A mix of uses. Housing:

Similar documents
Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Jasper 115 Street DC2 Urban Design Brief

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

5.0 Development Strategy 32

SHAPING WOOD WHARF CANARY WHARF S NEW PHASE

5.1 Site Planning & Building Form

PLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District

Marshall s Mill Holbeck

66 Isabella Street Rezoning Application - Preliminary Report

3.1 Existing Built Form

Director, Community Planning, Toronto and East York District

50+54 BELL STREET NORTH

Appendix C Built Form Guidelines

OVERVIEW PROJECT SUMMARY. A two storey detached townhouse which is modern and affordable.

Ku-ring-gai Local Environmental Plan No 194

32.07 RESIDENTIAL GROWTH ZONE. Shown on the planning scheme map as RGZ with a number (if shown). Purpose

Division 6 Residential Medium Density Zone: Assessment Criteria and Assessment Tables

32.08 GENERAL RESIDENTIAL ZONE. Shown on the planning scheme map as GRZ, R1Z, R2Z or R3Z with a number (if shown). Purpose

PLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013

18. Appendix H Urban Design Panel Presentation

Vauxhall Sky Gardens Wandsworth Road London SW8

LeBreton Flats Redevelopment Development Summary Chart (First Subdivision)

1 Valhalla Inn Road - Zoning Amendment - Preliminary Report

32.07 RESIDENTIAL GROWTH ZONE

Plan Dutch Village Road

Peter Street and 357 Richmond Street West - Zoning Amendment Application - Preliminary Report

50 and 52 Finch Avenue East - Official Plan and Zoning By-law Amendment Applications - Preliminary Report

Urban Design Brief (Richmond) Corp. 1631, 1635, 1639, 1643 and 1649 Richmond Street City of London

February 1, City of Verona Planning & Development 111 Lincoln Street Verona, WI 53593

8.5.1 R1, Single Detached Residential District

Supporting Information

Simon Court 2-4 Neeld Crescent London NW4 3RR

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

Division 8 General Urban (T4) Zone: Assessment Criteria and Assessment Tables

RM-3 District Schedule

9.3.5 Dual occupancy code

3636 Bathurst Street Zoning By-law Amendment Application - Preliminary Report

SPECIALIZED RESIDENTIAL APARTMENT (R.4) ZONES

MOTEL STRIP LOCATION 1. VIEW CORRIDORS/RESIDENTIAL STREETS URBAN DESIGN GUIDELINES

STAFF REPORT. September 25, City Council. Chief Planner and Executive Director, City Planning Division

200 St. Clair Ave W - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

412 Church Street Zoning Amendment Application - Request for Direction Report

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. S/1744/05/F Thriplow House and Garage on land Adjacent 22 Middle Street for S Hurst

ERECTION OF 42 NO. HOUSING UNITS (OUTLINE) AT Reserve Sites A And D, Hindhead Knoll, Walnut Tree FOR English Partnerships

108 Holders Hill Road London NW4 1LJ

Kidbrooke Village, Greenwich

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury)

Director, Community Planning, Etobicoke York District

230 Oak Street- Official Plan Amendment and Zoning Bylaw Amendment Applications - Preliminary Report

Design and Access Statement Volume III Part 4 of 9 Plot A1. May 2018 Allies and Morrison

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

6.0 DEVELOPMENT OPPORTUNITIES

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

Response to Urban Design Panel Comments

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

1955 to 1985 Yonge Street, 3 Belsize Drive and 18 to 22 Millwood Road OPA, Rezoning and Rental Demolition Applications Final Report

250 Davenport Road - Zoning Amendment Application and Rental Housing Demolition & Conversion - Preliminary Report

774 BRONSON AVENUE MINOR ZONING BY-LAW AMENDMENT + SITE PLAN CONTROL PLANNING RATIONALE + DESIGN BRIEF

The London TO LET. Former White Hart. Restaurant / Bar / Pub with A3, A4, A5 Consent (214m² / 2,311ft²) 42 Eastover, Bridgwater, Somerset, TA6 5AR

Goal 1 - Retain and enhance Cherry Creek North s unique physical character.

