ABBREVIATED RESETTLEMENT ACTION PLAN CESE ELEKTRİK ÜRETİM AŞ

Similar documents
POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

Resettlement Policy Framework

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

Indicate if land-based activity is primary source of income for owner or land user % ,45 TL He lives in. village..

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

RENEWABLE ENERGY INTEGRATION PROJECT

B. Justification of project design and alternative analysis:

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

REPUBLIC OF MACEDONIA

SFG kv İzmir Substation Abbreviated Resettlement Action Plan (ARAP) Turkish Electricity Transmission Company. Public Disclosure Authorized

DRAFT EXECUTIVE SUMMARY

Expropriation. Recommended Policy Wordings (full): Lao National Land Policy. Context. Policy. Standard of Public Purpose

Final Addendum to RAP for TANAP Pipeline Route. Final Addendum to Resettlement Action Plan (RAP) for TANAP Pipeline Route.

Resettlement Planning Document

INSTRUCTIONS FOR COMPLETING THE APPLICATION FORM

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

Creek Rehabilitation Plan for Apple Valley Questions and Answers from the Pre-Bid Meeting and Site Visit 06/23/2016

TANAP PROJECT FURTHER ENTITLEMENTS ON LAND ACQUISITION AND TANAP RAP FUND FOR ADDITIONAL ECONOMIC SUPPORT INFORMATION BROCHURE

Resettlement Policy Framework for the Turkey Geothermal Development Project

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

National Land Use Policy

Current Law Legislation for Land Consolidation in Turkey

TUZ GÖLÜ UNDERGROUND NATURAL GAS STORAGE PROJECT. E Issued for approval E.D. / B.E E.D M.Ş. D Issued for approval E.D. / B.E E.D M.

Land Acquisition Rehabilitation and Resettlement Act, 2013

Town zoning: A good option for your town?

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Resettlement Policy Framework for the Turkey Geothermal Development Project

The Pros and Cons of Building Licensed Offices of Surveying and Cadastre in Turkey

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

LAND ACQUISITION AND COMPENSATION

COMPONENT 2 - TSKB DRAFT

Crown Land Use Operational Policy: Trapline Cabin Policy APPROVED AMENDMENTS: Summary of Changes: Note /Approval

Guidelines for Construction of Recreational Buildings and Improvements Greater than 1000 Square Feet Outside Acceptable Development Areas

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

Involuntary Resettlement Due Diligence Report. ARM: Water Supply and Sanitation Sector Project Additional Financing

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

M A N N E S M A N N A.S / REAL ESTATE AND PROJECT APPRAISAL REPORT Bodrum/MUĞLA

Cibuk 1 Wind Farm Land Acquisition Plan Vetroelektrane Balkana d.o.o. October 2014

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY

Designing for transparency and participation in the Hellenic Cadastral Project

RESSETTLEMENT POLICY FRAMEWORK

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

National Reconstruction Authority

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

ALBANIA - VLORA BYPASS RESETTLEMENT ACTION PLAN REPORT

LAND ACQUISITION AND RESETTLEMENT DUE DILIGENCE REPORT. ARMENIA: WATER SUPPLY AND SANITATION SECTOR PROJECT. Phase II

LAND REFORM IN MALAWI

Design and Determine 3D Cadastral Systems: A Case Study of Turkey Hicret GURSOY SURMENELI* and Mehmet ALKAN* (Turkey)

Instruction As regards the implementation of decree on state-owned land approval for lease or concession

Report on Review of Land Acquisition and Compensation

PROJECT: HYDROPOWER PLANT BOSKOV MOST LAND ACQUISITION AND COMPENSATION FRAMEWORK

A. Approval / Disapproval of Resolution No : Adopting a Fair Housing Policy.

Easement Program Guidelines for Water Resources and Stream Work

TAP RESPONSE to CEE BANKWATCH NETWORK REPORT

Decree on State Land Lease or Concession

Presented at the FIG Working Week 2016, May 2-6, 2016 in Christchurch, New Zealand

