WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

Similar documents
PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

Location in Code Subject Fees

A RESOLUTION AMENDING THE FEE SCHEDULE OF THE TOWNSHIP OF AMITY, PENNSYLVANIA

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Towamencin Township Fee Schedule

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

New Hanover Township

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

Fee Resolution

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

TOWN OF BLOOMSBURG COLUMBIA COUNTY, PENNSYLVANIA RESOLUTION NO SETTING VARIOUS FEES

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

West Earl Township 2015 Fee Schedule Item Description Fee

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

RESOLUTION NO

City of High Point Development Fee Schedule

NEWLIN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

Permit Expiration and Permit Renewal Fees. General Administration Fees

West Earl Township 2016 Fee Schedule Item Description Fee

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

West Earl Township 2017 Fee Schedule Item Description Fee

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

Worcester Township Fee Schedule

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

East Vincent Township Chester County, Pennsylvania

EXHIBIT A to Ordinance No PART 1

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

Planning&Development Fee Standards

CITY OF FORT CALHOUN LOCAL FEES SCHEDULE

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Town of Walworth Fee Schedule 2019

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

Community Development Fees (as of March 2015)

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

2018 FEE SCHEDULE. Chapter 8 Animals, Article ll Dog License Dog at Large $75.00

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

Minor Subdivision or Annexation Plans... $1,500.00

SPRING GARDEN FEES SCHEDULE

RESOLUTION NO. RESOLVED, this 11 th day of December, TOWNSHIP OF FERGUSON. By: Steve Miller, Chairman Board of Supervisors [ S E A L ] ATTEST:

CITY OF BEL AIRE Schedule of Service, License and Permit Fees 2016

ORDINANCE NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF COMMERCE, TEXAS, THAT:

2018 Fee Schedule DESCRIPTION. As of January 1, 2018 BUILDING DEPARTMENT

Land Use Application Fees

FERGUSON TOWNSHIP 2014 FEE SCHEDULE

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

RESOLUTION NO

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

5755 Country Club Road * Shorewood, MN * / City of Shorewood MASTER FEE SCHEDULE

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

RESOLUTION NUMBER

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

City of Pine City Resolution #: 18-01

TOWN OF NEDERLAND 2017 FEE SCHEDULE

CITY OF HARKER HEIGHTS FEE SCHEDULE October 1, 2008 to September 30, 2009

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Stroh Ranch Apartment Sites

APPENDIX A 2018 FEE SCHEDULE

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

GENERAL OFFICE & MISC. REQUESTS

CITY OF BEACON SCHEDULE OF FEES

CITY OF HARKER HEIGHTS FEE SCHEDULE October 1, 2012 to September 30, 2013

APPOINTMENTS AND RESIGNATIONS BOARDS, COMMISSIONS AND COMMITTEES There were no items on the Agenda.

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

~ Please Detach and Save This Page ~

CITY OF SPRING LAKE PARK 2018 FEE SCHEDULE

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

RESOLUTION CANONSBURG BOROUGH FEE SCHEDULE As of September 10, AMUSEMENT LICENSES (Annual Fee)

Transcription:

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION # 2018-24 ESTABLISHING A FEE SCHEDULE OF PLANNING, ZONING, BUILDING AND OTHER FEES FOR CALENDAR YEAR 2019 WHEREAS, the Board of Supervisors of Palmer Township, Northampton County has determined it necessary to collect certain fees for directly rendered services and does hereby establish a Fee Schedule as attached hereto; and, WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to defray all expenses that may be incurred by the Township in connection with consideration of the various applications and permits; and, WHEREAS, the Palmer Township Board of Supervisors this fee schedule as necessary. annually reviews and amends NOW THEREFORE, be it so Resolved, by the Palmer Township Board of Supervisors that the attached fee schedule be set forth for calendar year 2019 and becomes effective January 01, 2019. SO RESOLVED AND ENACTED, this 10" day of December, 2018. Palmer Township Davidt. Colver Chairman Board of Supervisors Attest: Brenda DeGerolamo Interim Township Manager/ Secretary

