Case 3:13-cv MMD-WGC Document 48-7 Filed 09/05/13 Page 1 of 16 RTC EXHIBIT 1-E

Similar documents
INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY

AMENDMENT TO POWER PURCHASE AGREEMENT

VICINITY MAP SCALE 1'' = 2000'

UTILITY EASEMENT AGREEMENT

ORDINANCE NO: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GREENVILLE, TEXAS:

BILL NO (Emergency Measure) ORDINANCE NO. 5072

RESOLUTION NO. BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SAN JOSE THAT:

DEED AND DEDICATION FOR PUBLIC RIGHT OF WAY

DECLARATION OF EASEMENTS AND COST SHARING AGREEMENT

EASEMENT AGREEMENT. WHEREAS, Hall Brothers owns certain real property located in Weber County, Utah ( Hall Brothers Property );

DECLARATION OF DRAINAGE EASEMENTS. Document No. Document Title. (Declarant) Recording Data Return Address

TEMPORARY CONSTRUCTION EASEMENT AND AGREEMENT

CORPORATE SPECIAL WARRANTY DEED FOR RIGHT OF WAY

ORDINANCE NO

DISTRICT OF LAKE COUNTRY LICENCE OF OCCUPATION AND PUBLIC ACCESS RESTRICTION BYLAW 502, 2004

LIMITED, TEMPORARY, NON- EXCLUSIVE EASEMENT AGREEMENT

STANDARDIZED LEGAL DESCRIPTIONS AND EXHIBITS

Parcel Map Review Committee Staff Report

Honorable Mayor and Members of the City Council. Sewer Easement Deed Agreement at 2705 Walker Street

CHAPTER 154 RIGHTS OF WAY

PERMANENT EASEMENT AGREEMENT

GROUND LEASE AGREEMENT RECITALS

MEMORANDUM. Michael Smith, Director of Public Works. Discussion of Temporary Aerial Easement for KDC

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS

RIGHT OF WAY AND COMMON DRIVEWAY AGREEMENT SUN8 PDC, LLC, c/o DISTRIBUTED SUN, LLC SUBDIVISION DRYDEN, NEW YORK

DEED OF TEMPORARY EASEMENT

City Council Information Form

MEMORANDUM. Mayor and City Council. Warren Hutmacher, City Manager. Date: February 11, 2013

RESOLUTION NO. RD:EEH:LCP

COUNCIL AGENDA MEMO ITEM NO. III - #1

CONTRACT FOR SALE AND PURCHASE

ABBREVIATION LEGEND SITE INFORMATION:

SIDEWALK ACCESS EASEMENT AGREEMENT

LEASE AGREEMENT PARKING LOTS City of Yakima And JEM Development Company

AGENDA ITEM FORM INFORMATION ONLY PRESENTATION DISCUSSION ONLY ACTION ITEM

Terms and Conditions of Sales

DECLARATION OF UNITY OF CONTROL

NEIGHBORHOOD RESPONSIBILITY AGREEMENT FOR CANNABIS PROJECTS

MEMORANDUM. First Read: Temporary Easement Agreement for Palisades Venture, LLC

CONTRACT TO BUY AND SELL REAL ESTATE

CHAPTER FINAL AND PARCEL MAPS

As Introduced. 131st General Assembly Regular Session H. B. No

COUNCIL ACTION FORM Meeting Date: September 13, 2012 Staff Contact: John Sullivan, Public Works Director

City of Stevenson Planning Department

TEMPORARY ACCESS AND EASEMENT AGREEMENT

GREENWAY EASEMENT AGREEMENT

RESOLUTION NO. R RESOLUTION APPROVING A STORM SEWER EASEMENT AGREEMENT

AN ACT. The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

STAFF REPORT. Honorable Mayor and City Council

DOCUMENT VET SHEET for Karen McConnaughay Chairman, Kane County Board

City of Scotts Valley INTEROFFICE MEMORANDUM

PRESERVATION AND CONSERVATION RESTRICTION

BY BOARD OF COUNTY COMMISSIONERS

REAL ESTATE PURCHASE AGREEMENT

This is a sample form for information ONLY. UTILITY INFRASTRUCTURE CONVEYANCE AND SERVICE AGREEMENT

