Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

Similar documents
Proposed Residential Development at 1-5 Kai Hing Road, Kai Tak South

Improvement to Hoi Bun Road Park and Adjacent Area

Task Force on Kai Tak Harbourfront Development

Task Force on Kai Tak Harbourfront Development

Contribution of Manufacturing to GDP and Stock of Industrial Premises

APPROVED URBAN RENEWAL AUTHORITY PRINCE EDWARD ROAD WEST / YUEN NGAI STREET DEVELOPMENT SCHEME PLAN NO. S/K3/URA2/2

There is no Communal Open Space (COS) requirement for condominium developments.

Director, Community Planning, Toronto and East York District

Task Force on Harbourfront Developments on Hong Kong Island. Study on Pedestrian Connectivity between Wan Chai and Sheung Wan

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Commercial Properties Committee. Shopping Centres Scheduled for Completion in 2000/2001

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

New Business Districts Why Success or Failure

Multi-unit residential uses code

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Task Force on Harbourfront Developments on Hong Kong Island. Western Wholesale Food Market

RT-5 and RT-5N Districts Schedule

4027 and 4031 Ellesmere Road Zoning Amendment and Draft Plan of Subdivision Applications - Request for Direction Report

RM-7, RM-7N and RM-7AN Districts Schedules

Foreseeable Problems of Redevelopment of. Public Housing Estates a case study of Tsui. Ping (North) Estate

FM-1 District Schedule

1 Commercial developments in Singapore can broadly be categorised as:

RT-3 District Schedule

Property Development 26 SUN HUNG KAI PROPERTIES LIMITED. Manhattan Hill, West Kowloon

RM-1 and RM-1N Districts Schedule

FM-1 District Schedule

STAFF REPORT. September 25, City Council. Chief Planner and Executive Director, City Planning Division

Amendments to the Approved South West Kowloon Outline Zoning Plan No. S/K20/24

density framework ILLUSTRATION 3: DENSITY (4:1 FSR) EXPRESSED THROUGH BUILT FORM Example 1

Ku-ring-gai Local Environmental Plan No 194

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

Minutes of Meeting. Architects

CASTLES OF CALEDON URBAN DESIGN REPORT

Causeway Bay ( Sec. ) A of Marine Lot No. 269; RP of Sec. A of Marine Lot No. 269; and RP of Sec. E of Marine Lot No. 201

Redevelopment. The vertical green wall featured in URA redevelopment project One Wanchai Redevelopment Eng (5)a.indd 22

CD-1 (264) 101 Terminal Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

PROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E

FOR VIBRANT LIFESTYLES THE REACH, YUEN LONG, HONG KONG

RT-11 and RT-11N Districts Schedules

Unopened Space: Mapping Equitable Availability of Open Space in Hong Kong Press Conference Report by Carine Lai

RM-11 and RM-11N Districts Schedule

66 Isabella Street Rezoning Application - Preliminary Report

RM-8 and RM-8N Districts Schedule

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Current Density Guidelines for Public Housing Development

RM 4 and RM 4N Districts Schedule

Progress Update on Shatin to Central Link (SCL) 2 May 2013

111 Wenderly Drive Official Plan and Zoning By-law Amendment Applications - Preliminary Report

H4. Residential Mixed Housing Suburban Zone

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District

International Village By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

PLANNING RATIONALE REPORT

RM-3 District Schedule

Yonge Street and 3 Gerrard Street East - Zoning Amendment Application - Preliminary Report

HEC Sub-committee on Harbour Plan Review. Thirteenth Meeting

STAR STREET NEIGHBORHOOD A slice of Hong Kong

Weston Road (Phase 2) - Official Plan and Zoning By-law Amendment and Lifting of the (H) Holding Symbol Applications - Preliminary Report

RT-6 District Schedule

32.08 GENERAL RESIDENTIAL ZONE. Shown on the planning scheme map as GRZ, R1Z, R2Z or R3Z with a number (if shown). Purpose

5. Housing. Other Relevant Policies & Bylaws. Several City-wide policies guide our priorities for housing diversity at the neighbourhood level: Goals

Advisory Design Panel Report For the Meeting of February 27, 2019

CD-1 (247) Riverside East By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

Part 9 Specific Land Uses - Multi Dwelling Housing

20 Edward Street Zoning Amendment Application - Preliminary Report

Chair and Members of Committee of Adjustment Toronto and East York Panel. A0596/16TEY Yonge St New 5 Storey Non-residential Building

Planning Justification Report

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

5.0 Development Strategy 32

The Horizon, 54 New Coventry Road, Sheldon, Birmingham, B26 3BB

150 Eglinton Avenue East - Zoning Amendment Application - Preliminary Report

Centre and the Hong Kong Sectio

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

H6 Residential Terrace Housing and Apartment Buildings Zone

Director, Community Planning, Scarborough District ESC 44 OZ & ESC 44 SB

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

1202 & 1204 Avenue Road Zoning By-law Amendment Application - Preliminary Report

A MAJOR PROPERTIES UNDER DEVELOPMENT

900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2

8.5.1 R1, Single Detached Residential District

BUILDING FOR THE BETTER CHINA. Hong Kong

MTR Transformation of CBDs in Hong Kong

Business in Hong Kong Property Development

Redeveloping/Upgrading old and dilapidate districts as a form of improving the urban quality of Hong Kong

Kassner Goodspeed Architects Ltd.

