MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

Similar documents
MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

NEWLIN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

A RESOLUTION AMENDING THE FEE SCHEDULE OF THE TOWNSHIP OF AMITY, PENNSYLVANIA

Location in Code Subject Fees

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

FERGUSON TOWNSHIP 2014 FEE SCHEDULE

West Earl Township 2015 Fee Schedule Item Description Fee

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

RESOLUTION NO. RESOLVED, this 11 th day of December, TOWNSHIP OF FERGUSON. By: Steve Miller, Chairman Board of Supervisors [ S E A L ] ATTEST:

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

City of High Point Development Fee Schedule

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

RESOLUTION NO

Minor Subdivision or Annexation Plans... $1,500.00

ORDINANCE NO HOLDING TANK ORDINANCE

West Earl Township 2017 Fee Schedule Item Description Fee

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

West Earl Township 2016 Fee Schedule Item Description Fee

BUILDING PERMIT FEE SCHEDULE

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

BUILDING PERMIT APPLICATION. Commercial Building Permit Application Checklist

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

3. COMMUNITY DEVELOPMENT Approved FY 18 19

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Town of Walworth Fee Schedule 2019

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

New Hanover Township

City of Georgetown. Inspection Services

RESOLUTION PERMIT FEE SCHEDULE

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

Fee Schedule for Zoning, Building Permits, and Plan Review Services

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

TOWNSHIP OF UPPER ST. CLAIR

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

Planning&Development Fee Standards

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

2018 Town User Fees and Escrow Deposits Schedule for the Town of Hyde Park

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

PROVIDENCE TOWNSHIP 2019 BUDGET

BUILDING PERMIT SUBMITTAL REQUIREMENTS

LOWER OXFORD TOWNSHIP ORDINANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR HOLDING/RETAINING TANKS

9. Public (Federal, State, or local

Remember, PA One-Call before excavating. Simply dial 811 or

COMMERCIAL THIRD PARTY UCC BUILDING INSPECTOR SELECTION FORM & FEE SCHEDULE

DOVER TOWNSHIP YORK COUNTY, PENNSYLVANIA RESOLUTION

BUILDING PERMIT FEE SCHEDULE AMENDED April 9, 2002

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

Mobile Homes on Private Property Permits Licence and Inspection Services

MUNICIPALITY OF PENN HILLS. Ordinance No of 2012

WARMINSTER TOWNSHIP SUBDIVISION AND LAND DEVELOPMENT APPLICATION

RESOLUTION NO. 83 OF 2011

East Vincent Township Chester County, Pennsylvania

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Fees--Commercial Development (includes Residential 3 units or more) Effective August 1, 2017

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

Meeting Date: December 3, 2018 Agenda Item No:

EXHIBIT A to Ordinance No PART 1

DOVER TOWNSHIP YORK COUNTY, PENNSYLVANIA RESOLUTION

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

ORDINANCE NO

CITY OF JERSEY CITY GENERAL DEVELOPMENT APPLICATION

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

SCHUYLKILL TOWNSHIP SUBDIVISION APPLICATION FORM REVISED June 30, Name of Applicant: Address: Telephone No.: Contact: Fax:

Proposed City of Harris 2016 Fee Schedule

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

Transcription:

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #2018-03 A RESOLUTION OF THE TOWNSHIP OF MUDDY CREEK, COUNTY OF BUTLER, COMMONWEALTH OF PENNSYLVANIA, fixing the fees for filing of application, permits and licenses for the fiscal year 2018. The Board of Supervisors hereby Resolve as follows: UNIFORM CONSTRUCTION CODE BUILDING: Building Permit Application Fees (Plan review fees and inspection fees are additional): Residential Accessory Structures and Residential Additions $29.50 Demolition $29.50 Mobile Homes $74.50 Single Family Homes $129.50 All non residential structures 15% of inspection fees Plan Review Fees: USE GROUP RATE AREA B, R-1, R-2, R-3 $.13 First 15,000 s.f. $.08 15,001 up to Total s.f. A,E,H,I $.15 First 15,000 s.f. $.10 15,001 to up to Total s.f. M $.13 First 12,000 s.f. $.07 12,001 up to Total s.f. F,S,U $.10 First 12,000 s.f. $.07 12,001 up to Total s.f. Single Family Dwelling And Townhouse (IRC) $125.00 per unit Unlimited Residential Additions, Manufactured Homes and Accessory Structures (including Decks, swimming pools, porches etc) $50.00 Renovations or alterations to existing structures based on 75% of new construction review (commercial only) Review fees reflect an initial review and one subsequent revision. Any additional required reviews will be conducted at the 50% of the original review cost. (commercial only) Square footage shall include the aggregate sum of each dissimilar floor level. Miscellaneous Commercial Plan Review Fee : Minor commercial alterations < 1,500 s.f. Stand alone Mechanical, Plumbing, Electrical, Fire Preliminary Review(Height,Area, Type of Const.) $125.00 per hour $125.00 per hour $125.00 per hour For group definitions, please contact the township office. Residential Plans will be reviewed within fourteen (14) business days from date that all information required has been received. Commercial Plans will be reviewed within thirty (30) business days from date that all information required has been received.

