MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

Similar documents
MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

A RESOLUTION AMENDING THE FEE SCHEDULE OF THE TOWNSHIP OF AMITY, PENNSYLVANIA

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

Location in Code Subject Fees

City of High Point Development Fee Schedule

City of Wausau Building, Housing and Zoning Fee Schedule 2019

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

West Earl Township 2017 Fee Schedule Item Description Fee

West Earl Township 2016 Fee Schedule Item Description Fee

3. COMMUNITY DEVELOPMENT Approved FY 18 19

West Earl Township 2015 Fee Schedule Item Description Fee

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

Planning&Development Fee Standards

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

FERGUSON TOWNSHIP 2014 FEE SCHEDULE

APPENDIX A BUILDING PERMIT AND RELATED FEES

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

RESOLUTION NO. RESOLVED, this 11 th day of December, TOWNSHIP OF FERGUSON. By: Steve Miller, Chairman Board of Supervisors [ S E A L ] ATTEST:

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

RESOLUTION NO

NEWLIN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA

Minor Subdivision or Annexation Plans... $1,500.00

Town of Walworth Fee Schedule 2019

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

City of Georgetown. Inspection Services

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

$ $ $ $ $ Failed Inspection... Residential...$ must be paid prior to re-inspection Miscellaneous $ 146.

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

Fee Resolution

BUILDING PERMIT FEE SCHEDULE

FY 2018 FEE SCHEDULE (Effective )

The City of Daytona Beach Fee Schedule

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

Resolution Fee Schedule

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

BUILDING SERVICES ~ FEE SCHEDULE

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

East Vincent Township Chester County, Pennsylvania

Worcester Township Fee Schedule

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

City of Georgetown. Inspection Services

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Schedule of City Fees & Charges

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Class of Permits and Fees Schedule A

BUILDING PERMIT APPLICATION. Commercial Building Permit Application Checklist

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

Use permitted by: Right Special Exemption

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

DOVER TOWNSHIP YORK COUNTY, PENNSYLVANIA RESOLUTION

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

EXHIBIT A to Ordinance No PART 1

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

RESOLUTION NO

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

CHAPTER 18 SEWERS AND SEWAGE DISPOSAL

MUNICIPALITY OF PENN HILLS. Ordinance No of 2012

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

2018 Town User Fees and Escrow Deposits Schedule for the Town of Hyde Park

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

ASTON TOWNSHIP 2018 FEE SCHEDULE FOR CODE ENFORCEMENT

TOWNSHIP OF UPPER ST. CLAIR

DOVER TOWNSHIP YORK COUNTY, PENNSYLVANIA RESOLUTION

THE BOARD OF COUNTY COMMISSIONERS

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

Transcription:

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #2019-03 A RESOLUTION OF THE TOWNSHIP OF MUDDY CREEK, COUNTY OF BUTLER, COMMONWEALTH OF PENNSYLVANIA, fixing the fees for filing of application, permits and licenses for the fiscal year 2019. The Board of Supervisors hereby Resolve as follows: UNIFORM CONSTRUCTION CODE BUILDING: Building Permit Application Fees (Plan review fees and inspection fees are additional): Residential Accessory Structures and Residential Additions $29.50 Demolition $29.50 Mobile Homes $74.50 Single Family Homes $129.50 All non-residential structures $129.50 +15% of inspection fees Plan Review Fees: USE GROUP RATE AREA B, R-1, R-2, R-3 $.13 First 15,000 s.f. $.08 15,001 up to Total s.f. A,E,H,I $.15 First 15,000 s.f. $.10 15,001 to up to Total s.f. M $.13 First 12,000 s.f. $.07 12,001 up to Total s.f. F,S,U $.10 First 12,000 s.f. $.07 12,001 up to Total s.f. Single Family Dwelling And Townhouse (IRC) $125.00 per unit Unlimited Residential Additions, Manufactured Homes and Accessory Structures (including Decks, swimming pools, porches etc.) $50.00 Renovations or alterations to existing structures based on 75% of new construction review (commercial only) Review fees reflect an initial review and one subsequent revision. Any additional required reviews will be conducted at the 50% of the original review cost. (commercial only) Square footage shall include the aggregate sum of each dissimilar floor level. Miscellaneous Commercial Plan Review Fee : Minor commercial alterations < 1,500 s.f. Stand-alone Mechanical, Plumbing, Electrical, Fire Preliminary Review (Height, Area, Type of Const.) $125.00 per hour $125.00 per hour $125.00 per hour For group definitions, please contact the township office. Residential Plans will be reviewed within fourteen (14) business days from date that all information required has been received.