Planning Justification Report

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

City of Vancouver Zoning and Development By-law Planning, Urban Design and Sustainability Department

Les Saisons Sai Wan Ho Building Journal, June 2002

RT-2 District Schedule

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

RESIDENTIAL AND COMMERCIAL LAND VALUES

Natural Light & Ventilation. Sources. Regulation 45 (1) & 45 (2) A Public road with right of way. A Courtyard or Open Space within the site.

6. RESIDENTIAL ZONE REGULATIONS

770 BROOKFIELD ROAD Site Plan Control Atlantis Investments November 2017

17-23 Clairtrell Road and 391 Spring Garden Avenue - OPA & Rezoning, Site Plan - Preliminary Report

355 King St W and 119 Blue Jays Way - OPA & Rezoning Applications - Preliminary Report

STAFF REPORT PLN September 11, 2017

SUN HUNG KAI PROPERTIES LIMITED ANNUAL REPORT 2001/02

Proposed District Council Constituency Areas

Acting Director, Community Planning, Toronto and East York District

39 Thora Avenue Zoning Amendment Application Preliminary Report

Transcription:

For discussion on 23 November 2010 TFKT/04/2010 Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site) PURPOSE This paper is intended to (i) report the status of the statutorily approved redevelopment scheme of Nos. 1-5 Kai Hing Road (Kowloon Godown) for residential purpose at the Kowloon Bay waterfront and (ii) introduce to Members of the Task Force on Kai Tak Harbourfront Development further refinements of the redevelopment scheme. BACKGROUND Location (Plan 1) 2. The subject site, New Kowloon Inland Lot (NKIL) Nos. 5805, 5806 and 5982, is located at Nos. 1-5 Kai Hing Road, Kai Tak South and abuts Kowloon Bay waterfront to its southeast. It has a total site area of about 1.54ha. Land use zoning 3. The subject site is zoned as Commercial (2) ( C(2) ) on the Approved Kai Tak Outline Zoning Plan (OZP) (Plan No. S/K22/2) gazetted on 9.11.2007 with the following stipulations on the Notes attached to the OZP: Flat and House are Column 2 uses that may be permitted with or without conditions on application to the Town Planning Board. Maximum Plot Ratio for Non-domestic building: 9.5, or the plot ratio of the existing building, whichever is the greater. Maximum Plot Ratio for a domestic building or a building that is partly domestic and partly non-domestic on the site: 5.

Maximum Site Coverage (excluding basement): 65% or the site coverage of the existing building, whichever is the greater. Maximum Building Height: 100mPD, or the height of the existing building, whichever is the greater. A 20m wide promenade to be provided for public enjoyment. Land Status 4. The subject site is under single ownership. According to the land leases, NKIL No. 5805 and 5806 are permitted for godown uses and NKIL No. 5982, is permitted for industrial or godown uses or cargo handling use or concrete batching use. It also has a right of access to the sea from the lot s south-eastern boundary. Existing Land Uses 5. A major part of the subject site (NKIL Nos. 5805 & 5806) is currently occupied by Kowloon Godown Building. The rest of the subject site (NKIL Nos. 5982) is currently used as open storage/container yard. Adjacent Land Uses 6. The subject site is located in a mixed commercial / industrial / Government uses neighbourhood which is undergoing rapid transformation. 7. The subject site directly abuts onto the harbourfront in the south-east. Immediately adjoining the subject site in the south-west is a 6-storey dangerous goods godown, known as Kerry D.G. Warehouse. Kerry has the intention to redevelop the site into commercial / residential uses. Further away are Government uses including the Immigration Services Training Centre and the Public Works Central Laboratory Building, etc. 8. To the northwest of the subject site, right across Kai Hing Road is an industrial building, Pacific Trade Centre, which is mainly used for ancillary office purposes with some premises being approved by the Town Planning Board for office use.

