s Purpose and Need and objectives set by Amtrak, the Federal Railroad Administration (FRA), and the Maryland Department of Transportation (MDOT). Four alternatives were carried forward for further evaluation: Alternatives 1, 2, 3, and 11. o Alternative 1, No Build This alternative would not rebuild or replace the tunnel, but continue use of the existing B&P Tunnel with no improvements aside from routine maintenance. o Alternative 2 This alternative would reconstruct and modernize the tunnel in its existing alignment including widening. Cut and cover construction required would impact streets above the tunnel and adjacent homes and businesses. This alternative involves a two track tunnel and thus doesn t meet the project s Purpose and Need. This alternative would require shutting down the Northeast Corridor during construction. The team does not feel this alternative is viable. Question: Mr. Howard asked, does this study address freight capacity? Answer: Norfolk Southern has access rights, but the study is concerned primarily with passenger service. The Alternatives would accommodate future double stack freight clearance, but the project s purpose is not to increase freight service. Question: Mr. Howard noted, the Howard Street tunnel does not accommodate double stack freight; do you intend to put Howard Street traffic into this tunnel? Answer: That is not the intent of the study, as CSX does not currently operate on Amtrak s Northeast Corridor through Baltimore. But the project does not preclude accommodating double stack freight trains in order to allow flexibility in the future. Other improvements would need to occur outside the scope of this project in order for CSX freight traffic to be routed through the proposed tunnels. Alternatives 3 and 11 share common elements including bored tunnel construction, four tracks located in four bores, and they would each require ventilation plants to ensure proper tunnel ventilation, emergency containment, and evacuation needs. o Alternatives 3 and 11 include considerations for the future of the existing tunnel. o Each would require three above grade ventilation plants to house fans and control systems. One would be located at the north portal, one mid tunnel, and one at the south portal. The vent plant footprint is estimated, conservatively, at 100 feet by 200 feet, with a height of 55 feet. The estimated footprint can be modified to an extent. The plants would also include sound attenuators to reduce the noise of the fans, and facilities to allow for emergency egress/access. Question: Do you know what the vent plants will look like and where they will be placed? Answer: Yes, concepts and approximate locations will be shown later in the meeting. 2

Attendees were provided mapping of the APE for Alternatives 3 and 11 including surface disturbance areas, individual historic properties, historic districts, track alignments, and vent plant locations. The APE contains potential direct and indirect effect areas including noise, visual, and atmospheric. Question: Is the majority of the APE due to the vent plants? Answer: Vent plants are one reason, but also the portal excavation and cut and cover areas. o Mr. Goon of RK&K offered additional background on the maps; the rectangles note the general vent plant locations but there is flexibility about where they are ultimately placed. Question: Would the electric substation at Madison and Eutaw be comparable? Answer: Similar architecture would be considered. Question: Mr. Hopkins asked, have you done vibration analysis? Answer: There has been a cursory level of analysis but it is difficult to say whether a specific property will incur vibration impacts. Other factors to consider include home construction, soil, etc., but all will eventually be evaluated. It is reasonable to expect less impact at 150 below the surface, but the project will conduct a detailed analysis after the alignment is chosen. Question: Have you looked at this issue (vibration) in other areas around the country? Answer: Yes, in New York and elsewhere, other systems deep below the ground (around 150 ) are in solid rock resulting in less chance of noticeable vibration. Question: Mr. Howard asked, if you do a detailed vibration study only after you have chosen an alignment, is it then too late to change at that point and you are really looking at mitigation? Answer: Yes, because we expect comparable impacts under any alignment, but the detailed analysis would identify particularly sensitive sites (e.g. the Metro s consideration of the Wilmer Eye Clinic at Johns Hopkins). The project can mitigate for vibration with engineering and design solutions. Mr. Almquist of RK&K added there would be vibration impacts from the boring machines, but that severe impacts would be unlikely. Question: Is there a long term, cumulative impact from the train operation? Answer: Impacts from a new, deeper tunnel would likely be lesser than vibration from the existing B&P Tunnel. Mr. Goon added that the existing track level is 40 feet below the surface, not 150 feet deep. Question: Ms. Cole of the Maryland Historical Trust asked, can you give a sense of the degree of flexibility of the current alignments? Answer: The project does have constraints with the Northeast Corridor connections and the need to maintain service to Penn Station and the West Baltimore MARC Station. Rail has less flexibility than highway when it comes to track geometry; small changes to portal and track locations can require shifting a substantial length of the alignment. Question: Ms. Cole asked, the width of the corridor is set by four bores is that easier to construct? Answer: Yes, it is easier due to smaller bores, placement of ventilation shafts, and emergency egress considerations. Question: What is the tunnel width? Answer: Mr. Goon explained the tunnel diameters equaled 32.5 feet, plus 20 feet between bores. He noted that the limits of disturbance would have to allow room for constructability. 3

