Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority. Public Rental Housing Allocation Plan for 2010/11

Similar documents
Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority

Housing in Figures. Hong Kong Housing Authority

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Subsidised Housing Committee. Domestic Rents for New Estates

Housing in Figures. Hong Kong Housing Authority

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Rental Housing Committee. Fixing of Domestic Rents for New Estates

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report Committee Work (September November 1998)

For the Hong Kong Housing Society, 1998/1999 has been a year of. facing challenges and finding solutions

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JUNE 1998 to 31 AUGUST 1998) Abbreviations : PDB Provisional District Board

Gross Floor Area of HOS Flat by Phase / Estate

THE UNIVERSITY OF HONG KONG LIBRARIES. Hong Kong Collection. gift from Cheng Kar Foo, Andrew

BUILDING FOR THE BETTER CHINA. Hong Kong

Delia Memorial School (Hip Wo) Guidance notes on filling Student s Particulars Record

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 JULY 1999 to 30 SEPTEMBER 1999) Abbreviations : PDB Provisional District Board

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority. Green Form Subsidised Home Ownership Pilot Scheme

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Selection Method for Shaw College Student Hostel Places 2017/2018 (Second Draft)

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

香港物業管理公司協會有限公司 The Hong Kong Association of Property Management Companies Limited

Selection Method for Shaw College Student Hostel Places 2017/2018 (First Draft)

HOUSING MATTERS DISCUSSED AT DISTRICT BOARDS AND THEIR COMMITTEES (1 MARCH 1998 to 31 MAY 1998) Abbreviations : PDB Provisional District Board

Selection Method for Shaw College Student Hostel Places 2016/2017 (Final Version)

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Housing Authority. Secretary s Report - Committee Work (1 March to 31 May 1997)

Selection Method for Shaw College Student Hostel Places 2014/2015 (Second draft)

Shaw College Selection Method for Student Hostel Places 2018/2019 (1st Draft)

Kowloon Region. Unit No. District Meeting Venue & Contact Tel. Meeting Time. The Salvation Army Chuk Yuen Children and Youth Centre

Collection Point Address

Foreseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

Shaw College Selection Method for Student Hostel Places 2019/2020

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

HONG KONG HOUSING AUTHORITY

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

SENIOR CITIZEN RESIDENCES SCHEME

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Subsidised Housing Committee

S.F. Service Points Update Notice

The Past, Present and Future Land-forming in Hong Kong

Summary of Decision Made by the Home Ownership Committee

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: Kowloon

S.F. Service Points Update Notice

Self Service Terminal Service Hour Hong Kong District Branch

(A) Re-housing for Domestic Tenants

Major SmarTone Authorised Resellers

HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE

Highlights of the Year

Redevelopment: Tackling Urban Decay Effectively

SENIOR CITIZEN RESIDENCES SCHEME CHEERFUL COURT / JOLLY PLACE NGAU TAU KOK TSEUNG KWAN O. Application Form

BANK OF CHINA LIMITED (A joint stock company incorporated in the People s Republic of China with limited liability) Stock Code: 3988

Monthly update of MTR facilities for passengers with disabilities December 2017

Business in Hong Kong Property Development

Appendix. Office and Unit Lists. HKFYG Website: hkfyg.org.hk M21 Multimedia Web: M21.hk

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

Job Expo for Elderly and Rehabilitation Services

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

Kwok Yu LAU (Researcher of CityU Small-scale Research Project )

DECLARATION FOR APPLYING HONG KONG HOUSING SOCIETY S RENTAL UNIT

HK Island Central. Central / Admiralty / Sheung Wan Admiralty Centre ifc (International Finance Centre) (One & Two) Shanghai Commercial Bank Building

Redeveloping/Upgrading old and dilapidate districts as a form of improving the urban quality of Hong Kong

MEGA CUBE. Kowloon Bay, Hong Kong

THE UNIVERSITY OF HONG KONG LIBRARIES. This book was a gift from. Hong Kong Policy Research Institute Ltd.