AGREEMENT FOR TREATED EFFLUENT BETWEEN. CITY OF RENO, a municipal corporation, and CITY OF SPARKS, a municipal corporation AND

Planning Commission Staff Report September 15, 2016

BYRON TOWNSHIP ZONING APPLICATION

USE AGREEMENT AMONG <OWNER>, <LESSEE>, AND ORANGE COUNTY. THIS USE AGREEMENT (the Agreement ) is entered into by and among

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

DEED OF EASEMENT (RECLAIMED WATER,WATER AND SEWER) [AND DEED OF VACATION (RECLAIMED WATER, WATER AND SEWER)]

FULLER PARK PARKING LOT LAND LEASE

AGENDA UPDATE ECONOMIC DEVELOPMENT & FINANCE STANDING COMMITTEE MEETING MONDAY, AUGUST 10, 2015 III. COMMITTEE AGENDA

CITY AND COUNTY OF BROOMFIELD SUBDIVISION IMPROVEMENT AGREEMENT FOR (PROPERTY NAME - ALL CAPS)

Sketch & Legal Description of Mitigation Bank and Ingress/Egress Access Easements

Case JMC-7A Doc 1133 Filed 01/31/17 EOD 01/31/17 13:25:18 Pg 1 of 10 SO ORDERED: January 31, 2017.

Parcel Map Review Committee Staff Report Meeting Date: October 13, 2016

PERMANENT SANITARY SEWER EASEMENT AGREEMENT Bluemound Road Elm Grove, Wisconsin

INTERGOVERNMENTAL AGREEMENT

Board of Adjustment Staff Report Meeting Date: June 1, 2017

Earnest Money Agreement

COUNTY OF LOS ANGELES

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Agenda Item # Page # By-law No

Exhibit A: REAL ESTATE TRANSFER AGREEMENT

INTERLOCAL AGREEMENT Steigerwald Levee Modification Project. +t...

CONTRACT FOR SALE AND PURCHASE

Agreement - Engineering - Underground Right-of-Way Easement. Submitted for your approval and execution is the attached Underground Right-of-Way

ORDINANCE NO AN ORDINANCE To Be Entitled:

A Form Shopping Center Lease

ORDINANCE NO. CID-3087

WASHINGTON STATE COUNTY AUDITOR/RECORDER'S INDEXING FORM

The City Council of the City of Sulphur, Louisiana, met in special session at its

RECITALS. WHEREAS, the GMA requires counties to adopt county-wide planning policies in cooperation with cities within the County; and

EASEMENT AGREEMENT. hereinafter called Grantor, (whether grammatically singular or plural) and the:

PERMANENT DEEP TUNNEL EASEMENT AGREEMENT

ACCESS AND OPTION AGREEMENT TEMPLATE FOR REAL PROPERTY PARTNERSHIP PROJECTS

MODULAR MINING SYSTEMS TERMS AND CONDITIONS OF SALE

EASEMENT DEED. 2) Thence N 60º12 36 W through said Parcel 1 a distance of Two Hundred Ninety- Five and 97/100 (295.97) feet to a point;

DRAINAGE AND UTILITY EASEMENT. That Bruce Conrad, a single adult, hereinafter referred to as Grantor for good and

City of Edmonds TEMPORARY CONSTRUCTION EASEMENT

Parcel Map Review Committee Staff Report Meeting Date: October 8, 2015

PIPELINE RIGHT-OF-WAY EASEMENT

RESOLUTION NO. R

EASEMENT AGREEMENT. WHEREAS, Ferguson is the 100% owner of the property described on Exhibit B attached hereto (the Williams Property );