Commercial Plans will be reviewed within thirty (30) business days from date that all information required has been received. Rates for Inspection Services: (Fee per square foot of construction (gross aggregate) Group Description Fee per square foot ALL Demolition, commercial occupancy $135.00 Flat Rate A-1 Assembly Theaters.350 A-2 Assembly, night clubs, assembly, restaurants,.350 bars, banquet halls A-3 Assembly Churches.300 A-3 Assembly, general community halls, libraries,.350 museums A-4 Assembly arenas.300 B Business.350 E Education.400 F-1 Factory and Industrial, moderate hazard.250 F-2 Factory and Industrial, low hazard.250 H-1 High Hazard, explosives.300 H-2 through H-4 High Hazard.300 H-5 Hazardous Production.300 I-1 Institutional, supervised environment.350 I-2 Institutional, incapacitated.350 I-3 Institutional, restrained.400 I-4 Institutional, day care.400 M Mercantile.300 R-1 Residential, hotels.350 R-2 Residential, multiple family.350 R-3 Residential, one and two family.500 R-4 Residential, care/assisted living.350 S-1 Storage, moderate hazard.250 S-2 Storage, low hazard.225 U Utility, miscellaneous.250 Manufactured Homes Without basement $450.00 Manufactured Homes With basement $650.00 Communication w/associated equipment $250.00/ tower Towers Occupancy permits, demolition, decks, porches, roofs, swimming pools Accessory to one- and two-family dwellings $125.00 Gross aggregate shall include the sum of the square footage on each floor including the basement not to exceed 50,000 s.f. Fee includes all UCC required inspections (building general, mechanical, plumbing, energy and accessibility) Square footage for residential one- and two-family dwellings shall be calculated based upon maximum building footprint. Additions to residential structures shall be the base rate per schedule plus $100.00 Alterations to existing structures shall be calculated at 75% of the chart rate for the renovated area. Manufactured (HUD) homes shall be inspected for a flat fee of $450.00 plus $200.00 where basement provided. Occupancy Permits, Signs, Antenna, Demolitions, Decks, porches, roof replacement, pools etc. accessory to one- and two-family dwellings shall be inspected for a fee of $135.00 Communication towers and associated equipment shall be inspected for a flat fee of $250.00 per tower.

