Spring City Municipal Corporation (435) 462-2244 FAX: (435) 462-2654 www.springcityutah.org 150 East Center Street P.O. Box 189 Spring City, Utah 84662 Spring City Zoning Permit/Utility Service Request Date Paid Amount Paid for Permit Permit Number You must complete this ZONING PERMIT from Spring City before you can qualify for a building permit from Sanpete County. Please print legibly and answer each question. WHAT IS REQUIRED: 1. Your Name: Your phone # Your Contractor: License # 2. Serial Number of property you plan to build on: (This information may be obtained from Spring City Hall if building within the city limits. If the property is located in the buffer zone or outside the city limits you must contact the county for the serial number at the Sanpete County Recorder s Office, Manti, UT) 3. Address of proposed building (or approximate address if one has not yet been assigned.) Proposed Address: Legal Owner of Property Owner s Mailing Address Telephone Numbers: Home Work Cell Email: 4. Site Plan-DRAWN TO SCALE (min. 11 x 17 ), With all dimensions to the property line (including water, sewer, power) Code 10-1-7 Construction drawings, Google map of property. One copy of each of the above documents will remain in the city files.the Planning and Zoning Committee will examine your plans and specification to see that they conform to Spring City s applicable zoning, building regulations and/or bylaws. This permit also must be signed by the Mayor and City Council and gives the utility department notice of where you plan to build. 5. Does this permit require Historic Subcommittee review? YES NO In the case of a Zoning Permit within the Main Street Historic District, the permit also must be reviewed by the Historic Main Street Committee so that they can give advice and counsel upon matters concerning historic style and preservation. The Historic District is 500 North to 500 South and half a block east and west on Main Street. Reviewed by Historic Main Street Committee YES NO Zoning & Utility Permit Information Final 10/12/2016 1 of 5
6. Is this property located in a flood zone? YES NO 7. Detailed description of structure/building: (Include any building you might complete or plan to complete within the next two years. Spring City Zoning Permits are good for two years and building must begin within 90 days or permit expires.) Signature of Contractor: 8. If building is larger than 200 square feet you must meet with the Planning and Zoning Committee. All required documents must be presented at the meeting.(see CODE 10-1-4) 9. Building Property Line setbacks (see Code 10-6A-6) A. For corner lot, minimum structure setback is 30 ft from property line facing a street. B. Do any setbacks require a variance? YES NO All variances must go before the Board of Adjustments. C. All measurements should be made from the property line closest to: Side Yard 1(minimum 10 ft.) N S E W Street Side Yard 2(minimum 10 ft.) N S E W Street Rear Yard (minimum 30 ft.) N S E W Street Front Yard (min 30 ft. Corner lot or min 20 ft. if non-corner) N S E W Street D. What is the acreage? If less than 1.06 acres, prior owner: E. If less than 1.06 acres Recording date of lot split: Building Lot Size Requirements by date: Lot Size Dates Any size Before August 7, 1979 1/3 acre August 7, 1979 to May 5, 1987 1/2 acre May 6, 1987 to October 31, 1993 1.06 acre November 1, 1993 to April 5, 2004 1/2 acre April 6, 2004 to November 1, 2004 1.06 acre November 2, 2004 to present 10. Utility Information/Service Request You must contact each department and obtain a signature. The property owner will be given written instructions, if necessary, and a cost estimate for the proposed utility. Property Owner/Contractor provide the following: SEWER: Estimated cost: *Line extension needed? YES NO Zoning & Utility Permit Information Spring City Municipal Corporation Final 10/12/2016 2 of 5
Proposed depth at property line: Proposed location at property line: (Include on Plot Plan) Sewer hook-up fee is variable. Sewer connections are bid out to contractors. If the hook-up goes over the estimated cost the person requesting the services will be billed accordingly. If the hook-up fee is under the estimated cost the person requesting services will be refunded the overpayment. If the property is not located within 300 feet of a sewer line, you are not required to hook to the sewer. If a sewer hook-up is not possible, then an approved septic system must be installed. If a sewer line comes within 300 feet of the property at a later date, you will be required to hook up to the sewer within sixty (60) days of official