COMMUNICATION ISSUE / BACKGROUND. Application Type: Final Plat Case Number: FP Process Schedule Task Description Date

Similar documents
PLANNING COMMISSION COMMUNICATION

ARTICLE 15 - PLANNED UNIT DEVELOPMENT

Guide to Combined Preliminary and Final Plats

The following regulations shall apply in the R-E District:

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Guide to Preliminary Plans

PLANNED UNIT DEVELOPMENTS (Ordinance No.: 3036, 12/3/07; Repealed & Replaced by Ordinance No.: 4166, 10/15/12)

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Appendix J - Planned Unit Development (PUD)

PLANNING AND ZONING DEPARTMENT

TOOELE COUNTY LAND USE ORDINANCE CHAPTER 31 Page 1

CHECKLIST FOR DEVELOPMENT REVIEW

Town of Cary, North Carolina Rezoning Staff Report 14-REZ-31 Cary Park PDD Amendment (Waterford II) Town Council Meeting January 15, 2015

Guide to Minor Developments

In order to permit maximum applicability of the PUD District, PUD-1 and PUD-2 Districts are hereby created.

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

STAFF REPORT FOR MAJOR SUBDIVISION

SPECIAL ZONING DISTRICTS

ORDINANCE NOW THEREFORE, BE IT ENACTED BY THE CITY COMMISSION OF THE CITY OF WINTER GARDEN, FLORIDA, AS FOLLOWS:

Initial Subdivision Applications Shall Include the Following:

Rapid City Planning Commission

Residential Major Subdivision Review Checklist

STAFF REPORT FOR MAJOR SUBDIVISION

STAFF REPORT FOR MAJOR SUBDIVISION

Article 6: Planned Unit Developments

PLANNING COMMISSION STAFF REPORT

STAFF REPORT FOR MAJOR SUBDIVISION

SUBJECT: Application for Planned Unit Development and Rezoning 1725 Winnetka Road

Chapter SPECIAL USE ZONING DISTRICTS

PLANNING COMMISSION STAFF REPORT

APPLICATION PROCEDURE

PRIMUS TRACT MOUNT PLEASANT, SOUTH CAROLINA

Attachment 4. Planning Commission Staff Report. June 26, 2017

Chapter Planned Residential Development Overlay

CHAPTER34 PRUD - PLANNED RESIDENTIAL UNIT DEVELOPMENT

Cover Letter with Narrative Statement

PLANNED DEVELOPMENT DISTRICT STANDARDS. Cadence Site

Urban Planning and Land Use

DEVELOPMENT DEPARTMENT STAFF REPORT THE PARK AT 5 TH

Section Preliminary Plat Checklist and Application Forms

Site Plan Application

SECTION 16. "PUD" PLANNED UNIT DEVELOPMENT OVERLAY DISTRICT

I. Requirements for All Applications. C D W

PLANNING COMMISSION REPORT Regular Agenda -Public Hearing Item

SUBJECT PARCEL(S) Property Owner(s) TMS Number Approximate Acreage Carolina Park Development, LLC

PLANNING COMMISSION STAFF REPORT. Merrimac PLNSUB Planned Development 38 West Merrimac November 9, Request. Staff Recommendation

Article Optional Method Requirements

Operating Standards Attachment to Development Application

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

Community Development

TOWN OF ORO VALLEY PLANNING & ZONING COMMISSION MEETING DATE: December 6, 2011

Tentative Map Application Review Procedures

Letter of Intent May 2017 (Revised November 2017)

Special Use Permit - Planned Unit Development Checklist. Property Address:

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

MIDWAY CITY Planning Office 75 North 100 West Phone: x105 Midway, Utah Fax:

City of Sanibel. Planning Department STAFF REPORT

CHAPTER 10 Planned Unit Development Zoning Districts

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: April 18, 2019

PALM BEACH COUNTY PLANNING, ZONING AND BUILDING DEPARTMENT ZONING DIVISION

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT

FINAL DRAFT 12/1/16, Rev. to 7/18/17

ORDINANCE WHEREAS, the adoption of this Ordinance shall not be construed as an admission that the aforesaid claim has merit or is correct; and

Planned Unit Development (PUD). Sections:

SKETCH PLAN REVIEW SPECIAL EXCEPTION, SPECIAL REVIEW,

Residential Minor Subdivision Review Checklist

ARTICLE 13 CONDOMINIUM REGULATIONS

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

APPLICATION REVIEW CHECKLISTS

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

Condominium Unit Requirements.

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

Certified Survey Map (CSM) Submittal Updated: 6/29/18

MIDWAY CITY Municipal Code

CHAPTER 14 PLANNED UNIT DEVELOPMENTS

CONDOMINIUM REGULATIONS

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

ARTICLE IV: DEVELOPMENT STANDARDS

Sec Planned unit development (PUD) zoning district requirements and procedures.

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

New Electronic Planning Commission Submittal Process

Urban Planning and Land Use

ARTICLE 23 CONDOMINIUM STANDARDS

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

REPLACEMENT EXHIBIT 2 SECOND AMENDMENT TO THE COMPREHENSIVE DEVELOPMENT PLAN

Bowie Marketplace Residential Detailed Site Plan Statement of Justification January 13, 2017 Revised February 2, 1017

SUBDIVISION DESIGN PRINCIPLES AND STANDARDS

APPLICATION PROCESSING. CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you.

PROPOSED AMENDMENTS TO THE DERBY ZONING REGULATIONS AUGUST 12, 2008

ARTICLE FIVE FINAL DRAFT

STATE OF MICHIGAN COUNTY OF MARQUETTE, TOWNSHIP OF NEGAUNEE LAND DIVISION, SUBDIVISION AND CONDOMINIUM ORDINANCE

FREQUENTLY USED PLANNING & ZONING TERMS

Courtyards at Kinnamon Park Sketch Plan

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT MAY 18, 2017

STAFF REPORT FOR ANNEXATION AND ZONING. CASE NAME: Taylor Annexation and Zoning PC DATE: August 7, 2013

RECOMMENDATION: Approval subject to the following conditions:

DIVISION 9. PLANNED URBAN DEVELOPMENT CLASSIFICATION BY SPECIAL USE FOR ALL ZONING DISTRICTS Sec Statement Of Purpose: (a) Planned

Transcription:

COMMUNICATION TO: Chairperson and Members of the Planning Commission FROM: Matt Blakely, Town Planner SUBJECT: Final Plat of Harmony Subdivision - Third Filing DATE: Wednesday, May 8, 2013 ISSUE / BACKGROUND Owner: Applicant: Harmony, LLC Byron Collins, Harmony, LLC Application Type: Final Plat Case Number: FP-2013-002 Process Schedule Task Description Date Application Submitted 1/22/13 Acceptance of Application 1/24/13 Referral Agency Notification Referral comments were due by 2/15/13. 1/29/13 Comments Issued 2/25/13 Revised Zoning Map Submittal 3/15/13 Comments Issued 4/15/13 Notice Posted Public Hearing Notice posted at Town Hall, Timnath Post Office, Town of Timnath website, property posting and mailing to adjacent property owners 4/30/13 Planning Commission Public Hearing 5/8/13 Town Council 5/14/13 Legal Description/Address: A Tract of Land being Outlot 1 and Simon Court, Harmony Subdivision Second Filing and Tract B, Harmony Subdivision First and Second Filings Second Replat Located in Section 36, Township 7 North, Range 68 West of the Sixth Principal Meridian, Town of Timnath, County of Larimer, State of Colorado. Parcel Size (Acres): Number of Lots: Residential/Commercial: Approximately 187.81 Total Acres 97 Single-Family Detached/ 2 Mixed-Use Tracts and 1 Outlot for future development Phone: (970) 224-3211 FAX: (970) 224-3217 www.timnathgov.com 4800 Goodman St. Timnath, CO 80547

Existing Zoning: R-E and MU Districts Proposed Zoning: R-E and MU Districts with a PD Overlay with a PD Overlay Existing Land Use: Single-Family Proposed Land Use: unchanged Residential, Mixed-Use and Golf Course SERVICES: Water: Sewer: Fire: Special Districts: Fort Collins Loveland Water District South Fort Collins Sanitation District Poudre Fire Authority Within Timnath Development Authority Boundaries Adjacent Zoning/Land Uses: Direction Zoning Land Use North FA-1 (County) District Farming South C-2 Community Commercial, MU Vacant/Farming Mixed Use and FA-1 (County) East RMU Residential Mixed-use District Vacant/Farming (Town of Windsor) West MU Mixed Use, R-2 Single Family Residential, and R-E Estate Residential Districts Vacant/Farming Application Description: History: The 642-acre Harmony Subdivision was originally annexed to the Town of Timnath in 2004 as the Nelson Property. The parcel was originally zoned R-E Estate Residential with a Planned Development Overlay and MU Mixed Use. The Preliminary Plat was approved for a total of 515 single-family lots, an 18-hole golf course, and mixed-use tracts. The First Filing Final Plat was approved in June, 2005 with a total of 73 single-family lots. At that time a PD Overlay Amendment was also approved allowing specific exceptions to lot sizes and setbacks for the lots associated with the First Filing. The Second Filing Final Plat was approved in April, 2006 with a total of 121 single-family lots. At that time the PD Overlay was amended to allow specific exceptions to the setbacks related to the second filing lots. In October, 2006 an additional amendment to the PD Overlay Zoning was approved to allow a maximum lot coverage of 35%. In June, 2007 the PD Overlay Zoning was amended to allow additional exceptions to the setbacks and lot coverage for the first and second filing lots. Proposed Actions: The applicant is proposing a final plat of the area indicated by the above legal description, generally located in the southeast corner of the Harmony Subdivision, on the north side of Grand Tree Boulevard. This final plat is the third filing within the Harmony Subdivision and includes 97 single-family residential lots, the smallest lot is 7,040 square feet and the largest lot is 35,208 square feet. Harmony Subdivision Preliminary Plat Amendment (PP-2013-001) 2 of 4

The two Mixed-Use lots are Tracts E (3.34 acres) and F (1.53 acres) and currently are the locations of the existing maintenance facility and sales office for the Harmony Subdivision respectively. The rezoning application that is being processed concurrently redefines the zoning boundary to align the Mixed-Use Zone district with the boundaries of these two tracts as was originally intended. Outlot 1 (8.25 acres) is also being platted with this filing to define the lot for the future club house/recreation center. Tracts A, C, D, and G (20.23 total acres) are all common open space associated with the residential portion of the project and will be maintained by Harmony, LLC. Tract B (129.39 acres) is associated with the Golf Course and is privately owned and maintained by Harmony, LLC. Land Use: This Final Plat application has been reviewed against the Timnath Land Use Codes and Timnath Comprehensive Plan to ensure conformity. Upon completion of this review, staff has determined that all necessary elements of the Land Use Code have been adequately addressed for this application. Future Approvals/Processes: We are concurrently processing the review of Zoning Map Amendments, PD Overlay Zoning Amendments, and Preliminary Plat Amendments for all of Harmony Subdivision as well as a Final Plat application for the Harmony 4 th Filing. Exhibits associated with the Harmony Subdivision 3 rd Filing will be appended to the currently approved Subdivision Improvements Agreement for all of Harmony Subdivision and will be recorded with Larimer County. Review Criteria/Recommendation: This application was submitted as a complete and comprehensive application and adequately addressed all elements required to proceed with the approval process. Upon review of this application by all referral agencies and applicable ordinances, regulations, standards, criteria, and policies, all criteria set forth in Section 16.4.7.C of the Timnath Land Use Code (Tab 8, Final Plat Evaluation Forms, of the Planning Commission Manual) have been met and staff recommends approval. Final Plat Review Criteria. In addition to all provisions of this Code, the Town shall use the following criteria to evaluate the applicant s final plat application: 1. The final plat conforms to the approved preliminary plat and incorporates required changes, modifications and conditions attached to the approval of the preliminary plat unless otherwise approved by the Board. This final plat is in conformance with the proposed Preliminary Plat Amendments being concurrently processed with this application. 2. The development will substantially comply with this Code. This development substantially complies with the Town of Timnath Municipal Code. 3. All applicable technical standards have been met. (Ord. 10-2002; Ord. 4-2003; Ord. 10-2004) There are still minor technical comments that need to be addressed (see attached). Harmony Subdivision Preliminary Plat Amendment (PP-2013-001) 3 of 4