0 TOWNSHIP $` - " " COUNTY, PA Municipal Building, 3 Weller Place, Palmer, PA 18045-1975, Tel. 610-253- 7191, Fax 610-253- 9957 Website: www. palmertwp. com FEE SCHEDULE Effective: 01/ 01/ 2019 Construction Review/ Building Permit Fees Fee Accessory structure permit( sheds, detached garages, etc) 0 to 100 sq. ft. 35. 00 101 to 1, 000 sq. ft. 50. 00 Blasting permit* 75. 00 Must provide copy of State permit Building permit( residential) New construction, additions, and decks over 30" high 0.35 per sq. ft. Unfinished basements, attached garages 0.30 per sq. ft. Certificate of Occupancy New principal use 55. 00 Additions or renovations to principal use 10. 00 Pennsylvania UCC surcharge 4. 50 Commercial plan review fee Refer to Base Engineering fee schedule( Exhibit A) Curb construction permit 30. 00 Engineering fee 5. 00 per lineal ft. Demolition permit 50. 00 Digital sign inspection fee 1, 000. 00 annually Electrical permit 30. 00 Fence permit Under 32 linear ft. 35. 00 32 linear ft. and over 50. 00 Fire code permit( construction or operational) 50.00 Fire inspection fee 0 to 2, 500 sq. ft. 50. 00 2, 501 to 20, 000 sq. ft. 100. 00 20, 001 to 50, 000 sq. ft. 150. 00 50, 001 sq. ft. and over 200. 00 2 or more re- inspections 50. 00 Floodplain development permit 50. 00 Interior alteration permit Under 500 sq. ft. 75. 00 500 sq. ft. and over 150. 00 Mechanical permit 50. 00 Page 1

Paving permit driveways, parking lots Residential( new and resurfacing) 35. 00 Commercial ( new and resurfacing) 50. 00 Over 3, 000 sq. ft. requires stormwater review Plumbing permit 50. 00 Pool permit* Above- ground 100. 00 Temporary 30. 00 Inground 200. 00 All pools also require an electrical permit Replacement window permit 35. 00 Residential plan review fee New construction, additions 1000 sq. ft. and over 50. 00 Additions under 1000 sq. ft. 35. 00 Road opening permit Based on PennDOT Schedule Roofing/ siding permit Under 10 square 30. 00 30 square and over 50. 00 Septic system permit New/ replacement installation 1, 200. 00 Repairs 600. 00 Cleaning and pumping 10. 00 Sewer connection permit Customer facilities fee 115. 00 Repairs 50. 00 Sewer lateral inspection fee 500. 00 Sign permit New sign 100. 00 per sign Replacement sign ( same size or lettering) 60. 00 per sign Temporary sign, banner( Up to 14 days) 30. 00 Mobile sign 150. 00 Digital or electronic message sign 150. 00 Static billboard 250. 00 Digital billboard 500. 00 Street/ sidewalk construction permit 50. 00 Zoning permit New construction 55. 00 Residential 35. 00 Patios, decks under 30" Non- residential 100. 00 or 0. 0007 times value, whichever is greater Change of use/ occupancy 50. 00 Page 2

Planning and Development Fees Fee Building Code Board of Appeals application fee 750. 00 Zoning Hearing Board application fees Special exception single- family residential 500. 00 Special exception all other 1, 000. 00 Variance single- family residential 750. 00 Variance all other 1, 000. 00 Hearing continuance fee Single- family residential 250. 00 All others 500. 00 Interpretation of ordinance 500. 00 Curative amendment/ validity challenge 5, 000. 00 Transcription of hearing Actual Cost Zoning certification letter 50. 00 Subdivision/ land development application fees Lot line adjustment 500. 00 Sketch plan 500. 00 Minor subdivision 500. 00 Preliminary major subdivision or land development 1, 000. 00 Final major subdivision or land development 1, 000. 00 Site plan 500. 00 Conditional use request 1, 000. 00 Rezoning req uest 1, 500. 00 Zoning text amendment 1, 500. 00 Recreation fee( in lieu of improvements) Residential Non- residential 1, 500 per dwelling unit 3, 000 per acre Voluntary traffic contribution* Residential Non- residential if offered)by developer and accepted by Township 1, 000 per dwelling unit 1, 000 per peak PM trip Sanitary sewer extension application fee 1 to 25 lots 1, 000. 00 26 or more lots 5, 000. 00 Sanitary sewer planning module review fee 500. 00 Sanitarytapping sewer gee f 2, 660. 00 per EDU/ unit Additional fees will be charged in special sewer districts Page 3

