VILLAGE OF SALEM LAKES

Conditional Use Application

PLANNING AND PUBLIC WORKS DEPARTMENT CHANGE OF NONCONFORMING USE (Requires Public Hearing)

HOME OCCUPATION PERMIT

Applying for a Conditional Use Permit in San Juan County

HOME OCCUPATION. Application Packet Town of Taos Planning and Zoning Department. Ordinance Land Use Development Code

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

DEPARTMENT OF PLANNING Application for Variances, Special Exceptions through the Board of Adjustment

CONDITIONAL USE APPLICATION

The Elmore County Land Use & Building Department DOES NOT accept faxed applications or signatures.

Nassau County Department of Planning & Economic Opportunity Nassau Place Yulee, Florida 32097

APPLICATION FOR REGULAR ZONING PERMIT

Variance Application To The Zoning Board of Appeals

Conditional Use Permit / Standard Subdivision Application

LAKE COUNTY INTERIM USE APPLICATION VACATION RENTAL HOME

Individual Well Individual Septic. Community Well 19. What is the proposed method of sewage disposal? Public. None

PLANNING DEPARTMENT Application for a Type 2 Use through the Board of Adjustment & Appeals

Waseca County Planning and Zoning Office

1 st Hearing: 2 nd Hearing: Publication Dates: Notices Mailed: Rezone, Special Exception and Variance APPLICANT INFORMATION PROPERTY INFORMATION

Non-Plumbing Sanitary Permit Application

REQUEST FOR COUNCIL ACTION

Bed & Breakfast Special Home Occupation Application Packet

LAND USE APPLICATION

APPLICANT'S CHECKLIST FOR SPECIAL USE PERMIT

Special Exception Use Order Application

REZONING APPLICATION COVER SHEET

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

BARROW COUNTY, GEORGIA

Planned Residential Development ( PRD ) Application

CHAPTER 3 PERMITS, PLANS AND ANNEXATION

Note to the Owner, Applicant & Agent:

DEPARTMENT OF PLANNING SERVICES 1555 N 17 th Ave Greeley CO Phone (970) Fax (970)

LAGRANGE TOWNSHIP BOARD OF ZONING APPEALS REQUEST FOR HOME OCCUPATION/CONDITIONAL PERMIT NEW

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA. Fee: (see fee schedule) Validation No.

MINOR SUBDIVISION INFORMATION

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

USE PERMIT AND VARIANCE APPLICATION

CHAPTER 10 Planned Unit Development Zoning Districts

ARTICLE 8: SPECIAL LAND USES

The City of MIDWEST CITY 100 N. Midwest Blvd * Midwest City, Oklahoma (405) *TDD (405) * FAX (405)

File Name: Conditional Use Application_2017

CITY OF BRIGHTON. Community Development/Planning Department SPECIAL LAND USE APPLICATION

FOR OFFICE USE ONLY Date Submitted Received By Fees Paid $ Receipt No. Received By Application No. Application Complete Final Action Date

CONDITIONAL USE PERMIT APPLICATION COVER SHEET

CITY OF WINTER SPRINGS

APPLICATION FOR FLOODPLAIN PERMIT

Special Land Use. SLU Application & Review Standards

Mariposa County Public Works Department (209) (for road encroachments, road improvements, and engineering issues)

FINAL PLAT SUBMITTAL CHECKLIST

SPECIAL EXCEPTION APPLICATION LEVY COUNTY, FLORIDA

Applications will be received on business days between 9:00 AM and 3:00 PM

ZONING HEARING BOARD APPEAL APPLICATON REQUIREMENTS

Septic Tank / Drainfield / Holding Tank Permit Application

Expiration of Transportation Certificate of Concurrency for Application for Minor or Major Development; Approval

ARTICLE XI CONDITIONAL USE PERMITS

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

APPLICATION PROCESSING. CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you.