Question: Is the Baltimore Harbor Tunnel comparable? Answer: Mr. Goon explained that the tunnel bores are sized for trains but include walkways and emergency access. Mr. Almquist added the track width narrows at the portals; it is wider underground due to the bore separation. Mr. Goon emphasized the critical input needed is choice between the alternatives and not to refine or shift the alignments. Alternatives 3A, 3B, and 3C o Alignment, portal, and potential vent plant location overviews were provided for Alternatives 3A, 3B, and 3C. Alternatives 11A and 11B o Alignment, portal, and potential vent plant location overviews were provided for Alternatives 11A and 11B. Section 106 and Your Role as Consulting Parties Attendees were given an overview of the Section 106 Process and the role of consulting parties o Section 106 of the National Historic Preservation Act is a Federal law requiring lead Federal agencies, such as FRA, to take into account the effects of their undertakings on historic properties. o This meeting is part of the important process of seeking, discussing, and considering the views of consulting parties about how project effects on historic properties should be handled. The consulting parties role is advisory; the project team will respond in detail to comments provided. FRA will ultimately lead project decisions. Question: Is there a website or email for comments after this meeting? Answer: Yes, [www.bptunnel.com or info@bptunnel.com] but also please contact Eric Almquist [ealmquist@rkk.com] or Christeen Taniguchi [ctaniguchi@rkk.com]. Question: Does the 106 process start today? Answer: The process began about a year ago, when the project team initiated collaboration with the Maryland Historical Trust. Today is the beginning of the consultation, a key part of the process. The project team has identified historic properties through research and field work, and additional properties that may need further individual evaluation. The project will assess adverse effects and resolution. There is an Advisory Council on Historic Preservation publication, A Citizen s Guide to Section 106 Guide Review, which would be useful for consulting parties new to the Section 106 process. Area of Potential Effects and Study Area A map was provided showing the APE for Alternatives 3 and 11 and the historic properties identified in and around the APE. Build Alternative 2 received a study area boundary because it will likely not be carried forward. 4

Historic Properties within the Area of Potential Effects Ms. Taniguchi of RK&K gave an overview of the 19 historic properties identified within the project APE, which include districts, buildings, and structures, that are either listed in or eligible for the National Register of Historic Places (NRHP). The four criteria for NRHP evaluation are: A That are associated with events that have made a significant contribution to the broad patterns of our history; B That are associated with the lives of significant persons in or past; C That embody the distinctive characteristics of a type, period, or method of construction, or that represent the work of a master, or that possess high artistic values, or that represent a significant and distinguishable entity whose components may lack individual distinction; and D That have yielded or may be likely to yield, information important in history or prehistory. The properties must also retain integrity of location, design, setting, materials, workmanship, feeling, and association. Mr. Almquist noted the historic properties are all included on the handouts given to the attendees. The information was obtained from existing records and databases at the Maryland Historical Trust. The project has also identified additional properties for NRHP evaluation. Potential Impacts to Historic Properties There are no physical impacts to the Howard Street and North Avenue bridges. Question: Are the impacts physical and not visual? Answer: The project team began by first identifying the properties that would be physically impacted by construction of the south portal. We expect minimal or no impacts to properties above the bored portions of the tunnel, and each alternative (except for Alternative 2) would have similar and relatively minor impacts at the north portal. Physical impacts would occur from the vent plants, but the directly impacted historic properties (if any) are not yet known. Visual impacts from the portal areas and vent plants will be assessed at a later stage. Question: Is Harlem Park a separately designated district? Answer: Yes, it was determined eligible for the NRHP. Districts at the south portal area overlap and the team is considering how to best treat them and would welcome comments from the group on this. Ms. Taniguchi explained that the dotted areas on the maps provided represent areas outside the current mapping of the proposed Midtown Edmondson Historic District NRHP nomination, but could be included as part of an industrial context for the purposes of this project. The project team needs input on whether these areas need evaluation. Mr. Hopkins asked that the team include the Acme Warehouse/American Grocery property on the list for evaluation. Mr. Tamburrino of the Maryland Historical Trust committed to revisiting. Question: Ms. Schiszik of the Baltimore City Commission for Historical and Architectural Preservation asked if there is a potential for archeological finds? Answer: Yes, although large portions of the study corridors have been disturbed, the potential for both pre and postcontact archeological sites still exist. There is a higher potential for post contact sites. We intend to suspend detailed archeological impact studies until selection of a Preferred Alternative. Mr. Almquist discussed buildings and structures within existing historic districts that may require individual NRHP evaluations because they may be slated for demolition at the tunnel portal areas. Ms. Cole noted the properties would have the same level of Section 106 protection if 5