Referral Comments: Not Returned: Timnath Finance Department, Poudre River Public Library District, Poudre School District, Qwest Communication, Timnath Attorney, Timnath Public Works, Xcel Energy Returned with No Comments: Poudre Fire Authority, Timnath Police Department, Safebuilt, ComCast, AT&T Communication, Timnath Planning, City of Greeley Water. Returned with Comments: Timnath Engineering (TST), Fort Collins Loveland Water District, South Fort Collins Sanitation District (see attached). ATTACHMENTS: 1. Harmony Subdivision 3 rd Submittal Comments 2. Final Plat of Harmony Subdivision Third Filing 3. Harmony Subdivision General Development Information RECOMMENDED MOTION Final Plat Finding that a complete application was submitted and reviewed in accordance with all applicable Town regulations, the application conforms with the mission and goals of the Timnath Comprehensive Plan, and all criteria outlined in Section 16.4.7.C of the Timnath Municipal Code have been met, I move to recommend approval of the Final Plat of Harmony Subdivision Third Filing as presented in the Planning Commission Communication to the Timnath Town Council with the following conditions: 1. The applicant address all unresolved technical comments as outlined in the attached Harmony Subdivision 3 rd Submittal Comments to the satisfaction of the Town Staff and Referral Agencies prior to recording the Final Plat, and; 2. The appropriate exhibits be appended to the approved Subdivision Improvements Agreement prior to recording the Final Plat, and; 3. That Ordinance No. 7, Series 2013, an Ordinance regarding the Harmony Subdivision Zoning Map Amendments and Planned Development Overlay Amendments is approved by the Timnath Town Council prior to Final Plat approval, and; 4. That Resolution No. 7, Series 2013 a Resolution regarding the Harmony Subdivision Preliminary Plat Amendments is approved by Town Council prior to Final Plat approval. Harmony Subdivision Preliminary Plat Amendment (PP-2013-001) 4 of 4

MEMORANDUM TO: FROM: RE: Mark Tingey, Harmony, LLC (via e mail) Matt Blakely, Town Planner 3rd Submittal Comments for Harmony Subdivision 3 rd Filing Final Plat, PD Overlay Amendment, and Preliminary Plat Amendment (FP 2013 02, PP 2013 01, RZ 2013 01) DATE: Thursday May 2, 2013 The following represents the 3rd review of the above application by Staff and the affected referral agencies. The included comments are from all of the agencies that have provided comments. Please provide a point by point response to each of the following comments along with the original comment in a resubmittal to the Town. The following items must be addressed by the applicant: Town Planner, Matt Blakely (970) 224 3211 x19 PD Overlay All comments have been addressed to the Town s satisfaction. Preliminary Plat All comments have been addressed to the Town s satisfaction. Zoning Map All comments have been addressed to the Town s satisfaction. Final Plat All comments have been addressed to the Town s satisfaction. Landscape Plan Comments All comments have been addressed to the Town s satisfaction. Engineering, Steve Humann, TST Inc. (970)226 0557 All comments removed have been addressed to the Town s satisfaction. Remaining comments are listed below: 1. Traffic impact Study No Comments 2. Geotechnical Report No Comments 3. Drainage Study No Comments 4. Preliminary Plat All comments have been addressed. 5. Final Plat All comments have been addressed. 6. Construction Plans a. Street names Addressed b. Notes Addressed Phone: (970) 224-3211 FAX: (970) 224-3217 www.timnathgov.com 4800 Goodman St. Timnath, CO 80547

c. Storm Sewer Addressed d. Street Design Intersection grading and spot elevations addressed BUT the intersection design at each end of Small Street (Sheets C20, C21, and C25A) still does not drain correctly. e. Detail Sheets Addressed Additional Referral Agency Comments: In addition to these comments, please find the attached comments from: Fort Collins Loveland Water District/South Fort Collins Sanitation District comments are attached. Documents Required for Resubmittal: PDF Revised Construction Drawings (PICPs) PDF Written Response to Comments Note: You have been scheduled for a Public Hearing before the Town s Planning Commission on May 8th, 2013 at 7pm at the Town Administration Building. We have received the colored renderings and we will have them available for the meeting. It is important that a representative of this project be present at this meeting to present the project to the Planning Commission and answer any questions they may have. Please contact me at (970) 224 3211 or mblakely@timnathgov.com if you would like to schedule a comment review meeting and/or if you would like to schedule the Planning Commission Public Hearing. Cc: Byron Collins, Harmony, LLC (email) Tom Dugan, Pinecrest (email) Steve Humann, TST Inc. (email) Don Taranto, TST Inc. (email) April Getchius, Town Manager (email) Town File (HMYS) Page 2 of 2

FORT COLLINS LOVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT April 29, 2013 Mr. Matt Blakely, Town Planner Town of Timnath 4800 Goodman Street Timnath, CO 80547 RE: Harmony Subdivision Amended Preliminary Plat Final Plat Filing 3, Rezoning (PD Overlay Amendment) AKA Timnath South 3 rd Filing, Third Submittal Dear Mr. Blakely, The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comments. The length of the vertical water line deflection needs to be identified, show the beginning and ending stations of the deflection. All inverts of the existing connection manholes 5 on sheet C12 needs to be identified. The water line crossing in the storm sewer profiles are shown 10 feet deep. This is contrary to District requirements. Is it possible to re-route the waterline to the south of the box culvert to avoid the excessive depth? The detail sheet CD2 for the 8 inch water line crossing at the 4 x 8 box culvert was not provided for review. A water line valve is to be added to the 60 feet west of the elliptical RCP. The casing pipe needs to be shown on the water plans. The proposed ditch across the District s easement south of Storm Drain 9 restricts access for maintenance. Identify how this issue will be addressed. I am concerned that the water distribution looping is inadequate from the proposed connection in Grand Tree Boulevard to Simon Way. There would be approximately 87 homes out of water because it is a sole source water feed to Filing 3 until the development to the west connects into Grand Tree. Further, there does not appear to be adequate fire flow if the water line in Grand Tree was disrupted between Simon Way and Small Street. The Districts will require another review due to the nature of the above comments. Please do not hesitate to contact me at 226-3104, extension 104, if you have any questions or require additional information. Respectfully, Mr. Terry W. Farrill, P.E. District Engineer xc: Mr. Michael D. DiTullio, District Manager Mr. Byron Collins 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186

Harmony Subdivision General Development Information Town of Timnath, Colorado Rezoning and PD Overlay Amendment Preliminary Plat Amendment Third Filing Final Plat January 22, 2013 Revised: March 15, 2013 Harmony, LLC Timnath, Colorado

