We are building future. Kodumaja.

Similar documents
HOUSES COMPANY PROFILE

As society changes, so do our housing needs. Factors

A different viewpoint. PROPERTY OF DMCI HOMES

Sophia 6mx10m (60m2) Prefabricated 2BR + Bathroom & Kitchenette, 3 STAR Model $ 59,999

2014 Vancouver Building By-Law

Terms of Sale and Delivery for ST Skoleinventar A/S

Tenant Improvement Program (TIP) Design Review

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

Leasing to Finance Innovation Jurgita Bucyte Senior Adviser in Statistics & Economic Affairs, Leaseurope

INFO-PACK. Tiara Tower 14-Feb-14 Page 1

Glamping Room Super-pod 4m x 7.2m model

Architectural Process & Standard for Parish Construction Project Canons of the Episcopal Church in the Diocese of Alabama: Canon 6 Section 6

Living Solutions. Granny Flats Teenage Retreats Workshops Rumpus Room Home Office Pool House Spare Room Studios. Building a Home For Everyone

Construction information

Urban Planning and Architectural Standards for Social Housing Architectural Design

GENERAL TERMS OF ORDER for works performed on the ground

Chapter III THE HOUSING STOCK

Imperial Court. Sector 128, Noida INFOPACK MARKETED BY

Emil Møllers Gade 41 Horsens, Denmark

To Improve Space Utilization Efficiency: Periodic Renting Strategies of Residential Open Buildings

LEGEND. A Apartments. T Townhouses

Standard Features. Call Terri Thompson

MODERN LIVING IN LINDENLEA

Camp Construction Booklet

LUXURY IN THE NATURE.


inspired luxury aspired living. Railway Colony, Opp. Kendriya Vidyalaya, Palakkad.

Balanced ventilation in apartment buildings

ALTERATIONS/ IMPROVEMENT POLICY

Electrical Safety Statutes and Regulations May 2018 Labor Standards and Safety Division Mechanical Inspection

Hotel Room Super-pod 4m x 4.8m model

The Presentation of Nawrocki Group

SKYLINE HOMES OF ARKANSAS CIT Y, KANSAS 24' 28' 32' SERIES

A Safe Community for New Beginnings

Proposal for a COMMISSION REGULATION

Renovating older apartment buildings A multi-disciplinary international project. Architectural design & construction

EHSL - Private Sector Leasing Information for Care Providers and Local Authorities

Phase 2 & 3. Villa Type. 3 Bedroom Two Storey Built up 265 sq m. 4 Bedroom Two Storey Built up 290 sq m 14,100,000 13,100,000 16,000,000 15,000,000

Apt 83 Custom House Residence, 4 Ulster Street, Belfast, BT1 3ES

Luxury Homes FROM separate entry exits D L F B A Y V I E W

HOUSING ELEMENT GOALS, OBJECTIVES, & POLICIES

Brighton & Hove City Council. Standards for Licensable Houses in Multiple Occupation

INNOVATIVE STEEL STRUCTURES & DESIGN ALTON PKWY 154/123 IRVINE, CA LEO DELGADO DIRECT: (949)

Lunetten 4D Utrecht, The Netherlands,

AA VVS 09. Definition of Terms In application of AA VVS 09, the price base amount according to the National Insurance Act (1962:381) applies.

Energy consumption in an old residential building before and after deep energy renovation

St Charles Parish Housing Authority (SCPHA)

Devonshire Park Devonshire Road, Heaton, Bolton BL1 4PU

IT TAKES A BLOCK BLOCK LAYERS THE BUILDINGS THE ROOFSCAPE THE URBAN ARBORETUM THE GALLERIES GREENHOUSE AND MEETING PLACE ROOF TOP FARM

M O D E R N L I V I N G A T A F F O R D A B L E P R I C E S

HOW DO YOU DEFINE SUCCESS?

Selecting your contractor Construction contracts Construction liens Lien documents Payments to contractors

a) Tenant shall require its Contractor to provide and maintain the following insurance coverage:

Apartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.