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

Space No.: MANUFACTURED HOME SPACE LEASE AGREEMENT

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 27, 2018

RIGHT-OF-WAY MAINTENANCE AGREEMENT

LANDSCAPE AND MAINTENANCE EASEMENT. THIS LANDSCAPE AND MAINTENANCE EASEMENT, (hereinafter Easement )

Transcription:

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 1 of 16 RTC EXHIBIT 1-E

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 2 of 16 INTERLOCAL AGREEMENT PERMITTING CONSTRUCTION OF SOUTHEAST CONNECTOR ON THE TRUCKEE MEADOWS WATER RECLAMATION FACILITY This Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows Water Reclamation Facility (the "Agreement") is made this ~ day of t(lm!e4io.el{", 20_L'4- by and between the Regional Transportation Commission of Washoe County ("RTC"), the City of Reno, Nevada ("Reno") and the City of Sparks ("Sparks"). RECITALS This Agreement is made with reference to the following facts: A. The RTC has planned and will construct the SouthEast Connector, a highaccess control arterial roadway to be constructed between the intersection of Veteran's Parkway and South Meadows Parkway to the south, north to the intersection of Greg Street and Sparks Boulevard. B. The SouthEast Connector is a part of the Regional Transportation Plan approved by the RTC Board on November 21, 2008, followed by a Federal Conformity Determination on July 21, 2009, and approval by the Regional Planning Commission on September 14, 2009. C. The SouthEast Connector Project has been approved by the RTC, Sparks, Reno and Washoe County as part of the RTC's sales tax street and highway program of projects, fuel tax street and highway program of projects and the program of projects for the Regional Road Impact Fee by reason of two Interlocal Agreements, one executed on November 13, 2007, and one executed on November 10,2009 (the Program of Projects "POP Agreements"), each of which authorizes the RTC to proceed with those projects and to pay project costs from the Regional Street and Highway Fund, the Regional Road Impact Fee Fund or the Transportation Sales Tax Fund. D. The Truckee Meadows Water Reclamation Facility ("TMWRF") is a sewerage treatment plant jointly owned by Reno and Sparks located on 247.44+/- acres of land, a depiction of which is attached hereto as Exhibit "A" (the "TMWRF Parcel"). E. The SouthEast Connector Phase I project, RTC Project Number 532011 and Public Works Project Number WA-2013-036 from Greg Street to South of Cleanwater Way, hereafter "Southeast Connector Phase I project", will occupy the TMWRF parcel, will take approximately 58.46 acres of land of the TMWRF Parcel more particularly described in Exhibit "B" attached hereto,) F. The alignment of the SouthEast Connector Phase I project, will affect the current use of and access to the entire TMWRF parcel. The SouthEast Connector Phase I project will further affect existing sewer and effluent reuse lines and access to those lines.

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 3 of 16 G. The construction of the SouthEast Connector Phase I project through TMWRF parcel will require relocation of existing effluent reuse mainlines, stubs, and access points. The sewage pump around will be utilized by Reno and Sparks to complete projects at the TMWRF facility. H. The construction of the SouthEast Connector Phase I project through TMWRF parcel will require reinforcement lining of sewer interceptor segments. Sewer interceptor segments designated for lining are shown on Exhibit "C" attached hereto. I. By this Agreement, the RTC acquires rights, subject to Reno and Sparks permitting requirements, to construct the SouthEast Connector Phase I project on the TMWRF property from Reno and Sparks; this Agreement does not allocate to Reno or Sparks any responsibilities for letting construction or other necessary contracts, contract administration, supervision or the inspection or the performance of any work on the SouthEast Connector Phase I project but all work to construct the SouthEast Connector Phase I project shall be contracted for, administered, supervised, inspected and performed by the RTC or its contractors and subcontractors. J. Fee title to the TMWRF Parcel shall remain with Reno and Sparks. NOW, THEREFORE, it is hereby agreed as follows: 1. The parties agree that all facts described in the Recitals above are true and correct and are incorporated herein as a part hereof. The parties hereto approve and authorize the RTC to, upon approval of this agreement and of the consideration described and as set forth herein to Reno and Sparks, proceed with the design and construction of the SouthEast Connector Phase I project on the TMWRF property, subject to the Cities' permitting processes. In connection with the foregoing activities, RTC, its employees, agents and contractors shall: (a) coordinate with Reno and Sparks staff and use commercially reasonable efforts to minimize any and all disturbance disruption, interference or inconvenience to Reno and Sparks, its employees, agents, contractors, invitees, and users of TMWRF; (b) coordinate with Reno's Public Works Environmental Engineering Manager, and Sparks' Utility Manager to provide shut-down (or temporary "tum-off) of the existing re-use system for performing connection to, or abandonment of existing pipeline, or other work as necessary. Shut-down will be limited on a temporary basis only and further limited to occur only between November 15 and March 15; (c) make adequate provision for the safety and access of all persons affected thereby; and lnterlocal Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows Water Reclamation Facility 2

