Indicate if land-based activity is primary source of income for owner or land user % ,45 TL He lives in. village..

Similar documents
POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

TANAP PROJECT FURTHER ENTITLEMENTS ON LAND ACQUISITION AND TANAP RAP FUND FOR ADDITIONAL ECONOMIC SUPPORT INFORMATION BROCHURE

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

ABBREVIATED RESETTLEMENT ACTION PLAN CESE ELEKTRİK ÜRETİM AŞ

Final Addendum to RAP for TANAP Pipeline Route. Final Addendum to Resettlement Action Plan (RAP) for TANAP Pipeline Route.

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized

LAND ACQUISITION AND COMPENSATION

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

LAND ACQUISITION AND COMPENSATION

Resettlement Policy Framework

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

RENEWABLE ENERGY INTEGRATION PROJECT

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

TAP RESPONSE to CEE BANKWATCH NETWORK REPORT

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

DRAFT EXECUTIVE SUMMARY

PRE-APPLICATION FREQUENTLY ASKED QUESTIONS (FAQ) GENERAL PURCHASE OF DEVELOPMENT RIGHTS (PDR) FAQs

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

TUZ GÖLÜ UNDERGROUND NATURAL GAS STORAGE PROJECT. E Issued for approval E.D. / B.E E.D M.Ş. D Issued for approval E.D. / B.E E.D M.

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

REPUBLIC OF MACEDONIA

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

INNSBRUCK PROPERTY OWNERS ASSOCIATION, INC.

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

Resettlement Policy Framework for the Turkey Geothermal Development Project

Final Resettlement Action Plan (RAP) for Above Ground Installations (AGIs) Issued by

Astrophysical Research Consortium Rev. 11/06/2013 Property Management

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Resettlement Policy Framework for the Turkey Geothermal Development Project

New York Agricultural Land Trust

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

Summary: Resettlement Action Plan for the Thwake Multi- Purpose Dam-Kenya

NATIONAL LAND POLICY ON AGRICULTURE DEVELOPMENT

Dhaka Water Supply and Sanitation Project

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

APPLICATION FOR AGRICULTURAL USE ASSESSMENT

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014

Gearing up for change New IFRS on Leases

CONSERVATION EASEMENTS FREQUENTLY ASKED QUESTIONS

CONSERVATION EASEMENTS FREQUENTLY ASKED QUESTIONS

EUROPEAN UNION ACCOUNTING RULE 7 PROPERTY, PLANT & EQUIPMENT

3. Have both parties sign both copies, or sign one lease and make a copy of the

RESSETTLEMENT POLICY FRAMEWORK

Headline Verdana Bold The evolutions of leases accounting under IFRS 16 Mariano Bruno, Carlo Laganà, Giuseppe Ambrosio, Deloitte & Touche S.p.A.

Why IFRS 16 matters to the shipping industry

IAS 16 Property, Plant and Equipment. Uphold public interest

GEO: Urban Services Improvement Investment Program Tranche 2 (Mestia Water and Sewerage Networks Project)

ENTITLEMENT MATRIX. Gujarat State Highway Project - II. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Resettlement Planning Document

Purchase of Development Rights

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

Land Acquisition Plan

IAS Revenue. By:

Ron Shultz, Director of Policy Washington State Conservation Commission

Perry Farm Development Co.

Resettlement Planning Document

KALPATARU POWER TRANSMISSION LIMITED BRANCH OFFICE: PIAZZA GRANDE, AREA 108, V. SARGSYAN STR., YEREVAN, REPUBLIC OF ARMENIA. PHONE:

NATIONAL GANGA RIVER BASIN AUTHORITY

Saskatchewan Farmland Ownership

IFRS 16 Lease overview and EY s enabling toolkit

LAND ACQUISITION AND COMPENSATION

COMPONENT 2 - TSKB DRAFT

RESETTLEMENT POLICY FRAMEWORK FOR THE KAFUE TOWN-MUZUMA LIVINGSTONE 220KV TRANSMISSION LINE UP GRADE

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

TOWN OF LINCOLN COUNCIL POLICY

B. Justification of project design and alternative analysis:

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Subtitle H Agricultural Conservation Easement Program

AFG: Water Resources Development Investment Program Tranche 1- Construction of Northern Basin Development Main Canals

Internal Revenue Service Revenue Procedure

PUBLIC. Livelihood Restoration Framework August 2018 PUBLIC

TABLE OF CONTENTS 100. INTRODUCTION

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR

KEMENTERIAN PEKERJAAN UMUM DIREKTORAT JENDERAL BINA MARGA Jalan Pattimura No 20, Kebayoran Baru, Jakarta Selatan 12110

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF

Compass Exchange Advisors LLC

PRC: Guangxi Regional Cooperation and Integration Promotion Investment Program

RESETTLEMENT POLICY FRAMEWORK (RPF)

