NOTICE OF REGISTRATION. Re: Request for Inspection PANAMA: Land Administration Project (Loan No PAN)

Similar documents
THE INSPECTION PANEL 1818 H Street, N.W. Telephone: (202)

PROJECT INFORMATION DOCUMENT (PID) RESTRUCTURING. PA Land Administration

Panama - Land Administration Project Project Restructuring Project Paper

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018)

Proposal to Restructure

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3229 Project Name. Land Registry and Cadastre Modernization Project Region

Decree on State Land Lease or Concession

Integrated Safeguards Data Sheet (Updated)

Establishment of a land market in Ukraine: current state and prospects

FORCED DISPLACEMENT AND LAND DISPOSESSION. ANNUAL WORLD BANK CONFERENCE ON LAND AND POVERTY Washington DC, April 18-20, 2011

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

Integrated Safeguards Data Sheet (Initial)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Land Improvement Act

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized

The Boundary Concept Land Management Opportunities for Sustainable Development Provided by the Cadastre 2014 Approach. Jürg KAUFMANN, Switzerland

FOR OFFICIAL USE ONLY

The means to identify trends and policy innovations for strengthening Land Governance

Low Cost Titling in Africa

Shared Objectives and Partnerships in land management and administration BURKINA FASO

WHAT IS AN APPROPRIATE CADASTRAL SYSTEM IN AFRICA?

Land Tenure and Land Administration Systems. Kent Elbow Land Tenure and Property Rights Issues and Best Practices Workshop 30 September 2014

LAND REGISTRY & CADASTRE IN EUROPE

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

Public Disclosure Copy

Mini-Thesis Siam University (International Master of Business Administration), Bangkok, Thailand 2015 CHAPTER IV

Land Tenure and Land Management Issues for REDD Preparation in Guyana: Framing the Agenda for Policy Discussion

Public Disclosure Copy

Designing for transparency and participation in the Hellenic Cadastral Project

ELECTRONIC DEEDS REGISTRATION SYSTEMS BILL

Participants of the Ministerial Meeting on Housing and Land Management on 8 October 2013 in Geneva

THINK BIG do little. Start an avalanche

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

REPUBLIC OF ALBANIA THE ASSEMBLY. LAW No. 9235, dated ON RESTITUTION AND COMPENSATION OF PROPERTY

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

25 CFR, PART 151 LAND ACQUISITIONS

Support to Implementation of Multipurpose Cadastral Information system in Vietnam

Land Tenure and Geospatial Data and Technology

New York State Housing Trust Fund Corporation M E M O R A N D U M ANNUAL REPORT ON PROPERTY DISPOSAL GUIDELINES

ASSESSMENT OF CONSEQUENCES RESULTING FROM ABOLISHING THE OBSTACLES ON LAND TRANSACTIONS 1 SUMMARY

Quality Improvement of the Real Estate Cadastre in Serbia

Addressing Land Sector Opportunities with Geospatial Information in Nepal

Land policies and land reforms in China: current situation and lessons to be learned for the future Dr. Michael Klaus

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,300, Original Commitment 62,300,

The long experience of Greece addressing the question of Informal Settlements

Buffalo Niagara Convention Center. Management Corporation. Property Disposition Guidelines

Land consolidation and rural development in Serbia

Fostering the Sustainability of Mining Operations Through Improved Land Governance Framewoks A T O O L K I T. Public Disclosure Authorized

BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY. Board of Directors Meeting.

TCP PROJECT AGREEMENT SUPPORT GOVERNMENT IN FORMULATION OF A NATIONAL AND GENDER SENSITIVE LAND POLICY GUIDED BY THE VGGT PRINCIPLES

National Rural Environmental Registry System. Bangkok May 2017

BIOMASS-BASED DISTRICT HEATING PROJECT

PROPERTY DISPOSITION GUIDELINES OF STATE OF NEW YORK MORTGAGE AGENCY, ESTABLISHING STANDARDS FOR THE DISPOSITION AND REPORTING OF PROPERTY

Recent development in land consolidation in Macedonia and land valuation issues

For the reasons set forth in the preamble, the Department proposes to amend 25 CFR 151

Request for Proposals for Commercial Real Estate Brokerage Services Port Angeles, Washington. Issued June 6, 2016

ABSTRACT Land Administration System in Lithuania

PREPARATION FOR LAND CONSOLIDATION IN LITHUANIA. Vilma Daugaliene National Land Service under the Ministry of Agriculture

Legal Analysis of Memorandum of Understanding between the Government of Timor Leste and GTLeste Biotech. Legal issues concerning land and evictions

Cadastre: definitions

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

ATTACHMENT 2 - PROJECT CHARTER

Chapter 22 Historic Preservation/Design Review

Scheme of Service. for. Housing Officers

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 437

LAND ADMINISTRATION DEVELOPMENTS IN RWANDA

Native Title Explained

SUBJECT: CROWN RESERVED ROAD POLICY

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-44150) ON A LOAN IN THE AMOUNT OF US$31.