DEVELOPMENT PROJECTS COMPLETED

Gross Rental Income* Gross Rental Income* by Sector

THE HONG KONG MORTGAGE CORPORATION LIMITED ISSUANCE OF RETAIL BONDS. Press Release

More than 170 Restaurants Serve up Free Breakfasts from today in CLP Power Elderly Yum Cha Programme

Recommended District Council Constituency Areas

High Park Grand Mong Kok, Hong Kong

Uphold the Rule of Law Seize the Opportunities Make the Right Choices

TABLE OF CONTENTS. Pages. iii FOREWORD CHAPTER 5. A NEW HOUSING STRATEGY FOR HONG KONG Introduction 1 Vision 2 Principles 3 Strategy 4

S.F. Service Points Update Notice

A New Page of the NEC Expedition - DSD s Initial Experience on 5 More NEC Pilot Contracts

New Asia College Student Hostel Selection Criteria, Rules and Regulations

New Asia College Student Hostel Selection Criteria, Rules and Regulations

S.F. Service Points Update Notice

項目名稱應用完工年份建築師承辦商 1. 2 nos of Plant Room at Yau Oi Roof Sport Cladding Centre WIP ASD Shui On Bldg Co Ltd

St. James' Settlement Wanchai Community Centre 7/F, 85 Stone Nullah Lane, Wan Chai, Hong Kong

Mid-level, Hong Kong HKYWCA Kwun Lung Lau Community Work Office Shop 60, G/F, Block D, Kwun Lung Lau, Kennedy Town, Hong Kong

Hong Kong Out-patient Direct Settlement Network - April 2015

Recommended District Council Constituency Areas

BRANCH NETWORK & CORPORATE BANKING CENTRES

New Asia College Student Hostel Selection Criteria, Rules and Regulations

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

(sq.ft.)!!"!!!" HONG KONG 1. No. 1 Chatham Path % 4,017 R Completed Existing Mid-levels, Hong Kong!"#$1

Property Investment. 1. Two IFC, Central 2. International Commerce Centre, Kowloon Station 3. East Point City, Tseung Kwan O 4.

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

/ 2736 BOULEVARD, NATHAN ROAD, TSIM SHA TSUI

Summary of Decisions Made by the Subsidised Housing Committee

7-Eleven Store List DHL Pick Up Service

Contribution of Manufacturing to GDP and Stock of Industrial Premises

S.F. Express Circle K Convenience Store Self-pickup Service Service Coverage: New Territories

Occupational Safety and Health Council Construction Safety Promotional Campaign 2017 Competition Winners List

S.F. Service Points Update Notice

Facilitating Services Scheme

Redevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22

New Asia College Student Hostel Selection Criteria, Rules and Regulations For Local Student (Revised in March 2018)

2003 Village Representative Election List of Duly Elected Candidates in Uncontested IIR Elections

Transcription:

PAPER NO. SHC 29/2010 Memorandum for the Subsidised Housing Committee of the Hong Kong Housing Authority Public Rental Housing Allocation Plan for 2010/11 PURPOSE This paper informs Members of the result of the public rental housing (PRH) allocation in 2009/10, and seeks Members approval of the allocation plan for 2010/11. ALLOCATION PRINCIPLES 2. The key objective of our annual allocation planning is to maximise the rational allocation of our valuable public housing resources. The process involves first making a projection of the PRH supply in the new fiscal year, and then assessing the anticipated demands in various rehousing categories. In drawing up the allocation plan, we will ensure that the following practices/ targets/ key performance indicators (KPIs) are met: given the large number of applicants on the Waiting List (WL), we should allocate as many of the year s available flats as possible to this category (planned allocation of about 20 000 flats on average in the past few years) in the light of the PRH supply and other competing demands; our target on the Average Waiting Time (AWT) of around three years for general applicants (excluding applicants subject to the Quota and Points System (QPS)); our KPI on the percentage of vacant flats (currently set at below 1.5% of our PRH stock); and our KPI on the percentage of overcrowded households (currently set at below 0.6% of our total PRH households).