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 4 of 16 (d) maintain access for all vehicles and equipment to conduct regular business to the TMWRF without delays and not restrict access to TMWRF. (e) meet all terms and conditions of Truckee Meadows Structural Controls Design Manual, Updates and Errata as incorporated herein as if fully attached hereto. (f) RTC may excavate up to approximately 300,000 cubic yards of material from' the hill side east of the existing treatment plant. This material will be used for construction of the Southeast Connector Project. For removal of material, RTC shall be obligated to obtain a separate Special Use Permit from the City of Sparks. Any compensation due and owing for use of the excavated material shall be deemed paid in full with construction of the access road as described in 2a(iv). 2. Effective on the execution and delivery of this Agreement by the RTC and Reno and Sparks: (a) the RTC shall be obligated to: (i) reimburse Reno and Sparks for all costs pertaining to the sewerage pump around and lining of pipe segments. The sewer interceptor segments eligible for reimbursement are 12028, 14123, 12030, 11126, 11127 and 11132 (Exhibit "C"). The reimbursement for lining of sewer interceptor pipe segments will be determined by actual costs but shall not exceed $1,237,000. The reimbursement for sewerage pump around will include, but is not limited to set up, maintenance, and deconstruction. The payment to Reno by RTC of the pump around provision will not exceed $900,000; the approximate layout of the pump around is depicted in attachment "D". (ii) deposit a check payable to Reno's Sewer Enterprise Fund in the sum of $500,000 which represents a portion of the estimated amount of work to be contracted, bid, and managed by Reno, as referenced in 2a(i) and reimburse for the remainder due and owing pursuant to invoices submitted by Reno to RTC. (iii) reconstruct re-use lines in coordination with, and to the satisfaction of Reno and Sparks to re-establish utilization of re-use to the fullest extent possible. (iv) construct a secondary access road to TMWRF within four years of this agreement to be owned operated and maintained by Reno and Sparks. The RTC may utilize the excavated material from the secondary access road if it is suitable for construction of the SouthEast Connector. The secondary access road will be an improved surface to include a base material, but excludes paving. The road will be constructed at or above a minimum elevation of the 1997 flood event for which water surfaces are defined in a set of maps "Truckee River Flood Project Ground Surface and Water Surface Interlocal Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows Water Reclamation Facility 3