Project Overview The Harmony Subdivision is a mixed-use master planned community consisting of a mix of land uses including large lot single family detached homes as well as lifestyle homes and a mixeduse neighborhood center as well as a world class golf course. The property was annexed into the Town of Timnath in December of 2004 and zoned R-E (Estate Residential) and MU (Mixed Use) with a PD Overlay District at the time of annexation. A Preliminary Plat was approved at the time of annexation and zoning allowing for a total of 515 residential units on approximately 642 acres for a density of 0.80 residential units per acre. The First and Second filings have been platted and developed with 72 single-family lots in the First Filing and 132 single-family lots and two large acreage estate lots in the Second Filing (a total of 206 existing developed lots). Note that the First Filing was originally platted with 73 single family lots but Lots 1 and 2 were later replatted into one larger lot eliminating one platted lot leaving a total of 72 lots in the First Filing. 112 homes are built and occupied or under construction within these first two filings. With this submittal to the Town of Timnath, the applicant, Harmony, LLC, is requesting the following: 1. An amendment to a portion of the existing Zoning Map and an amendment to the existing PD Overlay exceptions to allow for additional exceptions for the Third and all future filings. 2. An amendment to the approved Preliminary Plat to update and revise the approved plan for modifications to the street and lot layouts for the Third and future filings, and 3. Review and approval of the Third Filing Final Plat. Property Owners/Applicant/Consultants Property Ownership Information Please see Ownership Portion of the Title Commitment, submitted with this application Property Owners Harmony, LLC Paragon Investment Group, LLC Mr. Byron Collins and Mr. Mark Tingey Mr. Byron Collins 6432 Grand Tree Blvd. 6432 Grand Tree Blvd. Timnath, CO 80547 Timnath, CO 80547 (970)224-4622 Fax: (970)407-7805 (970)224-4622 Fax: (970)407-7805 mtingey@comcast.net byroncollins@comcast.net byroncollins@comcast.net Harmony Club, LLC Mr. Rodney Nelson Mr. Byron Collins 13329 WCR 74 6432 Grand Tree Blvd. Eaton, CO 80615 2

Timnath, CO 80547 (970)224-4622 Fax: (970)407-7805 byroncollins@comcast.net Applicant/Developer Harmony, LLC c/o Mr. Byron Collins and Mr. Mark Tingey 6432 Grand Tree Blvd. Timnath, CO 80547 (970)416-0202 Fax: (970)407-7805 byroncollins@comcast.net mtingey@comcast.net Planning Consultant Civil Engineer and Surveyor PineCrest Planning & Design LLC Farnsworth Group Mr. Tom Dugan Mr. Brian Zick & Mr. JC Cundall 4225 Westshore Way 2310 East Prospect Fort Collins, CO 80525 Fort Collins, CO 80525 (970)226-1655 Fax: (970)226-1635 (970)484-7477 Fax: (970)484-7488 tom@pinecrestllc.net bzick@f-w.com jcundall@f-w.com Transportation Engineer Landscape Designer Mr. Matt Delich Mr. John Gettman Traffic & Transportation Engineering Centennial Design LLC 2722 Glen Haven Drive 601 S. 9 th Street Loveland, CO 80538 Berthoud, CO 80513 (970)669-2061 Fax: (970)669-5034 (970)567-1912 matt@delichassoc.com centennialdesign@hotmail.com Mineral Right Owners and Lessees (Mineral Estate) State of Colorado Land Board Mr. T.J. Kelly, Mineral Leasing Agent 1127 Sherman Street, Suite 300 Denver, Co 80203 For the following parcel of land: N ½ and SE ¼ of Sec 36, Township 7 North, Range 68 West of the Sixth Principal Meridian, Town of Timnath, County of Larimer, State of Colorado Harmony, LLC c/o Mr. Byron Collins and Mr. Mark Tingey 6432 Grand Tree Blvd. Timnath, CO 80547 (970)416-0202 Fax: (970)407-7805 3

byroncollins@comcast.net mtingey@comcast.net For the following parcel of land: SW ¼ of Sec 36, Township 7 North, Range 68 West of the Sixth Principal Meridian, Town of Timnath, County of Larimer, State of Colorado Surrounding and Interested Property Ownership Report The required Surrounding and Interested Property Ownership Report as well as the required Public Hearing Notification Envelopes will be submitted after the first review by the Town staff as requested by the Town Planner. Ditch Companies Lake Canal Reservoir Company Cache La Poudre Reservoir Co. Mr. Rodney Nelson, President Mr. Dale Towbridge, Manager 6312 E. Harmony Road P.O. Box 104 Fort Collins, CO 80525 Lucerne CO 80646 (970) 482-4108 (970) 352-0222 Application Fees The Signed Fee Agreement is included with this submittal as well as the following application fees: 1. Fee Agreement: $10,000.00 2. PD Overlay Amendment Application Fee: $500.00 3. Preliminary Plat Amendment Application Fee: $3,030.00 ($500.00 + $10/lot over 25 lots) (278 lots) 4. Final Plat Application Fee: $500.00 5. Poudre Fire Authority Review Fee: $250.00 Legal Description A TRACT OF LAND BEING OUTLOT 1, OUTLOT 5, SIMON COURT AND TRACT G, HARMONY SUBDIVISION SECOND FILING AND TRACT B, HARMONY SUBDIVISION FIRST AND SECOND FILINGS SECOND REPLAT LOCATED IN SECTION 36, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TOWN OF TIMNATH, COUNTY OF LARIMER, STATE OF COLORADO. REZONING and PD OVERLAY AMENDMENT - EXCEPTIONS Harmony was annexed into the Town of Timnath in December 2004 prior to the Town s adoption of any formal codes and anomalies exist between the current development within Harmony and the Town s current Land Use Code and design standards. As stated in the Amended and Restated Annexation and Development Agreement (item 23F under Vested Property Rights) the Town and Property Owner/Developer acknowledge that there are various irregularities and non-conforming residential improvements now existing on the Property such 4

