PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

Similar documents
BUILDING PERMIT FEE ESTIMATE

City of Wausau Building, Housing and Zoning Fee Schedule 2019

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

APPENDIX A BUILDING PERMIT AND RELATED FEES

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

3. COMMUNITY DEVELOPMENT Approved FY 18 19

Fee Resolution

CONSTRUCTION PERMIT FEE SUMMARY

The City of Daytona Beach Fee Schedule

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

CHAPTER 1321 Permit and Inspection Fees

WEST VINCENT TOWNSHIP COMMERCIAL BUILDING PERMIT

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

RESOLUTION NO

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

FY 2018 FEE SCHEDULE (Effective )

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

Chapter 101, CONSTRUCTION CODES, UNIFORM [HISTORY: Adopted by the Mayor and Council of the Borough of Laurel Springs as indicated in article

Planning Zoning Addendum of Fees. Item/Service. Agricultural Lot Split $ Conditional Use Application $300.00

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

RESOLUTION NO

CHICKASAW TRAIL INDUSTRIAL PARK SITE DEVELOPMENT PACKAGE

Appendix G Fee Schedule

Resolution Fee Schedule

CITY OF SEA ISLE CITY NEW JERSEY ORDINANCE NO (2016)

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

11/30/2016. Residential Building Plan submittal:

DEPARTMENT OF BUILDING AND SAFETY

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

10% of Building Permit in addition to the full Building Permit Fee

Community Development Fees (as of March 2015)

William Howard Taft High School

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

Charles Kozminski Elementary Community Academy

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

RESOLUTION NO Whereas, Resolution No. B384 established fees which were revised in

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President,

City of High Point Development Fee Schedule

City of Ridgefield, WA Master Fee Schedule Effective Date: February 24, 2017

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

KODIAK ISLAND BOROUGH, ALASKA FEE SCHEDULE Effective: August 3, 2017

Planning&Development Fee Standards

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

CITY OF TARPON SPRINGS, FLORIDA

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

C. For all areas of unincorporated Multnomah County:

City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

Fee Schedule Last Updated: November 21, 2017

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

Phoenix Military Academy High School 145 S Campbell Ave Chicago, IL Co-locating on this campus are MARINE MILITARY HS and PHOENIX MILITARY HS

List of Principal Officials

39-1. Enforcing agency established; subcode officials designated.

This fee structure applies to applications submitted on or after January 1, 2018.

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

CHAPTER 6: ALCOHOLIC BEVERAGES

Salmon P Chase Elementary School 2021 N Point St Chicago, IL 60647

Request for Proposal (RFP) Goodwill Industries of Greater Detroit (Goodwill) for OAKLAND COUNTY MICHIGAN WORKS! PONTIAC June 12, 2018

Alex Haley Elementary Academy S Eggleston Ave Chicago, IL 60628

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

Schedule of Fees Schedule A

BUI L DIN G A ND E L E V A T O R F E ES

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

New Hanover County Health Department Application for Improvement Permit and/or Authorization to Construct

FY2019 Fee Schedule. Engineering Drainage Fee

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

For Sale Granite Ridge Village th St. S. and th Ave. S. Waite Park, Minnesota

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

Resolution No Miscellaneous Fees - Engineering Effective

Delta Bylaw No. 7273, 2013 Page 5. Amend BL 7743, 2018 Schedule A Building and Plumbing Regulation

City of East Bethel 2019 Fee Schedule

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

THE TOWN OF Angier N O R T H C A R O L I N A

Tiny House on Wheels A Tiny House

SCHEDULE K PLANNING & BUILDING SERVICES

City of Beaumont Development Related Fee Schedule

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

Building Permit Fees below include $30 Zoning Filing fee and $4 State Education and Training fee, unless noted otherwise.

JEFFERSON COUNTY ENVIRONMENTAL SERVICES DEPARTMENT (ESD) IMPACT DIVISION COMMERCIAL PROJECT CHECKLIST (WEB: JEFFCOES.ORG)

Location in Code Subject Fees

Myra Bradwell Communications Arts & Sciences ES 7736 S Burnham Ave Chicago, IL 60649

CITY OF BEL AIRE Schedule of Service, License and Permit Fees 2016

Submission Procedures

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 2/16/2019

CHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS

Fee Schedule for Zoning, Building Permits, and Plan Review Services

TENANT DESIGN MANUAL UPDATED JUNE 2015

Transcription:

APPENDIX XII FEES Commission September 12, 2007 Appeal Council April 2, 2009 Building Department Commission October 10, 2007 Zoning Commission April, 13, 2005 Subdivision History: Subdivision Fees: 10/10/1996 11/12/2003 08/25/2004 04/13/2005 05/3/2012 04/04/2013 F14-14, adopted 1/8/15 F14-15,adopted 1/8/15 07/21/16 08/01/17 615 E. Worthey Street Gonzales, Louisiana 70737 Phone: (225) 450-1002 / Fax: (225)450-1352 Web: www.ascensionparish.net

SINGLE FAMILY FEES AS OF August 25, 2016 MAJOR Pre-Application Meeting Fee $900.00 Preliminary Plat review $3,000.00 plus $20.00 per lot Construction Plan Review $1,000.00 plus $100.00 per lot Final Plat Review $1,000.00 plus $20.00 per lot MINOR Minor Subdivision Review $1,000.00 Construction Plan Review $1,000.00 plus $100.00 per lot Final Plat Review $1,000.00 plus $20.00 per lot FAMILY PARTITION Family Partition Review $300 SIMPLE DIVISION Simple Division Review $100.00 plus $20.00 per lot REVISIONS TO A PRELIMINARY PLAT Minor revision $200.00 Major revision $200.00 REVISIONS TO A FINAL PLAT Minor revision Major revision $200.00 plus $20 per lot $200.00 plus $20 per lot The above fees shall cover the cost of two (2) reviews by the Parish Engineering Review Agency (ERA) for each item listed herein above. If after two (2) reviews, a plat or construction plan fails to address the comments of the ERA and further review is needed, the Applicant shall pay for additional review at the hourly rate approved by the Parish Council when selecting the Engineering Review Agency. No plat shall be submitted for consideration by the Planning and/or Zoning Commission until all fees have been paid, including any hourly fees due to the ERA due to the Applicant exceeding the two (2) submissions noted herinabove, have been paid in full.

MULTI-FAMILY FEES AS OF August 25, 2016 TOWNHOMES Pre-Application Meeting Fee $900.00 Preliminary Plat review $3,000.00 plus $20.00 per lot Construction Plan Review $1,000.00 plus $100.00 per lot Final Plat Review $1,000.00 plus $20.00 per lot CONDOMINIUMS / APARTMENTS Pre-Application Meeting Fee $900.00 Development Permit Review $1,050.00 MOBILE HOME PARKS & RECREATION VEHICLE PARKS Pre-Application Meeting Fee $900.00 Mobile Home Park Plan Review $3,000.00 plus $20.00 per lot Mobile Home Park Annual License $200.00 up to 11 units $400.00 12 units or more The above fees shall cover the cost of two (2) reviews by the Parish Engineering Review Agency (ERA) for each item listed herein above. If after two (2) reviews, a plat or construction plan fails to address the comments of the ERA and further review is needed, the Applicant shall pay for additional review at the hourly rate approved by the Parish Council when selecting the Engineering Review Agency. No plat shall be submitted for consideration by the Planning and/or Zoning Commission until all fees have been paid, including any hourly fees due to the ERA due to the Applicant exceeding the two (2) submissions noted herinabove, have been paid in full.

COMMERCIAL FEES AS OF August 25, 2016 Pre-Application Meeting Fee $900.00 Development Permit Review $1,050.00 Contract Agreement Review $600.00 If Applicable Historic Overlay Review Business Park Overlay Review Sign Permit $1,000.00 plus $50.00 per acre $1,000.00 plus $50.00 per acre $200.00 Per Application The above fees shall cover the cost of two (2) reviews by the Parish Engineering Review Agency (ERA) for each item listed herein above. If after two (2) reviews, a plat or construction plan fails to address the comments of the ERA and further review is needed, the Applicant shall pay for additional review at the hourly rate approved by the Parish Council when selecting the Engineering Review Agency. No plat shall be submitted for consideration by the Planning and/or Zoning Commission until all fees have been paid, including any hourly fees due to the ERA due to the Applicant exceeding the two (2) submissions noted herinabove, have been paid in full.