Itemized Fees for Installations/Alterations not relating to new work or additions: The following fees apply to the installation or alteration of fixtures common with electrical work. A fee of $75 per inspection shall apply where an installation or inspection required is not listed below. Residential Electrical Inspections (IRC) *IRC Electrical installation inspections (2 site visits rough inspection, Final inspection) Alterations and Additions $160.00 ($65 each additional inspection) PLUS All new service equipment up to 400 A $85.00 plus $10 per meter *IRC Electrical installation inspection (4 site visits Temp, rough inspection, final inspection, service) Complete Single-Family Dwelling $265.00 ($75 ea. additional inspection) Residential Electrical Work Other Than Additions/Alterations: NEC installation inspection (1 site visit) Service Upgrade or Rewire $85.00 plus $10/meter over 1 Solar PV $235 + $75 for new service Swimming Pools Above Ground/Hot Tub $95.00 In Ground $135.00 (2 site visits) Heating/AC Equipment $55.00/unit Generators $85.00/unit Transformers $80.00/unit Appliance (dishwasher/disposal etc.) $55.00/unit Septic, Grinder and related equipment $250.00/unit Commercial Electrical New Work/Alterations Cost per square foot of structure (up to 40,000 sf) $85. Plus.10 x gross SF Commercial Electrical Work Other than New Work/Alterations Electrical Services Temporary Service $85.00 (1 site visit) Permanent Service (Up to 200 amp) $85.00 (1 site visit) (Over 200 amp) $95.00 (1 site visit) (each additional meter) $15.00 per socket Signs $95.00/unit Solar PV 4225 + $25(each array over 4) + $75 for new service Public Swimming Pool $350.00 Site Lighting $80.00 plus $5.00 fixture unit Fire Alarm $265.00 Individual Equipment $55/per fixture *Additional inspections above minimum done at $75 per additional visit Residential Plumbing Work Other Than Additions/Alterations Fixture drain & supply Installed (water closet, lavatory, hose bibb, etc.): 1,2 Residential: New work 1-5 fixtures $20.00/fixture New work between 5-25 fixtures New work > 25 fixtures $95.00 + $5.00 for each fixture over 25

Commercial: New work 1-5 $25.00/fixture New work between 5-25 fixtures $165.00 New work > 25 fixtures $145.00 + $7.00 for each fixture over 25 Equipment Installation: Water Heater/Boiler replacement $95.00/unit (1 inspection) 2 Radiant Heating System $165.00 (2 site inspections) 2 1 Pricing includes 3 site inspections: (1 underground, 1 rough, 1 final) 2 Additional inspections required above minimum done a $65 per additional visit HVAC (1,2) Residential Commercial Gas piping & fixtures: New work (gas oven, grills, etc.) $75.00 $95.00 New work over 5 fixtures $95.00 $145.00 Equipment Installation: Furnace or Heating Unit $75.00/unit $95.00/unit 2 Type I or Type II Hood System $125.00/unit 2 New/Replaced Duct system (Res & Comm) 1 Pricing includes 2 site inspections: (1 rough, 1 final) 2 Additional inspections required above minimum done at $45 per additional visit $95.00 +.01 x cost of duct system Fire Protection (1,2) Fire Suppression Systems $195.00 $350.00 Fire Alarm Systems >>Required or Non-Required $95.00 $275.00 1. Pricing includes 2 site inspections (1 rough, 1 final) 2. Additional inspections required above minimum done at $45.00 per additional visit ASSESSMENT PERMIT: Accessory buildings or structures that $25.00 do not qualify for Uniform Construction Code compliance. SUBDIVISION/LAND DEVELOPMENT: 1. Lot Line Revision/Minor Revision Review $255.00 Administrative Fee $50.00 Recording Fee Escrow ** $45.00/page Engineering Base Fee Escrow* $160.00 2. Two through Four Lots $545.00 Administrative Fee $100.00 Recording Fee Escrow** $45.00/page Engineering Base Fee Escrow * $400.00 3. Five through Ten Lots Administrative Fee $225.00 $670.00 Recording Fee Escrow** $45.00/page Engineering Base Fee Escrow * $400.00

