Square feet of Lot: State Parcel: Subdivision. Name: Subd. Sec:

Similar documents
Cibola County Floodplain Development Permit Application

Flood Hazard Development Permit Application & Permit Forms. For Communities with Coastal Velocity Zones [60.3(e)] CONTENTS

Floodplain Development Land Use Review

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed by Surveyor)

(Chapter Flood Damage Prevention)

Town of Alexandria. Floodplain Management Ordinance

Flood Plain Administration. Oil & Gas

CHAPTER 24 F FLOOD ZONE OVERLAY DISTRICT

COMMERCIAL SITE DEVELOPMENT GUIDE FOR UNINCORPORATED ST. CHARLES COUNTY

JACKSON COUNTY DEVELOPMENT RULES, REGULATIONS AND PROTOCOLS Non-Commercial Structures

ARTICLE 14 FLOODPLAIN MANAGEMENT

CHAPTER XIX FLOOD DAMAGE PROTECTION. Article. 1 Definitions 2 General Provisions 3 Administration 4 Provisions for Flood Hazard Reduction

Date of Review: 11/6/2015 Reviewer: RCQ/LMC STATE

NOTICE OF LAND USE DECISION BY THE COOS COUNTY PLANNING DIRECTOR

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

TUSCARAWAS COUNTY FLOOD DAMAGE REDUCTION REGULATIONS

LINCOLN COUNTY FLOOD DAMAGE PREVENTION ORDINANCE

FLOODPLAIN MANAGEMENT ORDINANCE

FLOOD DAMAGE REDUCTION RESOLUTION GREENE COUNTY, OHIO

NOTICE

CHAPTER XVII. REGULATION OF FLOOD PLAIN STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

MODEL FLOODPLAIN MANAGEMENT / FLOOD DAMAGE PREVENTION ORDINANCE

CHAPTER 1108 Flood Damage Protection

(Ord. No. 743, )

SPECIAL PURPOSE FLOOD DAMAGE REDUCTION RESOLUTION FOR PICKAWAY COUNTY, OHIO

CITY OF AUSTELL DESIGN AND CONSTRUCTION STANDARDS LAND DEVELOPMENT ORDINANCES

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

Flood Hazard Zone. [Amended effective ; ; ; ; ; ]

CONDITIONAL USE PEMIT

Section Floodplain Development Ordinance This ordinance, adopted pursuant to the authority of RSA 674:16, shall be known as the Town of Newport

Township of Collier 2418 Hilltop Road Presto, PA 15142

CHAPTER 1313 Flood Damage Prevention Statutory authorization Exemption from filing a Findings

FLOOD DAMAGE PREVENTION

COMMERCIAL/ INDUSTRIAL PERMIT APPLICATION

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Meeting Minutes Lodi Township Planning Commission November 27, 2012 Lodi Township Hall 3755 Pleasant Lake Road Ann Arbor, MI 48103

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

CITY OF CAMBRIDGE FLOODPLAIN MANAGEMENT CHAPTER 7 (GRADING, EROSION AND SEDIMENT CONTROL)

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

Title 15. Buildings, Construction, Addressing and Land Use

Flood Damage Prevention

Zoning Permit Application Cover Page

Law # 1 of 2008 SECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE

CITY OF TARPON SPRINGS, FLORIDA

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

ORDINANCE # ARTICLE I STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS

FLOODPLAIN MANAGEMENT ORDINANCE CONTENTS

TOWN OF JEWETT LOCAL LAW # OF 2008 FLOOD PREVENTION LOCAL LAW STATUTORY AUTHORIZATION AND PURPOSE

BONNER COUNTY PLANNING DEPARTMENT

FLOODPLAIN MANAGEMENT ORDINANCE

CHAPTER 5 FLOOD DAMAGE PREVENTION. Statutory Authorization, Findings of Fact, Purpose, Methods, and Definitions