9. At the junction of Kai Hing Road and Lam Chak Street, immediately opposite to the subject site is a newly erected office building by Nan Fung with a building height of 136.45mPD equivalent to 30 storeys including 2 basements. 10. The industrial lots in the Kowloon Bay Industrial Area and the Kwun Tong Industrial Area are zoned as OU (Business) on the Kai Tak OZP to phase out industrial uses to meet the demands from economic restructuring and improvement to the environment. A number of industrial buildings have been redeveloped into office, hotel and commercial uses. Accessibility 11. The subject site abuts on Kai Hing Road, which is accessible from Hoi Bun Road. It is of 15-20 minutes walking distance from the Kowloon Bay MTR Station and from Ngau Tau Kok MTR Station. As shown on the Kai Tak OZP, a 20m wide promenade is required to be provided along the seaward boundary of the subject site linking the proposed Open Space zone along the waterfront to Hoi Bun Road for public enjoyment. Town Planning Board s Approval 12. At the meeting of HEC Sub-committee of Harbour Plan Review on 22.7.2009, the project proponent presented a development scheme with residential blocks having a building height of 100mPD to the members. The Sub-committee had no strong objection to the proposed residential use at the Commercial zone. It was noted that the overall building bulk of the proposed residential development (plot ratio 5) was better than a commercial development with a plot ratio of 9.5. Members also suggested that variations in building height of the residential towers should be considered to create a more interesting height profile. 13. In response to comments of the Sub-committee, the project proponent revised the scheme and submitted to the Town Planning Board (TPB) on 4.9.2009 a development scheme with a stepped height profile with building heights of 90.925mPD, 100mPD and 109.075mPD for the residential blocks, ascending towards Victoria Harbour to correspond to the existing height profile at the back. Some members of the community had reservation on the proposed relaxation of height restriction and the

reverse stepped height profile with residential blocks descending towards inland. Besides, Urban Design and Landscaping Unit considered the height variation of about 10m between the residential blocks ineffective. 14. In response to their comments, the project proponent submitted a further revised development scheme to the TPB on 18.1.2010. A stepped height profile with building heights descending towards Victoria Harbour was proposed and the three groups of residential towers, having building heights of 93.8mPD, 107.45mPD and 120mPD, provided a more effective height variation. However, there are some local objections on the proposed relaxation of height restriction. 15. After reviewing the building height profile in Kai Tak and adjoining areas, Planning Department considered that it would be appropriate to maintain the building height of this site as 100mPD because the stepped height building profile would be considered in the wider area of Kai Tak, Kowloon Bay and Kwun Tong where building height bands ranging from 100mPD, 120mPD and 140mPD have been incorporated in the respective OZPs. 16. Therefore, the development scheme was further revised with all building blocks having the height of 100mPD which respects the maximum building height requirement in Kai Tak as stipulated on the OZP, and the application was approved by the TPB on 10 September 2010. The approved scheme is shown in Annex 1. 17. After obtaining the planning approval, the project proponent continues to endeavor to improve the approved scheme. Comments from the Task Force on Kai Tak Harbourfront Development will be sought for further refinement. PROPOSED DEVELOPMENT Use 18. As approved by the TPB, the development proposal is mainly for residential use with some commercial elements. In accordance with the requirements on the Outline Zoning Plan, a 20m-wide promenade along the seaward boundary of the subject site will be surrendered to the Government for public use. The proposed revised redevelopment

scheme will consist of residential uses with about 600 sq.m of commercial area abutting the promenade, together with a flight of landing steps to facilitate the public to enjoy the harbour. Plot Ratio and Building Height 19. Same as the approved scheme, the proposed development will have a total plot ratio of 5 (Domestic PR: 4.96, Non-domestic PR: 0.04) equivalent to a total GFA of 77,020 sq.m and has a maximum building height of 100mPD. REFERENCE TO HARBOUR PLANNING PRINCIPLES AND GUIDELINES Adopting a lower development intensity 20. The proposed development has a plot ratio of 5 only as compared to the usually permitted plot ratio of 9.5 for a commercial development under the C(2) zone of the Kai Tak OZP. The lower development intensity is more compatible with the scale, massing and character at this prominent location along the waterfront. Enhancing urban design and landscape 21. The proposed development complies with the building height restriction of 100mPD which allows a stepped height building design to be formed in this part of Kowloon Bay. The residential development has a much lower plot ratio as compared to a normal commercial development permitted as of right on the OZP. It provides opportunities for better urban design in providing more visual and air ventilation permeability. It will also provide better landscape with different landscape elements at grade and on different levels to enhance the amenity of the area and the environmental quality of the area. 22. Rather than following a grid-like pattern, the building blocks were arranged in different angles to achieve a more interesting development layout. 23. A green coverage of not less than 25% at different levels (including 8% at covered greening areas at ground level and upper level