- 2-3. The annual allocation plan as approved by Members will serve as a guiding framework for our allocation work in the year. The actual allocation result which reflects the actual demand and changing circumstances will be reported to Members at the close of the year. AN OVERVIEW OF ALLOCATION WORK IN 2009/10 Number of Flats Allocated 4. At the meeting held on 19 May 2009, Members approved vide Paper No. SHC 25/2009 the 2009/10 PRH Allocation Plan, including the proposed allocation of 36 900 PRH flats in the year. As at the end of March 2010, we made a total of 35 650 allocations (see Annex). Members are requested to note that the completion of 2 365 new flats in Tin Ching Estate, Tin Shui Wai Area 104 was slightly deferred and intake formalities could not commence until March 2010. With the exception of 455 flats which still had to be reserved for clearance, regional transfer and other categories, the remaining newly-completed flats had all been offered to eligible applicants in advance, among which 899 WL applicants had tentatively accepted the offer in writing. Taking into account these accepted offers of newly-completed flats, a total of 36 549 flats were allocated in 2009/10, which was very close to the planned allocation of 36 900 flats. Clearance Rehousing 5. In 2009/10, a total of 222 flats were allocated under this category, with breakdown as follows - (a) Government Clearance Projects 6. Of the 220 flats set aside for Squatter Clearance, 49 flats were taken up by clearees, or 22.3% of the planned provision. The shortfall was mainly due to the re-scheduling of some planned clearance projects by the Government and some clearees had opted for compensation in lieu of PRH rehousing. Moreover, as rehousing arrangements for non-development clearances (on geotechnical grounds) were made on a voluntary basis, most of the clearees had opted to stay put despite repeated persuasion by the staff of the Lands Department. This further reduced the number of allocations made under this sub-category in 2009/10.

- 3 - (b) Clearance by Urban Renewal Authority 7. In 2009/10, we had set aside 300 flats for rehousing the Urban Renewal Authority (URA) clearees in accordance with the Memorandum of Understanding Note 1 entered into between URA and the Housing Authority (HA) in June 2002 and revised in June 2007. Of these, a total of 123 flats were allocated which accounts for 41% of the planned provision. The main reasons for the low take-up rate of the provision was due to that the compensation rates for the five projects of the former Land Development Corporation processed in the current fiscal year were relatively more attractive. As a result, 243 out of the 280 cases processed by URA under these projects had opted for cash compensation instead of PRH rehousing. Besides, since the assessment of the PRH eligibility of residents affected by clearance projects in Hai Tan Street of Sham Shui Po and in Kwun Tong had yet been completed by URA, rehousing would have to commence later. As for the recovery of private properties by the Government at Ma Tau Kok and To Kwa Wan, rehousing has commenced since March 2010. (c) Interim Housing Clearance and Trawling 8. HA approved the clearance of Block 12, Kwai Shing East Estate Interim Housing (KSEIH) in August 2008 involving about 200 families. As at the end of March 2010, 49 clearees were rehoused to PRH flats. Taking into account the one interim housing (IH) household from Shek Lei (II) Estate who had been successfully transferred under our Trawling Exercise, a total of 50 flats were allocated under this sub-category in 2009/10. Comprehensive Redevelopment, Estate Clearance and Major Repairs 9. In 2009/10, a total of 3 350 flats were reserved under this category and 3 360 flats were allocated with breakdown as follows: (a) Comprehensive Redevelopment 10. 3 224 flats were allocated under this sub-category in 2009/10. They were allocated to the affected tenants of Lower Ngau Tau Kok (II) Estate which was the last estate to be cleared for comprehensive redevelopment. All tenants of the estate had moved out by the end of January 2010. Note 1 Under the Memorandum of Understanding, URA shall pay to HA reservation fees equivalent to the monthly rentals payable for the flats reserved.