4. Eleven and Up Administrative Fee $225.00 Recording Fee Escrow ** $45.00/page Engineering Fee Escrow * $200.00 per lot 5. Residential Land Development $525.00 Administrative Fee $75.00 Recording Fee Escrow** $45.00/page Engineering Base Fee Escrow * $400.00 6. Non-Residential Development Administrative Fee $125.00 Recording Fee Escrow** $45/page Engineering Fee (Base Rate) Escrow* $600.00 Engineering Fee Escrow * $100.00 Additional per acre after five acres. *Any engineering fees that exceed the base rate fee incurred by the township will be the responsibility of the applicant. **The applicant will be responsible to reimburse the Township for any costs incurred above and beyond the fees listed in the fee schedule. Plans will not be recorded until all fees have been paid. DRIVEWAY PERMIT (Plus storm water, road occupancy, and/or engineering fee if applicable) Newly Constructed Driveway Permit Application $25.00 New Driveway Engineer Fee $100.00 Existing Driveway Permit Application $25.00 Existing Driveway Modification Inspection Fee $25.00 *Engineering fee incurred for existing driveway Modification will be the responsibility of the Applicant. SEPTIC Administrative Fee Plus fees listed below for SEO services Single Family Residential (in ground and elevated systems) $75.00/application $600.00 + Application fee Spray Irrigation System (IRSIS) Soil profile<20,000 s.f. $200.00 Soil profile 20,000 to 39,999 s.f. $250.00 >40,000 s.f. $350.00 Review Design (Issue/Deny) Permit 20,000 sf $150.00 Review Design (Issue/Deny) Permit 20,001 to 39,999 sf $175.00 Review Design (Issue/Deny) Permit 40,000 + $200.00 Pre-Construction Inspection $125.00 Final Inspection (All systems) $125.00

Total Fee 20,000 s.f. Total Fee 20,0001 to 39,999 s.f. Total Fee 40,000 s.f. + $600.00 + Application fee $675.00 + Application fee $800.00 + Application fee Commercial/Multifamily/Community System <800 gpd $700.00 + Application fee >799 gpd $800.00 + Application fee Commercial / Institutional / Multifamily / Community System (Inground and elevated systems) 200-799gpd 800-1199 gpd Site Investigation and or Soil Evaluation $ 250.00 $275.00 (up to 5 pits) Percolation Test (up to 8 holes) $ 250.00 $275.00 Review Design (Issue / Deny Permit ) $ 75.00 $ 100.00 Interim Inspection $ 50.00 $ 50.00 Final Inspection $ 75.00 $100.00 Total Fee: $ 700.00 $800.00 Alternate Systems Requiring A Morphological Survey Assisting the Soil Scientist with a Morphological Survey or evaluation of the site soils $225.00 Inspection of design drawings and issuing of a permit $150.00 Pre-Construction Inspection/meeting $125.00 Final Inspection $100.00 Total Fee $600.00 (If percolation test is required within site additional $240.00 fee will be required) Additional Fees Alternate Site Pit & Perc. Testing per. D.E.P or Twp. Regulations (up to 5 pits & 1 perc. up to 8 holes on same day as primary site testing) $100.00 each Verification of Prior Testing $100.00 Granny Plats $150.00 (Twp. determines if hardship)

10-acre exemption ($25.00 by applicant $100.00 by Twp). (If Municipality does not prohibit the use of exemption) $125.00 New Septic Tank, Dose Tank, Holding Tank or Distribution box installation (per tank or item) $150.00 Non-Building Waiver or lot line revision per. system walk around $75.00 Walk Around for sewage facilities planning per. system $50.00 Abandoned systems (system not used for more than 1 year and require Building permit) Dye Test existing system (3 consecutive dye tests) $405.00 Planning Module Review $35.00 Dye Testing $150.00 Unprepared Site charge $50.00 Fee to review design because original was returned for any cause $50.00 Deny permit for any cause $50,00 Interim Inspection (if requested or required) $50.00 Pre-Construction Inspection/meeting (if requested or required) $125.00 Additional pits over 5 or perc. holes over 8 requested by land owner or required on the same day as original testing $25.00 Commercial, Institutional, Multi family or Community systems greater than (2 EDU)1199gpd shall be $800.00 + $200.00 per. EDU System Inspections Per. Agreements or D.E.P Regulations System or component that needs laboratory analysis $200.00 (Includes up to $60.00 Lab Fees) System or component that does not require lab. Including Holding Tank (per tank) $125.00 If dye test is needed during inspection $100.00 Miscellaneous and Enforcement Activities A Charge of $65.00 per. hour will apply to the following including travel time: Legal action including court hearings Complaint Investigations (All complaints shall be written and signed) Violation Investigations Miscellaneous activities.

