Design and Construction of Foundation in Schedule Area No 2 (North-western New Territories) with vibration performance consideration

Similar documents
A New Page of the NEC Expedition - DSD s Initial Experience on 5 More NEC Pilot Contracts

Railway Developments and Highlights of the Construction Features of Recent Railway Projects

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

Parallel Lines : Railway Infrastructure Development and its interaction with Urban Growth in Hong Kong

Develop a GIS-based Electronic Mark Plant Circulation System in a collaborative and end-user computing approach

ARTICLE 7 UTILITIES AND EASEMENTS

Bridging Research and Practice

Project Summary Major Property Development Projects in Hong Kong. Project Summary Major Property Development Projects in Hong Kong.

RM-1 and RM-1N Districts Schedule

BUILDING FOR THE BETTER CHINA. Hong Kong

RM-7, RM-7N and RM-7AN Districts Schedules

RM-8 and RM-8N Districts Schedule

HKBN Mass Deploys Fiber-To-The-Home Making the Future Today in Hong Kong

CHAPTER IV. ELECTRIC

JEFFERSON COUNTY, ALABAMA

A mix of uses. Housing:

RT-11 and RT-11N Districts Schedules

Prospective Builders, Utilities, Public Agencies, and Engineering Firms

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

REPORT HUTT CITY COUNCIL. Preliminary Land Development Assessment 8 Harold Grove, Stokes Valley. Report prepared for: HUTT CITY COUNCIL

Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats

Summary of Major Properties At 31st March, 2001

Railway Development in Hong Kong

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. S/1744/05/F Thriplow House and Garage on land Adjacent 22 Middle Street for S Hurst

HOME ENROLLMENT NOTIFICATION OF CONSTRUCTION AND INSPECTION BUILDER/SELLER APPLICATION FOR HOME ENROLLMENT

Policy and Standards for Public Local Residential Streets And Private Streets

Build Over Easement Guidelines

Collection Point Address

THE HONG KONG HOUSING AUTHORITY. Memorandum for the Building Committee. Current Density Guidelines for Public Housing Development

Les Saisons Sai Wan Ho Building Journal, June 2002

Task Force on Kai Tak Harbourfront Development. Residential Development at 1-5 Kai Hing Road, Kai Tak South (Kowloon Godown Site)

RM-11 and RM-11N Districts Schedule

PLANNING REPORT. Lot 5, SDR Lot 6 and 7 Concession 3 Township of Normanby Municipality of West Grey County of Grey

149(+/-) Acres. Prime Location Development Opportunity. Partially Completed. 260 Shepherd of the Hills Expressway Branson Mo

Property condition survey for the Ewa Silo building located in the premises of the Port of Szczecin

Government Vaccination Programme 2018/19 List of HA GOPCs for GVP Vaccination

OF CHANGE IN SHEAR WALL LOCATION ON STOREY DRIFT OF MULTISTOREY BUILDING SUBJECTED TO LATERAL LOADS

RM-10 and RM-10N Districts Schedule

PLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District

Determination of p-y Curves and Pile Lateral Capacity by Direct Use of CPT Data

RM-3 District Schedule

Standards of Practice for Surveying in the State of Alabama

Devin Defriza Harisdani 1*, Edward Anugrah Zai 1

Initial Project Report Appl # Brink/Harrison

GUIDELINES FOR BUILD OVERS

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

1061 The Queensway - Official Plan and Zoning By-law Amendment Applications - Preliminary Report

a. provide for the continuation of collector streets and thoroughfare streets between adjacent subdivisions;

MANUFACTURING FACILITY

Gross Floor Area of HOS Flat by Phase / Estate

Progress Update on Shatin to Central Link (SCL) 2 May 2013

Rule 21 STANDARDS OF PRACTICE FOR SURVEYING

1417, , 1427 & 1429 Yonge Street - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

City of Grande Prairie Development Services Department

Property Development. 1. YOHO Town, Yuen Long 2. Park Island, Ma Wan 3. Severn 8, The Peak 4. The Arch, Kowloon Station. Park Island, Ma Wan

Certified Site Program Application Bolivar Business Park

MTR to work closely and align with the Government on announcement mechanism in relation to Railway Protection Area

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING

DAYLIGHTING DESIGN. Strategies for Achieving Quality Daylighting. Spring 2014 College of Architecture, Texas Tech University 1

TRANSBAY JOINT POWERS AUTHORITY

Appendix: List of CLP Power s EV charging stations (14 December 2018)

Residential Development Opportunity

Centre and the Hong Kong Sectio

CLP Power Extends Electric Vehicle Charging Network as Popularity of Green Motoring Accelerates

HSIN CHONG CONSTRUCTION GROUP LTD.