Septic Tank / Drainfield / Holding Tank Permit Application

Oxford Floodplain Management Ordinance

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

Remember, PA One-Call before excavating. Simply dial 811 or

FLOODPLAIN MANAGEMENT ORDINANCE FOR THE TOWN OF WELD, MAINE

MASON COUNTY FLOODPLAIN ORDINANCE

TOWN OF BRIDGTON FLOODPLAIN MANAGEMENT ORDINANCE TABLE OF CONTENTS I PURPOSE AND ESTABLISHMENT... 2 II PERMIT REQUIRED... 2

WAYNE COUNTY, WV FLOODPLAIN ORDINANCE

SPECIAL PURPOSE FLOOD DAMAGE PREVENTION ORDINANCE. Adopted: June 24th, 1998

SPECIAL PURPOSE FLOOD DAMAGE PREVENTION REGULATIONS for FAIRFIELD COUNTY

PRELMINARY PLAT CHECKLIST

Instructions for Residential Building Permit Application

City of Waterville, Maine, Selected Ordinances

Septic Tank / Drainfield / Holding Tank Permit Application

FLOODPLAIN MANAGEMENT ORDINANCE FOR THE TOWN OF SUMNER, MAINE

DIVISION 1. - GENERAL PROVISIONS

CARTER COUNTY, OKLAHOMA FLOODPLAIN BOARD REGULATIONS ARTICLE I STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS

Certified Survey Review Instructions

TOWN OF SPAFFORD LOCAL LAW 3 OF THE YEAR 2016

ORDINANCE NO TOWNSHIP OF EAST WINDSOR COUNTY OF MERCER

ORDINANCE NO (1123)

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

BUILDING PERMIT APPLICATION

Interim Use Permit Application

A. To prevent unwise development from increasing flood or drainage hazards to others.

Waupaca County. Floodplain. Ordinance

TITLE 14 ZONING AND LAND USE CONTROL CHAPTER 1 MUNICIPAL PLANNING COMMISSION

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

ORDINANCE NO. 992 CITY OF OCEAN SHORES, WASHINGTON

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

BUILDING LOCATION PERMIT APPLICATION

RD:VMT:NGA ORD. NO /3/09 ORDINANCE NO

OSSF Permit Application

2016 Fredericksburg Area Floodplain Management Workshop Tuesday, October 25, 2016

The Onekama Township Flood Damage Prevention Ordinance of Onekama Township, Manistee County, Michigan was adopted by the Onekama ORDINANCE #4

City of Ferndale Floodplain Management Ordinance Page 1 of 18 ORDINANCE 08-02

BUILDING PERMIT APPLICATION

FLOOD DAMAGE PREVENTION COURT ORDER ARTICLE I STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND METHODS

MANSFIELD TOWNSHIP BURLINGTON COUNTY ORDINANCE

ORDINANCE NO. 990 CITY OF OCEAN SHORES, WASHINGTON. NOW, THEREFORE, the City Council of the Ocean Shores does hereby ordain as follows:

TITLE 14 ZONING AND LAND USE CONTROL CHAPTER 1 MUNICIPAL PLANNING COMMISSION

CHATHAM COUNTY FLOOD DAMAGE PREVENTION ORDINANCE ARTICLE 1 STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND OBJECTIVES

FLOOD HAZARD (FH) ZONING DISTRICT OR FLOOD HAZARD OVERLAY ZONE (Ord A, 10/20/2009) 1.0 INTRODUCTION

Town of Lisbon, Maine SUBDIVISION REVIEW APPLICATION

Caldwell County. Flood Damage Prevention Ordinance

Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion or in flood heights or velocities;

ORDINANCE NO. THE CITY COUNCIL OF THE CITY OF BISHOP, STATE OF CALIFORNIA DOES ORDAIN AS FOLLOWS:

Transcription:

Permit # Floodplain Development Permit Application Hendricks County Planning & Building 355 S. Washington Street Suite 212, Danville IN 46122 Office: 317-745-9255 / Fax: 317-745-9347 Owner Information Current Address: Telephone: Property Information Township: Square feet of Lot: Lot acreage: Project Address: County Parcel: Zoning District: Date the parcel was created: State Parcel: Subdivision Subd. Sec: 32- Subd. Lot No.: Surveyor/Engineer Information Builder Information (if same as owner sign & check affidavit) Current Address: Telephone: Use of Structure: Type of Structural Activity: Type of Structure: B. Other Development Activities Excavation (not from Watercourse alteration Residential New Structure Principal Building Clearing Drainage Contractor Listing #: A. Structural Devlepment (check all that apply) Multi Residential Commercial 1 Remodel to Existing 1 Addition to Accessory Existing Building improvements Placement of fill Individual water/sewer system Elevated Grading Road, street or bridge construction Industrial 1 Relocation of Floodproofed Mining Dredging Existing Demolition Structure Manufacture Drilling Replacement of Structure (mobile) Home Contractor Listing Affidavit Signed if the builder is same as owner: previous section) material Other development not listed above (specify) 1 If the value of the addition or alteration to a strucutre equals or exceeds 50% of the value of the structure before the addition or alteration, the entire structure MUST be treated as a substantially improved structure. A relocated structure MUST be treated as a new structure. (Section 10.4 (B)) Estimated Construction Cost $ New Meter/Upgrade/Relocate: Yes or No (Circle One)

Source of Utilities Public Well Sewer Septic Duke HPC IPL Flood information 1.) The proposed development is located on FIRM map panel: (number and suffix) 2.) The date of the FIRM: 3.) The proposed development is located in zone: (A, AE, shaded X or unshaded X) If located in shaded/unshaded X, then no Floodplain Development Permit is required. 4.) Is the proposed development located within a regulatory floodway of Zone AE? 5.) If YES, refer to the IDNR for Construction in a Floodway. If NO, continue. Note: Water: Sewage Disposal: Electrical Power: Plumber: 6.) Base flood elevation at the site: Feet above mean sea level (MSL) 7.) Vertical datum used in the Flood Insurance Study, on flood maps, and in survey is 8.) Source of the base flood elevation (BFE) FIRM (flood map) Flood Insurance Study Profile #: Other Source (specify): This elevation MUST be greater than the BFE. (see ordinance for requirments). For non-residential structure, floodproofing may be used for protection. 9.) Elevation to which any nonresidential structure will be floodproofed: Feet above MSL. The following documents will be required as applicable by the Floodplain Administrator (check the included documentation): Plans including location of structures, water bodies, roads, lot dimensions and proposed development (grading, watercourse relocation and/or landform alterations). Plans drawn to scale including where applicable: details for anchoring structures, proposed elevation of lowest floor (including basement), types of water-resistant materials, floodproofing details of utilities and details of enclosures below the first floor (See section 10.4(B)). Change in water elevation (feet) Meets ordinance limits on elevation increases? Yes No Approval from IDNR if the proposed development is in a regulatory floodway Outlet into regulated drain? Yes No Yes or No (Circle One) If yes, please see Surveyor's Office If the proposed development is located withing Zone A, AE or shaded X (critical facilities only), apply the criteria of the Floodplain Management Ordinance to minimize flood damages to the proposed Development and to adjacent properties as well. For structures, the provisions of the ordinance specify that the lowest floor, including utilities, be elevated above the base flood elevation. Therefore, it is necessary that the following information be provided: Surveyor's Office approval Conditions of Application 1.) 2.) 3.) 4.) 5.) 6.) 7.) 8.) 9.) A copy of Wetlands Permit from the U.S. Army Corps of Engineers if required; and other local, state and federal permits. No work shall be started before a permit has been posted or continued if the permit has been destroyed, lost, or stolen. Any person who violates this Hendricks County Zoning Ordinance or fails to comply with any of its requirements shall, upon conviction, be fined in accordance with the ordinanace and in addition, shall pay all costs and expenses involved. If construction has already commenced, an Affidavit of Compliance is required. The permit shall be posted in a conspicuous location, visible from the street, on the premises, and shall remain in place during the entire period of construction. No inspection shall be performed without a posted permit. A re-inspection fee may be charged as defined by the "Building Inpsection and General Requirements" form. This fee must be paid prior to scheduling the re-inspection. The permit becomes void if an inspection has not been completed/scheduled within a year. Construction must be completed within two years. If any changes or deviations are made from the original application, a new permit (with payment of required fees) shall be required. The undersigned shall be responsible to schedule all building inspections. The structure shall not be occupied until all inspections have been made and approved and a Certificate of Occupancy has been issued. The undersigned owner or agent understands the approval of this application does not constitute a privilege to violate any applicable governmental ordinances, codes or laws. In addition, any commmission or misrepresentation of face, with or without intention of the undersigned, or any alteration or change from this application, without approval of the Building official, shall constitute sufficient grounds for the revocation of any permit issued which was based on the approval of this application. Signature of Applicant I certify that to the best of my knowledge the information contained in this application is true and accurate.

