Regulatory Fee Schedule

Similar documents
State: Zip: Daytime Phone: Ext.: Cell Phone: State: Zip: Daytime Phone: Ext.: Cell Phone: Zip: Municipality: County:

ALREADY SUBMITTED FOR HIGHLANDS COUNCIL PRE

APPENDIX-D NJDEP LURP FORM & CHECKLISTS

FRESHWATER WETLANDS LETTER OF INTERPRETATION (LOI) APPLICATION CHECKLIST AND FEE TABLE (Updated March 2016)

BASICS OF FLOODPLAIN MANAGEMENT & PLANNING IN NEW JERSEY

Flood Hazard Area Control Act Rules

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

GRANT OF CONSERVATION RESTRICTION (Wetland Mitigation/Riparian Zone Mitigation) WITNESSETH:

A. Maintenance. All legally established, nonconforming structures can be maintained (e.g., painting and repairs);

TOWNSHIP OF EGG HARBOR ZONING BOARD ADJUSTMENT CHECK LIST

YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

Directions For Filling Out A CAMA MINOR Permit

Schedule "A Fees (Planning Advisory Program)

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

Overview of Federal and State Floodplain Management Programs

Chesapeake Bay Preservation Area (CBPA) Map Update. Presentation to the County Board July 15, 2017

ORDINANCE NO WHEREAS, the Town of Jupiter ( Town ) has adopted a Comprehensive Plan

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

SECTION 10: FLOOD HAZARD EVALUATION 10-1

***** Subchapter A. GENERAL PROVISIONS ***** PERMIT APPLICATIONS

OWNERSHIP DETAILS. Mailing Address: City / Town: Postal Code. Phone Business: ( ) Residence: ( ) FAX: ( )

Chapter 136. SOIL EROSION

Washington Township Wastewater Management Plan. January 27, 2012

MINUTES 7:30 PM. Block 40, Lots 8 & 8.04 Minor Subdivision Tumble Falls Road Completeness Determination

PERMIT APPLICATION FORM

Shoreline Permit Requirements

This Ordinance is adopted under the authority of the Highlands Act and the New Jersey

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

ARLINGTON COUNTY CODE. Chapter 61 CHESAPEAKE BAY PRESERVATION ORDINANCE*

Request to Advertise: Chesapeake Bay Preservation Area (CBPA) Map Update. June 20, 2017

ARTICLE I. IN GENERAL

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

Ordinance Page 1

Floodplain Development Land Use Review

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project

FINAL DRAFT CONSISTENCY REVIEW AND RECOMMENDATIONS REPORT

ANDOVER CODE. Checklist #5 Preliminary Site Plan Conditional Use

TOWN OF MANCHESTER BY THE SEA WETLANDS REGULATIONS GENERAL BY LAW ARTICLE XVII APPENDIX A APPLICATION SUBMITTAL REQUIREMENTS 2/26/13

» USGS Quadrangle Map (Figure 1);» Local Street Map (Figure 2);» Tax Map (Figure 3);

SECTION IV. Recommended Motion: Staff recommends the following motion (with modifications and additions following discussion):

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer:

DEVELOPMENT PLAN REVIEW CHECKLIST. To initiate the application, the applicant shall submit to the Administrative Officer:

Subsection Highlands Area Exemptions by Township l - Township of Sparta Highlands Area Exemption Ordinance 1.

Draft Zoning Ordinance for Planning Board Review Town of Brunswick, Maine

Comparison of Highlands Plan Conformance versus Non-Conformance for Oakland s Highlands Planning Area

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

ATTACHMENT 3 NOTICE OF EXEMPTION. Clerk of the Board County of Santa Barbara 105 E. Anapamu Street, Room 407 Santa Barbara, CA

LOT LINE ADJUSTMENT APPLICATION GUIDE (BCC , ET SEQ.)

H 7741 SUBSTITUTE A ======== LC005052/SUB A/2 ======== S T A T E O F R H O D E I S L A N D

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS

4.2 RESIDENTIAL ZONING DISTRICTS

Buffer and Soil Loss Statutes, as amended in 2017 by Laws of Minnesota 2017, Chapter 93 (S.F. 844)