Escrow Fees Fee Subdivision and land development review escrow Pre- submission meeting 2, 500. 00 Lot line adjustment 3, 000. 00 Sketch plan 5, 000. 00 Site plan 5, 000. 00 Minor subdivision 5, 000. 00 Preliminary major subdivision or land development Residential 5, 000. 00+$ 100. 00 per lot or unit,$ 50, 000 Max Non- Residential 5, 000. 00+$ 1, 000. 00 Final major subdivision or land development per acre,$ 50, 000 Max Residential 5, 000. 00+$ 100. 00 per lot or unit,$ 50, 000 Max Non- Residential 5, 000. 00+$ 1, 000. 00 per acre,$ 50, 000 Max Land development construction escrow 5% of improvements including sewer extension) estimate,$ 5, 000 minimum, 50, 000 maximum Miscellaneous engineering review escrow 1, 000. 00 Storm water, grading, floodplain, retaining wall, etc.) Sewer lateral construction escrow( Township Install lateral from main sewer line to property line installation) 13, 500. 00 Sewer Rates Fee Unmetered water service 105. 00 Metered water service a) Minimum ( 5 units) 27. 50 b) First 100 units 5. 50/ unit c) Next 900 units 3. 88/ unit d) Over 1, 000 units 3. 13/ unit Documents and Publications Fee Plans and ordinances Zoning ordinance and map 30. 00 Zoning map only 5. 00 Subdivision and land development ordinance 20. 00 Comprehensive plan 15. 00 Copies of maps or plans 5. 00 Copies larger than 11" x 17" 5. 00 per side Sewer specification manuals Sanitary sewer extensions 40. 00 Pressure wastewater sewer and grinder pumps 15. 00 Page 4

Police reports Accident report Incident report 15. 00 per report 0. 25 per page per side Fire reports non- criminal investigation reports Residential properties 75. 00 Commercial properties 100. 00 All other( i. e. accident reports) 50. 00 Open Records requests/ duplications 8. 5" x 11" up 11" x 17" 0. 25 per page per side Maps/ plans greater than 11" x 17" 5. 00 per page Electronic media Actual Cost Postage Actual Cost Certification of copies 1. 00 per request Licenses and Miscellaneous Fees Fee Bounced check fee 25. 00 Business license 25. 00 Dog pound fee Pick- up fee 50. 00 Holding fee 25. 00 per day Easement agreement` Recording fee, up to 4 pages 18. 50 Recording fee, each additional page 2. 00 Parcel certification fee 10. 00 per parcel As set by County, may be subject to change Foreclosed property registration fee 200. 00 per year Funeral escort Fee 25. 00/ escort Knox Box fee 25. 00 Liquor license transfer request 2, 000. 00 Moving permit 5. 00 Pathfinder sign rental Initial registration- 6" x 24" sign 100. 00 Initial registration 6" x 36" sign 100. 00 Annual permit 25. 00 Peddlers license Perday 25. 00 Per month 100. 00 Peryear 750. 00 Page 5

Plumber' s license 50. 00 Master plumber 30. 00 Journeyman 15. 00 Apprentice Water diversion meter* 160. 00 Requires plumbing permit and associated fees Yard waste drop off fee- RESIDENTIAL Cartrunk 5. 00 Pickup or small utility trailer( Smaller than or equal to 8' x 8') each 12. 00 Large trailer( larger than 8' x 8' or tandem axle 30. 00 Non- commercial stake body truck 30. 00 Non- commercial small dump truck 30. 00 Yard waste drop off fee COMMERCIAL Commercial large trailer( larger than 8' x 8' or tandem axle) 60. 00 Commercial stake body truck 60. 00 Commercial small dump truck 60. 00 Facility Rentals Fee Fairview Park Pavilion 75. 00 residents 150. 00 non- residents Penn Pump Park Pavilion 100. 00 residents Pavilion permit not to exceed 150 people 175. 00 non- residents Penn Pump Park Picnic Permit 50.00 residents Picnic Permit not to exceed 50 people 100. 00 non- residents Briarcliff Park Pavilion 75. 00 residents 150. 00 non- residents Riverview Park Pavilion 100. 00 residents 175. 00 non- residents Mill Race Park Pavilion 75. 00 residents 150. 00 non- residents BIP Pavilion at the Charles Chrin Community Center 75. 00 residents 150. 00 non- residents Page 6