- 4 - (b) Estate Clearance 11. As at the end of March 2010, a total of 136 flats were allocated under the sub-category of Estate Clearance. This included clearees from So Uk Estate Note 2 Phases 1 and 2 and from Block 22 of Tung Tau (I) Estate Note 3. With the last clearee allocated a flat in this year, all tenants in So Uk Estate Phase 1 had moved. With 97 households allocated through the Early Thinning-out Exercises Note 4, it is anticipated the remaining 2 300 households in Phase 2 would move out by April 2012. Furthermore, 38 households from Block 22 of Tung Tau (I) Estate were also allocated through the Early Thinning Exercises with the remaining 800 households to move out within 2012. Waiting List 12. A total of 18 927 flats Note 5 were allocated to the general WL applicants in 2009/10. A total of 1 948 flats were allocated to non-elderly one-person applicants under QPS. 13. To sum up, a total of 20 875 flats, or 85.2% of the planned allocation of 24 500 flats, were allocated to WL applicants in 2009/10. Taking into account the 899 new flats in Tin Ching Estate which were allocated to WL applicants through the advanced allocation, a total of 21 774 flats were allocated, or 88.9% of the planned allocation to WL applicants in the year. The shortfall in allocation was mainly due to that more WL applicants tended to accept their flat allocation only at later offers to them in the year. Moreover, allocation through various transfer schemes also resulted in longer time-lag Note 6 in turning over of the returned flats for allocation. Note 2 Note 3 Note 4 Note 5 Note 6 At the end of March 2006, HA announced the clearance of So Uk Estate in two phases in 2008 and 2011 respectively. At the end of March 2009, HA announced the clearance of Block 22, Tung Tau (I) Estate in June 2012. To encourage the early removal of the clearees in So Uk Phase 2, three Early Thinning-out Exercises had been launched in 2009/10 to allocate flats to affected clearees as soon as possible. Including 1 460 flats successfully let out through the Express Flat Allocation Scheme (EFAS) (as at the end of March 2010). Normally a sitting tenant who succeeds in applying for a flat under various transfer exercises will be given two months time to surrender his existing flat after completing the intake formalities for the new flat. Upon recovery of the existing flat, further time is required for refurbishment and arrangement of offer to a new tenant.

- 5 - Compassionate Rehousing 14. We allocated a total of 2 449 flats under this category to cases recommended by the Social Welfare Department (SWD) in 2009/10. Transfer 15. 7 909 flats were allocated under this category in 2009/10, with breakdown as follows: (a) Overcrowding Relief/ Living Space Improvement Transfer Scheme 16. A total of 1 851 flats were successfully allocated through the Territory-wide Overcrowding Relief (TWOR) exercises and the Living Space Improvement Transfer Scheme (LSITS) in 2009/10. The two TWOR exercises launched in 2009/10 together with the applications brought forward from 2008/09 and processed in 2009/10, a total of 691 overcrowded households were successfully transferred to larger flats. The total number of overcrowded households was further reduced from 3 729 by the end of March 2009 to 3 271 by the end of March 2010, representing 0.48% of the total PRH households, which was within our KPI of below 0.6%. Moreover, in the fourth LSITS exercise which was launched in March 2009, a total of 1 160 households (including 879 eligible for cross-district transfer Note 7 ) were rehoused. (b) Other Categories of Transfers 17. 6 058 flats were successfully allocated under this category, with details as follow : We launched two Regional Transfer Exercises in Sau Mau Ping/ Kwun Tong (North) and Tuen Mun/ Yuen Long/ Tin Shui Wai respectively. They were all well received by the tenants. A total of 1 188 flats were successfully allocated this year. In the third phase of the Harmonious Families Transfer Scheme launched at the end of 2009, together with the cases carried forward from the second phase of the scheme processed in this year, a total of 345 flats were allocated this year. Note 7 Eligible applicants living in PRH for over ten years are allowed to apply for transfer to any district of their choice.

- 6-1 951 and 2 574 flats were let out through internal transfers and special transfers respectively this year. Junior Civil Servants and Pensioners 18. A total of 827 flats was allocated under this category in 2009/10, consuming 82.7% of the approved quota. Average Waiting Time 19. In 2009/10, we maintained our target on the average waiting time at around three years for general WL applicants Note 8 and around two years for elderly one-person applicants. As at the end of March 2010, the actual average waiting time was 2 years for general WL applicants and 1.1 years for elderly one-person applicants. Vacancy Rate 20. As at the end of March 2010, the number of lettable vacant flats stood at 6 917. Against our total lettable PRH stock of 697 533 flats, this represented a vacancy rate of 1%, which was within our KPI of below 1.5%. PROPOSED 2010/11 ALLOCATION PLAN 21. The supply of PRH in 2010/11 comprises new production and refurbished flats. We estimate that about 31 100 PRH flats will be made available for allocation in the year. (a) New flats available for allocation 22. The forecast on the number of new flats available for allocation in the year is based on the Public Housing Construction Programme compiled in March 2010. Four new public housing estate projects will be due for completion in 2010/11. Coupled with four projects which were completed in March 2010 and carried forward to the 2010/11 provision, a total of 12 265 new flats will be available from all the projects, with details shown as follows - Note 8 Excluding the applicants under QPS.