To establish the structure and content of contracts.

a. RIGHTS OF WAY: Utility will own, operate and maintain extension facilities only: ISSUED BY Date Filed: July 2, 1996

IEA ECBCS Annex 50 Prefab Retrofit of Buildings. Vorgefertigte Fassaden- und Dachelemente in der Sanierung

New Loft-Style Homes. In Downtown Des Moines Most Exciting New Neighborhood

Interim report presentation

The Mask Cottage, Built 2000

15. September 2014 Reconstruction after WW II

Chapter 09. Chapter 9 Learning Objectives. Housing Alternatives by life stage. The Decision: Factors and Finances

ADAPTATIONS POLICY 2012

CHAPTER 10 ARTICLE II DIVISION 2: MINIMUM STANDARDS

A guide to... HMO and Multi-Unit Blocks

Seabreezes, Newton, Isle of Lewis 355,000. Offers Over

Contract Law Basics and Standard Form Construction Contracts ENSC SFU. Presented by: Bob Gill, MEng, PEng, FEC

FREE ESTIMATE. How to: to complete these forms simply click the grey box and type your response.

WESTBROOK III & HIGHLAND III Live Work Town Center Townhomes

2015 IBC Allowable Heights and Areas

TO LET. Radford Road Workshop Alvechurch Birmingham.

VILLAS - 2 STOREY. Pricelist

FLOOR PLANS. 62 GERMANY ISLAND - The Heart of Europe GERMANY ISLAND - The Heart of Europe 63

An exclusive development of 4 designer villas with stunning sea views

CO-OPERATIVE SOLUTIONS TO THE AGE OLD PROBLEMS IN HOUSING

47A Knightsbridge Park, Belfast, BT9 5EH. Offers Over 495,000. Telephone

Governing Body 323rd Session, Geneva, March 2015

1/9 Comber Place, Comber Heights, Johnsonville, Wellington

Dispelling the Myths About Manufactured Housing

Innovative Models for Financing and Developing ADUs

Seabreezes, Newton, Stornoway, Isle of Lewis 335,000. Offers Over

Viewing By Appointment on

SPECIFICATIONS. Exteriors Cement Plaster; Cement based weather coat painting.

YOUR STOREY IN HISTORY AYIKKARA, KANNUR

INFO-PACK. Knight s Court Info Pack Page 1

Offering Memorandum. 790 Ferrari Ln., Ontario CA T F PAGE

EXHIBIT C. Leasehold Improvements Work Letter

Seaview Gate Dublin Road Shankill Co Dublin sherryfitz.ie

Asking price of 141,950 High Thorpe Crescent, Cleethorpes, DN35

An Established Authority On New Jersey Real Estate

518 3 rd Avenue South St. Petersburg, Florida

Understanding Accessibility Features to Meet Housing Needs

'Specialists in Corporate Relocation'

BUILDING SPECIFICATIONS

Municipal Assessment. Taxes (annual) Expenses/Energy (annual) Room(s) and Additional Space(s) Centris No (Active) $1,195,000 + GST/QST

SMITH DOUGLAS H OMES P RE SENT S HIGHLANDS AT MADISON PARK BASE PRICE SHEET. The Benson 3 Beds / 2.5 Baths Approx 1,801 Sq. Ft.

CGFB s 30 design is offered in a classic design style with the option to choose from our range of wall, roof and colour selections.

Roggelseweg 138 te Egchel

4/9 Comber Place, Comber Heights, Johnsonville, Wellington. Architect s impression of 4/9 Comber Place

An in depth analysis of all aspects of pipe work restoration. Part 2

Transcription:

We are building future Kodumaja www.kodumaja.ee 2018 1

What does Kodumaja mean? Kodumaja name of trademark - group of the companies who are acting under the trademark Kodumaja often used when talking about specific company in the group of Kodumaja companies 2018 2

2018 3 Group of companies connected to Kodumaja

Main field of activity Design and construction of prefabricated wooden frame buildings Kodumaja companies produces and builds mainly: apartments in multi - storey apartment buildings apartments in small buildings (houses with 4 6 apartments, row houses, standard double houses and standard private dwellings designed usually in cooperation with the customer) assisted living apartments for elderly people and people with disabilities other buildings for permanent use (student apartments, hotels, etc.) and if capacity is available then also modules for camps and offices, nursery schools, schools, holiday homes etc. 2018 4

Multi-storey house in Norway on 14 floors World s tallest wooden structure multi-storey house Treet 14 floors, 52,8 m Bergen, Norway 2018 5