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

Urban Design Brief 6233, 6237, 6241 and 6245 Main Street, Stouffville Pace Savings and Credit Union June 15, 2012

4.5 Residential mix. MARLOWE ROAD DESIGN AND ACCESS STATEMENT May 2015

1 AYLESBURY ESTATE Development Specification (Consolidated) November 2015

4650 Eglinton Avenue West - Zoning By-law Amendment Application - Preliminary Report

Computer Generated Image of the consented scheme

836 St Clair Ave W - Zoning Amendment Application - Preliminary Report

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

Division 5 Residential Low Density Zone: Assessment Criteria and Assessment Tables

770 BROOKFIELD ROAD Site Plan Control Atlantis Investments November 2017

Policy and Standards for Public Local Residential Streets And Private Streets

Montreal Road District Secondary Plan [Amendment #127, October 9, 2013]

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report

RM-5, RM-5A, RM-5B, RM-5C and RM-5D Districts Schedule

Masshouse Plot 3, Land at Masshouse Lane/Park Street, Masshouse Plaza, City Centre, Birmingham, B5

BYLAW NUMBER 20P2017

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

Section 2.1 Land use and Density

Kassner Goodspeed Architects Ltd.

Report of: DEVELOPMENT MANAGEMENT SECTION HEAD. 19 Cassiobury Park Avenue PARK

CITY OF SUBIACO 1.SEP PUCE MATCH 1 SEP 2017

Live. Work. Play. The Bay La Sun way.

Re: Item No THE WILLOW TREE TOWER Landmark Building. Landmark Site.

Director, Community Planning, North York District NNY 23 OZ and NNY 23 RH

Rawlinson House, Lewisham, London SE13 5EL

1 Cumbrian Gardens London NW2 1EB

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December

16 Sevington Road London NW4 3SB

Sheppard Ave East and 6, 8 and 10 Greenbriar Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

HOUSING ISSUES REPORT

REPORT TO THE BOARD OF GOVERNORS

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

8.14 Single Detached with Granny Flat or Coach House Edgemere

Alver Village. 1, 2, 3 & 4 bedroom homes Homes you ll love, in a carefully chosen location.

Transcription:

7 Massing and uses Page 79

7:1. A mix of uses % Total Habitable Occ/ People Rooms HR Studio 6.8% 308 1 0.90 277 1 bed 32.0% 1442 2 0.90 2,595 2 bed 37.6% 1691 3 0.90 4,567 3 bed 21.2% 955 4 0.90 3,438 4 bed hs. 2.3% 104 5 0.90 468 100% 4,500 11,345 The preceding sections have concentrated on the public realm of the scheme. This comes first because the process of urban design, unlike architecture is about the creation of public spaces. In the public realm section the built form and use of the scheme with respect to enclosure ratios and the animation of spaces are discussed. This section concentrates on the buildings. The overall land use and massing strategies are identified before looking at each of the character areas in detail. The land use strategy is set out on the plan to the right. This is based on the following uses: neighbourhood and partly about maximising development potential near to public transport. Densities of just over 200 units/ha implies a significant proportion of flats although the scheme includes town houses along the northern boundary of the site. Beyond that the housing is based on apartments. This however includes a broad range of apartments sizes and types including affordable housing. Housing: The predominant land use on the site will be housing. This accords with the London Plan as well as with market advice. The site is seen as a good place to live with easy access to Heathrow and Central London. The illustrative scheme includes up to 4,500 residential units. This represents a residential density of 150 units/ha across the site as a whole although, of course the net densities vary significantly. The way in which this density has been determined is described in Section 4.2 and is partly about the creation of a lively urban Page 80