as, but not limited to, front yard courtyard walls, auto courtyards with courtyard walls, lot coverage percentages, side yard setbacks, front loading garages, large acreage estate lots, and the like. The irregularities and non-conforming residential improvements within the Property were accepted and approved by the Town at the time of the Agreement. Also, as stated in the Agreement, the Town shall not deny building permits for residential improvements within the Property in the future solely based upon similar non-conforming aesthetic irregularities so long as such irregularities: (i) do not adversely impact public health and safety, (ii) are reasonably harmonious with the existing residential improvements within the Property, and (iii) are approved by the Design Review Committee of the homeowners association for the Property. It is the overall intent of this PD Overlay Amendment to carry forward with these same design standards throughout the balance of the Harmony neighborhood as the previous filings were permitted. The Harmony Subdivision is zoned R-E (Estate Residential) and MU (Mixed Use) allowing a variety of residential, commercial and business uses as well as a world class golf club and course with a Planned Development (PD) Overlay District overlaying the entire property. The current boundary between the R-E Zone District and the MU Zone District divides the Third Filing single family lots and at the recommendation of Town staff, the applicant is proposing to rezone the single family portion of the Third Filing to R-E so that all of the single family residential lots within the Third Filing are in the same zoning district (the R-E Zone District). The boundary of the MU Zone District is shifted south and includes the entire portions of Tract E and F of the Third Filing. The intent and purpose of the PD Overlay District is to permit and encourage innovative design and high quality, master-planned developments on large parcels of land. The PD Overlay District is also intended to permit greater flexibility in the application of zoning and development standards and greater freedom in providing a mix of land uses in the development of a balanced community. The PD Overlay District allows the Harmony Subdivision to preserve critical environmental resources, provide vast amounts of open space and recreational amenities, include exceptional design, and provide greater efficiencies in the layout and provision of roads, utilities and other infrastructure. With the approval of the First and Second Filings of the Harmony Subdivision, zoning exceptions have been approved for the PD Overlay District. These exceptions to the standard R- E zone district allowed for a smaller minimum lot size, a reduced minimum front, rear, and side yard setbacks, and a reduced minimum distance between buildings as well as an exception to the lot coverage ratio based on the type of home product. As approved by the Town Council, many of these exceptions apply to the entire project including the Third, Fourth, and all future filings. This current submittal requests that additional specific exceptions be applied to the Third Filing, Fourth Filing, and all future filings whose lots have or will be platted for which specific exceptions can be determined. Included in this exception would be identifying the lot coverage ratio for each phase. 5

Subdivision Regulation Exceptions (in addition to the previously approved PD Overlay Exceptions) Zoning, Land Use and Design Standards that the Third and Fourth Filings as well as all future filings vary from are listed below: 3 rd Filing 4 th Filing and R-E Zone PD Exceptions Future Filing PD Exceptions Minimum Lot Area: 1 acre 0.16 acre 0.21 acre Minimum Lot Width at House Setback from ROW: 140 feet 60 feet 60 feet Minimum Distance Between Buildings: 40 feet 10 feet 10 feet Street Continuity Max. (Town Standard): 660 feet 850 feet 1,200 feet Lot Coverage. Lot Coverage is defined as the ratio between the lot area located under a solid roof and the entire lot area. Lifestyle home lots, defined as any lot that is part of an enclave with a separate Home Owner s Association (HOA) responsible for commonly maintained but individually owned areas of each lot (i.e. maintenance-free), will have a maximum lot coverage of 60%. A maximum lot coverage of 50% applies to all single-family estate lots for the Harmony PD. The following table provides a listing of which lots are lifestyle home lots, with a maximum 60% lot coverage and which are single-family estate lots, with a maximum 50% lot coverage for the Third, Fourth and any future filings. Harmony Lot Coverage Table; Third, Fourth and any Future Single-Family Residential Filings. Third Filing PD Exceptions Fourth and all Future Filing PD Exceptions Single-Family Estate Lots All Lots Lifestyle Home Lots All Lots Maximum Lot Coverage 60% 50% Block Diversity and Garage Orientation /Placement Standards Harmony by virtue of the neighborhood being a custom home community, shall be exempt from the Land Use Code requirements in Section 16.2.18.C.6 for garage orientation and placement standards and Section 16.2.18.D requiring a block diversity plan. This exception shall apply to all development within the Harmony Subdivision. Street Continuity. Street Continuity is defined in the Larimer County Urban Area Street Standards as the continuous length of a roadway segment that is uninterrupted by 90 degree turns or controlled intersections. The adopted Town standard is a maximum of 660 between intersections. Due to the topographic features of the site as well as the open space features and to help provide for greater efficiencies in the design of the neighborhoods, street lengths in excess of the 660 standard are being requested. Note that the Preliminary Plat that was approved by the Town in 2004 has numerous streets that exceed this standard. 6

A safety concern is typically associated with the longer distance between streets with the possibility of traffic cutting through neighborhoods without any traffic calming devices in place. The street and lot layouts of the proposed neighborhoods discourage and in some cases eliminate the possibility of this concern and stop signs will be placed at all intersections that exceed the 660 standard to slow and stop traffic as it moves through the neighborhood. Residential Lot Access to Adjacent Street. Harmony by virtue of the neighborhood being a custom home community, shall be exempt from the Land Use Code requirements in Section 16.2.7.B.2 which requires a no greater than 20 feet in width. The maximum driveway width for the Harmony Subdivision shall be no greater than 30 feet in width. This exception shall apply to all development within the Harmony Subdivision. Justification and Benefits Provided. The Town of Timnath Land Use Code provides for the PD Overlay Zone District to permit and encourage innovative design and high quality, master-planned developments on large parcels of land. The PD Overlay District is also intended to permit greater flexibility in the application of zoning and development standards and greater freedom in providing a mix of land uses in the development of a balanced community. Harmony provides a high quality master-planned community, offering a unique lifestyle to its residents. Some of the unique features include low densities, a future mixed-use component, a championship golf course and club house, significant topographic variety, and large amounts of open space. In order to take advantage of the approximately 57% of the site which is open space, lots are clustered and reduced in size from codified one acre lots as defined in typical R-E zoning. Although Harmony varies from the underlying strict R-E zoning standards, the PD Overlay District allows Harmony to provide a model example for the Timnath Land Use Plan goals for the area. The PD Overlay District exceptions that allow the Harmony development reductions in setbacks and lot sizes, the lot coverage maximums as well as the increase in the street continuity are all land planning features that have made Harmony the premier neighborhood and community in Northern Colorado. Noted benefits include: - Harmony has a very low density with less than 1 dwelling unit per acre. This has been a constant from the very first planning stages and is consistent with the underlying R-E zoning. - With the golf course and open space tracts, there are vast amounts of open space. The lots have been clustered and the streets have been designed to blend in with the natural characteristics of the land. This community is an excellent example of utilization of site topography, natural features and vegetation. The street and lot layouts are designed to enhance and compliment the landform, with walkouts and exceptional views of the Front Range. - Every lot backs to open space and/or the golf course and in some cases both. Visually the overall effect is a very open neighborhood even with the reduced setbacks and proposed increases in lot coverage. - The Harmony development has strict architectural control and site design covenants developed to maintain the intent and design of the community. These covenants dictate architectural control while still providing the most flexibility to the homeowner. Homes within Harmony incorporate a variety of covered outdoor living spaces, entry features, 7