ZONING FEES AS OF August 25, 2016 Application and Review Fee $750.00 1 Acre Application and Review Fee $900.00 1.01 through 2.00 Acres Application and Review Fee $1,050.00 2.01 through 3.00 Acres Application and Review Fee $1,200.00 3.01 through 4.00 Acres Application and Review Fee $1,350.00 4.01 through 5.00 Acres Application and Review Fee $1,500.00 5.01 through 6.00 Acres Application and Review Fee $1,650.00 6.01 through 7.00 Acres Application and Review Fee $1,800.00 7.01 through 8.00 Acres Application and Review Fee $1,950.00 8.01 through 9.00 Acres Application and Review Fee $2,100.00 9.01 through 10.00 Acres Application and Review Fee $2,250.00 10.01 through 11.00 Acres Application and Review Fee $2,400.00 11.01 through 12.00 Acres Application and Review Fee $2,550.00 12.01 through 13.00 Acres Application and Review Fee $2,700.00 13.01 through 14.00 Acres Application and Review Fee $2,850.00 14.01 through 15.00 Acres Application and Review Fee $3,000.00 15.01 through 16.00 Acres Application and Review Fee $3,150.00 16.01 through 17.00 Acres Application and Review Fee $3,300.00 17.01 through 18.00 Acres Application and Review Fee $3,450.00 18.01 through 19.00 Acres Application and Review Fee $3,600.00 19.01 through 20.00 Acres Application and Review Fee $3,750.00 20.01 through 21.00 Acres Application and Review Fee $3,900.00 21.01 through 22.00 Acres Application and Review Fee $4,000.00 22.01 Acres and larger

PUD & SPUD FEES AS OF August 25, 2016 Concept Plan Pre-Application Conference $900.00 Concept Plan Review $5,000.00 plus $50.00 per acre Development Plan Review $5,000.00 plus $50.00 per acre Development Plan Developer's Agreement Review $600.00 Construction Plan (per Phase) Final Plat Review $3,000.00 plus $50.00 per acre $3,000.00 plus $50.00 per acre The above fees shall cover the cost of two (2) reviews by the Parish Engineering Review Agency (ERA) for each item listed herein above. If after two (2) reviews, a plat or construction plan fails to address the comments of the ERA and further review is needed, the Applicant shall pay for additional review at the hourly rate approved by the Parish Council when selecting the Engineering Review Agency. No plat shall be submitted for consideration by the Planning and/or Zoning Commission until all fees have been paid, including any hourly fees due to the ERA due to the Applicant exceeding the two (2) submissions noted herinabove, have been paid in full.

TND FEES AS OF August 25, 2016 Concept Plan Pre-Application Conference $10,000.00 plus $50.00 per acre General Implementation Plan Review $10,000.00 plus $50.00 per acre Specific Implementation Plan Review $10,000.00 plus $50.00 per acre Developer's Agreement Review $600.00 Construction Plan (per phase) Final Plat Review $5,000.00 plus $50.00 per acre $3,000.00 plus $50.00 per acre The above fees shall cover the cost of two (2) reviews by the Parish Engineering Review Agency (ERA) for each item listed herein above. If after two (2) reviews, a plat or construction plan fails to address the comments of the ERA and further review is needed, the Applicant shall pay for additional review at the hourly rate approved by the Parish Council when selecting the Engineering Review Agency. No plat shall be submitted for consideration by the Planning and/or Zoning Commission until all fees have been paid, including any hourly fees due to the ERA due to the Applicant exceeding the two (2) submissions noted herinabove, have been paid in full.

STANDARD FEES AS OF August 1, 2017 RECORDATION FEES Plat Recordation Fee Bond Recordation Fee $125.00 8½" x 14" + $20 ea. Additional page $125.00 11" x 17" + $20 ea. Additional page $125.00 18" x 24" + $20 ea. Additional page $125.00 24" x 36" + $20 ea. Additional page $105.00 1 5 pages $205.00 6 25 pages $305.00 26 50 pages +$5 each additional page $305.00 51 or more pages 1st 50 pages $5.00 Each additional page after 50 $20.00 Pages larger than 8½" x 14" per page Developer's Agreement Recordation Contract Agreement Recordation Condominium Document Recordation Certified Mail outs Concept Plan Notifications Development Plan Notifications General Implementation Plan Notifications Specific Plan Notifications Sign for Public Notification Posting Same as Bond Recordation Fee above Same as Bond Recordation Fee above Same as Bond Recordation Fee above $7.50 per name of adjacent property owners $7.50 per name of adjacent property owners $7.50 per name of adjacent property owners $7.50 per name of adjacent property owners $7.50 per name of adjacent property owners $25.00 each Culvert Permit (per access) $50.00 Servitude Revocation $100.00 Signage for new Private Streets $100.00 Cost includes 911 approved street sign 7' or 10' mounting post and hardware

ADMINISTRATIVE FEES AS OF August 25, 2016 Appeal to decision / Interpretation $500.00 per appeal Variance $70.00 Per Request