2018 6 Multi storey house in Norway on 4-6 floors

2018 7 Group of multi-storey houses in Norway 5 floors

2018 8 Multi-storey house in Sweden 5 floors

2018 9 Group of multi-storey houses in Norway 3-5 floors

2018 10 Multi-storey house in Norway 5 floors

2018 11 Group of houses in Norway on 3 4 floors

2018 12 Assisted living apartments in Sweden 4 floors

2018 13 Group of multi-storey houses in Norway 4 floors

2018 14 Multi-storey house in Norway 2 floors

2018 15 Building with student apartments in Norway on 4 floors

Assisted living for people with physical and mental disabilities in Denmark on 3 4 floors 2018 16

2018 17 Multi-storey house in Norway 5 floors

2018 18 Multi-storey house in Norway 5 floors

2018 19 Multi-storey house in Norway 4 floors

History Kodumaja history established - 19.05.1994 first house mounted 06.11.1995 (Kodumaja birthday) first export 1996 (private dwellings to Germany, France) construction of apartment buildings and export to Norway started (Bodø) November 1997 Kodumaja finished construction works of new factory KM Element OÜ February 2008 2014 2015 Kodumaja is building in Bergen (Norway) world tallest wooden apartment building (14 floors, 52,8 m high) More detailed overview: http://www.kodumaja.ee/en/introduction/history-of-kodumaja 2018 20

Strategic markets of Kodumaja and built living units for permanent living (as of 31.12.2017) Norway 5 956 Sweden 356 Denmark 361 Finland 116 Estonia 256 Other countries 17 TOTAL: 7 059 2018 21

As of 31.12.2017 Kodumaja companies have built apartments in 5 and more storey apartment buildings 1 342 apartments in 4 storey apartment buildings 1 577 apartments in 2 3 storey apartment buildings 2 539 apartments in small houses (double and row houses) 936 private dwellings and Norwegian holiday homes (Norske Hytta) 274 assisted living apartments for elderly people and people with disabilities 263 hotel rooms in hotels 104 modular room sections for schools and office buildings 102 modular room sections for building the site premises 35 2018 22

2018 23 Sales geography and turnover

Way of building Way of building 2018 24

We are building from prefabricated modular sections (MS) MS is spatial part of a building where the floor, walls and ceiling of MS are assembled at the factory. One MS may include several rooms. Since MS is a closed element, it is possible to complete following at the factory: install doors and windows complete up to 95% of the interior finishing of the rooms (incl. installation of ceramic tiles, floor coverings, mouldings, etc) build piping and cable systems within MS (incl. electricity, water, sewerage, heating, ventilation, security alarm system, TV, fire sprinkler system, etc) install bathroom fixtures and fittings (incl. faucets, toilets, bathtubs, sinks, shower cabins, etc) install kitchen and bathroom furniture and home appliances complete most of exterior finishing works (in case of light exterior finishing materials) Kodumaja is able to produce MS, which transportation dimensions are within the following limits: width - 5,3 m, length - 14,5 m and height - 4,5 m. The typical weight of one MS is: 8 16 tons. Time for mounting one MS on a completed foundation is: 20 60 minutes. In case of multi-storey blocks of flats Kodumaja site team is able to mount: 15 30 MS a day. 2018 25

2018 26 Production at the factory

2018 27 Factory readiness of interior finishing

2018 28 Transportation and construction

Why modular sections? Why Kodumaja way of building is competitive? 2018 29

Advantages (1) Good working conditions = high quality at lower costs production does not depend on weather conditions, dependency of construction on weather conditions is minimized good conditions for work performance, management and quality control assure high quality of work performed 2018 30

Advantages (2) Efficient construction method = good possibility for shortening construction time production at the factory with simultaneous construction on the construction site shortens construction time and minimises fixed overheads factory production enables a large amount of workforce to be simultaneously engaged high level of completion of the factory-produced modular sections minimizes quantity of work and saves time and money on the construction site 2018 31

Advantages (3) Focusing on development of flexibility = readiness for implementation of one-of-a kind projects long experience of developing customer-oriented flexibility more experience, compared to the competitors, in the manufacturing of large MS and design and construction of 5 and more storey apartment buildings from factory-produced MS an extensive scope of delivery which enables our customers to solve a lot of different problems at once and with one supplier Kodumaja 2018 32

Advantages (4) Compliance with applicable norms and standards = high durability and healthy human environment at low maintenance costs Carefully thought out, tested and approved structural and technical solutions as well as materials comply with norms and standards in our markets. 2018 33

Advantages (5) Responsibility and competence = important decisions are made and processes are managed by competent managers and specialist with long experience As Kodumaja customers are professional construction companies from Nordic countries, we can pool their vast experience and practices with our own experience. 2018 34