2017 ROAD ASSET VALUATION

ORANGE BLOSSOM GARDENS PLANNED UNIT DEVELOPMENT PREPARED BY: COASTAL ENGINEERING CONSULTANTS, INC.

Policy for Accepting Potentially Contaminated Lands to be Conveyed to the City under the Planning Act

the conditions contained in their respective Orders until January 1, 2025, at the discretion of the Director of Planning, Property and Development.

Section 821. PRESERVATION OF LAND MONUMENTS, CONTROL POINTS, AND PROPERTY CORNERS

18 D Shop D & Portion of Shop B, G/F, B. 16 B Shop B, G/F and Shop A2 & A3, Upper G/F, A2

5, 7 and 9 Dale Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

250 Lawrence Avenue West - Official Plan and Zoning By-law Amendment Applications Preliminary Report

Details of vendor / Owner / Builder / Firm

Zoning By-law Amendment & Site Plan Control Application

RM 4 and RM 4N Districts Schedule

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

Lake of the Woods County Land Use Permit Instruction Sheet

For personal use only

Frequently Asked Questions About 20A Undergrounding Updated on June 17, 2014

Planning Justification Report

Quarter Section Township Range Meridian 4. Mailing Address Street and number City/town Province Postal code

FLOOR AND ROOM NUMBERING GUIDELINES

Highland Green Estates Neighbourhood Area Structure Plan

HONG KONG HOUSING AUTHORITY HOME OWNERSHIP SCHEME AND PRIVATE SECTOR PARTICIPATION SCHEME AND TENANTS PURCHASE SCHEME INFORMATION FOR APPLICANTS ON

HONG KONG EXAMINATIONS AND ASSESSMENT AUTHORITY 2019 HONG KONG DIPLOMA OF SECONDARY EDUCATION EXAMINATION ENGLISH LANGUAGE

Certified Site Program Application Trogdon Industrial Park

66 Isabella Street Rezoning Application - Preliminary Report

Schedule of Principal Properties

Boise County Planning & Zoning Department P.O Box 1300 Idaho City, Idaho Phone (208) Fax (208)

250, 252, 254 and 256 Royal York Road and 8 and 10 Drummond Street - Zoning By-law Amendment Application - Preliminary Report

Special Land Use Permit to exceed two-story height limit to allow for existing three-story office building

PROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

DEVELOPMENT OPPORTUNITY FOUNDATION HOUSE, ICKNIELD WAY, LETCHWORTH GARDEN CITY, SG6 1GD

21 Old Mill Road - Official Plan and Zoning Amendment Applications - Preliminary Report

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

1098 ROUTE 46 EAST RIDGEFIELD, NEW JERSEY /- ACRES

CITY UTILITIES DESIGN STANDARDS MANUAL

Transcription:

Design and Construction of Foundation in Schedule Area No 2 (North-western New Territories) with vibration performance consideration Presented by Ir. Adam Choy (Director Meinhardt (C&S) Ltd) Ir. Alex Lai (Technical Director Meinhardt (C&S) Ltd) Ir. Jacqueline Tse (Senior Engineer Meinhardt (C&S) Ltd) 31 Aug 213

Content of Presentation Project Information Site Constraints Schedule Area No.2 Classification System Foundation Design in Marble Zone Vibration Assessment Monitoring and Public Relation Plan Construction Consideration

Project Information Proposed development in YLTL 518. Yuen Long Bounded by Yuen Long On Ning Road at the southern side, Tai Kiu Road at the western side and Yuen Long On Lok Road at the northern side Consists of 4 towers and each contains 32-33 storeys with Podium and basement below West Rail Long Ping Station aligned along the northern side and 16m away from site WEST RAIL STATION YUEN LONG ON LOK ROAD WANG CHAU ROAD THE SITE TAI KIU ROAD YUEN LONG ON NING ROAD

Site Constraints Photo of the site Existing Aged Village THE SITE Housing Authority s Site

Major Concerns on Design and Construction Complex geology and possible presence of cavity Limitations of increased vertical stress on marble surface karst Vibration Effect on existing aged buildings Limitations of Induced Vibration to Surrounding Existing Structures

Schedule Area No. 2 Scheduled Area No. 2 is defined as an area where the presence of marble containing cavities is possible at depth. Scheduled Area No. 2 covers a large area where complex geology and marble-bearing rocks of the Yuen Long Formation and Tuen Mun Formation can be expected.