Department of Planning and Development

Burnett County, WI SUBDIVISION VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS PROCESS (NOTE: PLEASE READ ENTIRE APPLICATION BEFORE PROCEEDING)

City of Newport. Zoning Board of Review

SPECIAL USE FOR A PLANNED UNIT DEVELOPMENT (P.U.D.), REZONING, and COMPREHENSIVE PLAN AMENDMENT APPLICATION PACKET

Application for Conditional Use Permit CITY OF VALDOSTA PLANNING AND ZONING DIVISION

Administrative Zoning Variation Application Procedures and Checklist

PLANNING COMMISSION COMMUNICATION

SUBDIVISION APPLICATION

Minor Subdivision Application

Charter Township of Garfield Grand Traverse County

CITY OF CUDAHY CALIFORNIA Incorporated November 10, 1960 P.O. Box Santa Ana Street Cudahy, California

Phone Fax Phone Fax. Owner/Agent Signature (Agents must provide written proof of authorization) OFFICE USE ONLY

EASEMENT ACCESS INSTRUCTION SHEET

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

BEFORE THE HEARINGS EXAMINER FOR THE CITY OF BREMERTON

ADMINISTRATIVE HEARING STAFF REPORT

ARTICLE 12 PROCEDURES AND STANDARDS

WASHINGTON COUNTY CUP SUBMITTAL CHECKLIST

Planning & Zoning Department GENERAL APPLICATION 400 DeWitt Street - Portage, WI Phone: Fax:

Septic Tank / Drainfield / Holding Tank Permit Application

City of Harrisburg Variance and Special Exception Application

City of La Puente E. Main Street, La Puente, CA Telephone (626) Fax (

SPECIAL USE PERMIT APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

CHAPTER 18 SITE CONDOMINIUM PROJECTS

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required:

Burnett County, WI LAND USE VARIANCE APPLICATION, EXPLANATION, & REQUIREMENTS

TALBOT COUNTY OFFICE OF PLANNING & ZONING

Interim Use Permit Application

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin County Treasurer.

Concurrency Reservation Certificate (CRC) APPLICATION FORM

REZONING APPLICATION CHECKLIST BUCKINGHAM COUNTY OFFICE OF ZONING AND PLANNING MINUMUM SUBMISSION REQUIREMENTS

ADMINISTRATIVE PERMIT FOR TEMPORARY MOBILE HOME APPLICATION

MIDWAY CITY Municipal Code

Town of Jupiter Island APPLICATION FOR IMPACT REVIEW COMMITTEE

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

Transcription:

Receipt No. Fee Date Date Permit Issued: Certificate of Compliance: Date DOOR COUNTY LAND USE SERVICES 421 Nebraska Street Door County Government Center Sturgeon Bay, Wisconsin 54235 (920) 746-2323 - FAX (920) 746-2387 APPLICATION FOR CONDITIONAL USE PERMIT TO THE ZONING ADMINISTRATOR. The undersigned hereby makes application for a CONDITIONAL USE PERMIT for the work described and located as shown herein. The undersigned agrees that all work shall be done in accordance with the requirements of the Door County Comprehensive Zoning Ordinance. 1. OWNER NAME AND MAILING ADDRESS Name No. Street City State Zip Home Phone # - - Daytime Phone # - - Email: 2. BUILDING SITE LOCATION Fire # Road Town of Local Phone # - - 3. DEVELOPER NAME AND MAILING ADDRESS Name No. Street City State Zip Phone # - - Email: 4. PROPERTY IDENTIFICATION Parcel No. - - 5. USE Proposed use of land or structure: 6. SANITARY PERMIT Type of System Sanitary Permit No. Date of Issuance Approximate date of installation 7. BUILDING PLANS AND SITE PLAN TO SCALE BUILDING PLAN AND SITE PLAN REQUIRED. IF PLANS EXCEED AN 11 X 17 FORMAT, SUBMIT ONE COPY OF EACH SHEET REDUCED TO 11 X 17. 8. ROCKHOLES A rockhole is any depression or opening in the ground surface through which gathered surface water enters bedrock and eventually joins groundwater. To the best of your knowledge, do any rockholes exist on the lot? No Yes If yes, show location on Site Plan. 9. FEE $500.00 Make check payable to the Door County Treasurer. 10. AUTHORIZATION FOR INSPECTION I hereby authorize the Zoning Administrator(s) to enter and remain in or on the premises for which this application is made at any reasonable time for all purposes of inspection relative to this petition. 11. SIGNATURE OF APPLICANT OR AGENT Date Shoreland Zoning Yes / No Inspections: Zoning District (FOR OFFICE USE ONLY) Date Inspector Remarks Permit Issued: (by) (date) (for) (w/conditions) Permit Denied (by) (date) for the following reasons:

APPLICATION FOR CONDITIONAL USE PERMIT ADDENDUM A conditional use permit applicant has the burden of proof. S/he must demonstrate that the application and all requirements and conditions established by the Resource Planning Committee relating to the conditional use are or shall be satisfied, all of which must be supported by substantial evidence. Substantial evidence means facts and information, other than merely personal preferences or speculation, directly pertaining to the requirements and conditions an applicant must meet to obtain a conditional use permit and that reasonable persons would accept in support of a conclusion. If an applicant meets this burden of proof, the Resource Planning Committee will grant the conditional use permit. If an applicant fails to meet this burden of proof, the conditional use permit application will be denied. To aid in its review of the proposed project, the Committee will consider the Door County Comprehensive Zoning Ordinance criteria set forth below. Answer all portions of all questions completely. State not applicable, if appropriate, offering an explanation as to why facts and information were not provided. Please provide the Resource Planning Committee members substantial evidence regarding: 1) Whether the proposed project will adversely affect property values in the area. 2) Whether the proposed use is similar to other uses in the area. 3) Whether the proposed project is consistent with the Door County Comprehensive and Farmland Preservation Plan or any officially adopted town plan. 4) Provision of an approved sanitary waste disposal system. Public Sewer Private Onsite Wastewater Treatment System (POWTS) Existing Conventional Septic New Other In-ground System Holding Tank 5) Provision for a potable water supply. Public Water Supply (Liberty Grove Sanitary District #1 and Maplewood only) Well Existing New Private Well Shared Well 6) Provisions for solid waste disposal. Commercial hauler Private delivery to collection site Other 7) Whether the proposed use creates noise, odor, or dust. Noise: Odor: Dust:

8) Provision of safe vehicular and pedestrian access. Vehicular Access CONDITIONAL USE PERMIT ADDENDUM PAGE 2 Existing Driveway(s) to. (Road Name) New Driveway(s) to. (Road Name) Pedestrian Access Sidewalks Path or Trail No Pedestrian Traffic 9) Whether the proposed project adversely impacts neighborhood traffic flow and congestion. Existing traffic: High Levels Medium Levels Low Levels 10) Adequacy of emergency services and their ability to service the site. Take this form to the local Fire Chief with a copy of the plans for review. Have Fire Chief complete and sign below. As Fire Chief of the Fire Department, I have reviewed the plans of this project. Our Department ( can / cannot ) access this site for fire protection purposes. Other Fire Chief comments: (Signature) 11) Provision for proper surface water drainage. Natural Infiltration (explain below) Some Grading of the Site (explain below) Engineered Stormwater and/or Erosion Control Plan (attach), Fire Chief (Date) 12) Whether proposed buildings contribute to visual harmony with existing buildings in the neighborhood, particularly as related to scale and design.

CONDITIONAL USE PERMIT ADDENDUM PAGE 3 13) Whether the proposed project creates excessive exterior lighting glare or spillover onto neighboring properties. 14) Whether the proposed project leads to a major change in the natural character of the area through the removal of natural vegetation or alteration of the topography. Natural Vegetation: No Removal Some Removal Significant Removal (provide Landscape Plan) Topography: No Change Some Change Major Change (provide Grading Plan) 15) Whether, and in what amount and form, financial assurance is necessary to meet the objectives of this ordinance. 16) Whether, and to what extent, site-specific conditions should be imposed to mitigate potentially problematic impacts of the use. 17) The impact of the proposed project on public health, public safety, or the general welfare of the County. The Resource Planning Committee will establish a completion date for the proposed project. By what month and year will the project be completed?, The Resource Planning Committee is allowed to consider topics in addition to the above. Please provide information on additional topics you think the Committee should or may consider in evaluating this project. Note that a conditional use permit will generally remain in effect as long as the conditions and requirements upon which the permit was issued are followed. Subsequent owners of the property are generally allowed to continue the use, subject to those conditions and requirements. An affidavit is to be recorded with the deed to provide successors in interest notice of the conditional use permit and conditions and requirements. The Resource Planning Committee may, however, impose conditions regarding the permit s duration, transfer, or renewal, in addition to any other conditions pertaining to ordinance standards or the specific criteria listed above. For example, the Committee may grant a limited term conditional use permit if a reasonable basis exists for such limitation. Any limited term conditional use permit may be subject to renewal after a re-evaluation of the use via a hearing before the Resource Planning Committee.