PUTNAM COUNTYCOMPREHENSIVE PLAN

Form WFR-001 Revision 03/11

ORDINANCE NO. 5 CASE NO. ORA THIRD SET OF OMNIBUS AMENDMENTS TO THE KOOTENAI COUNTY LAND USE AND DEVELOPMENT CODE

PREPARED BY PLANNING DEPARTMENT ORANGE COUNTY NORTH CAROLINA

MULTI-FAMILY DWELLING UNIT SUBDIVISION ORDINANCE TOWN OF SIDNEY, MAINE

CHESAPEAKE BAY PRESERVATION AREA EXCEPTION APPLICATION INSTRUCTIONS

Public Notice. Notice No Closing Date: August 16, 2018

City of Sanibel. Planning Department STAFF REPORT

SENATE, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED SEPTEMBER 8, 2016

(Draft Glenville ordinance, June 2008) ARTICLE XXII Transfer of Development Rights

PRELIMINARY PLAT CHECK LIST

Town of Pineville. Post-Construction Storm Water Ordinance

Boyertown Borough and Colebrookdale and Pike Townships Joint Zoning Ordinance

MS MINOR SUBDIVISION TREVITHICK

JOINT APPLICATION FOR INDIVIDUAL ENVIRONMENTAL RESOURCE PERMIT/ AUTHORIZATION TO USE STATE-OWNED SUBMERGED LANDS/ FEDERAL DREDGE AND FILL PERMIT

Article 5. Environmentally Sensitive Areas

Solar Act Subsection t. Application Form

Land Use Application

First Name Last Name. Company Name (if applicable) Street Address City State Zip. Owner Phone. . First Name Last Name

SIBLEY COUNTY. Article 330 Buffer Ordinance of the Code of Ordinances of the County of Sibley

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland)

MILLE LACS COUNTY BUFFER ORDINANCE

City Of Attleboro Conservation Commission

A. General Information

Public Access Rules Draft August 16, 2010

RIPARIAN BUFFER CONSERVATION ZONE MODEL ORDINANCE

SHORELINE PERMIT REQUIREMENTS

Residential Project Convenience Facilities

ADAMS COUNTY CONSERVATION DISTRICT S

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

Newburyport Code of Ordinances Chapter 6.5: Environment Article II: Wetlands Protection Ordinance

TOWNSHIP OF MENDHAM Ord. No

CHAPTER 15 SOIL DRAINAGE MANAGEMENT PLAN DESIGN STATE HEALTH DEPARTMENT SEWAGE HANDLING AND DISPOSAL REGULATIONS. Article 5

Conservation Design Subdivisions

BY BOARD OF COUNTY COMMISSIONERS AN ACT TO BE ENTITLED

Zoning/Building Permit Application

CITY OF PORTSMOUTH PLANNING DEPARTMENT. MEMORANDUM To:

Town of Jupiter Island Delegated Mangrove Authority For the State of Florida

MASTER PROGRAM FOR OKANOGAN COUNTY SHORELINE MANAGEMENT

LAND USE ORDINANCE, TOWN OF RICHMOND, MAINE TABLE OF CONTENTS

Town of Acton, Maine ZONING ORDINANCE. Amendments Approved at Town Meeting, June 16, 2018

Administrative Penalty Order (APO) Plan for Buffer Law Implementation

CHAPTER 15 SOIL DRAINAGE MANAGEMENT PLAN DESIGN STATE HEALTH DEPARTMENT SEWAGE HANDLING AND DISPOSAL REGULATIONS. Article 5

Thurston County Planning Department BOARD OF COUNTY COMMISSIONERS PUBLIC HEARING DRAFT AMENDMENTS TO THE CRITICAL AREAS REGULATIONS. Chapter 24.

ARTICLE 6: RESOURCE PROTECTION STANDARDS. Article History 3 SECTION 6.01 PURPOSE 4 SECTION 6.02 WETLANDS 4

Transcription:

Regulatory Schedule STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF LAND USE REGULATION Website: www.state.nj.gov/dep/landuse Revised September 2017 All permit fees shall be paid by check or money order; made payable Treasurer, State of New Jersey. Each check or money order must be marked to identify the nature of the submittal for which the fee is being paid and the name of the applicant and submitted to: Postal Mailing Address NJ Department of Environmental Protection Division of Land Use Regulation P.O. Box 420, Code 501-02A Trenton, New Jersey 08625-0420 Attn: Application Support Street Address (Courier & Hand Carry Only) NJ Department of Environmental Protection Division of Land Use Regulation 501 East State Street Station Plaza 5, 2 nd Floor Trenton, New Jersey, 08609 Attn: Application Support PLEASE NOTE: 1) Under each Program administered by the Division of Land Use Regulation, there is also a separate fee for the review of stormwater management calculations for any project that qualifies as a major development under the Department s Stormwater Management rules at N.J.A.C. 7:8-1.2 - see Section 4. For projects which require permits under two or more Programs, the stormwater management fee will only be applied once. 2) The 25% discount for multiple applications is NO LONGER APPLICABLE. Section 1 Freshwater Wetlands N.J.A.C. 7:7A 1. Letter of Interpretation (LOI) (N.J.A.C. 7:7A-3.2 to 3.4) Presence/absence LOI *To determine if wetlands are preset or absent Footprint of disturbance LOI *To determine if wetlands or transition areas are present or absent in a footprint of land not to exceed one acre Delineation LOI * For verification or delineation of a wetland boundary line for a parcel of land less than one acre Line verification * For verification of proposed wetland boundary line on a parcel of one acre or more $1,000 $1,000 $1,000 $1,000 plus $100.00 per acre of the site (or 1