and refuge/sky garden) will be provided to enhance landscape amenity. 24. Opportunities will also be taken to increasing the greening provision at the public waterfront promenade. Details of the design and planting provisions will be discussed with Leisure and Cultural Services Department (LCSD). Enhancing visual permeability 25. The proposed residential development will provide visual corridor from various vantage points along the waterfront in Kai Tak and Kowloon Bay, as well as from Quarry Bay across the harbour. 26. Various visual corridors are provided to allow visual permeability from different angles. One visual corridor is oriented perpendicular to Kai Hing Road to improve visual access from the hinterland to the Harbour. Others allow visual permeability from Kai Hing Road to the new Kwun Tong Harbourfront Promenade. Enhancing air ventilation 27. The visual corridors also serve well as air ventilation corridors, allowing the prevailing south / south-east wind from the sea to blow towards inland. In addition, a sky garden and void area are also provided to further enhance air ventilation above the nearby low rise podium in the area. 28. The residential development proposal will exhibit a number of environmental design features which will benefit the local area from air ventilation perspective. Ground level setbacks and wind corridors will be provided to improve air ventilation to the inner areas through Lam Chak Street and Kai Hing Road. Enhancing accessibility to the harbourfront 29. In accordance with the stipulations on the OZP, a 20m-wide promenade abutting the waterfront shall be provided for public enjoyment purpose upon redevelopment of the subject site. This promenade will serve as an important linkage to other parts of proposed promenade along Kowloon Bay. It also serves as an important access from Hoi Bun Road, which links the older Kwun Tong commercial/

industrial area and Ngau Tau Kok areas, to the harbourfront. Access to the harbourfront can easily be made from Hoi Bun Road, and from the other side of the promenade where open space will be provided by the Government. Ensuring integrated planning for a vibrant harbour 30. The project proponent will provide residential as well as reasonable scale of commercial uses within the site. A 20m-wide promenade along the harbourfront will be provided for public use. 600 sq.m of commercial area is located near the Hoi Bun Road abutting the promenade. They will provide food and beverage and retail outlets related to marine uses. A flight of landing steps will be provided and open for use by the public. This integrated planning will optimize both the uses on land and in the harbour. 31. With the provision of the 20m wide promenade, there may be opportunities to provide venue for cultural/social events and leisure/entertainment activities, subject to the agreement of LCSD. 32. With the provision of the landing steps near the commercial uses, the development will facilitate land/water enjoyment. The landing steps will be managed by the commercial uses and will be open to public use during reasonable hours from 7am to 10pm. 33. Cycling, fishing, and pet walking may be allowed at the promenade if agreed by LCSD who will take over the promenade in the future. Enhancing connectivity of waterfront promenade 34. Currently, the waterfront in the subject site is not open or accessible to the public due to the existence of the godown building and open storage yard. The proposed residential development will give incentive for the project proponent to redevelop the site. Upon redevelopment, a 20m-wide strip of land has to be provided as public promenade. This section of promenade is vital as it will act as a public passageway linking the two adjacent open spaces to allow a continuation of the waterfront promenade to Kwun Tong and Kai Tak.

Facilitating public enjoyment of the harbour 35. We will facilitate public enjoyment of the harbourfront at all times. The project proponent will provide the harbourfront promenade, with the design to be agreed by LCSD. 36. The promenade is open for public use at all times, possible nuisance caused by the public will be mitigated by the boundary wall and landscaping. The promenade will be constructed together with the proposed development and is expected to complete by 2015. It is the intention of the project proponent to hand it over to the Government as soon as practicable and upon Government s request. The management and maintenance costs of promenade would be born by the project proponent before handover to the Government. Complying with traffic and environmental requirements 37. The proposed development will comply with the traffic as well as environmental requirements of the respective government departments. 38. With regard to the interface with the Kerry dangerous goods godown, our proposed development will have a 9m separation from the adjoining lot boundary, and is 15m away from the Kerry Godown building. The Risk Assessment carried out by AECOM demonstrates that the potential risk is acceptable. In fact, Kerry is also planning to redevelop the godown into residential use. 39. As the landing steps does not have an over-hanging structure, it will not affect future implementation of possible environmentally friendly transport system along the proposed waterfront promenade as delineated on the Kai Tak OZP. 40. Since the subject site is located near Kwun Tong By-pass, a number of traffic noise measures will be adopted including the self-protecting building form for the tower next to Kwun Tong By-pass, acoustics fins for the potentially noise-sensitive flats, and use of 6mm thick glass for the windows. 41. The future environmentally friendly transport system will take into consideration the approved residential development and provide

noise mitigation measures as appropriate. WAY FORWARD 42. The project proponent will submit an s16a application to the TPB for minor change of built form in due course. Hong Tai Yuen Limited November 2010