Rates for Inspection Services: (Fee per square foot of construction (gross aggregate) Group Description Fee per square foot ALL Demolition, commercial occupancy $125.00 Flat Rate A-1 Assembly Theaters.350 A-2 Assembly, nightclubs,assembly,.350 restaurants,bars,banquet halls A-3 Assembly Churches.300 A-3 Assembly, general community halls,.350 libraries, museums A-4 Assembly arenas.300 B Business.350 E Education.400 F-1 Factory and Industrial, moderate.250 hazard F-2 Factory and Industrial, low hazard.250 H-1 High Hazard, explosives.300 H-2 through H-4 High Hazard.300 H-5 Hazardous Production.300 I-1 Institutional, supervised environment.350 I-2 Institutional, incapacitated.350 I-3 Institutional, restrained.400 I-4 Institutional, day care.400 M Mercantile.300 R-1 Residential, hotels.350 R-2 Residential, multiple family.350 R-3 Residential, one and two family.475 R-4 Residential, care/assisted living.350 S-1 Storage, moderate hazard.250 S-2 Storage, low hazard.225 U Utility, miscellaneous.250 Manufactured Without basement $450.00 Homes Manufactured With basement $650.00 Homes Communication w/associated equipment $250.00/ tower Towers Occupancy permits, demolition, decks, porches, roofs, swimming pools Accessory to one and two family dwellings $125.00 Gross aggregate shall include the sum of the square footage on each floor including the basement not to exceed 50,000 s.f. Fee includes all UCC required inspections (building general, mechanical, plumbing, energy and accessibility) Square footage for residential one and two family dwellings shall be calculated based upon maximum building footprint. Additions to residential structures shall be the base rate per schedule plus $100.00 Alterations to existing structures shall be calculated at 75% of the chart rate for the renovated area.

ASSESSMENT PERMIT: Accessory buildings or structures that $25.00 do not qualify for Uniform Construction Code compliance. SUBDIVISION/LAND DEVELOPMENT: 1. Lot Line Revision/Minor Revision Review $255.00 Administrative Fee $50.00 Recording Fee Escrow ** $50.00 Engineering Base Fee Escrow* $155.00 2. Two through Four Lots $550.00 Administrative Fee $100.00 Recording Fee Escrow** $50.00 Engineering Base Fee Escrow * $400.00 3. Five through Ten Lots Administrative Fee $225.00 $675.00 Recording Fee Escrow** $50.00 Engineering Base Fee Escrow * $400.00 4. Eleven and Up Administrative Fee $225.00 Recording Fee Escrow ** $50.00 Engineering Fee Escrow * $200.00 per lot 5. Residential Land Development $525.00 Administrative Fee $75.00 Recording Fee Escrow** $50.00 Engineering Base Fee Escrow * $400.00 6. Non Residential Development Administrative Fee $125.00 Recording Fee Escrow** $100.00 Engineering Fee (Base Rate)Escrow* $600.00 Engineering Fee Escrow * $100.00 Additional per acre after five acres. *Any engineering fees that exceed the base rate fee incurred by the township will be the responsibility of the applicant. **The applicant will be responsible to reimburse the Township for any costs incurred above and beyond the fees listed in the fee schedule. Plans will not be recorded until all fees have been paid. DRIVEWAY PERMIT (Plus storm water, road occupancy, and/or engineering fee if applicable) Newly Constructed Driveway Permit Application $25.00 New Driveway Engineer Fee $100.00 Existing Driveway Permit Application $25.00 Existing Driveway Modification Inspection Fee $25.00