KRS 324A A.150 Definitions for KRS 324A.150 to 324A.164. Effective: June 25, 2013

In search of land laws that protect the rights of forest peoples in the Democratic Republic of Congo

ROYAL GOVERNMENT OF CAMBODIA. Ministry of Land Management, Urban Planning and Construction

Opening land market in Ukraine: current policy developments and issues for discussion

Clelia Rontoyanni, Public Sector Specialist

ARTICLE I 1. STATEMENT OF PURPOSE AND APPLICABILITY

Corporate Services Planning and Economic Development. Memorandum

Property Disposition Compliance Process Governance Committee #1345, approved March 29, 2017

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES

IC Chapter 11. Appraisal Management Companies

Republika e Kosovës Republika Kosovo - Republic of Kosovo Kuvendi - Skupština - Assembly

Land Administration and Management in Nepal" Krishna Raj B.C. Joint Secretary Ministry of Land Reform and Management Nepal

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Bosnia and Herzegovina Framework Pledge Law

Here is the actual law (In English) on who is eligible to obtain a real estate license in Panama.

FIRST CADASTRE PROJECT

PROPOSED AMENDMENTS TO SSB 5788 S AMD 201 BY SENATOR SPANEL PROPOSED BY THE WASHINGTON HOME INSPECTORS LEGISLATIVE ADVISORY GROUP

DISPOSAL OF PROPERTY GUIDELINES Dutchess County Water and Wastewater Authority

CAO ASSESSMENT REPORT

Results of Central European Land Knowledge Center (CELK) Activities

EITF ABSTRACTS. Title: Applying the Conditions in Paragraph 42 of FASB Statement No. 144 in Determining Whether to Report Discontinued Operations

Developing Land Policy in a Post-Conflict Environment: The Case of Southern Sudan

Public Disclosure Copy

Public Disclosure Copy

VILLAGE OF FAIRPORT LOCAL DEVELOPMENT CORPORATION DISPOSITION OF PROPERTY GUIDELINES ADOPTED PURSUANT TO TITLE 5-A OF THE PUBLIC AUTHORITIES LAW

Economic and Social Council 6 July 2018

BRIEFING TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM

REGULATION OF HEAD OF THE NATIONAL LAND AGENCY OF THE REPUBLIC OF INDONESIA NUMBER 3 YEAR 2007 REGARDING

Transcription:

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT 1818 H Street, NW Phone: (202) 458-5200 INTERNATIONAL DEVELOPMENT ASSOCIATION Washington, DC 20433, USA Fax : (202) 522-0916 Internet: http://www.worldbank.org/inspection IPN REQUEST RQ 09/04 March 20, 2009 NOTICE OF REGISTRATION Re: Request for Inspection PANAMA: Land Administration Project (Loan No. 7045-PAN) On March 17, 2009 the Inspection Panel (the Panel ) received a Request for Inspection (the Request ) related to the Panama: Land Administration Project (the Project in Spanish, Programa Nacional de Administración de Tierras PRONAT). The Request was submitted by leaders of the Congreso de Area Anexa de la Provincia De Bocas Del Toro on behalf of the communities that live in the so-called áreas anexas 1 to the Comarca Ngabe-Bulge 2 in the Bocas del Toro Province, Panama (the Requesters ). The Requesters claim that they and the community that they represent have been harmed and are likely to suffer further harm from the above-referenced Project. On February 25, 2009, the Panel received a first Request related to this Project raising similar issues on non-compliance and harm, and registered it in the Inspection Panel Register on March 11, 2009 as IPN Request RQ01/09. The first Request was submitted by representatives of the indigenous community of Pueblo Naso, several individual members of the community and representatives of some community organizations. The Project The Project is partially financed by a loan from the International Bank for Reconstruction and Development (the Bank ) in an amount equal to forty-seven million nine hundred thousand dollars (US$ 47,900,000). The Loan was approved on January 16, 2001. After experiencing some implementation problems, the Project was restructured on 1 In English neighboring areas 2 According to Section 1.02 (f) of the Loan Agreement Comarca means the indigenous territory established as a special political and administrative subdivision of the Borrower s territory, pursuant to the procedure set forth in the Borrower s political constitution. Loan Agreement (Land Administration Project) between Republic of Panama and the International Bank for Reconstruction and Development, dated April 2, 2001 (the Loan Agreement). The Loan Agreement was amended in June 2006. 1