patios and oversized garages. These elements enhance the livability of the home while maintaining significant visual interest as viewed from the street but increased the overall roofed square footage resulting in a higher lot coverage percentage. Compliance with the Town Municipal Code The applicant believes that the proposed exceptions to the PD Overlay District meet the intent of the Town of Timnath s Land Use Code for the following reasons: A. Promotes a compact, well-defined, sustainable neighborhood that enhances the Town s character. B. Creates livable neighborhoods that foster a sense of community. C. Provides for innovative, quality site design, architecture and landscaping. D. Encourages the proper arrangement of streets in relation to existing and planned streets and ensuring streets facilitate safe, efficient and pleasant walking, biking and driving. E. Provides for a variety of sizes and housing types. PRELIMINARY PLAT AMENDMENT The Preliminary Plat for the Harmony Subdivision was approved for the 642 acre site by the Town of Timnath in December 2004. This approved Preliminary Plat allowed for a total of 515 single family residential lots with an overall density of 0.80 units per acre as well as mixed use residential, commercial and business uses. The First and Second filings have been platted and developed with 72 single-family lots in the First Filing (note that the original First Filing was platted with 73 lots but Lots 1 and 2 were later combined in a replat) and 132 single-family lots and two large acreage estate lots in the Second Filing (a total of 206 existing developed lots). 112 homes are built and occupied or under construction within these first two filings. This amendment request to the Preliminary Plat is for unplatted areas within the Harmony Subdivision, specifically the area to the east of Club Drive and the area west of the maintenance facility in the southwest portion of the development, north of Grand Tree Blvd. With this amendment, the applicant is requesting the approval to make revisions to the street and lot layouts without exceeding the total number of lots or overall density permitted by the existing approved Preliminary Plat and zoning. Legal Description (for Amended Portions of the Preliminary Plat) A TRACT OF LAND BEING OUTLOT 1, OUTLOT 5, SIMON COURT AND TRACT G, HARMONY SUBDIVISION SECOND FILING AND TRACT B, HARMONY SUBDIVISION FIRST AND SECOND FILINGS SECOND REPLAT LOCATED IN SECTION 36, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TOWN OF TIMNATH, COUNTY OF LARIMER, STATE OF COLORADO. 8

Land Use Summary Existing Zoning R-E Estate Residential District and MU Mixed Use District with PD Overlay as amended. Land Use Acreage No. of Units % of Total Residential 198.48 483 30.87 Mixed Use 60.15 32 9.36 Open Space/Neighborhood Parks 150.11 0 23.35 Golf Course/Open Space 234.19 0 36.42 TOTAL 642.86 515 100% Compliance with the Town Municipal Code The applicant believes that the proposed revisions to the approved Preliminary Plat meet the intent of the Town of Timnath s Land Use Code for the following reasons: 1. By allowing the revisions to the Preliminary Plat to proceed, the applicant believes it has met the intent of the Land Use Code by: A. Promoting compact, well-defined, sustainable neighborhoods that enhance the Town s character. B. Creates livable neighborhoods that foster a sense of community. C. Encouraging the proper arrangement of streets in relation to existing or planed streets and ensuring streets facilitate safe, efficient and pleasant walking, biking and driving. D. Providing a variety of lot sizes and housing types. E. Provides for innovative, quality site design, architecture and landscaping. F. Encourages the proper arrangement of streets in relation to existing and planned streets and ensuring streets facilitate safe, efficient and pleasant walking, biking and driving. G. Provides for a variety of sizes and housing types. H. Provides open spaces for adequate storm water management. I. Ensuring compliance with the Code and Town Comprehensive Plan. Compliance with the Town Comprehensive Plan The applicant believes that the proposed revisions to the approved Preliminary Plat meet the intent of the Town of Timnath s Comprehensive Plan per the June 2007 update for the following reasons: 1. By allowing the revised Preliminary Plat to proceed as proposed, the applicant believes it has met the following Community Goals provisions as stated in the Comprehensive Plan: A. Growth Management (GM) GM Goal 1 Development occurring within or around Timnath will preserve and enhance the small town qualities and characteristics of the town. GM Goal 3 Require construction of adequate public facilities and infrastructure as new development occurs. 9

GM Goal 4 Development in Timnath will pay its own way with regard to infrastructure improvements and services needed to support growth. GM Goal 5 Ensure that growth occurs in a logical and connected pattern. GM Goal 7 Balance the staging and land use mix of residential, commercial and employment land uses in planned developments to ensure that residents needs are met and the Town s fiscal and economic health is safeguarded. B. Land Use (LU) LU Goal 2 Ensure an appropriate mix of housing types and densities in order to preserve the existing small town character. LU Goal 3 Include a mixed use, commercial, and industrial districts that provide jobs and services to both local and regional citizens, and revenue to the town. LU Goal 4 Foster the small town character of Timnath through well-designed growth and preservation of open space buffers within the GMA area. C. Community Image and Design (CID) CID Goal 1 New development and redevelopment in the Town of Timnath will seek to preserve and enhance the town s existing small town character, form, and charm. CID Goal 6 Require exceptional and well-planned site and landscape design in residential and commercial areas, including elements such as: large, contiguous open spaces; meaningful setbacks from major roadways or open corridors; tree lined streets; appropriate design and scale signage; preservation of stands of healthy trees. D. Community Facilities and Services (CFS) CFS Goal 1 Ensure that services and infrastructure are provided to citizens in a cost-effective manner. CFS Goal 2 Work with service providers that offer facilities and services such as potable water, sanitary sewer, schools, libraries, police and public safety to the Town. GFS Goal 3 - Infrastructure that accompanies new development, or is implemented in the existing town must be state of the art yet maintain the small town character. GFS Goal 4 Timnath should be a pedestrian and bicycle-friendly community. Off-street bike and pedestrian trails, bike lanes along heavily traveled roads, and sidewalks along urban streets should be provided throughout the community. GFS Goal 6 Ensure that mechanisms are provided for maintenance of infrastructure constructed or required to serve newly annexed and developing areas, including streets. E. Recreation and Open Space (ROS) ROS Goal 1 Provide a balanced and connected system of recreation facilities, parks and open space that builds on the assets of Town. ROS Goal 5 Develop a connective system of trails and greenways that provide opportunities for pedestrian, bicycle and equestrian recreation. F. Environmental (ENV) ENV Goal 1 Grow in a manner that will complement the natural characteristics of the area, including such elements as climate, topography, vegetation, waterways, groundwater, and wildlife. 10