Responsibilities of the Grant Recipient LAND AND WATER CONSERVATION FUND PROGRAM

A. Approval / Disapproval of Resolution No : Adopting a Fair Housing Policy.

Umatilla County Department of Land Use Planning

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA URBAN WATER SUPPLY AND SANITATION. Hawassa Water Supply and Sanitation Project AND

LAND ACQUISITION AND COMPENSATION

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

Pipeline Easement and Right-of-Way Agreements

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

Resettlement Compensation Framework Railway Corridor VIII - Eastern section

PENINSULA TOWNSHIP PLANNING COMMISSION MINUTES Center Road Traverse City, MI (Township Hall) February 27, :30 pm - amended time

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

Various Means of Public Participation in Government Compulsory Acquisition of Land

National Reconstruction Authority

3. Your tenancy agreement

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

Regulation on the Identification and Registration of Immovable Cultural and Natural Property to Be Protected

STATE COMMITTEE OF THE REPUBLIC OF UZBEKISTAN ON LAND RESOURCES, GEODESIES, TO CARTOGRAPHY AND STATE INVENTORY

218 Uber Road Mercer County, PA Agricultural Lease Request for Proposals

Port Moresby Power Grid Development Project.

PRC: Fujian Soil Conservation and Rural Development II Project

Lodge Park Access Statement

Dhaka Water Supply and Sanitation Project

Techniques for Stewardship of Preserved Farms: Three Programs Saving America s Farms and Farmland Conference

Land Administration and Management in Nepal" Krishna Raj B.C. Joint Secretary Ministry of Land Reform and Management Nepal

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE

by Tahsin YOMRALIOGLU, Bayram UZUN & Recep NISANCI Department of Surveying Engineering Karadeniz Technical University Trabzon, Turkey

DIRECTORATE DEEDS REGISTRATION SUB-SECTOR PROGRAMME. Title security of tenure to real property. Description

TABLE OF CONTENTS CHAPTER 1 INTRODUCTORY PROVISIONS Section 1 Purposes. 6. Section 2 Statutory Authorization. 7.

Land Acquisition and Resettlement Policy Framework

MIDWAY CITY Municipal Code

Planning Justification Report

ASSESSMENT OF CONSEQUENCES RESULTING FROM ABOLISHING THE OBSTACLES ON LAND TRANSACTIONS 1 SUMMARY

REPUBLIC OF ALBANIA THE ASSEMBLY. LAW No. 9235, dated ON RESTITUTION AND COMPENSATION OF PROPERTY

Addressing Land Sector Opportunities with Geospatial Information in Nepal

MEMORANDUM THE RIGHTS OF LAND OWNERS IN RELATION TO THOSE OF HOLDERS OF RIGHTS IN TERMS OF THE MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT

To: Andrew Clark Your Ref: Our Ref: From: Louise Staples & Hannah Burden Date: 14 June 2010 Location: NFU HQ, Stoneleigh

RP Introduction ABBREVIATED RESETTLEMENT ACTION PLAN (RAP) 1 MAURITIUS URBAN INFRASTRUCTURE PROJECT

In light of this objective, Global Witness is providing feedback on key sections of the 6 th draft of the national land policy:

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

Transcription:

1. Information About Project Name &Location of Sub-project Project Sponsor Project Cost Installed Generation Capacity Key Dates of Implementation ABBREVIATED RESETTLEMENT ACTION PLAN CESE ELEKTRİK ÜRETİM A.Ş. MAVI HEPP is located in Maçka town committed to Trabzon province. CESE ELEKTRİK ÜRETİM AŞ 14.765.899 Euro 2 unit*5.8 MW/unit=11.6 MW Expropriation was done for 0.47 ha area (only 5 parcels) at 27.10.2010. Committee of experts consisting of agricultural engineers prepared expert reports about all parcels separately on 31.01.2011. Fees for expropriation areas paid on 17.02.2011. In terms of environmental and land acquisition conditions, Mavi hydroelectricity project is a smooth and easy project compared to other HEPP projects. Power plant of Mavi HEPP is near the Trabzon-Gümüşhane highway and regulator of this project is very close to this highway. So, there is only 1,700 meter access road in this project. Instead of a transmission channel, a tunnel is constructed between water intake and forebay with the purpose to protect the pristine nature of the area and not to expropriate huge lands. Addition to these entire situations, building shed of this HEPP project which had been previously used by General Directorate of Highways was rented from this public authority. Project Components& Land Requirements Access road, including improvements to existing roads (km&ha): 400 meter access road about 0,2 ha (to access regulator) and 1,300 meter access road about 0,65 ha (to access forebay and penstock), totally 1,700 meter access road about 0,85 ha. Transmission line corridor (ha): 2,8 km about 0,15 ha Penstock(s) (number, ha, length and diameter): One penstock (254 m. length, 1,50 m diameter) Power house, switchyard, associated facilities at power house site (ha): 648 m 2 (18 m* 36 m) powerhouse. (Switchyard has not planned yet) Weir/regulator/ or impoundment structure; indicate which & size of structure: Regulator 500 m 2 Reservoir/ storage impoundment area (ha): There is no reservoir/storage impoundment area. Other physical features requiring land (ha): 383 m 2 (11.6 m*33 m) sedimentation pool 3,745 m. long transmission tunnel and two approach tunnel (270 m and 130 m long)

360 m 2 (12m*30m) forebay. Temporary sites needed for equipment parks, lay-down areas, etc: 2,786.84 m 2 about 0,27 ha Completion of census/inventory of assets: The expropriation process for the private owners was completed. All the compensations were paid in February 2011. The process for the State Land was completed, too. For the electricity transmission line the process has just begun. As it can be seen in Annex 9, route of the electricity transmission line is on the state land. Completion date of the land acquisition: Still on going. Site plan, including associated facilities: Can be found on attachment. 2.Inventory of Land & Assets Acquired from Private Owners (Completely Volunteer Purchased) In the MAVI hydroelectricity project, only five parcels of land belong to private owners and, none of these lands were purchased voluntarily. All these lands were expropriated and expropriation details are given below. 2.1. Inventory of Land & Assets Acquired from Private Owners (Expropriation) Name of Owners/land user Project Component: Area(s) / plots(s) acquired (ha) Owner s/user s total land holding (ha); % taken for project. Land use: pasture, agriculture, residence, etc. The expropriated areas consist of 5 parcels only. The information about the names of the land users, amount of total and acquired areas, unit and total prices of each parcel, structure on the land and expropriation reason of the land is given on Annex 1 (Gürgenağaç Village) and Annex 2 (Anayurt Village) on CESE Land Acquisition Table. 0.47 ha areas were expropriated for the construction of the HEPP. These areas are located in the regulator area. 4 parcels of these lands are pasture and one parcel is hazelnut garden. In the land registration it was written as hazelnut garden but the hazelnut trees in this land are not fertile because the region is not suitable for hazelnut trees. As seen on Annex 5 below, there was not any hazelnut tree in this area. Detail information about these lands is given on Annex 1 and 2 on CESE Land Acquisition Table. The total land belonging to the land owners was 20,951.26 m 2 (2 ha). 22% of this total land was expropriated for the project. Details are given on Annex 1 and 2 on CESE Land Acquisition Table. The lands that are expropriated for this project are generally sandy, gravelly lands and haven t been