BUILDING FEES AS OF August 25, 2016 Commercial Building Permit : Bid price plus 10% = valuation value for permitting Building Permit for Commercial up to 100K value $3.00 per $1000 of value: $25.00 minimum Building Permit for Commercial: 100K - 500K value $300.00 plus $2.00 per $1000 over 100K of value Building Permit for Commercial: > 500K value $1,100.00 plus $1.50 per $1000 over 500K of value Commercial Plan Review $150.00 Residential Building Permit : $75 per square feet of of living area to determine value of home Residential Building Permit : $12 per square feet of total area to determine accessory structures Building Permit for Residential up to 100K value $1.50 per $1000 of value: $25.00 minimum Building Permit for Residential 100K - 500K value $150.00 plus $1.00 per $1000 over 100K of value Residential Home Plan Review $50.00 Miscelaneous Permit Fees Demolition Permit $60.00 House Moving Permit $100.00 plus $50.00 per load / truck after 1st Culvert Permit, Commercial $50.00 Occupancy: Commercial $45.00 Occupancy: Residential $25.00 Sign Permit $100.00 Per Application Inspection Fees Building Inspection Fees $30.00 $50.00 after 2nd, $100.00 after 3rd Inspections: Building, after hours on holiday $250.00 Inspections: Building, after hours on weekday $150.00 Inspections: Building, after hours on weekend $200.00 License Fees (Annual) Builder, Electrician, Plumber, & Mechanical $150.00 $100 renew License: House Movers $100.00 $50 renew License: Residential and framers $100.00 $100 renew Mobile Home Park $200.00 up to 11 units Mobile Home Park $400.00 12 units or more Moible Home Park License renew inspection $50.00 Third trip and thereafter

ELECTRICAL FEES AS OF August 25, 2016 Circuit Charge $4.00 Each 120 Volt circuit Circuit Charge $7.00 Each 240 Volt circuit Electrical Change Out $25.00 $3.00 Less than 1 HP $6.00 1 through 2 HP $8.00 3 through 6 HP $10.00 7 through 14 HP $12.00 15 through 29 HP $16.00 30 through 100 HP $20.00 101 through 249 HP $24.00 250 HP and above $12.00 through 100 amps $14.00 through 200 amps $16.00 through 400 amps $18.00 through 600 amps $20.00 through 800 amps $22.00 through 1000 amps $24.00 through 1200 amps $26.00 through 1400 amps $30.00 through 1600 amps $34.00 through 1800 amps $38.00 through 2000 amps $42.00 through 2400 amps $46.00 through 2500 amps Rebuild Service $20.00 Relocating Service $20.00 Temporary Cut-In: Commercial $40.00 Temporary Cut-In: Residential $20.00 Temporary Meter $20.00 Upgrading the Service $20.00 ***Minimum Permit total fee*** $25.00

MECHANICAL FEES AS OF August 25, 2016 A/C Unit 0 to 4+ tons $45.00 A/C Unit 5 to 9+ tons $65.00 A/C Unit 10 tons and over $8.00 Per ton Refrigeration Unit 0 to 4+ HP $45.00 Refrigeration Unit 5 to 9+ HP $65.00 Refrigeration Unit 10 HP and over $7.00 Per HP Boilers $65.00 Change Out: Coil Only $31.00 Change Out: Condenser Only $31.00 Change Out: Heater Only $31.00 Change Outs: > 10 Tons $8.00 Change Outs: 0 to 4+ Tons $45.00 Change Outs: 5 to 9+ Tons $65.00 Chiller Cooling / Heating Coil $14.00 Commercial Clothes Dryer $31.00 Coolers/Freezers $45.00 Cooling Towers $85.00 Duct Alterations $27.00 Duct Heaters : less than or equal to 25 tons $27.00 Duct Heaters : more than 25 tons $8.00 Fire Extinguishing System $45.00 Heater Unit $31.00 Hoods $45.00 Incinerator $45.00 Mobile Home : Commercial $22.00 Mobile Home : Single Family Residential $20.00 ***Minimum Permit total fee*** $25.00

PLUMBING FEES AS OF August 25, 2016 Each fixture : Bathtub, HW Heater, Lavatory, Shower, Bath, Sink, Water Closet, Washing Machine, A/C Drain, Fixtures $7.00 Gas, Urinal, Flood Drain, Drinking fountain, Service sink, Bidet, Dishwasher, Garbage Disposal, Roof Drain, or other Heating Units $7.00 each. Pool, Swimming $42.00 Receptors (Grease, Oil, Acid, Etc.) $7.00 Sewer Tie-In (non parish system) $7.00 Sewer Tie-In (Parish system) $500.00 $0.50 each above 20 to 100 ea., then Sprinkler System $15.00 $0.25 each above 100. Standpipes $25.00 ***Minimum Plumbing Permit Fee*** $25.00