they were a contributing resource to a historic district even if they were not individually listed on or eligible for the NRHP. Mr. Almquist clarified the evaluations would be beneficial during the Section 4(f) analysis, under which the relative significance of each Section 4(f) property is a consideration. o Comment: Under Section 4(f) evaluation of impacts to the community, Alternative 11 has a higher impact on the neighborhood. Answer: That is a strong consideration. The group reviewed the 19 historic properties and the 237 contributing resources to historic districts. Portal Areas o Detailed maps of portal excavation areas for each alternative were provided to the attendees, with identified historic properties highlighted. o A discussion followed of the south portal area under Alternative 3A where surface impacts were noted in yellow on the map. Mr. Almquist explained that after cut andcover construction in a trench, there would be sliver impacts to properties, including the LBR Warehouse and the American Storage Company. o At the boring portal, the surface would be disturbed for cut and cover but filled in and reused; the plans showed a cut section with retaining walls and the track below grade, with improvements at grade for the tracks. o Question: Would Bridge 2410 be demolished? Answer: There would be no direct impacts. Baltimore City plans to replace the bridge. o Question: What are the limits of disturbance? Answer: The limits of disturbance are shown in yellow on the mapping provided and include temporary retaining walls; there may also be additional temporary impacts. o Question: How many boring machines will be needed? Answer: The project has not yet decided on the process, but the engineering team anticipates two boring machines. Additional background on the construction process was provided. Mr. Almquist continued by noting that on the tables, properties listed with a Y will be demolished. Alternatives 3B and 3C include shifted alignments to improve the existing curve located at West Baltimore MARC. Question: Ms. Schiszik asked are costs to move people being considered? Answer: Yes, those costs will be included in the EIS. American Ice Company o Question: Would the American Ice Company be demolished? Answer: Yes, for Alternatives 3B, 11A, and 11B. o Mr. Hopkins asserted the American Ice Company is the single most important building in the study area, noting its history as the earliest ice manufacturer in the country, its importance to the region for the last 100 years, its significance as a visual landmark, and the focus of development in west Baltimore. While the property has lost support structures that completed the complex, the main building retains integrity to reflect both its architectural character and the property s role in Baltimore s ice industry. The recent NRHP designation of this large, half block property has made it eligible for historic tax credits. While the property has been vacant for a long time and the owner s 6