Land use plan Page 81

Illustrative Land use table - based on the illustrative masterplan BLOCK NO. PLOT AREA No. FLOORS Net Floor Area Residential Commercial Retail Leisure Transport Community Housing units 1 3,008 9-16 30,606 30,606 479 5 2,055 8 9,600 9,600 6 4,032 6 12,331 12,331 193 7 3,396 5-9 11,578 11,578 181 8 2,856 4-7 8,102 8,102 127 10 3,919 6 5,736 5,736 90 11 2,135 7 6,348 6,348 99 12 3,886 4-9 14,214 14,214 222 13 5,803 6 7,618 7,618 119 14 8,548 6 41,030 41,030 15 2,957 4-6 7,736 7,736 121 16 1,834 9 10,040 10,040 157 17 700 10 5,600 5,600 88 18 887 11 7,806 7,806 19 2,167 12 15,107 15,107 20 2,325 7-9 13,036 11,853 1,183 185 21 1,604 7 9,817 8,414 1,402 22 1,781 7 4,889 4,889 23 3,900 7 13,105 11,875 1,230 186 24 1,248 7 6,989 5,990 998 25 2,742 7 10,748 9,586 1,162 150 26 1,449 7 8,114 6,955 1,159 27 841 7-9 5,229 4,556 673 71 28 4,164 6 11,033 7,702 3,331 120 29 4,371 6-9 19,198 3,264 3,497 12,437 51 30 680 14 7,616 7,616 119 31 549 10 4,841 4,392 449 69 32 1,005 6 3,494 2,912 582 46 33 2,472 7 9,378 8,038 1,340 126 34 2,780 8 9,789 9,789 153 35 1,915 6 7,480 7,480 117 36 680 6 3,265 3,265 51 37 145 2 232 232 38 1,537 4 4,534 4,534 71 39 5,142 5 10,727 10,727 168 40 3,259 6 14,629 13,243 867 518 207 41 1,278 6 5,231 5,231 82 42 1,873 5 5,403 5,403 85 43 2,640 4 5,483 5,483 86 44 4,629 1-5 7,411 3,600 3,811 56 45 597 3 1,432 1,432 22 46 1,776 3 2,213 2,213 27 47 1,798 3 2,530 2,530 29 48 2,248 3 2,779 2,779 33 49 1,753 3 1,346 1,346 15 50 4,137 4 6,157 6,157 96 51 3,275 5 2,748 2,748 43 52 2,686 4 2,253 2,253 35 53 983 4 3,146 3,146 49 54 993 2 1,589 0 1,589 56 431 14 4,827 4,827 76 TOTALS 123,868 426,142 289,889 47,770 12,006 12,722 58,356 5,400 4,500 Community Uses: The illustrative masterplan includes a range of community uses to serve the needs of the new and existing communities. These include a new two-form entry primary school with a nursery to be created to the west of the park (Block 44). The buildings include 1,970m 2 of space in line with DfES guidance (see Section 9.6) along with a 551m 2 nursery school. The proposed design of the school has drawn on the work that is currently being undertaken in London to create urban schools. One of the first of these to be completed is Hampton Guerney school in Westminster (pictured above). This is much more densely built than the school proposed as part of the masterplan. As explained in Section 9.6 it is based on schools currently being developed in Lambeth. To the west of the school within the same block is a proposed new health centre as requested by the Primary Care Trust. This is proposed to be a 1,290m 2 facility that serves the existing as much as the new community. It is proposed to incorporate a six GP Practice together with a range of clinic facilities. Block 54 is proposed as a new community facility. It is proposed to Page 82 be a two storey building (of around 1,600m 2 ) with a range of facilities for both the new and existing community. It is likely to have a particular focus on youth facilities and would be linked to the sports pitches running along the Straight. Retailing: There is up to 15,000m 2 of retailing proposed as part of the scheme. This is concentrated at the eastern end of the boulevard around Southall Rise and spreads westwards towards the Etoile. This retailing is designed to serve the needs of the residents of the scheme. This retailing will be complementary to the existing retailing in Southall. We envisage that proximity to the lively retail centre of Southall will be an important attraction to residents moving to the former Gas Works site. In this way the scheme will bring new customers for local retailers in Southall. It was also clear from our public consultations that people in Southall would welcome a greater range of western retailers in the area because they currently have to travel to Ealing or Uxbridge for durable goods. The retailing on the site therefore has the potential to complement the existing