Inventory of any structures or other fixed or productive assets (wells, fences, trees, field crops, etc) affected. Indicate if land was rented or informally used by another party. Indicate if non-owner users had assets, trees, crops, etc affected Indicate if land-based activity is primary source of income for owner or land user. Compensation paid. Dates delivered. Impact on income of owner. used for agricultural production. There aren t any residences also. The land is not used for agricultural production. You can see the regulator area (expropriated lands) photos on Annex 5 below. There aren t any settled animals that use the area for reproduction or living because it is a rocky ground. The expropriated lands for this project are generally unqualified lands for agricultural production as indicated before. These lands are not used for generating income. The compensation for the expropriated lands was paid by the sponsor. The expropriated land was not rented or informally used by another party. The expropriated land was not rented or informally used by another party. So there isn t any assets, trees etc. used by non-owner user. Gürgenağaç villagers are mostly making their living from agriculture. But the agricultural areas in this area have steep slope in the high altitudes and not deemed to be beneficial in economic terms so villagers use these areas only to meet their own daily needs. There are also retired people living in these villages. They have pensions and social securities. But the most of the expropriated land owners are not living in the village. There are 5 parcels of expropriated land as indicated before and there are only 11 project affected people but only four of them live in Gürgenağaç village. Other project affected people are living either in other cities or abroad. 70,002.37 TL has been paid to the land owners for expropriation of 20,951.26 m 2 land. Detailed information about compensations paid for each land owner is given on Annex 1 and 2 on CESE Land Acquisition Table. The value of the expropriated land was determined as 15 TL/m 2 by the court, but CESE A.Ş. paid 5 TL/m 2 more to the land owners as favor so that the total compensation became 20TL/m 2 for the expropriated lands. The compensations paid for the expropriation was completed in 17.02.2011. There has been no negative impact on income of land owners whose lands had been expropriated. The expropriated lands are inefficient lands for

farming and hadn t been used for any purpose before, so the compensations paid for these lands have positive effect on the incomes of owners. Most of the expropriated lands are small areas not more than as average 22% of the whole land. The remaining part of the lands could still be used by the landowners. Two parcels of the expropriated lands owners live abroad so they cannot use these lands. From this point of view, it can be said, the compensations paid for these lands were extra incomes for the land owners. During the site visit made on 26.10.2011 and 28.06.2012, the project owners Selim Yılmaz and Cemil Yılmaz declared that nobody had complaints about expropriation. Selim Yılmaz and Cemil Yılmaz have houses in Gürgenağaç village and they live in these houses some months of the year. So, when any complaint occurs, local people could get in touch with project owners easily. 3.Inventory of Public, Community, or State Land Acquired Land parcels / plots acquired (ha). Forest area: 39,061.00 m 2 Treasury area: 14,155.25 m 2 Total Area (Forest+Treasury): 53,216.25 m 2 Details are given on Annex 3-4 on CESE Land Acquisition Table. Land type / land use: Forest, commons for grazing, other. The areas acquired from Ministry of Environment and Forest and Treasury were for the construction of regulator, forebay, penstock and power house. It is hilly unqualified forest land. Photos can be seen on Annex 5-7. Ownership: State, community, other. Structures or other fixed assets. Ministry of Environment and Forest, Treasury. The land is hilly unqualified forest area. There aren t any structures or fixed asset for public use. Compensation, land transfer, or other measures to mitigate impacts on land users. Specify measures and dates of delivery. 32,522.67 TL was paid for the forestry. The compensation which will be paid for the Treasury hasn t been determined yet.

4.Consultations,Communications & Management of Grievances and Implementation Issues -General Information About Project and Project Area : Mavi HEPP is located in Gürgenağaç and Bağışlı villages, committed to Trabzon province, on Hamsiköy Stream (Değirmendere). Project area is 34 km. away from Trabzon province and 11 km away from Maçka district. Gürgenağaç village which is 1.100 m away from Mavi HEPP regulator has population of 314 (142 male+172 female). Bağışlı village which is 550 m away from transmission tunnel has population of 282 (150 male+132 female). In terms of environmental and land acquisition conditions, Mavi hydroelectricity project is a smooth and easy project compared to other HEPP projects. Power plant of Mavi HEPP is near the Trabzon-Gümüşhane highway and regulator of this project is very close to this highway. So, there is only 1,700 meter access road in this project. Instead of a transmission channel, a tunnel is constructed between water intake and forebay with the purpose to protect the pristine nature of the area and not to expropriate huge lands. Addition to all these situation, building shed of this HEPP project which had been previously used by General Directorate of Highways was rented from this public authority. Maçka district has mountanious and rugged land structure and large part of these land is covered by forests. So agricultural land is very small in this district. Agricultural areas that have steep slope in the high altitude areas are not deemed to be beneficial in eceonomic terms so people use these areas to meet their daily needs. The regulator of the Mavi HEPP is located in Gürgenağaç village. The regulator is located on treasury land and on lands of private owners. These lands are unqualified lands that are not used for agricultural production or for residence. They are mostly sandy and gravelly lands. You can see the photos of regulator area on Annex 5.1 and 5.2 below. The water will be transferred from regulator to the power house by 3.700 m. long tunnel. You can see transmission tunnel photos on Annex 6 below. The power plant, penstock and forebay is located in Bağışlı village. The area where the power house is constructed is near the Trabzon-Gümüşhane highway. The power plant, forebay and penstock is located on hilly unqualified forest land. You can see power plant and penstock photos on Annex 7 below. There isn t any historical or cultural structure around the project area. In order to construct the HEPP, expropriation by the civil court, hiring forest land from the Ministry of Environment and Forest and Treasury was done. 4,634.42 m 2 area was expropriated, 70,002.37 TL was paid for this expropriation. The value of the expropriated land was determined as 15 TL/m 2 by the court, but CESE A.Ş. paid 5 TL/m 2 more to the land owners as favor so that the total compensation became 20TL/m 2 for the expropriated lands. In order to use 39,061 m 2 forest area, permissions were taken from District and Management Office of Forest. Also 14,155.25 m 2 Treasury area was used. There isn t any structure expropriation so there isn t any resettlement.