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 5 of 16 Elevation Maps" on file with the Truckee River Flood Management Authority. The road will meet minimum secondary access standards for a subdivision, will clear all lateral obstructions by at least eighteen feet, will support legal axle loads, will not exceed eight percent grade, and will link TMWRF and the existing dirt access road running south of Clean Water Way. All environmental work including permitting, mitigation and/or remediation, necessary for the access road will be completed and secured by the Regional Transportation Commission. The R TC will secure the easements necessary to complete construction of this road. RTC will work with Reno and Sparks to determine the best alignment. A depiction of the secondary access road concept is attached as Exhibit "E". (v) RTC shall be obligated to include Southeast Connector Phase I improvements including roadway, shared use path, and bridge structure into their preventative, corrective, and rehabilitation maintenance program of projects. 3. By entering into this Agreement, the RTC shall be deemed to have fully compensated Reno and Sparks, and Reno and Sparks shall have no further claim for any of the following costs and damages: (a) For the use of the property depicted in Exhibits "B" and "E," and any related lost income claims, or claims for severance or relocation damages. (b) Notwithstanding the foregoing, costs and damages do not include: (i) RTC's acquisition of any additional real property not depicted on Exhibits "B" or "E;" (ii) environmental mitigation measures imposed by federal, state or local agencies designed to reduce the adverse environmental effects of the SouthEast Connector Phase I project or the access road. 4. All notices required by this Agreement must be given to each of the parties in care of the following people and at the following addresses, by email or U.S. Mail: RTC: Reno: Jeffrey D. Hale, P.E., Engineering Director Regional Transportation Commission 1105 Terminal Way, Suite 108 Reno, NV 89502 Email: jhale@rtcwashoe.com Tel: 775/348-0171 John Flansberg Public Works Department P.O. Box 1900 Reno, NV 89505 Email: flansbergj @reno.gov Tel: 775/657-4570 Interlocal Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows Water Reclamation Facility 4

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 6 of 16 Sparks: Neil Krutz Deputy City Manager for Community Services 431 Prater Way, Sparks, NV 89431 Email: nkrutz@cityofsparks.us Tel: 775/353-2340 7. Subject to the limitations of NRS Chapter 41, each of the RTC and Reno and Sparks agree to indemnify, defend and hold harmless the other froin and against 'YIY liability, including, but not limited to, property damage and personal injury or death,/proximately caused by the negligent acts or omissions of its officers, employees, contractors and agents arising out of the performance of this Agreement, including the design and construction of the SouthEast Connector. In no event shall Reno, Sparks or the RTC be obligated to indemnify the other party for the negligence of the other party's officers, employees, contractors or agents. 8. Reno and Sparks will work cooperatively with RTC to assist in coordinating the expeditious processing and consideration of all necessary permits, entitlements and approvals, if any are required by Reno and Sparks. RTC acknowledges that the execution of this Agreement by Reno or Sparks do not limit in any manner the discretion of Reno and Sparks in their approval process, and do not relieve the RTC from the obligation to obtain all necessary permits, entitlements and approvals for the construction of the Sou~ast Connector project. 9. This Agreement shall be governed by the laws of the State of Nevada. The legality or invalidity of any provision or portion of this Agreement shall not affect the validity of the remainder of the Agreement and that remainder shall be deemed in full force and effect. -THE REMAINDER OF THIS PAGE IS LEFT INTENTIONALLY BLANK- Interlocal Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows Water Reclamation Facility 5

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 7 of 16 10. This Agreement constitutes the entire contract between the parties with respect to the subject matter of this Agreement and it shall not be modified unless the modification is in writing and signed by all of the parties. 11. This Agreement shall not be construed to provide any person or entity who or which is not a party to this Agreement with any benefits or causes of action or obligate the parties to this Agreement to that entity or person who is not a party to this Agreement. Dated:-------- By: OC2~~ APPRO~~M: CITY ATTORNEY'S OFFICE Dated: CITY OF SPARKS, NEVADA ATTEST: ~, By: :_A~R./Yh.J:--'----=-- 0. CityoFd _ Geno Martini, Mayor ~~PfJlJf-IG 1 0 AP~ ~~,~-~:..._\_o ~~ SPARKS CITY CLERK CITY ATTORNEY'S OFFICE Interlocal Agreement Permitting Construction of SouthEast Connector on the Truckee Meadows Water Reclamation Facility 6

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 8 of 16 EXHIBIT "A" Reno-Sparks Jointly Owned Property APN 021-020-02 Site Address: 8500 Clean Water Way, Sparks, NV Total Property Area= 247.42 Acres