2. Authorization under a general (N.J.A.C. 7:7A-5) All General Permits (excluding GP16, GP17, & GP25 see below) General permit 16---Habitat creation and enhancement activities, General permit 17---Trails and boardwalks where the project is located on publicly-owned land General permit 25---Malfunctioning individual subsurface sewage disposal (septic) systems $1,000 No fee 3. Transition area waiver (N.J.A.C. 7:7A-6) Transition area waiver with a valid letter of interpretation Transition area waiver without a valid letter of interpretation $1,000 plus $100.00 per acres of disturbed regulated area (or $1,000 plus $100.00 per acre of disturbed regulated area (or and the application fee for the appropriate LOI 4. Freshwater wetlands or open water fill individual permit (N.J.A.C. 7:7A-7) Freshwater wetlands or open water fill individual permit for the construction of one single-family home or duplex and/or appurtenant improvements, which is not being constructed as part of a residential subdivision or multi-unit development Freshwater wetlands or open water fill individual permit for any other activity $5,000 plus $2,500 per acre of disturbed regulated area (or 5. Water quality certificate (N.J.A.C. 7:7A-2.1(d)) Water quality certificate where a permit is not also issued $5,000 plus $2,500 per acre of disturbed regulated area (or fraction thereof) 2

6. Modification of an authorization under a general permit, a transition area waiver or a freshwater wetlands or open water fill individual permit (N.J.A.C. 7:7A-14.3) Minor modification of an authorization under a general $500.00 permit Minor modification of a transition area waiver $500.00 Minor modification of a freshwater wetlands or open $500.00 water fill individual permit Major modification of a transition area waiver, 30 percent of the original freshwater wetlands or open water fill individual permit application fee or $500.00, whichever is greater 7. Extension of a letter of interpretation (LOI) at N.J.A.C. 7:7A-3.6 or an authorization under a general permit, a transition area waiver, or an individual permit (N.J.A.C. 7:7A-14.6) Extension of a presence/absence LOI $500.00 Extension of a footprint of disturbance LOI $500.00 Extension of a delineation LOI $500.00 Extension of a verification LOI 50 percent of the original application fee or $500.00, whichever is greater Extension of an authorization under a general $500.00 permit Extension of a transition area waiver $500.00 Extension of a freshwater wetlands or open water fill individual permit 50 percent of original application fee or $500.00, whichever is greater 8. Exemption (N.J.A.C. 7:7A-2.10) Exemption letter $500.00 Please Note: If more than one inspection by the Department is necessary because of any act or omission of the applicant, the Department may assess an additional fee for each additional visit in an amount not to exceed $1,000.00. No application for a letter of interpretation, approval, certificate or permit shall be reviewed or considered until this fee has been paid. 3

Section 2 Flood Hazard Area N.J.A.C. 7:13 1. Verification (N.J.A.C. 7:13-5) Method 1 (Department delineation method; see N.J.A.C. 7:13-3.3) Method 2 (FEMA tidal method; see N.J.A.C. 7:13-3.4(d)) Method 3 (FEMA fluvial method; see N.J.A.C. 7:13-3.4(e)) Method 4 (FEMA hydraulic method; see N.J.A.C. 7:13-3.4(f)) Method 5 (approximation method; see N.J.A.C. 7:13-3.5) Method 6 (calculation method; see N.J.A.C. 7:13-3.6) $1,000 1 $1,000 1 $1,000 1 Delineation of Riparian Zone only $1,000 $4,000 plus $400.00 per each 100 linear feet of regulated water (or 2 $1,000 1 $4,000 plus $400.00 per each 100 linear feet of regulated water (or 2 2. Authorization under a general permit-by-certification (N.J.A.C. 7:13-6 and 8) General permits-by-certification 4 and 5 No fee All other general permits-by certification $1,000 3. Authorization under a general permit (N.J.A.C. 7:13-6 and 9) General permits 1, 4, and 5 No fee All other general permit $1,000 4. Individual permit (N.J.A.C. 7:13-10, 11, and 12) Individual permit for the construction of one SFH or Duplex, which is not being constructed as part of a residential subdivision or multi-unit development, or for the construction of an addition or other accessory structure to a SFH or Duplex 4