- 7 - New production from January 2010 to March 2010 Project Completion Date No. of Flats Ex-Chai Wan project (Chai Wan Estate) March 2010 1 600 Tung Tau Cottage Area West (Mei Yan March 2010 799 House, Mei Tung Estate) Choi Wan Road Site 2 Phase 1 (Choi Tak March 2010 1 462 Estate) Choi Wan Road Site 3B Phase 1 (Choi Fook March 2010 2 524 Estate) Sub-total 6 385 New production from April 2010 to February 2011 # Project Anticipated Completion Date No. of Flats Shatin Pass December 2010 1 278 Tseung Kwan O Area 73B December 2010 1 974 Kwai Luen Road February 2011 1 470 Hung Hom Estate Phase 2 February 2011 1 158 Sub-total 5 880 Total 12 265 # New production is compiled in accordance with the Public Housing Construction Programme in March 2010. The period of supply of new production runs from April 2010 to February 2011, beyond which any new flats completed can only be made ready for allocation in the following year due to the lead time required for the handover and letting of flats. For this reason, Ma On Shan Area 86B (2 587 flats) and Choi Wan Road Sites 2, 3A and 3B Phase 2 (5 205 flats), all scheduled for completion in March 2011, are excluded from the computation. 23. Taking into account the above 12 265 new flats and the vacant new flats brought forward from the previous year, we estimate that about 12 600 new flats will be made available for allocation in 2010/11.

- 8 - (b) Refurbished flats available for Allocation 24. For refurbished flats, the forecast is mainly based on the existing stock in hand, together with those likely to recover and become available for re-allocation in the year for reasons of voluntary surrender, termination of tenancy, transfer to new flats and purchase of surplus flats under the Home Ownership Scheme/ Private Sector Participation Scheme, etc. We estimate that about 18 500 refurbished flats will be made available for re-allocation in 2010/11. Proposed Allocation Clearance Rehousing 25. The total planned allocation under this category is 520 flats, including: In consideration of the anticipated demand, we propose to deploy 220 flats for government clearance projects (including squatter huts and private tenements); URA has advised that about 300 flats will be required to rehouse residents under various redevelopment projects scheduled for 2010/11. Estate Clearance and Major Repairs 26. Taking into account the demand arising from the clearance of So Uk Estate Phase 2 and the Early Thinning-out Exercise for Block 22 of Tung Tau (I) Estate, we propose to set aside a total of 150 flats under this category. Waiting List 27. As in the past few years, we propose to give WL category the biggest share of the year s PRH allocation, and a total of 21 930 flats are so planned for 2010/11, representing 70.5% of the year s provision, and exceeding the 66.4% provision in 2009/10 by 4.1%.

- 9 - Non-elderly One-person WL Applicants 28. Members agreed in 2006 vide Paper No. SHC 36/2006 to set the annual allocation for non-elderly one-person WL applicants subject to QPS at 8% of the number of flats to be allocated to WL applicants, with the ceiling of 2 000 flats. Hence, a quota of 1 760 flats (i.e. 8% of 21 930 flats) will be set for 2010/11. We will continue to launch another EFAS exercise in 2010/11 in order to boost the letting rate of PRH. Compassionate Rehousing 29. We propose to set aside 2 000 flats for this category in 2010/11. We will handle with flexibility the extra demand arising from the actual number of recommendations by SWD when necessary. Overcrowding Relief/ Living Space Improvement and Transfers 30. As at 31 March 2010, the number of overcrowded households dropped to 3 271, or 0.48% of the total number of PRH households. We, therefore, propose to maintain the provision of 1 500 flats for overcrowding relief and living space improvement in 2010/11. We further propose to set aside 4 000 flats for various forms of transfers (including Harmonious Families Transfer Scheme, Housing for Senior Citizens Conversion Programme, under-occupation transfer cases and other transfer exercises) in 2010/11. Overall speaking, we will flexibly deploy the 5 500 flats set aside under all these transfer sub-categories. Junior Civil Servants and Pensioners 31. We propose to maintain the quota at 1 000 flats under this category in 2010/11.