BIOMASS-BASED DISTRICT HEATING PROJECT

FACT SHEET: Exploration for Oil and Gas

Replacement of 110kV Noyemberyan and Lalvar Overhead Transmission Lines. Abbreviated Resettlement Action Plan

GOLDEN EAGLE CHARTER SCHOOL

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT

CHAPTER TAX CREDITS AND SUBSIDY LAYERING. The Table of Contents

AGRICULTURAL VALUE CHAIN DEVELOPMENT PROGRAMME (AVCP) PROJECT 1 SUMMARY OF ABBREVIATED RESETTLEMENT ACTION PLAN

Appendix 1 Exposure Draft: ED/2013/8 Agriculture: Bearer Plants Proposed amendments to IAS 16 and IAS 41

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

- Farm Transfers - Real World Examples

Business Combinations

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

RESETTLEMENT MANAGEMENT FRAMEWORK

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 10-Q

EXHIBIT E LOW INCOME HOUSING TAX CREDIT APPLICATION REQUIREMENTS

National Land Use Policy

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Social Audit Reporting Format on Land Acquisition I Social Impact Screening Format (for application to all past sub-project investments) Name & Location of Sub-project: Erzincan Compressor Station I Erzincan-<;:aytrlr- Village Project contractor or Sponsor or investor: BOT AS Petroleum Pipeline Corporation Cost of Expropriation:410,000.00 TRY (Approximately USD 230.000,00) Installed generation capacity (No. units X MW/unit): 4x12 MW Or Type/brief description of the subproject component: four 4 turbine/compressor units with 3+1 (three unit in operation and one unit spare) configuration and the other complementary units and equipments Why was this site selected, and why is this amount of land necessary? The most optimised elevation and location in terms of gas flow requirements. The land is necessary for the units and equipments installation and social and administrative buildings Key Dates of implementation For example-application, approval, public consultation, court dates, work start dates etc Inventory of Land & Assets Acquired from Private OWners Name of Project Owner's/user's% Land use: pasture, agriculture, residence, etc. Compensation Impact on Owners/land Component: of total land (ha) Inventory of any structures or other fixed or paid. income of user Area(s) I and %taken productive assets (wells, fences, trees, field Other actions owner. plots(s) crops, etc) affected. taken for Impact on lease acquired Indicate if land is rented or informally used by renters or or info.rmalland (ha) another party. users. users.' Indicate if non-owner users have assets, trees, Dates crops, etc affected delivered. Indicate if land-based activity is primary source of income for owner or land user. 1.30 1.30 100.00% 31.495,45 TL He lives in 1.MR. FAHRmiN village.. Upon TEKiN his request, he was given a job on a permanent basis, currently working at Erzurum Compressor Station. Furthermore, he has got All lands are being used for agricultural another land activities. and he rents others for No physical assets have been determined in cultivate land acquisition process. purposes. His livelihood is According to investigation of land acquisition affected in teams, these fields are not primary source of better way. 0.33 0.96 34.36% income for land-owners. All lands are rented. 19.142,18 TL Land owner has 2.MR. Agriculture activity is main source of livelihood passed away. RUSTEM KAYA for the region, many of land-owners have more His 9 inheritors than one lands. shared his heritage and 7 of them live in lsta nbul. Thus,

All the landowners and users of land acquired their life for the compressor station have been standards do adequately compensated, including through not change provision of jobs at the site, as needed because of expropriation. One of his inheritor, Abdurrahman KAVA, applied for a job to BOT~, too. He is an employee in Compressor Station and he lives in village. He has got an arable land. He uses this land, and also he rents another lands for cultivate purposes. In addition to this information, there is an agreement between BOTA$ and land owner. Land owner voluntarily sold his land to BOT~ :and land cost has paid to him. 3.MR. 0.58 0.58 100.00% 17.988,70 TL He is son of DURSUN previous land KADiR KAVA owner; Riistem KAVA. He lives in village. He rents lands to cultivat e. Between BOTA$ and land owner there is an agreement, too. He voluntarily sold his land to BOTA~ :and land cost has paid to him. His main source of livelihood is agriculture activity. 4.MR.Ali 1.72 2.61 65.84% 68.322,37 TL He has passed HAVDAR away. His AVDEMiR inheritors shared his heritage and most of them live in istanbul. Thus their life

st andards do not change because of expropriation. One of his inheritor, Mesut AYDEMIR, lives in S1rata~ village. He is a farmer there. 5. MR. HOSNO 0.21 2.28 9.20% 6.488,36TL One of the GOLER share holder of MR. FiKRET this lan d, Fikret SULU SULU has passed away 3 months ago (in July 2012). Hi.isni.i GOLER, lives in village. His main source of livelihood is agriculture activity. 6. MR. 1.03 1.03 100.00% 31.790,37 Tl On the land IBRAHiM EFE registry, he is owner of the parcel but he has passed away and he has 9 inheritors. One of the inheritor, Nadir EFE, was using the entire land to cultivate and he was earning his livelihood from this land. Other inheritors live abroad or In miscellaneous cities of Turkey. Nadir EFE took his share of expropriation with other inheritors and all inheritors signed offici a I deed which conta m s the declaration they got the expropriation compensation m accordance with their intent and requirement (Please see Attachment 1). Therefore e~opriatlon