-Consultations,Communications & Management of Grievances: In order to exchange views and give information on the possible effects of the project the stakeholder consultation meetings were held on 15th of September, 2010 in Gürgenağaç Village coffee house and second meeting at the same day in Bağışlı Village. Its announcement has been published on two different days (23rd August and 1st September 2010) in the regional newspaper called Günebakış and meeting announcements displayed at village heads offices. Invitation text was posted to all local and national administrators by e-mail and fax. Local stakeholders were interested in the meeting. 27 people from Gürgenağaç village (2 women, 25 men) and 9 people from Bağışlı village participated to the meeting. The meeting started with the introductory speech of Aynur SEZER, the project specialist of Suen LTD. She explained the purpose of the meeting. And she discussed the relationship of global warming, renewable energy facilities and Mavi HEPP project. She mentioned that the project would create employment opportunities during construction and operation period. She explained that instead of a conveyance canal, the project developers planned to construct a tunnel between water intake and forebay with the purpose to protect the pristine nature of the area. By holding this meeting, local people have information about the HEPP that will construct in their villages and obtaining information about their views and suggestions. Mrs Sezer told the participants that the purpose of this meeting was to hear the concerns of the stakeholders and if existed, the ways to minimize them. There were some concerns about the project, these were: 1. Participant from Bağışlı village asked the future of the water mill that he operated. The project owner Selim Yılmaz answered his question and guaranteed the operation of the water mill. In addition, Mr Yılmaz and participants visited the place of the water mill to observe the situation at the mill. 2. Some participants asked the risk of erosion and landslide potential around regulator. Mrs Sezer and Mr Yılmaz answered that the geological studies were continuing at this area, according to conclusions of this studies all necessary measures would be taken. 3. Another subject that the participants concerned about was employment. Project owners indicated that 74 people would be hired in construction period and 14 people in operation period. For this employment requirement, priority would be given to the local people. Mrs Sezer told the audience that the project would be implemented according to certain criteria and in case of any breach, she said the locals to call them by phone or write their concerns on the notebook that would be left on construction area. Project owner, Selim Yılmaz and Cemil Yılmaz have houses in Gürgenağaç village and they live in these houses some months of the year. So, when any complaint occurs, local people could get in touch with project owners easily.