JUNKYARD PERMIT: Non-Residential $200.00 200 Vehicles or more $100.00 50 to 100 Vehicles $ 75.00 Less than 50 Vehicles $ 50.00 OVERWEIGHT HAULING Bond: $12,500 - $50,000/mile Application/Administrative Fee $100.00 Road Inspection Fees (Pre/Post) $90.00 ROAD OCCUPANCY PERMIT: Administration Fee $100.00 Road Inspection Fees (Pre/Post) $90.00 Bonding As determined by Board of Supervisors Based on the project. EQUIPMENT RENTAL: Dump Trucks with operator $80.00/hour Dump Trucks with snow plow and Operator $90.00/hour Skid steer with operator $40.00/hour Backhoe with operator $80.00/hour Grader with operator $70.00/hour Ford Truck with operator $60.00/hour Ford Truck with snow plow and operator $70.00/hour Tractor with mower and operator $50.00/hour HIGHWAY OCCUPANCY PERMIT (PADOT) Administrative Fee $25.00 Application Fee In accordance with Most recent edition of the Schedule of Fees for Highway Occupancy Permits issued by PSATS Engineering Fee $500.00+ GRADING PERMIT: Application/Administrative Fee $25.00 Engineer Review Fee $100.00+ STORMWATER MANAGEMENT REVIEW: Application/Administrative Fee $100.00 Engineer Fees $800.00+ FLOOD ZONE REVIEW: Administrative Review (refundable if permit is not issued) $25.00 Engineer Fees $Actual costs+ Flood Zone Letters $100.00/letter

PUBLIC HEARING (UCC AND SEWAGE) RESIDENTIAL A: In submitting an application for a residential appeal, a filing fee of $700.00 and an escrow deposit of $500.00 is required. B: In the event that the costs associated with processing the application to the Building Code Board of Appeals shall exceed the escrow amount, the applicant shall be required to deposit an additional sum in escrow to cover the additional costs. COMMERCIAL A: In submitting an application for a commercial, institutional or industrial appeal, a filing fee of $1750 and an escrow deposit of $1000 is required. B: In the event that the cost associated with processing the application to the Building Code Board of Appeals shall exceed the escrow amount, the applicant shall be required to deposit an additional sum in escrow to cover the additional costs. APPEALS BOARD (No Hearing) Application/Hearing Fee: $300.00 Plus any additional legal fees/engineering fees incurred by the township. REAL ESTATE TAX COLLECTOR FEES Tax Card Duplicates, Extra Tax Cards, Reprint Tax Cards $10.00/card Tax Certifications (3 years) $40.00 MISCELLANEOUS Municipal No Lien Letters $20.00/parcel Copies of Single Pages (Act 100) $.25/page Facsimile Fee $.25/page Email Fee $.25/page Certification of a record $5.00/certification Postage to mail records (Actual cost) Return Check Fee $37.00 Mailing Planning Modules/Building Permits/ Engineering Plans $Actual reproduction costs Research by Office Staff $25.00/hour Subdivision/Land Development Ordinance $25.00 Administrative Fees are non-refundable unless otherwise noted. Applicant is responsible to reimburse the Township for any costs incurred by the Township beyond the fees listed above for services performed by consultants for the Township at the normal rate charge. Any engineering fees that exceed the base rate fee incurred by the township will be the responsibility of the applicant. +All engineer fees shall be paid prior to the issuance of any permit, letter or plans. The applicant will be responsible to reimburse the Township for any costs incurred above and beyond the fees listed in the fee schedule.

Resolution, or parts thereof in conflict with this Resolution be and is hereby repealed insofar as the same may effect this Resolution. ENACTED AND RESOLVED this 7th day of January, 2019. ATTEST: Kelly Livermore Secretary/Treasurer (SEAL) MUDDY CREEK TOWNSHIP BOARD OF SUPERVISORS: Dale Kerr Eric Saunders Robert J. Jesteadt, Sr.