intentions are unknown, it has high redevelopment potential. Baltimore Heritage will not support demolition of the American Ice Company. o Question: Ms. Cole asked, how does the American Ice Company fit in with MDOT s plans for the West Baltimore MARC Station in terms of transit oriented development (TOD)? Answer: The B&P Tunnel project does not preclude TOD at the station but, depending on the alternative chosen, could convert part of the area proposed for redevelopment to transportation use. The loss of the Red Line project could also impact the TOD potential, as the future of the station as a multi modal transit hub was an important component of the West Baltimore MARC Station Master Plan. Mr. Hopkins pointed out the large size of the American Ice Company property, mostly consisting of surface lot. He noted that reuse of the historic building is possible. Alternative 3C addresses the curve at the West Baltimore MARC Station by shifting west to flatten the curve, and has impacts to industrial properties in addition to residential. o Question: This alternative would not demolish the American Ice Company but requires boring in the Western Maryland Railroad area? Answer: Yes, and impacts the asphalt plant, houses on Edmondson Avenue, the firehouse and the old railroad station property. Mr. Prosser of Amtrak added the portal would be south of the Western Maryland Railroad tracks; the track no longer connects to the Northeast Corridor. o Question: Mr. Howard noted, is it correct to summarize 3A has the most minimal impacts, but does not address the curve; B and C address the curve in two different ways but has more impacts? Answer: Yes, there would be a travel time difference of plus or minus 30 seconds. Even Alternative 3A is faster than the speed today. Alternative 3A locks in the curve at the West Baltimore MARC station for the life of the new tunnel. The curve is also a barrier to creating high level platforms at the existing West Baltimore MARC station. Mr. Goon added that currently the team has no preferred alternative. o Question: Mr. Hopkins asked, how important is 30 seconds? Answer: Mr. Prosser explained it would impact allowable speeds and remain a bottleneck in the future, which is detrimental to service for MARC and Amtrak. The project is part of a larger Northeast Corridor effort where small time savings at locations along the corridor will add up. o Question: Is the West Baltimore MARC Station ADA accessible? Answer: Currently, the West Baltimore MARC Station does not include high level platforms considered the ADA standard. The station is currently in compliance with the law, as it was built prior to the ADA regulations but any major change to the station would require high level platforms. If 3A is chosen, it will not change the West Baltimore MARC platforms. Alternatives 3B, 3C, 11A, and 11B would each modify the track alignment at West Baltimore MARC, flattening the curve and allowing ADA accessibility. 11B would lower the profile and pass underneath Franklin and Mulberry Streets. 11A would shift the West Baltimore MARC platforms south by around 700 feet. 7

Alternatives 11A and 11B o The alignment in 11A is straighter and has major impacts to historic properties including the American Ice Company. The alternative is not likely to be advanced, but is still under consideration. Mr. Hopkins commented that the demolition could jeopardize properties and districts, including the pending NRHP Midtown Edmondson nomination. o Alternative 11B would reduce impacts relative to 11A by shifting the south portal to the American Ice Company block. The West Baltimore MARC station would be below grade. The alternative will include a temporary spur for the Northeast Corridor during construction to maintain Northeast Corridor service. o Question: Ms. De Arcangelis asked, can anything be built on cut and cover refill? Answer: Yes, that could include a building, park, etc. The depth of the refill would have to be considered when determining what could go there. Potential mitigation could include TOD and reinvestment. o Question: Could you tunnel before the American Ice Company? Answer: Shifting the portal further south would interfere with the Gwynns Falls Bridge. Mr. Prosser further explained the clearance needed in the tunnel and the challenges of fitting in other rail infrastructure such as interlockings and platforms, which cannot be located on vertical grades. Vent Shaft Areas o Detailed maps of the area of consideration for vent mid tunnel vent plants for each alternative were provided to the attendees, with identified historic properties and district contributing resources highlighted. Next Steps Ms. Cole emphasized the importance of not rushing the Section 106 process. Consulting parties need to be comfortable with the historic properties identified, and would also need the report before providing comments. Mr. Hopkins asked that the discussion at the next meeting focus on the vent shafts. Question: Will these materials be posted to the project website? Answer: Yes, there will be a Section 106 specific page added to the website with the materials presented today (Note: The material presented at the meeting were uploaded on the project website on July 27, 2015). Question: What is the schedule for the report? Answer: FRA has to comment on the historic architectural and archeological reports. After the project team addresses the comments, the documents will be distributed to consulting parties for your review and comment. This will take place in about two weeks (Note: These reports were posted July 31, 2015, on RK&K s DMS site for consulting parties review; hard copies were also distributed to the Maryland Historical Trust on the same day). Mr. Goon added that follow up discussion could include the north portal and vent shafts. Mr. Almquist asked if another 2.5 hour meeting could be scheduled within the next three weeks; attendees could expect to be contacted via email to schedule a date and time (Note: August 5, 2015 from 1:30 to 4:00 has been scheduled for the second consulting parties meeting). 8

The group asked that the project team develop a timeline for the Section 106 process, which was noted as an action item (Note: A timeline has been created, and will be presented and discussed at the second consulting parties meeting). 9