Charles Chrin Community Center Community Room A and B Each 45. 00/ hr. residents 55. 00/ hr. non- residents Combined 90. 00/ hr. residents 110.00/ hr. non- residents Multi- Purpose Room Half 45. 00/ hr. residents 55. 00/ hr. non- residents Entire 90. 00/ hr. residents 110. 00/ hr. non- residents Gymnasium Gymnasium Rental 50.00/ hr. Special events Variable Laying floor 90. 00 Kitchen/ dining room 15. 00/ hr. Page 7

EXHIBIT A

BASE ENGINEERING, INC. PALMER TOWNSHIP 2019 FEE SCHEDULE Base Engineering Inc. PLAN REVIEW AND BUILDING INSPECTIONS Building Code/ Inspections PA Phone: 610437-0978 Fax 610-432- 3800 UCC BascEngfticering Baseeng. com COMMERCIAL RATE SCHEDULE Includes Plan Review and Inspections for Shell and Core or Single Occupant Buildings The highest calculated fee will prevail) New Buildings, Additions Use Groups B, M, S, F... 0. 24 per square ft. Use Group A, R... 0. 25 per square ft. Use Groups H, I, E... 0. 27 per square ft Please Note: Fees for large projects, including warehousing and distribution centers will be determined on a case by case basis factoring in actual number of inspections that will be required rather than a set fee. Please feel free to contact us at 610-437- 0978 if you would like to discuss a project or get an estimated cost. All fees for large projects include Plan reviews and number of inspections required to complete. Alterations, Renovations Modification, Fitouts, Individual Trade Permits Use Groups B, M, S, F 1, 000-150, 000...$ 21. 00 per$ 1, 000 value 151, 000-300, 000...$ 18. 00 per$ 1, 000 value 301, 000-500, 000...$ 15. 00 per$ 1, 000 value 500, 000 and above......$ 10. 00 per$ 1, 000 value Use Group A, R 1, 000-150, 000... $ 22. 00 per$ 1, 000 value 151, 000-300, 000...$ 19. 00 per$ 1, 000 value 301, 000-500, 000...:...$ 16. 00 per$ 1, 000 value 500, 000 and above......$ 11. 00 per$ 1, 000 value Use Groups H, I, E 1, 000-150, 000...$ 23. 00 per$ 1, 000 value 151, 000-300, 000...$ 20. 00 per$ 1, 000 value 301, 000-500, 000...$ 17. 00 per$ 1, 000 value 500, 000 and above......$ 12. 00 per $ 1, 000 value Minimum (New Construction)...... $ 1, 500. 00 Minimum( Alterations& Miscellaneous Fitout)... $ 325. 00 P:\ Clerical\ FeeSchedules\ Building Code Department Fee Schedules\ Palmer Township 2018 FeeSch. doc Page 1 of 2

Commercial Plan Review Only New construction and Alterations Use Groups B, M, S, up to 10, 000 SY... Use Group A, up to 10, 000 SY... Use Groups H, I, E, up to 10, 000 S. F.... Use Group R, up to 10, 000 S. F.... 0. 10 per foot 0. 15 per foot 0. 15 per foot 0. 15 per foot Minimum account required - $ 300. 00 - ( 3) Disciplines An additional $ 125. 00 will be charged for over( 3) disciplines GENERAL NOTES: Commercial Package plans are quoted based on hourly maximums and/ or fixed inspection numbers. Failures, locked premises, violation reinspections will be backcharged if in excess of allotted inspections. Commercial accounts as contract price will be subject to backcharges for failures, locked premises, violation visits in excess of contract quotes. All non- fixed rate inspections will be billed at hourly rate of: Plan Review Building Electrical Clerical 65. 00/ hr. 65. 00/ hr. 65. 00/ hr. 32. 00/ hr. PRE- APPLICATION CONSULTATION: If a consultation is required or requested prior to application and/ or review of plans, the charge will be $ 65. 00/ hr. If the consultation involves the services of our Professional Engineer, the charge will be $ 95. 00/ hr. MINIMUM INSPECTION FEES: Commercial: Electrical/ No plans $ 150. 00 Building/ No plans $ 150. 00 Mechanical/ No plans $ 150. 00 noplans Plumbing/ $ 150. 00 NOTE: Base reserves the right to alter the above quoted rates+ or to reflect the actual costs of any construction not specifically addressed in this rate schedule. Please feel free to call if you have any questions or need further information before quoting fees. P:\ Cleriuil\ FeeSchedulm\] 3uilding Code Department Fee SchedulesTalmer Township 2018 FeeSch.doc Page 2 of 2