County of Door LAND USE SERVICES County Government Center 421 Nebraska Street Sturgeon Bay, WI 54235 Phone: (920) 746-2323 FAX: (920) 746-2387 Website: map.co.door.wi.us/planning Please provide a description of your project. PROJECT SCOPE DECLARATION [2017 Wisconsin Act 68; Effective November 29, 2017] 66.10015(2)(b), Wisconsin Statutes, provides as follows: If a project requires more than one approval or approvals from one or more political subdivisions and the applicant identifies the full scope of the project at the time of filing the application for the first approval required for the project, the existing requirements applicable in each political subdivision at the time of filing the application for the first approval required for the project shall be applicable to all subsequent approvals required for the project, unless the applicant and the political subdivision agree otherwise. Please check which of the following two statements applies to this project. This is the first application filed for the project in which the full scope of the project has been identified. I acknowledge and understand that, for purposes of 66.10015(2)(b), Wis. Stats., the full scope of the project is identified in this application. This is not the first application filed for this project where the full scope of the project was identified. The first application was filed with the Town/Village/City/County/State of on the day of, 20. I acknowledge and understand that, for purposes of 66.10015(2)(b), Wis. Stats., the full scope of the project was identified in the first application. This Declaration is incorporated into and made part of the associated Door County application. Property Owner(s) Name(s): Signature Signature: Date: Date: Parcel Number (of Project): - - Fire Number & Street Address (of Project):

Door County Land Use Services CONDITIONAL USE PERMIT A conditional use is one that has been determined to be compatible in a particular area, not a use that is always compatible at a specific site within that area. The use is subject to requirements and conditions, and is only allowed under a conditional use permit (CUP) issued by Door County. A conditional use permit is also required if an owner wishes to expand a non-conforming use (i.e., a use previously legally established which would not be allowed under current zoning regulations). PERMIT & HEARING PROCESS 1. Submit a completed application form with a $500.00 non-refundable fee. 2. Provide a detailed written description of your project, building plans, and a site plan (drawn to scale). Provide one complete set of plans no larger than 11 x 17. 3. If an agent will represent you, you must submit your agent s name, telephone number, and mailing address to the Door County Land Use Services Department. 4. Once the application is deemed complete, a copy of the application packet and staff report will be sent to the town to ask for recommendations and comments. You and neighboring property owners will receive a copy of the letter and staff report which forwards your application to the town. Please call the town to see if/when the town may be meeting to discuss this matter. 5. The Door County Land Use Services Department will publish a notice of the hearing in the Door County Advocate and will notify you and neighboring property owners in writing of the hearing date / time. It takes ~2 months from time of application submittal to hearing date. 6. If the applicant/agent fails to appear at the hearing, s/he will be deemed to be in default and the conditional use permit may, in the RPC s sole discretion, be denied. The applicant/agent may, if s/he failed to appear for good reason, request in writing that the RPC reopen the default denial. A written request to reopen shall be received by the Door County Land Use Services Department within 30 days of the default denial. The RPC may, in its sole discretion, reopen a default denial if good cause is shown, such as mistake, inadvertence, or excusable neglect. If a default denial is reopened, the applicant/agent must submit a new fee, unless the RPC determines otherwise. 7. Other people can also attend the hearing to testify for or against your request. 8. Once the conditional use permit is issued, the applicant shall obtain a regular zoning permit within twelve months to authorize any new construction related to establishing the conditional use. CRITERIA USED TO MAKE A DECISION The Door County Resource Planning Committee (RPC) decision to approve, approve with conditions, or deny the CUP must be supported by substantial evidence. A conditional use permit applicant has the burden of proof. S/he must demonstrate, by substantial evidence, that the application and all requirements and conditions established in the ordinance and by the RPC relating to the conditional use are or shall be satisfied. If an applicant meets their burden of proof, then the RPC must grant the CUP. If an applicant fails to meet their burden of proof, the CUP will be denied. The CUP may also be denied if there is substantial evidence opposing the conclusions and evidence of the applicant, as the RPC s decision need only be supported by substantial evidence. Testimony and exhibits offered by persons other than the applicant, whether in support of or opposition to the CUP, must constitute substantial evidence. Substantial evidence means facts and information, other than merely personal preferences or speculation, directly pertaining to the requirements and conditions an applicant must meet to obtain a conditional use permit and that reasonable persons would accept in support of a conclusion. To aid in its review of the proposed project, the RPC will consider the Door County Comprehensive Zoning Ordinance criteria set forth below. 6/6/2018 Page 1 of 2