- 10 - RECOMMENDATIONS 32. In summary, the proposed 2010/11 PRH Allocation Plan is set out as follows: Proposed Allocation in 2010/11 Rehousing Category % 1. CLEARANCE 520 1.7 (a) Government Clearance Projects (220) (0.7) (b) Urban Renewal Authority (300) (1.0) 2. ESTATE CLEARANCE AND MAJOR REPAIRS 150 0.5 3. WAITING LIST 21 930 70.5 (a) General Applicants Note 9 (20 170) (64.8) (b) QPS Applicants (1 760) (5.7) 4. COMPASSIONATE 2 000 6.4 5. TRANSFER 5 500 17.7 (a) Overcrowding Relief / LSITS (1 500) (4.8) (b) Transfers (4 000) (12.9) 6. EMERGENCY 0 0 7. JUNIOR CIVIL SERVANTS AND PENSIONERS 1 000 3.2 Total 31 100 100 Note 9 Including EFAS applicants.

- 11 - PUBLICITY 33. We will announce the approved 2010/11 Allocation Plan and explain that we, in the course of drawing up the plan, have taken into account the anticipated supply of PRH flats and the anticipated demand for PRH under various rehousing categories in the coming year. We will closely monitor any change in the circumstances and make every effort to achieve our target of maintaining AWT Note 10 at around three years. DECLASSIFICATION 34. We recommend that this paper be declassified upon Members approval of the recommendations in paragraph 32 above. The paper will be made available to the public at the HA homepage, the Department s library and through the Departmental Access to Information Officer if it is declassified. DISCUSSION 35. At the meeting of the Subsidised Housing Committee to be held on 17 May 2010, Members will be requested to approve: (a) the 2010/11 PRH Allocation Plan (paragraph 32); and (b) the declassification of the paper (paragraph 34). Ms Cindy CHAN Secretary, Subsidised Housing Committee Tel. No.: 2761 5033 Fax No.: 2761 0019 File Ref. : HD(H) APP/A 5/8/4 (Strategy Division) Date of Issue : 11 May 2010 Note 10 Excluding the applicants subjected to QPS.

Public Rental Housing Allocation in 2009/10 (for the period from 1.4.2009 to 31.3.2010) Annex Rehousing Category Flats Allocated New Refurbished Total % (a) (b) (c) = (a) + (b) 1. CLEARANCE 167 55 222 0.6 (a) Government Clearance Projects (21) (28) (49) (0.1) (b) Urban Renewal Authority (109) (14) (123) (0.4) (c) IH Trawling/ Clearance (37) (13) (50) (0.1) 2. COMPREHENSIVE REDEVELOPMENT, ESTATE 3 280 80 3 360 9.4 CLEARANCE AND MAJOR REPAIRS (a) Comprehensive Redevelopment (3 187) (37) (3 224) (9.0) (b) Estate Clearance (93) (43) (136) (0.4) 3. WAITING LIST 11 792 Note 1 9 083 20 875 Note 1 58.6 (a) General Applicants Note 2 (10 437) (8 490) (18 927) (53.1) (b) QPS Applicants (1 355) (593) (1 948) (5.5) 4. COMPASSIONATE 11 2 438 2 449 6.9 5. TRANSFER 2 271 5 638 7 909 22.2 (a) Overcrowding Relief/ LSITS Note 3 (753) (1 098) (1 851) (5.2) (b) Transfers (1 518) (4 540) (6 058) (17.0) 6. EMERGENCY 3 5 8 0 7. JUNIOR CIVIL SERVANTS AND PENSIONERS 564 263 827 2.3 Total 18 088 Note 4 17 562 35 650 Note 4 100 Note 1 Note 2 Note 3 Note 4 Excluding the (899) new flats (in Tin Ching Estate) which offers have been accepted in writing by applicants pending intake. Including Express Flat Allocation Scheme applicants. LSITS = Living Space Improvement Transfer Scheme Excluding the (899) new flats (in Tin Ching Estate) which offers have been accepted in writing by applicants pending intake.