5. Individual permit for activities not included in section 4 above (N.J.A.C. 7:13-10, 11, and 12) Base fee for any other individual permit $3,000 Additional review fee per project element 1 Add applicable proposed element fee to the base fee. Bank or channel stabilization, reestablishment, protection or modification project Bridge, culvert, footbridge, low dam or other water control structure Review of hydrologic, hydraulic and/or flood storage displacement (net-fill) calculations required No review of calculations required Review of hydrologic, hydraulic, and/or flood storage displacement (net-fill) calculations required No review of calculations required Review of flood storage displacement (net-fill) calculations for any project not listed above $4,000 plus $400.00 per each 100 linear feet of regulated water (or 2 $1,000 per project $4,000 per structure $1,000 per structure $4,000 Review of a hardship exception request $4,000 1 Utility line $1,000 per crossing of a regulated water 6. Extension of verification, general permit authorization, or individual permit (N.J.A.C. 7:13-22.3) Extension of a verification based on $240 Method 1, 2, 3, 5, or the riparian zone alone Extension of a verification based on 25 percent of the original application fee Method 4 or 6 Extension of an authorization under a $240 general permit Extension of an individual permit 25 percent of the original application fee 7. Modification of a verification, general permit authorization, or individual permit (N.J.A.C. 7:13-22.5) Administrative Modification $500 per approval modified Minor Technical $500 per project element modified Modification Major Technical Modification 30 percent of the original permit application fee or $500, whichever is greater 5

8. Revision of a Department delineation (N.J.A.C. 7:13-3.7) Each major revision $4,000 plus $400.00 per each 100-foot segment of regulated water (or to be re-delineated 2 Each minor revision $500.00 1 This fee does not apply for any application associated with the construction of one private residence, which is not being constructed as part of a residential subdivision or multi-unit development, or for the construction of an addition or other structure appurtenant to a private residence. Section 3 Coastal Projects N.J.A.C. 7:7 1. Determination of exemption (N.J.A.C. 7:7-2.2(f) or N.J.A.C. 7:7-2.4(h)) Applicability (Jurisdictional) Determination for Coastal Programs No fee Request for a written determination of exemption from CAFRA $500.00 Request for a written determination of exemption from the $500.00 Waterfront Development Law 2. Authorization under a general permit-by-certification (N.J.A.C. 7:7-5) General permits-by-certification $600.00 3. Authorization under a general permit (N.J.A.C. 7:7-6) GP 24 - General permit for habitat creation, restoration, No fee enhancement, and living shoreline activities All other general permit $1,000 4. CAFRA individual permit CAFRA individual permit for the development of one single family home or duplex and/or accessory development, which is not being constructed as part of a residential subdivision or multi-unit development CAFRA individual permit for any other residential development CAFRA individual permit for a commercial, industrial, or public development $3,000 per unit $3,000 per acre of the site (or fraction thereof) 6

5. Coastal wetlands individual permit Coastal wetlands individual permit for the development of one SFH/duplex and/or accessory development, which is not constructed as part of a residential subdivision or multi-unit development Coastal wetlands individual permit for any other development $3,000 per acre of wetlands to be disturbed (or 6. Waterfront development individual permit Waterfront development individual permit for the development of one single-family home or duplex and/or accessory development located landward of the mean high water line, where the development is not being constructed as part of a residential subdivision or multi-unit development Waterfront development individual permit for any other residential development located landward of the mean high water line Waterfront development individual permit for a commercial, industrial, or public development located landward of the mean high water line Waterfront development individual permit for development located waterward of the mean high water line, such as a dock or bulkhead, at a single-family or duplex lot, where the development is not being constructed as part of a residential subdivision or multi-unit development Waterfront development individual permit for any other development located waterward of the mean high water line $3,000 per unit $3,000 per acre of the site (or fraction thereof) $3,000 per acre of water area impacted by the development (or 7. Request for a modification of a waterfront development, coastal wetlands, or CAFRA individual permit, or a general permit (N.J.A.C. 7:7-27.5) Administrative modification No fee Minor technical modification of a waterfront $500.00 development, coastal wetlands, or CAFRA general permit authorization or individual permit Major technical modification of a waterfront development, coastal wetlands, or CAFRA general permit authorization or individual permit 30 percent of the original application fee or $500.00, whichever is greater 7