1) Whether the proposed project will adversely affect property values in the area. 2) Whether the proposed use is similar to other uses in the area. 3) Whether the proposed project is consistent with the Door County Comprehensive and Farmland Preservation Plan or any officially adopted town plan. 4) Provision of an approved sanitary waste disposal system. 5) Provision for a potable water supply. 6) Provisions for solid waste disposal. 7) Whether the proposed use creates noise, odor, or dust. 8) Provision of safe vehicular and pedestrian access. 9) Whether the proposed project adversely impacts neighborhood traffic flow and congestion. 10) Adequacy of emergency services and their ability to service the site. 11) Provision for proper surface water drainage. 12) Whether proposed buildings contribute to visual harmony with existing buildings in the neighborhood, particularly as related to scale and design. 13) Whether the proposed project creates excessive exterior lighting glare or spillover onto neighboring properties. 14) Whether the proposed project leads to a major change in the natural character of the area through the removal of natural vegetation or alteration of the topography. 15) Whether, and in what amount and form, financial assurance is necessary to meet the objectives of this ordinance. 16) Whether, and to what extent, site-specific conditions should be imposed to mitigate potentially problematic impacts of the use. 17) The impact of the proposed project on public health, public safety, or the general welfare of the County. *Note: State, federal, and local requirements also need to be met. The RPC is allowed to consider topics, related to the purposes of the ordinance and based on substantial evidence, in addition to the above. If the conditional use permit application is approved, the RPC will establish a completion date for the proposed project. Once the use is established, a conditional use permit will generally remain in effect as long as the conditions and requirements upon which the permit was issued are followed. Subsequent owners of the property are generally allowed to continue the use, subject to those conditions and requirements. An affidavit is to be recorded with the deed to provide successors in interest notice of the conditional use permit and conditions and requirements. The RPC may, however, impose conditions regarding the permit s duration, transfer, or renewal, in addition to any other conditions pertaining to ordinance standards or the criteria listed above. For example, the RPC may grant a limited term conditional use permit if a reasonable basis exists for such limitation. Any limited term conditional use permit may be subject to renewal after a re-evaluation of the use via a hearing before the RPC. RESOURCE PLANNING COMMITTEE DECISION The RPC will consider the evidence presented and will most likely make a decision that same day at a business meeting after the hearing(s). If the hearings are lengthy or if additional information is needed, it is possible the decision could be tabled to a later date. The RPC will approve, with or without conditions, or deny the request. The Door County Land Use Services Department will send the applicant the RPC s decision in writing within a few days after the hearing and meeting. APPEALS If the conditional use permit is denied, you may appeal the decision to Door County Board of Adjustment as provided in Sec. 59.694(10), Wis. Stats. If the permit is approved, it may be appealed to the Board of Adjustment by any aggrieved party. All appeals must be filed within the time constraints set forth in the statutes (i.e., 30 days after the decision is filed with the Door County Land Use Services Department). For this reason, you may want to delay the start of the project until the appeal period has expired. Page 2 of 2 6/6/2018