Printed Name Signature Date Forms which may be required by the Floodplain Administrator ELEVATION CERTIFICATE Required per Floodplain Management Ordinance (10.3(B) upon placement of the lowest floor before framing continues and upon completion of construction. Certificates require completion by a Professional Land Surveyor or Registered Professional Engineer. Refer to FEMA website for the form: https://www.fema.gov/elevation-certificate NON-CONVERSION AGREEMENT Required per Floodplain Management Ordinance (10.4(B) FLOODPROOFING CERTIFICATE Required per Floodplain Management Ordinance (10.3(B) when floodproofing is utilized for a structure. Certificates require completion by a Professional Land Surveyor or Registered Professional Engineer. Refer to FEMA website for other versions of the form: http://www.fema.gov/media-library/assets/documents/2748?id=1600 NO-RISE CERTIFICATE Any project in a floodway must be reviewed by IDNR to determine if the project will increase flood heights. An engineering analysis must be conducted before a permit can be issued. The community's permit file must have a record of the results of this analysis, which can be in the form of a No-Rise Certification. This No-rise Certification must be supported by technical data and signed by a registered professional engineer. The supporting technical data should be based on the standard step-backwater computer model used to develop the 100-year floodway shown on the Flood Insurance Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM). (Submit only if required to do so by the Floodplain Administrator). Floodplain Administrator will complete this section I have determined that the proposed development IS WILL IS NOT WILL NOT In conformance with the Floodplain Management Ordinance For Office Use Only A Floodplain Development Permit be issued, subject to any conditions attached to and made part of this permit. Permit #: Date Issued: Reviewed By: PC Case: Permit Fee: $ Issued By: Review Date: BZA Case: Zoning Violation: CONSTRUCTION & CERTIFICATION (completed by the Floodplain Administrator) ELEVATION CERTIFICATE OR FLOODPROOFING CERTIFICATION The Applicant to provide certification of the elevation of the lowest floor or floodproofing before framing or other construction continues. Type of certification provided: Elevation Certificate Floodproofing Certification Date of Certification: Date Received: Certification signed by : Engineer Surveyor Architect "AS BUILT" ELEVATION The Applicant to provide as-builts and an Elevation Certification or Floodproofing Certification upon completion of construction. Date of Certification: Date Received: The Actual ("As-Built") elevation of the top of the lowest floor, including the basement, is Feet above MSL, 1.) vertical datum: 2.) The Actual ("As-Built") elevation of floodproofing protection, is Feet above MSL, vertical datum: CERTIFICATE OF OCCUPANCY/COMPLETION I have determined that the development is in conformance with the Floodplain Management Ordinance and a Certificate of Occupancy/Completion MAY MAY NOT be issued, subject to any conditions attached to and made part of this permit. Date the Certificate of Occupancy/Occupancy was issed by the FPA:

PERMIT PROCEDURE WORKFLOW