Geology of Yuen Long Distribution of marble-bearing sedimentary rock Typical geological section

Features in Marble Factors affecting Karst Dissolution Surface Karst Overhangs Dissolution Joints Deep Cavity Zone Underground Channel Underground Cavity Form by weakened and dissected marble Rock mass undercut Joints locally opened by dissolution Form by concentrated water flow, usually in form of series of medium size cavities. Form by collapse of small cavities Occurred at marble/non-marble boundary, usually large cavity.

Classification System Marble Quality Designation (MQD): Site Zoning and Classification: Stage 1 GI Calculate MQD (every 5m of all BH) Borehole Rating Plot BH Rating and Identify problem area Assign Site Classes

Classification System Marble Class

Classification System Site Zoning and Classification: BH Rating Site Classification Ref. GEO report 29 page 11&12

Site Zoning Of Classification Stage 1 BH / Existing BH rating = Stage 1 BH / Existing BH rating 5 Stage 2 BH rating = 2 5 1 Zone 1 (Very Difficult Site) Stage 2 BH rating 5 2 Tower 1 1 2 5 2 Tower 5 2 2 2 Adjacent Site (Very Difficult Site) 5 Zone 2 (Fair Site) 2 2 Podium Tower 2 5 Tower 3 Adjacent Site (Fair Site)

Design Guidelines 1. Redundancy Factor Easy Site: Driven H-piles with 1% 2% redundancy Fair Site: Driven H-piles with 2% 3% redundancy Very Difficult / Extremely Difficult Site: No simple rules Ref. GEO report 29 2. Limits on Increase of Vertical Stress on marble surface (Easy Site) (Fair Site) (Very Difficult Site) (Extremely Difficult Site) Ref. GEO publication No.1/26

Foundation Design in Marble Zone

Ground Investigation Problems need to verify in GI works: Present of cavities Cavity-fill material Highly irregular rockhead level Associated with collapse feature Special requirement in GI works: Carry out GI in stage 2m of continuous MARBLE / METHAMORPHIC rock class II or better cavity free rock with TCR> 85% Layout of the BH Drillholes shall be at the edges of the main pile foundation area

Layers Appear Alternatively Stratum Description Approximate thickness(m) / level (mpd) Fill Sandy silty CLAY 2.m 9.1m Alluvium Stiff to very stiff sandy, silty CLAY and silty fine to medium SAND 5.5m 26.1m Metamorphosed Completely to highly decomposed 16.m 145m Siltstone metamorphosed SILTSTONE Fault Gouge Very stiff slightly sandy SILT 2.m 35m Karst Collapse Angular medium to coarse GRAVEL, COBBLES and BOULDERS of impure marble and pure marble 2m 35m Sound Marble Slightly decomposed MARBLE Approx. -82mPD ~ - 29mPD

T1 Average rockhead level (-1 ~ -11mPD) T5 Average rockhead level (below -15mPD) T2 Average rockhead level (-12 ~ -13mPD) T3 Average rockhead level (below -15mPD)

Geological Profile Fill Alluvium Founding E1 E1 Metamorphosed Siltstone, Fault Gouge, Karst Collapse Appear Alternatively Sound Marble Section E1-E1

Geological Profile Alluvium Fill F1 Founding Metamorphosed Siltstone, Fault Gouge, Karst Collapse Appear Alternatively F1 Marble Section F1-F1

Geological Profile Marble (light grey, depth 95-99m) Marble (white, depth 13-17m)

Geological Profile Cavity /cavity infill

Geological Profile Fault zone (fault gouge, depth ~68m)

Foundation Options Options Advantage Disadvantage Remark Driven H- pile with preboring Shaft- Grouted Friction Barrette / Friction Bored Pile End Bearing Bored Pile 1. Lower construction cost 2. Conventional foundation type for marble area 1. Higher capacity for piles terminated at shallower depth to avoid stress increase on the cavities 2. Minimal vibration and noise to the local residents 3. The existing Franki piles within the site can be removed by chiselling or pulling out 4. Hard layers can be overcome by trench cutter or chiseling 1. Higher capacity achieved at rockhead 2. Minimal vibration and noise to the local residents 1. H-pile driven to design level, otherwise review of additional stress on cavity is required 2. More nos. of pile required due to redundancy control 1. Trial pile with load-test is required 2. Excessive grout loss in Karst collapse layer 3. Friction cannot developed in Karst collapse layer 4. High construction cost 1. Sound marble bedrock over 11m below ground and exceeded the practical limit of conventional end bearing bored pile (except Tower 1) Adopted for Tower 2, 3 & 5 NOTadopted for this site Adoptedfor Tower 1 to minimize the additional stress due to Tower 2,3 & 5 foundation loading