ENV Goal 4 Provide and preserve existing healthy trees of desirable species, whenever possible. ENV Goal 5 Protect water resources in line with all applicable State of Colorado statues. 2. By allowing the amendments to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Growth Management (GM) principles and policies as stated in the Comprehensive Plan: A. GM Principle 1 GM Policy 1.1 The town will establish a Growth Management Area (GMA) for the Town of Timnath that will contain the Town s planned and desired growth over the next 10-20 years. The Timnath GMA is delineated on the Land Use map. The Growth Management Area is intended to depict appropriate locations of future urbanlevel development around Timnath. Urban-level development is defined as an average density of at least 2 housing units per acre, with existing or planned availability of public water and public sanitary sewer. A lower average density may occur in areas that serve as a buffer on the periphery of the GMA. GM Policy 1.2 Adopt and implement the Timnath Comprehensive Plan establishing the preferred pattern of growth for Timnath and surrounding areas. GM Policy 1.7 The Plan identifies areas within the GMA that are suitable for development, and the general land uses and type of development that the town envisions. The plan also identifies general areas that should remain as open space to serve areas of recreation, buffers, and gateways to the community. The relationships between all of the various components are depicted in the Land Use Plan as a general guide for development of the area. B. GM Principle 2 GM Policy 2.3 Encourage clustered development and other innovative development strategies within areas designated for residential. C. GM Principle 4 GM Policy 4.1 Encourage development only where it can be adequately served by critical public facilities and services such as water, sewer, transportation, schools, fire and emergency services, and parks. GM Policy 4.2 Create a fee structure for development in Timnath that provides the appropriate level of funding for services that are required by new development, including cooperation with Larimer County, the City of Fort Collins, the Town of Windsor and other jurisdictions that levy fees for development impacts. This shall include mechanism for funding of operation and maintenance of facilities and services that are required to serve new development areas. 3. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Land Use (LU) principles and policies as stated in the Comprehensive Plan: A. Land Use Principle 3 LU Policy 3.3 Provide opportunities for urban density residential development in the low-density residential area that is similar or lower than the density in Downtown Core. Low-density residential areas will serve as transition areas between residential areas and County Density residential areas. Development of these areas will promote 11

connectivity between neighborhoods and maintain the small town character, through the use of linkages such as streets, trails, and open space. 4. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Community Image and Design (CID) principles and policies as stated in the Comprehensive Plan: A. CID Principle 1 CID Policy 1.2 Assign a zone district to annexed land that is based upon the Comprehensive Land Use Plan. Each zoning district in Timnath will have its own set of standards and regulations that apply to all new development and redevelopment. The depth and detail of each district s standards will vary depending on what is determined appropriate to preserve and enhance Timnath s small town character. The standards and regulations will provide specific direction to landowners regarding the type and intensity of development permitted and how development needs to occur. Site planning, architecture, lighting, and signage will be regulated in order to achieve the intended character for the area, per the Comprehensive Plan. CID Policy 1.5 Require appropriate streetscape design on new or redeveloped roads, including the provision of street trees and sidewalks. 5. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Economy (EC) principles and policies as stated in the Comprehensive Plan: A. EC Principle 1 EC Policy 1.1 Provide an adequate supply of land suitable for commercial and employment development at key locations along Harmony Road/County Road 38, Mulberry Road/Hwy 14, and throughout the GMA area. EC Policy 1.2 Encourage a mix of commercial uses in appropriate areas of the GMA as indicated on the Future Land Use Map. For example, small retail, offices, sit-down restaurants, and entertainment venues may be the most appropriate in the Downtown Core, while more regional-type commercial (lodging, chain-style restaurants, and gas stations) may be appropriate at the Harmony Road/I-25 interchange. The Harmony Road/County Road 38, Mulberry Road/Hwy 14 corridors are desirable locations for a variety of commercial, business, light industrial, and office uses. 6. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Transportation (TR) principles and policies as stated in the Comprehensive Plan: A. TR Principle 2 TR Policy 2.1 Develop and incorporate a system of bicycle lanes and trails that connect to the Downtown Core and other activity centers and neighborhoods into the design of streets and developments in Timnath. The bicycle lanes will be consistent throughout the town and continuous when possible. TR Policy 2.3 Incorporate pedestrian sidewalks and connections that accommodate and encourage pedestrian activity into new development and street construction projects. 12

7. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Community Facilities and Services (CFS) principles and policies as stated in the Comprehensive Plan: A. CFS Principle 1 CFS Policy 1.3 Require developers to pay for all infrastructure improvements required for new development. 8. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Recreation and Open Space (ROS) principles and policies as stated in the Comprehensive Plan: A. ROS Principle 2 ROS Policy 2.1 Preserve an extensive open space network to retain the natural setting that exists within the GMA, to buffer the town from surrounding communities, and to provide recreational opportunities for residents. 9. By allowing the revisions to the Preliminary Plat to proceed as proposed the applicant believes it has met the following Environment (ENV) principles and policies as stated in the Comprehensive Plan: A. ENV Principle 1 ENV Policy 1.1 Preserve important visual features of the landscape and encourage the use of indigenous vegetation within new developments or redevelopment through the use of appropriate design and land use regulations. In summary, the applicant believes that the proposed preliminary plat revisions and development are in substantial conformance with the Town s Municipal Code (Land Use Code) and Comprehensive Plan. While not meeting all of the principles and policies of the plan, the majority as related to the project are met or exceeded. This Preliminary Plat Amendment request will help the Town meet many of its goals and assist the Town in providing a mix of different residential housing types while preserving open space corridors throughout the site. HARMONY SUBDIVISION THIRD FILING FINAL PLAT This Third Filing of the Harmony Subdivision is located within the southwest portion of the Harmony development and is approximately 188 acres in size. There are 97 residential lots, two mixed use tracts (the existing maintenance facility-tract E and the Harmony Center building Tract F), 20.23 acres of privately owned neighborhood parks and common open space, 129.39 acres of golf course/open space, and one outlot (future clubhouse/recreation center-outlot 1) totaling 8.25 acres. The overall gross density is 0.52 residential units per acre. The proposed homes in this phase will be considered Lifestyle Homes in which the Homeowners Association (HOA) will be responsible for maintaining all of the common open space areas as well as the individually owned areas within each lot. Consistency with Approved Preliminary Plat This Third Filing of the Harmony Subdivision will be in general conformance with the amended Preliminary Plat as submitted with this application. 13