8. Extension of a general permit authorization or an individual permit (N.J.A.C. 7:27.3) Request to extend a general permit authorization $240 Request to extend a waterfront development individual permit for activities located waterward of the mean high water line 25 percent of the original application fee Section 4 Additional s for Major Development Requiring Stormwater Review (Excluding Highlands Projects) N.J.A.C. 7:8 The additional fees for a Flood Hazard Area, Freshwater Wetlands, Waterfront Development, Coastal Wetlands or CAFRA application that requires review pursuant to the Stormwater Management Rules, N.J.A.C. 7:8, are as follows: 1. Additional application fee for stormwater review if a project is a major development pursuant to the Stormwater Management Rules (see N.J.A.C. 7:8-1.2) Base fee for any major development $3,000 Additional fee for review of groundwater recharge calculations (see N.J.A.C. 7:8-5.4) $250.00 per acre of land disturbed by the project (or Additional fee for review of runoff quantity calculations (see N.J.A.C. 7:8-5.4) Additional fee for review of water quality calculations (see N.J.A.C. 7:8-5.5) Additional fee if project disturbs vegetation within a Special Water Resource Protection Area (see N.J.A.C. 7:8-5.5) $250.00 per acre of land disturbed by the project (or $250.00 per acre of impervious surface subject to water quality review (or NOTE: The additional application fees for stormwater review set forth in this table shall not exceed $20,000. This fee is paid only once for each project regardless of the number of permits applied for. 8

Section 5 Highlands Projects N.J.A.C. 7:38 1. Highlands Pre-Application Meetings (N.J.A.C. 7:38-8) Highlands Applicability Determinations - HAD (N.J.A.C. 7:38-2.3) Highlands Pre-Application Meeting (Excludes NJDOT) $500.00 HAD for applicants that are: $100.00 Proposing improvements costing < $100,000 Seeking a determination based on receipt of a woodland management plan Seeking a determination if an agricultural or horticultural activity is not regulated as a major Highlands development Municipalities HAD for NJDOT No HAD for those applicants other than above $750.00 2. Highlands Resource Area Determination - HRAD (N.J.A.C. 7:38-4) HRAD Footprint of Disturbance $500 plus $50.00 per acre of the site (or HRAD Boundary Delineation for site of 1 acre or less $500.00 HRAD Boundary Verification $750 plus $100.00 per acre of the site (or HRAD Renewal (Extension) 25 percent of the original application fee or $250.00, whichever is greater 3. Highlands General Permits (N.J.A.C. 7:38-14) Highlands General Permit #1 Habitat Creation/Enhancement No Highlands General Permit #2 - Bank Stabilization Activities $500.00 9

4. Highlands Preservation Area Approval - HPAA (N.J.A.C. 7:38-6) Brownfields designation (N.J.A.C. 7:38-6.6) $500.00 HPAA with a completed HRAD $2,500 plus $50.00 per acre of the site (or HPAA without a completed HRAD $3,250 plus $100.00 per acre of the site (or HPAA Renewal $1,000 5. Additional s for Highlands Preservation Area Approval HPAA with Waiver review Brownfields Redevelopment Redevelopment in previously developed area 70% coverage (N.J.A.C. 7:38-6.7) Takings without just compensation (N.J.A.C. 7:38-6.8) Construction of 100% affordable housing (N.J.A.C. 7:38-6.9) + HPAA fee $250 $500 $500 HPAA with Water Quality Management Plan Amendment $1,000 6. HPAA Requiring Stormwater Review (N.J.A.C. 7:38-6.1(d)) Qualifier Area of Impact + HPAA Base fee for any Any size project major development Additional fee for the Up to 3 acres $500 review of More than 3 acres and up to 10 acres $1,000 groundwater More than 10 acres and up to 100 acres recharge calculations per area of land disturbed by the project More than 100 acres $4,000 Additional fee for the review of runoff quantity calculations per area of land disturbed by the project Up to 3 acres $500 More than 3 acres and up to 10 acres $1,000 More than 10 acres and up to 100 acres More than 100 acres $4,000 10

Additional fee for the review of water quality calculations per area of impervious surface under review Up to 1 acre $500 More than 1 acre and up to 3 acres $1,000 More than 3 acres and up to 10 acres More than 10 acres $4,000 7. HPAA Requiring Water Supply Review Please refer to N.J.A.C. 7:38-10.2(g) 11