June 23, 2006 to narrow the project scope and outputs and improve implementation and financing modalities. 3 According to the original Loan Agreement, the objectives of the Project were to: (a) promote equitable access to land and improve land tenure security by providing Land Administration Services in the Project Area; and (b) enhance natural resources conservation through the consolidation of the SINAP 4 and Indigenous Peoples Territories. The Loan Agreement, as amended to reflect the restructuring of the Project, provides, however, that the objective of the Project is to modernize the land administration system, including priority protected areas and Indigenous Peoples Territories. 5 After being restructured in March 2006, the Project has four components: 6 (1) Land Policy, Legal and Institutional Framework, which includes activities aimed at improving the existing policy and legal institutional framework and strengthening the institutions providing land administration services; (2) Land Regularization Services, supporting the modernization of the Borrower s geodetic network, the gathering and analysis of land tenure related data, including the development and implementation of an Integrated Cadastral and Registry Information System (SIICAR) and the carrying out of legal cadastre surveys and area-based measurement and land demarcation activities; (3) Consolidation of Protected Areas and Indigenous Territories, which supports the consolidation of the National Protected Areas System (SINAP), the establishment and consolidation of protected areas within SINAP, and the establishment and consolidation of indigenous territories in the project area; and (4) Project Administration, Monitoring & Evaluation providing technical assistance services and support for land administration entities at national and local level. The Project Appraisal Document (PAD) states that Project-supported land administration activities cover a range of land regularization actions, including legal rights recognition, titling, conflict resolution, legal cadastre, and registry, and that the consolidation of SINAP and indigenous territories, entails mapping, field demarcation, buffer zone limits, determination of their legal status; and land management plans in selected areas including local and participatory consultation processes. 7 The Project component related to Consolidation of Protected Areas and Indigenous Territories entails the carrying out of physical demarcation activities in protected areas, and provides for participatory decision-making processes to define boundaries and status of the demarcated areas. In this regard, the PAD states that consolidation of indigenous peoples territories includes not only technical actions related to demarcation but also a number of complementary activities, such as conflict resolution and support to design or 3 Memorandum and Recommendation of the President on a Proposal to Restructure the Land Administration Project Loan No. 7045- PAN for the Republic of Panama., dated March 27, 2006. SEC. R2006-0047, dated March 30, 2006. 4 The Loan Agreement states that SINAP means Sistema Nacional de Tierras Protegidas the Borrower s system of protected areas. 5 Amendment to the Loan Agreement, dated June 23, 2006. 6 Source: current Project Information Document (PID) 7 Project Appraisal Document (PAD) on a Proposed Loan in the Amount of US$ 47.9 million to the Republic of Panama for a Land Administration Project, dated December 14, 2000, pg. 3 2

complete the Cartas Orgánicas 8 [Organic Charters] and other regulations and norms dealing with the administration of indigenous territories 9 (emphasis added). The Request The Requesters object to the way the Project is being implemented, particularly in relation to disclosure of information activities, and the consultation and measurement methods utilized in the demarcation of the Ngabe territories in the Bocas del Toro province, the Parque Internacional (World Heritage Site), the Bosque Protector [Protector Forest] Palo Seco (tropical upland forest), and the Bastimentos National Marine Park. According to the Requesters, not only do the Project s actions violate their human and land occupation rights, but also contravene to the conventions and international treaties to which Panama is a party as well as the World Bank s strategies and operational policies on indigenous peoples approved by the Bank s Board on February 22, 2006. The Requesters state that the Government rejected a proposal on how to deal with the áreas anexas (defined as such in Law No. 10 of 1997) and, as a result, it was not possible to demarcate these areas or territories that were left out of the Comarca Ngabe- Bugle. The Requesters claim that, upon a request from the communities of the áreas anexas and of the islands of the Boca del Toro province, local Bank staff agreed to meet with them in the PRONAT offices in the town of Changuinola. In this meeting, to which Government officials also participated, the Requesters expressed their concerns about the implementation of the PRONAT and what they consider negligence and irregularities directly affecting the land rights of the Ngabe communities of the Bocas del Toro province and the áreas anexas, which remain outside the limits of the Comarca Ngabe-Bugle. According to the Requesters, as a result of this meeting, Bank staff agreed to make an evaluation of the Project and address their concerns. The Requesters claim that during a follow-up visit that took place in January 2008, local Bank staff were informed that the communities were about to complain against irregularities in the implementation of PRONAT to the Bank s executive management in Washington. In response, the Requesters state, they were then told to wait until a March 2, 2008 community meeting where local Bank staff would present an answer to their concerns. According to the Requesters nobody from the Bank attended the March meeting and until now they have yet to receive a response from the Bank. According to the Requesters, in 2001 the Government of Panama obtained Bank financing so that PRONAT could measure and demarcate the territories of the native peoples of the Bocas del Toro province. They claim, however, that practically since that moment, this Program has violated the indigenous land rights, since PRONAT s main objective is to title land and not to demarcate territories. They also claim that the Project is restricting the areas recognized as indigenous peoples lands to those used for housing, 8 A Carta Orgánica is a set of rules and regulations governing the internal affairs of a Comarca. 9 PAD pp. 6 7 3