Tower 1 Bored pile layout Average founding level around -1mPD~-11mPD Bored Piles dia. are 2.5m with 3.75m bellout Pile Capacity = 55223 kn

Tower 1 Bored pile section E2 T1 Average founding level (-1~-11mPD) T5 Average founding level (below -15mPD) E2 T2 Average founding level (-12~-13mPD) T3 Average founding level (below -15mPD)

Grade S45 35X35X18 kg/m to be used Pile length vary from 44-89m T2,3 and Zone B Podium T5 and Zone A Podium Pile Capacity (Without Wind) Pile Capacity (With Wind) Pile Capacity (Without Wind) Pile Capacity (With Wind) Without Group With Group Factor Factor 2958 kn 2514 kn 3697 kn 3143 kn 2 kn 17 kn 25 kn 2125 kn

The site is divided into three parts: T5 & Zone A Podium (Driven H-Pile) T2,3 & Zone B Podium (Driven H-Pile) T1 (Bored Pile) T5 ZONE A PODIUM T1 T2 T3 ZONE B PODIUM

Pile termination criteria will be based on : (i) ±5m range of proposed founding level (ii) Final set table If the pile terminated outside the termination criteria, the subjected pile will be investigated and foundation amendment will be submitted for approval

Overcome underground obstruction / Karst Cobbles obstruction Minimize vibration effect Backfill with compacted sand after preboring

Scope of vibration assessment: Piling activities, i.e. driven H-pile, induce vibration which may bring negative effect on surround structures. To control the effect of piling activities on surround structures and meet the requirement stated in PNAP APP-137 (Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations)

Assessment on structure conditions of surround existing structures. Estimation of vibration effect on surround existing structures.

Housing Authority s Site Nullah Low-rise Building along Yuen Long On Ning Road Tai Kiu Village West-Rail Station

Surround Existing Structures Distance No. of Storeys Foundation Type Age(yr) Condition Tai Kiu Village, Tai Kiu Road ~ 2m 1 4 Footings 5-4 Fair Precast Low Rise Buildings, Yuen Long On Ning Road ~ 23m 6 13 Concrete Piles Nullah between On Lok Road, Long Yip Street 35-44 Good ~ 2m N/A N/A N/A Good Site Occupied by Housing Authority Adjacent N/A N/A N/A N/A

Condition of surrounding buildings WANG CHAU ROAD YUEN LONG ON LOK ROAD YUEN LONG ON NING ROAD GOOD THE SITE TAI KIU ROAD FAIR GOOD WEST RAIL STATION

Photo 1 - Tai Kiu Village 1

Photo 2 - Tai Kiu Village (Arch) 2

Photo 3 - Tai Kiu Village (Entrance Tower) 3

Photo 4 - Tai Kiu Village (indoor condition) 4

Photo 5 - Tai Kiu Village (indoor condition) 5

Photo 6 - Tung Cheong Building, 59B Yuen Long On Ning Road 7 6 Photo 7 - Po Fung Building, 59A Yuen Long On Ning Road

9 8 Photo 8 - Nullah along Yuen Long On Lok Road Photo 9 - Adjacent site occupied by Housing Authority

Assessments process Based on BS5228-2:29 Given the Empirical formula, v res W 1. r = k p 3 Where v res resultant PPV (mm s -1 ) W nominal hammer energy (J) L pile toe depth (m) x distance measured along the ground surface (m) r slope distance from pile toe (m), r 2 = L 2 + x 2 kp for piles not at refusal 1 k p 3 depending on soil type (kp =1 adopted in vibration assessments) Range of parameters suggested in BS5228 1 L 27m 1 x 111m 1.5 W 85kJ

According to PNAP APP-137, the following empirical values are used for assessment : Location Type of Building Maximum ppv (mm/s) Transient Vibration (e.g. Drop Continuous Vibration (e.g. hammer) Vibration hammer) Low rise side Tai Kiu Village side Robust and stable buildings in general Vibration sensitive / dilapidated buildings PNAP Proposed PNAP Proposed 15 7.5 7.5 7.5 7.5 3. 3. 3.