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 9 of 16 stantec Consulting Inc. 6980 Sierra Center Parkway Suite 100 Reno NV 89511 Tel: (175) om Fax: (ns) ~787 stante::.com EXHIBIT "B" Stantec October 23, 2012 Project No. 180101205 Legal Description REGIONAL TRANSPORTATION COMMISSION RIGHT OF WAY WIDENING OWNER: CITY OF RENO AND CITY OF SPARKS APN: 021 020 02 Being a portion of Parcel II as described in Document No. 389008 recorded July 16, 1963, Official records of Washoe County, Nevada, situate in a portion of the north one-half (N 1/2) of Section 14 and the south one-half (S 1/2) of Section 11, T19N, R20E, Mount Diablo Meridian, Washoe county, Nevada, more particularly described as follows: BEGINNING at the southeast comer ofparcel1 as shown on Record of Survey No. 4045 recorded March 6, 2002, Official Records of Washoe County, Nevada coincident with a point on the north right-ofway of Clean Water Way and a point on the west line of the aforementioned Parcel II; Thence departing said right-of-way and along the west property line of said Parcel II, North 00 32'45''East, 643.36 feet; Thence departing said west property line the following eight (8) courses; 1. North 26 37' 40" East, 364.59 feet to the beginning of a non-tangent curve, a tangent line to said beginning bears North 29 21'36" East; 2. 307.60 feet along the arc of a 1815.00 foot radius curve to the left through a central angle of 09 42'37"; 3. North 70 21'02" West, 15.00 feet along a radial line to the beginning of a curve; 4. 377.41 feet along the arc of a 1800.00 foot radius curve to the left through a central angle of 12000' 47"; 5. South 82 21 '49" East, along a radial line, 117.50 feet to the beginning of a non-tangent curve, a tangent line to said beginning bears North 07 38'11" East;

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 10 of 16 6. 541.41 feet along the arc of a 1917.50 foot radius curve to the left through a central angle of 16 10'39" to the beginning of a compound curve; 7. 213.45 feet along the arc of a 1419.50 foot radius curve to the left through a central angle of 08 36'56" to the beginning of a non-tangent curve, a tangent line to said beginning bears North 15 29'09" West; 8. 317.77 feet along the arc of a 2103.72 foot radius curve through a central angle of 08 39' 17" to the southerly line of the Truckee River as shown on Record of Survey No. 1167, recorded April 18, 1978 as File No. 526613, Official Records of Washoe County, Nevada; Thence easterly, along said southerly line the following eighteen (18) courses; 1. North 81 37'22" East, 21.72 feet; 2. North 75 11' 15" East, 105.61 feet; 3. North 81 28'09" East, 76.85 feet; 4. North 84 23'35" East, 115.65 feet; 5. South 87 07'36" East, 77.80 feet; 6. South 89 38'00" Bast, 78.10 feet; 7. South 83 00'53" Bast, 142.26 feet; 8. South 81 03'43" East, 86.25 feet; 9. South 75 13'32" Bast, 18.82 feet; 10. North 86 30' 15" East, 31.16 feet; 11. South 88 49'46" East, 83.22 feet; 12. South 87 39'43" East, 149.53 feet; 13. South 87 24'32" East, 90.69 feet; 14. South 89 03'46" Bast, 97.81 feet; 15. North 83 31' 16" Bast, 95.71 feet; 16. North 76 52'52" East, 86.35 feet; 17. North 66 36'44" East, 107.32 feet; 18. North 58 46'45" East, 68.04 feet; Thence departing said southerly line the following eight (8) courses; 1. South 23 05'27" West, 431.69 feet; 2. South 21 39' 18" West, 371.82 feet; 3. South 22 18'51" West, 316.54 feet; 4. South23 44'19"West, 195.82feet; 5. South 24 08'00" West, 198.51 feet; 6. South 24 46'55" West, 286.98 feet; 7. South 25 19'28" West, 270.66 feet; 8. South 30 15'56" West, 1063.73 feet to the south line of the aforementioned Parcel II; Thence along said south line North 88 49' 16" West, 473.59 feet to a point on the south right-of-way of Clean Water Way;