compensation partitioned among the heirs, Nadir EFE affected by not usmg the land for cultivative purposes after expropr ation Upon hos request, he was goven a job on a permanent basos, currently working at Erzurum Compressor Station as subcontractor (AHM) employee since 23/08/2012 (please see his payment sheet as attachment 2). Besodes, he derives revenue from leased lands to cultivate. Now, he os m good economic s tuatoo n and about h s satlsfactoon he has a declaratoon Please see attachment 3). 7. MR. HAKKI 1.05 1.05 100.00% 32.410,67 TL He has passed DO~AN away and he has 9 inheritors. 4 of them live in Istanbul and 4 of them live in village. In that village, they all have more than one land using by their own, and also they rent another lands to cultivate. Remaining inheritor is the wife of the Ia nd owner. She lives in village. Her children take care of her and provide all needs to her. S.MR. 1.11 1.11 100.00% 40.796,31 TL He is an old

MURSELSULU man, therefore 9.MR. 0.69 0.69 100.00% 2S.437,31 TL he is not able to MURSELSULU farm. He has got some lands and his sons generate profit from these lands in the name of him. 10.MR. 1.10 1.54 71.24% 42.162,80 Tl He lives in DAVUTMETE village. He earns h is livelihood by renting lands to cultivate. His life standards have not changed because of expropriation. ll.mr. 0.66 0.66 100.00% 24.393,03 TL He lives; in BEDiRHAN Bursa and he is KAPLAN retired. His income source is retirement pension. Additionally, he is a land owner in the village. Not affected 12.MR. 0.33 2.15 15.19% 12.049,71 TL All of the Ia nd DAVUTALi owners live AYDEMiR abroad. They MS. GOLAY shared the AYDEMiR compensation MR. CENGiZ and their OZAKAR livelihoods are MR.GARiP not affected at TAN all. MS. VELiZ TAN MR.CiHAN TAN MR. IBRAHiM AYDEM IR 13.MR. 1.85 1.8S 100.00% 57.222,67 TL He lives. in KEMAL Bozag village KILI<;GON and he is owner of a dairy farm as source of income. Inventory of Public, Community, or State Land Acquired La nd parcels for Land type I land Ownership: State, community, other. Compensation, land transfer, or other Project Components use: Forest, Structures or other fixed assets. measures to mitigate impacts on land Area acquired I commons for users. Specify measures and dates of parcel grazing, other. delivery. No public, community or state lands were acquired.

Public Awareness, Consultations, and Communication Concerns raised at Concerns raised How these concerns were resolved? the public outside public consultation consultation Please see Attachment A. Status of land Acquisition I Completed I Pending Court decision I ongoing I I I Please see Attachment B. Special Assistance provided beyond cash compensation payment of acquired land Alternative land Relocation Livelihood restoration measures Summary of impact which it addressed assistance According to Expr opriation Law, all compensations should be paid in cash via bank deposit. As far as our teams have learned, landowners have used their moneys, to buy new fields, to make some modifications in their houses and t o pay their debt s. Identification of vulnerable groups For example elderly, Sources of M ethods and channels used to contract them Assistance provided to them disabled, widows, etc information for vulnerable groups In environmental management studies no vulnerable groups have been identified in project area. Grievance Redress process Mechanisms PAPs awareness of Are the Grievance mechanisms and procedures Any third party settlement mechanism, available for project the grievance affordable and accessible involvement of community leaders, impacted persons to protocol NGOs register their grieva nces and complaints. Yes Yes Th rough village legal entity (Muhtar) Yes. In this project, mutual settlement. mechanism for the gathering of grievances and requests of the people effected by the project determined as follows: impacted persons can directly submit their grievances t o

the address of General Directorate ofbot~ Department of Construction and Land Acquisition (Ankara) verbally or in written in any time. They can also submit their grievances via Muhtar. Muhtar lhas got contact information (address and telephone) of BOTA~, so muhtar delivers the requests or complaints received from impacted persons to BOTA~ and BOT~ evaluates the complaints and tries to resolve as soon as possible. At the same time, impacted persons' all legal rights are reserved. They can both submit their grievances to the BOT~ and also to the court. If there is a court decision, BOTA~will implement the decision of the court. i Please describe social economic profile of each land owner or user (to determine the level of vulnerability or the impacts ofland acquisition using the following variables or) based on gender, age, education, occupation, income level, asset ownership, and number of children in the household of the PAP.