provision in Southall. While the retailing on the former Gas Works site has been restricted to up to 15,000m 2 there is a need in urban design terms to maximise the amount of active frontage. The scheme therefore seeks to maximise active frontage by creating wide, shallow retail units. This would allow the retailing to stretch along most of the boulevard to create active ground floor uses. This is fed by a multi-storey car park at either end and would operate as a circuit with people walking up one side of the road and down the other. The retailing is proposed to be anchored by a small supermarket in Block 28. Workspace: The illustrative scheme maximises the amount of workspace that market advice suggests is viable on the site. This workspace is made up predominantly of B1 workspace in blocks to the south of the Boulevard with some B2. This amounts to around 60,000 m 2 and is likely to be developed in the later phases once schemes such as Stockley Park and Chiswick Park, which can offer higher parking standards, have been completed. There is also a potential to provide a managed workspace facility for media industries as suggested by The Southall Partnership. This could occupy the ground and first floors of blocks 29 or possibly 40. This facility would however be dependent on finance being raised and a developer/ operator being identified. Leisure uses: Leisure uses proposed include a hotel, health centre and bars and eating establishments. In the masterplan these are concentrated around the Etoile. This is to be a focus for eating and drinking with uses linking through to the canal waterfront. In total the scheme includes around 16,000m 2 of leisure uses of which 4,000m 2 would be bars and restaurants. It is anticipated that the Etoile area will serve the residents of the scheme as well as attracting people from surrounding areas. There will also be leisure uses at the eastern end of the boulevard as part of the retail area. The leisure uses include a proposed hotel in the south-western part of the site (Block 5). This would be up to 12,000m 2 facilities with around 390 rooms and is envisaged as a budget hotel that would serve the West London area and Heathrow in particular. It could be linked to the airport and to Hayes and Southall Stations by public transport. It could also relate to the airport parking (Block 5) with people dropping off their car being able to stay at the hotel before catching their flight or travelling home. Parking: All of the above uses include parking provision as described in Section 5.6. The only parking that is a use in its own right is the airport parking in Block 14. This is a relocation of the current parking operation on the site and is designed to accommodate up to 3,500 cars in a long-stay facility. This is accommodated in a multi-storey structure with 6-8 levels with the efficient use of space achieved through 'stacked' parking. Note. All figures given are gross external Page 83