*Engineering fee incurred for existing driveway Modification will be the responsibility of the Applicant. SEPTIC Administrative Fee $75.00/application Plus fees listed below for SEO services Single Family Residential (in ground and elevated systems) $600.00 Spray Irrigation System (IRSIS) <20,000 s.f. $600.00 20,000 to 40,000 s.f. $675.00 >40,000 s.f. $800.00 Commercial/Multifamily/Community System <800 gpd $700.00 >799 gpd $800.00 Alternate Systems Requiring A Morphological Survey $815.00 Additional Fees: Administration fee Plus fees listed below for SEO services $25.00/application Alternate Site Pit/Perc Test per DEP or Township $100.00 each (5 pits and 1 perc) Verification of Prior Testing $100.00 Granny Flat $150.00 New Tank Replacement $150.00 Ten Acre Exemption $125.00 Non Building Waiver per system $75.00 Walk Around for Sewage Planning per system $50.00 Abandoned system (not used for more than 1 yr) $405.00 Dye Testing Existing System (per test) $150.00 Planning Module Review $35.00 Unprepared Site charge $50.00 Fee to Inspect design $50.00 Interim Inspection (if requested or required) $50.00 Pre construction Inspection (if requested or required) $125.00 Additional Pits requested by on the same day as Scheduled test $25.00 Inspection fees per Agreements or DEP Systems that need lab analysis (includes lab) $200.00 Systems or components with no lab analysis $125.00 (includes holding tanks) Dye Test needed during inspection $100.00 Granny Flat Application (New) $25.00 (Plus SEO fees) Granny Flat Annual Renewal $10.00

JUNKYARD PERMIT: Non-Residential $200.00 200 Vehicles or more $100.00 50 to 100 Vehicles $ 75.00 Less than 50 Vehicles $ 50.00 OVERWEIGHT HAULING Bond: $12,500 - $50,000/mile Application/Administrative Fee $100.00 Road Inspection Fees (Pre/Post) $90.00 ROAD OCCUPANCY PERMIT: Administration Fee $100.00 Road Inspection Fees (Pre/Post) $90.00 Bonding As determined by Board of Supervisors Based on the project. EQUIPMENT RENTAL: Dump Trucks with operator Dump Trucks with snow plow and Operator Skid steer with operator Backhoe with operator Grader with operator Ford Truck with operator Ford Truck with snow plow and operator Tractor with mower and operator $80.00/hour $90.00/hour $40.00/hour $80.00/hour $70.00/hour $60.00/hour $70.00/hour $50.00/hour HIGHWAY OCCUPANCY PERMIT (PADOT) Administrative Fee $25.00 Application Fee In accordance with Most recent edition of the Schedule of Fees for Highway Occupancy Permits issued by PSATS Engineering Fee Actual costs GRADING PERMIT: Application/Administrative Fee $25.00 Engineer Review Fee Actual costs+ STORMWATER MANAGEMENT REVIEW: Application/Administrative Fee $100.00 Engineer Fees $Actual costs+ FLOOD ZONE REVIEW: Administrative Review (refundable if permit is not issued) $25.00 Engineer Fees $Actual costs+ Flood Zone Letters $100.00/letter PUBLIC HEARING (UCC AND SEWAGE)

RESIDENTIAL A: In submitting an application for a residential appeal, a filing fee of $700.00 and an escrow deposit of $500.00 is required. B: In the event that the costs associated with processing the application to the Building Code Board of Appeals shall exceed the escrow amount, the applicant shall be required to deposit an additional sum in escrow to cover the additional costs. COMMERCIAL A: In submitting an application for a commercial, institutional or industrial appeal, a filing fee of $1750 and an escrow deposit of $1000 is required. B: In the event that the cost associated with processing the application to the Building Code Board of Appeals shall exceed the escrow amount, the applicant shall be required to deposit an additional sum in escrow to cover the additional costs. APPEALS BOARD (No Hearing) Application/Hearing Fee: $300.00 Plus any additional legal fees/engineering fees incurred by the township. MISCELLANEOUS Municipal No Lien Letters $20.00 Copies of Single Pages (Act 100) $.25/page Facsimile Fee $.25/page Email Fee $.25/page Certification of a record $5.00/certification Postage to mail records (Actual cost) Return Check Fee $37.00 Mailing Planning Modules/Building Permits/ Engineering Plans $Actual reproduction costs Research by Office Staff $25.00/hour Subdivision/Land Development Ordinance $25.00 Administrative Fees are non-refundable unless otherwise noted. Applicant is responsible to reimburse the Township for any costs incurred by the Township beyond the fees listed above for services performed by consultants for the Township at the normal rate charge. Any engineering fees that exceed the base rate fee incurred by the township will be the responsibility of the applicant. +All engineer fees shall be paid prior to the issuance of any permit, letter or plans. The applicant will be responsible to reimburse the Township for any costs incurred above and beyond the fees listed in the fee schedule. Resolution, or parts thereof in conflict with this Resolution be and is hereby repealed insofar as the same may effect this Resolution. ENACTED AND RESOLVED this 2nd day of January, 2018.

ATTEST: Kelly Livermore Secretary/Treasurer (SEAL) MUDDY CREEK TOWNSHIP BOARD OF SUPERVISORS: Dale Kerr Eric Saunders Robert J. Jesteadt, Sr.