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 11 of 16 Thence departing said south right of way, North 00 32' 45" East. 50.00 feet to the POINT OF BEGINNING. Containing 58.46 acres of land, more or less. NOTE: A field survey was not performed to establish the mean high water mark of the Truckee River. Dimensions along the south line of said Truckee River were taken from said Record of Survey No. 1167. BASIS OF BEARINGS: NAD 83(94 HARN) Nevada State Plane Coordinate System, West Zone. V:\52804\active\18010120,_21Ela\report\Exhib~:sll.epJJ)escriiouMPN_021-020-02~0W.doc

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 12 of 16 CLEAN WATER ~ ~ co POINT OF BEGINNING FOUND 5/8" REBAR PLS 1797 CITY OF RENO AND CITY OF SPARKS APN 021-020-02 DEED DOCUMENT NO. 389008 D LEGEND 1 "=400' AREA: 58.46 ACRES± BASIS OF BEARINGS: NEVADA STATE PLANE COORDINATE SYSTEM, WEST. ZONE, MODIFIED, NAD 83 (94) HARN PROPERTY LINE ADJACENT PROPERTY SOUTHEAST CONNECTOR RIGHT OF WAY c I I I I Stantec Consulting 6980 Sierra Center Parkway, Suite 100 Reno NV U.S.A. 89511 Tel. 775.850.0777 Stanlec Fox. 775.850.0787 www.stantec.com PAGE 4 OF 5 ~of>~ Ciilni)PiiijiCt Figure No. RTC/SE CONNECTOR SEC.11&:14,T19N,R20E,MOM SPARKS, NEVADA 1.0 EXHIBIT MAP-CITY OF RENO AND SPARKS

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 13 of 16 LINE L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 LINE TABLE BEARING LENGTH N/A N/A N26"37'40"E 364.59 N70'21'02"W 15.00 S82'21' 49"E 117.50 S23"05'27"W 404.32 S21'39'18"W 371.82 S22.18'51 "W 316.54 S23"44'19"W 195.82 L21 S75i3'32"E 18.82 S24.08'00"W 198.51 L22 N86'30'15"E 31.16 S24'46'55"W 286.98 L23 S88"49'46"E 83.22 S25i9'28"W 270.66 L24 S87"39' 43" 149.53 N81'37'22"E 21.72 L25 S87"24'32"E 90.69 N75i1'15"E 105.61 L26 S89"03'46"E 97.81 N81'28'09"E 76.85 L27 N83"31'16"E 95.71 N84.23'35"E 115.65 L28 N76"52'52"E 86.35 S87'07'36"E 77.80.L29 N66"36'44"E 107.32 S89'38'00"E 78.10 L30 N58"46' 45" 68.04 S83'00'53"E 142.26 S81'03' 43" 86.25 L32 N00"32' 45"E 50.00 L31 N88"49'16"W 473.59 CURVE C1 C2 C3 C4, C5 CURVE TABLE LENGTH RADIUS DELTA 377.41 1800.00 12"00'47" 541.41 1917.50 16'10'39" 213.45 1419.50 8"36'55" 317.77 2103.72 8'39'17" 307.60 1815.00 9.42'37" TANGENT N07"38'11"E N15'29'39"W N29'21'36"E c I I I I Stantec Consulting 6980 Sierra Center Parkway, Suite 100 Reno NV U.SA 89511 Tel. 775.850.0777 Fox. 775.850.0787 www.stantec.com PAGE 5 OF 5 1~io~M CiiOiit/PI'DJIO Flgln No. RTC/SE CONNECTOR SEC.11 &14,T19N,R20E,t.tot.4 SPARKS, NEVADA 1,0 EXHIBIT MAP-CITY OF RENO AND SPARKS

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 14 of 16 EXHIBIT "C"

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 15 of 16

Case 3:13-cv-00403-MMD-WGC Document 48-7 Filed 09/05/13 Page 16 of 16 EXHIBIT "E" CONCEPTUAL SECONDARY ACCESS ROAD ALIGNMENT l l