notice. (Spring City Code 8-3-2-A) WATER: Estimated cost: *Line extension needed? YES NO If water service is requested for outside city limits water service petition must be filed and either two (2) water shares of Class A Horseshoe Irrigation Water or their current equivalent monetary value. Size of service requested: 3/4 line 1 line Proposed location at property line: (Include on Plot Plan) POWER: Estimated cost: *Line extension needed? YES NO Meter base location: (Include on Plot Plan) Service amperage requested 150 amp Overhead Underground 200 amp Overhead Underground Larger service please specify amp Overhead Underground *All Line extensions/adjustments must be approved by the Mayor/City Council. FIRE: Needs a fire hydrant installed. Cost of fire hydrant will be at property owner s expense. No fire hydrant installation required Can respond to a fire with no difficulties. Will do best to respond to a fire. (Due to road conditions, or other problems/issues) Property is within feet of a fire hydrant. Explanation if needed: 11. Impact Fees: Impact fees are based upon the total maximum impact per Equivalent Residential Unit (ERU). If anything other than a residence (ex. motel, campground, RV park, restaurant, business, laundromat, store, church, etc) is built the impact fee will be higher. Applicant is required to pay for all FEES, which may include ( sewer, water, power, extensions, impact fees) before FINAL approval is granted for this zoning permit. FEE Amount FEE Amount Electric Security Deposit Sewer Line Extension Electric Hook-up Electric Impact Electric Line Extension Sewer Hook-up Sewer Impact Water Security Deposit Water Hook-up Water Impact Water Line Extension Total Amount Due Zoning & Utility Permit Information Spring City Municipal Corporation Final 10/12/2016 3 of 5
SIGNATURES Property Owner I,, acknowledge to adhere to the Planning and Zoning codes as outlined in this document and available online http://www.springcityutah.org/code I will notify the Zoning Administrator at the following building milestones are achieved (Milestone Checks page 7/7.) 1.) Lot and building are staked out 2.) When the foundation is dug but before it is formed 3.) When it is formed Failure to have the appropriate milestones checked, will result in all corrections being made at the owner s expense. Signature I,, understand that if I do not hook onto the city sewer system, and a sewer line is installed within 300 feet of the property in the future, I must hook-up within sixty (60) days of official notice. I also must inform any future buyers/owners of the property of this stipulation. Signature I,, understand that if the property is outside the city limits, I will be required to give the city two (2) water shares of Class A Horseshoe Irrigation Water or their current equivalent monetary value for water service. Signature I,, as the property owner understand the statements concerning impact fee calculation. Signature We, the property owner and contractor, understand that we cannot have any construction materials stored within the city right-of-way. This means no rocks may be placed in the city right-of-way off the property, no cement dumping etc. Any items/debris left in the city right-of-way will be removed by the city at the property owner s expense. Signature Signature We, the property owner and contractor, understand the locations, availability, and limitations of services requested and agree to all that has heretofore and will be hereafter put in writing. Property owner Signature Contractor Signature Zoning & Utility Permit Information Spring City Municipal Corporation Final 10/12/2016 4 of 5
Planning & Zoning Commission Setbacks Historic Subcommittee Maximum Building Height Milestone Checks 1.) Lot and building are staked out 2.) When the foundation is dug but before it is formed 3.) When it is formed I, being the Zoning Administrator for Spring City, have met with the applicant and have had an on-site inspection the the property. I have examined the plans and specifications and found the following to be a true statement of facts: Applicant meets all of Spring City s Building and Zoning requirements. Applicant DOES NOT meet all of Spring City s Building and Zoning requirements. City Recorder Did the City Recorder: 1. Give this permit a number YES Date 2. Record this Zoning Permit? YES Date 3. Make a copy of this Zoning Permit? YES Date 4. Keep a copy of the Plot Plan, YES Date 5. Check all applicable signatures YES Date Signature Spring Spring City Mayor City Council Members Zoning & Utility Permit Information Spring City Municipal Corporation Final 10/12/2016 5 of 5