Advantages (6) Devoted and experienced personnel, carefully thought out and certified management system = well controlled and managed cooperation process and high quality final result of the work helps to achieve high satisfaction of the cooperation partners Management system of Kodumaja companies is built up according to international standards ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 and certified. 2018 35

Specialities Certain limitation in the architectural designs. Architects must be able to think in terms of prefab modules when designing a building. It is important to make majority of significant decisions regarding the building before the start of the production and construction process. The production and construction process proceeds at a relatively fast pace and needs thorough preparation. Many later modifications may result in considerable extra costs. Special requirements for transport. Prefab modules are often oversized cargo and the transport of prefab modules means that you are partly transporting "air". Some customers are sceptical about timber-frame as a building's load bearing structure. Somewhat increased material consumption. Prefab modules need stronger structures due to transportation and repeated hoisting. Modular sections has closed structure all around which increases some material costs as well. At the same time it is also giving an extra advantages solid and strong building, good sound insulation etc. Deeper analysis may show that seemingly disadvantageous specialities may actually provide certain benefits. 2018 36

How Kodumaja works? How Kodumaja works? 2018 37

Customers of Kodumaja and role of Kodumaja companies in cooperation Kodumaja customers on export markets: general contraction companies companies offering construction project management real estate developers Kodumaja companies are acting as subcontractor of the customer who performs most of the construction works above the foundations of the buildings. According to agreement Kodumaja companies may also take responsibility of main contractor for all construction works above the foundations of the buildings. Kodumaja customers in Estonia: final users of buildings and apartments Kodumaja companies are acting as real estate developer and builder of turn key houses. 2018

Work organization PRIMARY PROCESS OF KODUMAJA client who wants to have something built Sales Execution of the order Warranty period a satisfied client who recommends Kodumaja to their acquaintances even after the guarantee period Each customer and order is treated as a separate project. In different stages of the primary process the project has one specific liable person who also acts as the client s contact. 2018 39

From the customers in export countries Kodumaja companies are expecting usually Performance of general contractors functions Coordination of all subcontractors work, fulfilment of formalities in local governments including obtaining building permits and permits for use, etc. Design and construction of foundations and public utility lines by the customer or through subcontractors To ensure compatibility of foundations and public utility lines with the building's superstructure, cooperation with Kodumaja is vitally important. Due performance of other customer obligations under the contract entered into with Kodumaja resolution of organizational issues, which are reasonable to solve in the export country by local people. The scope of delivery and the division of liability are subjects of negotiations. The mutual obligations of Kodumaja company and the customer are established in negotiations and they are specified in sales contracts and their annexes. 2018 40

KM Element OÜ (factory - Ravila 61, Tartu, Estonia) Production premises and capacities (as of 01.01.2018) Production premises 14 697 m 2 with possibility to increase by 7000 m 2 if building 2 extra production halls Material warehouses / loading and transportation territory Warehouse and transportation territory of finished products Workers wardrobes, lunchroom, shower rooms 5 722 m 2 / 5 287 m 2 21 103 m 2 1 598 m 2 Offices 1 151 m 2 Whole territory 75 265 m 2 ca 560 medium-sized apartments Possible capacity per 1 year (production and construction) and with increased production premises ca 1060 medium-sized apartments 2018 41

Kodumajatehase AS (factory - Betooni 2, Tartu, Estonia) Production premises and capacities (as of 01.01.2018) Production premises 9 935 m 2 Material warehouses / loading and transportation territory 2 969 m 2 / 3 559 m 2 Warehouse and transportation territory of finished products Workers wardrobes, lunchroom, shower rooms 8 489 m 2 1 026 m 2 Offices / parking areas 1 667 m 2 / 3 131 m 2 Whole territory 28 641 m 2 Possible capacity per 1 year (production and construction) ca 440 medium-sized apartments 2018 42

Turnover and personnel 1995 2017 and target 2018 1995 2017 real (consolidated since 2002) 2018 target 2018 43

Coordinates Kodumaja companies Homepage in internet: www.kodumaja.ee Kodumaja AS KM Element OÜ Kodumaja Kinnisvaraarenduse OÜ KM Nederland B.V. Kodumajatehase AS Kodumaja Projekteerimise OÜ Ravila 61, Tartu 51014, Estonia Telefon: + 372 7 385 999 e - mail: info@kodumaja.ee Betooni 2, Tartu 51014, Estonia Telefon: + 372 7 385 989 e - mail: info@kodumaja.ee 2018 44