excluding the areas that the communities use for materials, medicines, craft items, workshops and other production activities The Requesters argue that the lack of territorial protection has allowed tourism, mining and hydroelectric enterprises to speculate with our land which is shamelessly given away by the national authorities by way of Law number 2 of 2006 on concession and titling of islands and coasts 10 The Request also claim that the Bank-financed Project supported a new Bill of Law, approved by the National Assembly on December 3, 2008 as Law No. 72, which established collective land property in indigenous territories and specifically prohibited the creation of new áreas anexas. In the Requesters opinion, Law No. 72 constitutes a flagrant and very serious violation of the sole and true aspiration of the communities of the áreas anexas, that is, the creation of a juridical framework that would respect the cultural and all forms of political life of the Ngabe-Bugle people. The Requesters state that they hold directly responsible the Government and Government institutions for their problems but, at the same time, that they are also disappointed with the World Bank, who has not enforced its operational policies on indigenous peoples, adding that for this reason they are requesting the Inspection Panel to carry out an in-depth and detailed investigation of all that has happened since the arrival of PRONAT in our territory. The above claims may constitute non-compliance by the Bank with various provisions of the following operational Policies and Procedures: OD 4. 20 OP/BP 13.05 Indigenous Peoples Project Supervision In accordance with paragraph 17 of the Panel s Operating Procedures (the Operating Procedures ), I am notifying you that I have, on March 20, 2009, which is also the date of the dispatch of this notice, registered this Request in the Inspection Panel Register. Please note that the Panel s registration is an administrative procedure and it implies no judgment whatsoever concerning the merits of the Request for Inspection. As provided in paragraph 18 of the IBRD Resolution that established the Panel ( Resolution ), paragraphs 2 and 8 of the Conclusions of the Board s Second Review of the Inspection Panel (the 1999 Clarifications ), and paragraph 18(d) of the Operating Procedures, Bank Management must provide the Panel, no later than April 20, 2009, with written evidence that it has complied, or intends to comply, with the Bank s relevant policies and procedures in relation to the above-referenced Project. The subject matter that Management must deal with in a response to the Request is set out in paragraphs 3 and 4 of the 1999 Clarifications. 10 The Request refers specifically to the concession of 6.215 hectares in the rural area of Valle Risco, a Ngabe indigenous territory, granted by ANAM [Autoridad Nacional del Ambiente] for the construction of the hydroelectric project Chan 75, and points out that this case was denounced to the Supreme Court of Justice, the Inter American Commission on Human Rights, and to the United Nations Rapporteur on Indigenous Peoples. 4

After receiving the Management response, the Panel will, as outlined in the 1999 Clarifications and as provided by paragraph 19 of the Resolution, determine whether the Request meets the eligibility criteria set out in paragraphs 12 to 14 [of the Resolution] and shall make a recommendation to the Executive Directors as to whether the matter should be investigated. The Request has been assigned IPN Request Number RQ 09/04. Yours sincerely, Werner Kiene Chairperson Messrs Pedro Abrego Presidente de Área Anexa Dionisio Elington Presidente de Área Insular Feliciano Santo MODETEAP. Mr. Robert B. Zoellick President International Bank for Reconstruction and Development The Executive Directors and Alternates International Bank for Reconstruction and Development 5