MISSION BAY SOUTH BLOCK 6 WEST M I S S I O N B A Y S O U T H B L O C K 6 W E S T
Doug Shoemaker President William Ho Sr. Project Manager Barbara Gualco Vice President Housing Development Liz Jackson-Simpson Patricia Tu Executive Director Career Center Manager Paulett Taggart Eric Robinson Roselie Ledda Design Principal Managing Principal Project Manager Mike Liebe Regional Vice President Property Operations
Projected Schedule Schematic Design 13 weeks Design Development 16 weeks Construction Documents 27 weeks Construction Start Q1 2019 TCO: Q4 2020
OCII SMALL BUSINESS ENTERPRISE (SBE) GOAL 50% SBE participation goal (Professional and Personal Services Contracting) First consideration will be given to San Francisco-based SBEs, with LBE certification. Non-San Francisco-based SBEs will be used to satisfy participation goals only if San Francisco-based SBEs are not available, qualified, or if their bids or fees are significantly higher than those of on San Francisco-based SBEs For information on LBE certification with the City and County of San Francisco, please visit the following site: http://sfgov.org/cmd/lbe-certification Trainee-hiring Goals All design professionals with contracts over $100,000 must make a good-faith effort to meet trainee-hiring goals in accordance with OCII s SBE Program. Contact: Maria Pecot, OCII Contract Compliance Specialist maria.pecot@sfgov.org
Massing Concept Four wings Breaks down the scale of the building Porosity: Physical / Visual Connections Opportunity for diversity of facades Smaller identifiable sub-communities
Ground Level Plan Podium Level Plan
CHINA BASIN STREET MISSION BAY BOULEVARD
THE MEWS MERRIMAC STREET
MHC s (Owner) Consultants Archeologist Owner s Rep / Construction Manager Civil Surveyor Environmental Consultant (Phase 1, and further studies as needed) Geotechnical Engineer / Settlement Analysis Construction Testing & Inspection Market Analysis Furniture / Art Selection IT / Communications / Security Cathodic Protection Consultant Methane Mitigation Consultant PTA s (Architect) Consultants Associate Architect (SBE/LBE-specific opportunity) Civil Engineer Landscape Architect and Irrigation Design Structural Engineer MEP Engineer and Fire Protection Engineering (Respondent can apply for each individual discipline or collectively) Utility / Joint Trench Engineer Lighting Design Consultant Acoustical Consultant Waterproofing Consultant Solar Hot Water and PV Design OSHA/OPOS (Building Maintenance System) Greenpoints/Energy Modeling / Commissioning Consultant Green Roof Consultant Elevator Consultant Signage Reprographics Contact: Danielle Greene, Mercy Housing California DGreene@mercyhousing.org Contact: Roselie Ledda, Paulett Taggart Architects rel@ptarc.com
RFQ Schedule Issuance of RFQ April 20, 2017 Optional Pre-Submittal Conference May 5, 2017 2pm Question & Answer Period Questions Due: Responses Posted: May 11, 2017-2pm May 18, 2017 2pm Responses to all questions will be posted as an RFQ Addendum at the following site: http://sfocii.org/rfps-rfqs-bids Qualifications Submission Due May 23, 2017 2pm Questions and Qualifications Submissions to RFQ must be by email only. Submit one PDF soft copy (via email: 5MB max, all documents & attachments must be bound into a single file) Submit to: Consultants of MHC (Owner) Danielle Greene, MHC DGreene@mercyhousing.org Consultants of PTA (Architect) Roselie Ledda, PTA rel@ptarc.com