TOWN OF SANDOWN - PERMIT FEES *Fines may be issued for work started without a permit * effective June 1, 2011 Example: Normal permit fee applies (ex. $50.00) Fine to be paid will be double the permit fee (ex. $100) Total due for that permit (ex. $150) PERMIT TYPE FEES EFFECTIVE 1/2/13 ELECTRIC PERMIT TOM TOMBARELLO (603) 702-3207 1 INSPECTION 55.00 2 INSPECTIONS 90.00 NEW DWELLING UNIT/SERVICE 3 INSPECTIONS: SERVICE/ROUGH/FINAL 125.00 SERVICE NEW, CHANGE AND/OR UPGRADE 1 INSPECTION 55.00 ABOVE GROUND POOL 55.00 1 INSPECTION IN GROUND POOL 90.00 2 INSPECTIONS GENERATOR PORTABLE/1 INSEPCTION 55.00 PERMANENT/2 INSPECTIONS 90.00 A PORTABLE GASOLINE POWERED GENERATOR, ONLY AN ELECTRIC PERMIT REQURIED SOLAR PANELS 90.00 (building permit required) COMMERCIAL MAINTENANCE PERMIT 125.00 (prior approval needed) 3 inspections per year for general maintenance only copy of current driver s license and current Master NH electrician s license is required at time of application Master Electrician or Owner/Occupant of SFD can pull permit **
SEPTIC PERMIT (revised fees as of 6/17/13) ED MENCIS (603) 770-5479 (revised fees as of 3/27/17) TEST PIT 55.00 initial 25.00 each addt l TOWN REVIEW 40.00 INSTALLATION 55.00 WELL PERMIT (revised fee as of 5/1/13) ED MENCIS (603) 770-5479 WELL 55.00 ******************************************************************* PLUMBING PERMIT GARY PARADIS (603) 303-1501 NEW HOUSE OR 2 INSPECTIONS 120.00 PLUMBING 1 INSPECTION 80.00 RE-INSPECTION FEE 40.00 Copy of NH Master s plumbing license required along with driver s license GAS PIPING PERMIT GARY PARADIS (603) 303-1501 GAS PIPING INSIDE 65.00 Homeowner cannot pull this permit GAS FURNACES 65.00 GAS FIRPLACES 65.00 Gas permit is needed for all gas fireplaces with our without gas hookup Vented Fireplace Gas permit $65 Chimney Permit $30 Non-Vented Fireplace - Gas permit $65
PROPANE TANK 65.00 GAS PIPING OUTSIDE 65.00 GAS GENERATORS 65.00 PERMIT REQUIRED IF A STATIONARY GENERATOR AND TIED INTO EXISTING PROPANE TANK RE-INSPECTION FEES 40.00 TO BE DETERMINED BY INSPECTOR NEW PERMIT REQUIRED Homeowner cannot pull this permit OIL PERMIT 25.00 CHIEF TAPLEY (603) 235-9302 OIL FURNACES 25.00 (EQUIPMENT INSTALLATION) CHIEF TAPLEY (603) 235-9302 ONE COPY TO APPLICANT ORIGINAL AND ONE COPY TO INSPECTOR Homeowner can pull this permit OIL TANKS (INSIDE&OUTSIDE) 25.00 CHIEF TAPLEY (603) 235-9302 Homeowner can pull this permit CHIMNEY PERMIT CHIEF TAPLEY (603) 235-9302 CHIMNEY PERMIT 30.00 (ANY TYPE WOOD STOVE OR CHIMNEY) STOVES/FIREPLACES WOOD OR PELLET STOVES NO PERMIT NEEDED BUT FIRE CHIEF NEEDS TO INSPECT- RESIDENT SHOULD HAVE MANUFACTURER S BOOKLET OR METAL TAG AVAILABLE TO SHOW DISTANCES
DRIVEWAY PERMIT ARTHUR GENUALDO (603) 887-3484 DRIVEWAY 20.00 INSPECTOR MUST APPROVE BEFORE WORK IS PERFORMED Copy to applicant Original to Inspector DRIVEWAY PAVING PERMIT ARTHUR GENUALDO (603) 887-3484 PAVING PERMIT Copy to applicant Original to Inspector 20.00 - INSPECTOR MUST APPROVE BEFORE WORK IS PERFORMED BUILDING PERMITS BOB BOGOSH (603) 867-6085 BUILDING PERMITS APPLICATION GIVEN OUT BY OFFICE PERMITS ISSUED BY BUILDING INSPECTOR OFFICE, BOB BOGOSH BUILDING INSPECTOR WINTER OFFICE HOURS: MONDAY 5:00 7:00 PM THURSDAY 3:00 4:00 PM OTHER TIMES BY APPOINTMENT OFFICE PHONE (603) 887-6085 CELL PHONE (603) 867-6085 BUILDING PERMIT CONSTRUCTION FEES: PERMIT APPLICATION FEE 35.00 BUILDING PERMIT RENEWAL FEE 35.00 NEW HOME.08 per sq. ft. finished plus number of inspections.06 per sq. ft. unfinished/basements/third floor walkups/decks COMMERCIAL.10 per sq. ft INSPECTION FEE plus number of inspections 35.00 PER INSPECTION
DEMOLITION PERMIT 40.00 SHEDS UP TO 144 SQ. FT. 40.00 POOLS 40.00 PLUS INSPECTIONS REROOF 40.00 LIFT STOP WORK ORDER 100.00 BUILDING INSPECTIONS: - FOOTINGS - FOUNDATION - FRAME - INSULATION - LIFE SAFETY - FINAL/CERTIFICATE OF OCCUPANCY $35 PER INSPECTION STARTING WITH OUT A PERMIT DOUBLE THE PERMIT FEE PLUS ASSOCIATED FEES BY PLUMBING INSPECTOR/ ELECTRICAL INSPECTOR/ FIRE DEPARTMENT NEW HOME FOUNDATIONS TO BE CERTIFIED BEFORE ISSUING A FULL BUILDLING PERMIT