7:2. Massing Ground levels The vertical dimension of the masterplan has been designed to exploit the potential of the site while avoiding adverse impacts on surrounding buildings. This informs the Building Heights Parameter Plan.The existence of the rigid gas holder in the centre of the site which at 90m is the equivalent of a 32 storey building creates the potential for buildings of some scale on the site. However the massing of the masterplan does not suggest a building of this height and has been guided by the following concerns: To match the low-rise residential environment to the north To achieve a high level of density in the scheme To concentrate density around nodes To create well-proportioned streets and public spaces To avoid excessive over shadowing of spaces and accommodation To create an exciting townscape with a series of dramatic vistas and landmarks. Ground levels: The ground level of the site is currently just over 31m AOD and it is largely flat. It then drops by a metre of so to the canal and the railway is raised on a low embankment of between 1 and 2m above site level. One of the constraints on heights has been the water table as described in Section 2.2. This is between 1.5 and 2m below ground level although there are variations based on underground obstructions. The significance of the water table is that basement car parking cannot cost-effectively be built below the water table. The top of any underground parking is therefore going to be around 32.5-33m AOD and therefore between 1.5m and 2m above current ground level. This potentially has a negative effect on the street scene and to overcome this it is proposed that the ground level in parts of the site is raised to be consistent with the top of the parking. These areas are shown on the plan to the left and involve much of the Waterside area, Etoile and the eastern gateway. To the north the situation is less important because the blocks are lower density and there is the potential to accommodate parking within courtyards rather than in the basement. The ground modelling is used to raise the northern boulevard at either end. This would be hardly noticeable on the ground but would create a subtle bowl effect, accentuating the perspective of the street. Building massing: With these points in mind the massing of the scheme has been designed as follows: The buildings on the northern edge of the site should be a maximum of 3 storeys high and the section through the northern part of the site has been designed so that the existing residential accommodation will not see the blocks further into the site. The northern-most blocks are therefore around 9m high to their eves on a ground level of 32m AOD. Within this area there is the potential for smaller buildings to rise above this. The heights of the central parts of the boulevard are around seven storeys. This is necessary to create an urban enclosure ratio appropriate for the width of the street. The blocks to the north of the boulevard include ground floor retailing (5m) with six floors of residential above (3m) giving an approximate height to eves of 23m plus plant and servicing. The indicative plan shows a small tower on the eastern tip of Block 27 to mark the centre of Southall Rise. The Parameter Plans allow for elements of this area to rise to 10 storeys provided that they are a small part of the overall area. Just as the ground levels rise at either end of the boulevard so do Page 84

Site Section building heights. This is to increase density at the main activity nodes and to create a more intensely urban environment. The Eastern Gateway is punctuated by three gateway towers. The indicative scheme shows Blocks 30 and 56 rising to 14 storeys and the eastern tip of Block 40 at 10 storeys. The Etoile has been conceived as a slightly lower set of towers in a star shape to create a dramatic space. Blocks 17 and 31 are 8 and 10 storeys in height, as is Block 20. Block 19 then rises slightly above this to 10-12 storeys. There is also the potential to allow the tip of Block 34 to rise to 8 storeys. The views in both directions along the boulevard are terminated by landmark towers (Blocks 31 and 56). These should be distinctive towers that create dramatic landmarks and enclose the space of the street. The Waterside residential area is envisaged as a high density urban quarter and the building heights reflect this. The buildings range between 6 and 8 storeys with the canalside height limited to 5 storeys to minimise overshadowing and to maximise the number of apartments with a view over the Yeading Brook Corridor. At the western gateway the heights of buildings then rise again to a series of towers as part of Block 1. The end block rises to 16 storeys or 50m giving a total height of 83.5m AOD. Page 85

7:3. Shadow study Shading analysis The massing model has been tested for shadowing as illustrated in the plans to the right. This has been used to assess the extent to which the built form overshadows other buildings and public realm areas. The plans show that there are no major overshadowing issues on the scheme. This is because the dimensions of the major streets and spaces are such that for most of the year the shadows of the buildings to the south do not reach the buildings to the north for the central part of the day. In particular the northern side of the boulevard is not overshadowed except in mid-winter making it ideal for shops and cafes. There is likely to be some overshading, something that is inevitable for a scheme of this density, but his can be addressed by breaking up the building form and using light reflecting materials. An exercise has been undertaken to identify double-loaded apartment blocks (see Section 9.7) that create single-aspect north-facing flats. The plan to the left shows that there are a small number of these but this is substantially fewer than on a number of other major schemes in London. The shadow study also shows that the scheme would not have a major impact on the canal towpath because of the way the blocks step down towards the water. For most of the year the canal would be overshadowed in the morning, move out of shadow by mid day and be in full sunlight through the afternoon. It is therefore not anticipated that the development will affect the canal due to shading. Page 86

March 7am 10am 12 noon 3pm 6pm June 7am 10am 12 noon 3pm 6pm September 7am 10am 12 noon 3pm 6pm December 7am 10am 12 noon 3pm 6pm Page 87

Page 88