Three site visits were made to the project area to examine the expropriation process. The first visit was made on 03.08.2010. This visit was also made for the preparation of the project evaluation report. Constructional activities hadn t begun at that time. While wondering around the project site, no agricultural activity and no structure or fixed assetes were seen. After the sponsor started the construction, two visits was made on 26.10.2011 and 28.06.2012. During these visits the inventory of exproptiation for preparing the land acquisition table was obtained. Additionally the project area was gone out with the sponsor. No grievances were reported during the visits. Telephone call was made with the headman of Gürgenağaç village (Yahya Can) on 21.06.2012 in order to obtain information about concerns (if any). Mr. Can said, there were no concerns and no complaints about the project and the company, and also no complaints about the expropriation. The last meeting was arranged on 28.06.2012 in order to obtain information about concerns (if any).the councilor of Bağışlı village (Mr. Aziz Kara) and a landowner (Mr. İhsan Köse-shareholder) whose lands were expropriated attended the meeting. You can see the photo taken with the landowner and the village headman on Annex 8 below. Mr. Can and Mr. Kara gave information about the people whose lands were expropriated: Hamit Can & Sabri Can: 1,016.61 m 2 area of their land was expropriated. Hamit Can lives in İstanbul but his brother Sabri Can lives in Gürgenağaç village. Sabri Can is retired, he has pension and social securitiy. Ali Can: 971,31 m 2 area of his land was expropriated. He doesn t live in village, he lives in Bursa. Fatma Köse, Güller Özcan, Ali Köse, Hayriye Öztürk, Orhan Köse, Yusuf Köse: 1,775.64 m 2 area of their land was expropriated. This land was in the stream bed so its unqualified, gravelly land. Two shareholders live in abroad, others live in village. One of the shareholder is civil cervant. One of the sahreholder s son who lives in village (İhsan Köse) is working in CESE AŞ. He said that they used the money for supplying the personel needs and they had not faced any problem during the construction of the HEPP. Ahmet Çubukçu&Mustafa Çubukçu: 870,86 m 2 area of their land was expropriated. They live in Trabzon and engaged in trade. Some months of the year (especially in summer) they come to the village. In the construction period of the Mavi HEPP, a villager from Bağışlı village made a grievance of his dirty drinking water. Project sponsors solve his problem immediately and supplied water to his house from another water source. The project sponsor did some assistance to the villagers within the context of corporate social responsibility. For example; 50 young villagers are employed during the construction period. When the HEPP begins to produce electricity, 3-4 villagers will have permanent jobs in the company. It can be interpreted as a small

but important step in order to prevent migration from the region. Besides, the daily needs of the working personnel was met from the nearest residential areas, therefore, an additional income source was created for the local people. Bağışlı village headman (Mahmut Yazıcı) and Gürgenağaç village headman (Yahya Can) wrote letter of thanks to CESE Company for their services. The company also did some constructions around as favor so as to help villagers; Road of the Bağışlı village is rehabilitated by CESE Corporation. Mosque of the Bağışlı village is repaired by CESE Corporation. Road of the Gürgenağaç village is rehabilitated by CESE Corporation. Graveyard fence of the Gürgenağaç village is repaired by CESE Corporation. The building construction materials were sent to villages in the area. - Identification of Vulnerable PAP: There are only 11 project affected people (PAP). The sponsor of Mavi HEPP declared that there were not any vulnerable project affected people whose lands were expropriated. The sponsor did assistances to the people living in the villages around, in the scope of corporate social responsibility. If any complaint occurs related with firm or project, local people can touch with these numbers below, easily. Selim YILMAZ (Project Owner): 0 462 523 22 60 Aziz KARA (Mukhtar of Bağışlı Village): 0 537 815 40 85 Yahya CAN (Mukhtar of Gürgenağaç Village): 0 535 368 54 51

Annex 5.1: Regulator Area (Before Construction) Gravelly Lands. There is not any hazelnut garden. 5.2: Regulator Area (During Construction) Gravelly lands in the stream bed.

Annex 6: Transmission Tunnel Annex 7.1: Forebay and Penstock Area (Before Construction) Hilly unqualified forest land

Annex 7.2: Penstock (During Construction) Hilly unqualified land Annex 7.3: Power Plant Area (Before Construction)

Annex 7.4: Power Plant (During Construction) Trabzon-Gümüşhane highway Annex 8: Photo Taken with the Villagers and Village Headman From left to right: TKB s expropriation specialist, Mr İhsan KÖSE (villager), Mr. Selim Yılmaz (sponsor of Mavi HEPP), Mr Aziz KARA (councilor), TKB s environmental specialist.

Annex 9: Route of the Electricity Transmission Line