Protective Covenants, Home Owners Association Documents and Architectural Design Guidelines These documents were submitted and approved with previous filings within the Harmony Subdivision. These documents are the same for this Third and all future filings and all lots and tracts within the Harmony Subdivision will be required to comply with the same covenants and restrictions currently in place upon final plat approval and recording. A copy of these documents is included with this submittal. Legal Description A TRACT OF LAND BEING OUTLOT 1 AND SIMON COURT, HARMONY SUBDIVISION SECOND FILING AND TRACT B, HARMONY SUBDIVISION FIRST AND SECOND FILINGS SECOND REPLAT LOCATED IN SECTION 36, TOWNSHIP 7 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TOWN OF TIMNATH, COUNTY OF LARIMER, STATE OF COLORADO. Land Use Summary Existing Zoning: R-E and MU with PD Overlay (Town of Timnath) Land Use Acreage No. of Residential Units Residential (Lots 208-304 & ROW) 25.07 97 Neighborhood Parks and Open Space (Tracts A, C, D and G) 20.23 0 Mixed Use Tracts (Tracts E & F) 4.87 0 Golf Course/Open Space (Tract B) 129.39 0 Future Development (Outlot 1) 8.25 0 TOTAL 187.81 97 Subdivision Improvement Agreement (SIA) Upon review of the plat submittal, the applicant will work with Town staff on preparation of the Subdivision Improvements Agreement. Open Space Ownership and Dedication All open space and recreation facilities will be privately owned and maintained by the Harmony Club, LLC. Soils Reports An overall soils report for the development has been submitted with this application and additional soils testing will be completed once overlot grading is completed and will include all necessary pavement designs for the development. 14

Compliance with the Town Municipal Code The applicant believes that the proposed Third Filing Final Plat meets the intent of the Town of Timnath s Land Use Code for the following reasons: 1. By allowing the final plat to proceed as proposed, the applicant believes it has meet the intent of the Land Use Code by: A. Promoting compact, well-defined, sustainable neighborhoods that enhance the Town s character. B. Create livable neighborhoods that foster a sense of community and reduce dependency on private vehicles. C. Encouraging the proper arrangement of streets in relation to existing or planned streets and ensuring streets facilitate safe, efficient and pleasant walking, biking and driving. D. Providing a variety of lot sizes and housing types. E. Protecting sensitive natural and historic areas and the Town s environmental quality. F. Providing adequate and convenient open spaces. G. Providing open spaces for adequate storm water management. H. Providing protection from geologic hazards and flood management. I. Ensuring compliance with the Code and Town Comprehensive Plan. Compliance with the Town Comprehensive Plan The applicant believes that the proposed Third Filing Final Plat meets the intent of the Town of Timnath s Comprehensive Plan per the June 2007 update for the following reasons: 1. By allowing the Third Filing Final Plat to proceed as proposed, the applicant believes it has met the following Community Goals provisions as stated in the Comprehensive Plan: A. Growth Management (GM) GM Goal 1 Development occurring within or around Timnath will preserve and enhance the small town qualities and characteristics of the town. GM Goal 3 Require construction of adequate public facilities and infrastructure as new development occurs. GM Goal 4 Development in Timnath will pay its own way with regard to infrastructure improvements and services needed to support growth. GM Goal 5 Ensure that growth occurs in a logical and connected pattern. GM Goal 7 Balance the staging and land use mix of residential, commercial and employment land uses in planned developments to ensure that residents needs are met and the Town s fiscal and economic health is safeguarded. B. Land Use (LU) LU Goal 2 Ensure an appropriate mix of housing types and densities in order to preserve the existing small town character. LU Goal 4 Foster the small town character of Timnath through well-designed growth and preservation of open space buffers within the GMA area. C. Community Image and Design (CID) 15

CID Goal 1 New development and redevelopment in the Town of Timnath will seek to preserve and enhance the town s existing small town character, form, and charm. CID Goal 6 Require exceptional and well-planned site and landscape design in residential and commercial areas, including elements such as: large, contiguous open spaces; meaningful setbacks from major roadways or open corridors; tree lined streets; appropriate design and scale signage; preservation of stands of healthy trees. D. Community Facilities and Services (CFS) CFS Goal 1 Ensure that services and infrastructure are provided to citizens in a cost-effective manner. CFS Goal 2 Work with service providers that offer facilities and services such as potable water, sanitary sewer, schools, libraries, police and public safety to the Town. GFS Goal 3 - Infrastructure that accompanies new development, or is implemented in the existing town must be state of the art yet maintain the small town character. GFS Goal 4 Timnath should be a pedestrian and bicycle-friendly community. Off-street bike and pedestrian trails, bike lanes along heavily traveled roads, and sidewalks along urban streets should be provided throughout the community. GFS Goal 6 Ensure that mechanisms are provided for maintenance of infrastructure constructed or required to serve newly annexed and developing areas, including streets. E. Recreation and Open Space (ROS) ROS Goal 1 Provide a balanced and connected system of recreation facilities, parks and open space that builds on the assets of Town. ROS Goal 5 Develop a connective system of trails and greenways that provide opportunities for pedestrian, bicycle and equestrian recreation. F. Environmental (ENV) ENV Goal 1 Grow in a manner that will complement the natural characteristics of the area, including such elements as climate, topography, vegetation, waterways, groundwater, and wildlife. ENV Goal 4 Provide and preserve existing healthy trees of desirable species, whenever possible. ENV Goal 5 Protect water resources in line with all applicable State of Colorado statues. 2. By allowing the Third Filing Final Plat to proceed as proposed the applicant believes it has met the following Growth Management (GM) principles and policies as stated in the Comprehensive Plan: D. GM Principle 1 GM Policy 1.1 The town will establish a Growth Management Area (GMA) for the Town of Timnath that will contain the Town s planned and desired growth over the next 10-20 years. The Timnath GMA is delineated on the Land Use map. The Growth Management Area is intended to depict appropriate locations of future urbanlevel development around Timnath. Urban-level development is defined as an average density of at least 2 housing units per acre, with existing or planned 16