About the Project. The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland).

Similar documents
F R E QUENTLY AS K E D QUESTIONS

2016 Rate Case Summary & Frequently Asked Questions Regarding Sharyland Utilities Regulated Delivery Rates

WELCOME Garland Power & Light

People, Property and Power Lines. Frequently asked questions about power lines on or near your property

Appendix B Public Meeting Information

Rate Case Dismissal & Asset Exchange July 24, 2017

PUC Process for Approval of a Transmission Line

) ) ) ) ) ) (Issued September )

Welcome! Sarpy Transmission Project. Public Hearing October 23, 2018

RESOLUTION NO

[Landowner name and address] Notification of Public Informational Meeting Re: [Insert Tax ID] Dear [Title] [Landowner],

Right-of-Way and Easements for Electric Facility Construction

EMINENT DOMAIN Educational Series

PRIVATE PROPERTY PUBLIC PURPOSE

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, (Schedule B);

SPP RE Transition Additional Information Regarding NERC s Proposed Transferee Regional Entities December 15, 2017

PUC DOCKET NO

Board Agenda Wednesday, Dec. 13, 2017 LCRA Board Room Austin

Sarpy Transmission Project & La Vista Transmission Project Project Updates. Tim Nissen, PE Director T&D Engineering & Substation August 17, 2017

IC Chapter 7. Real Property Transactions

June 28, Technical Director File Reference No Financial Accounting Standards Board 401 Merritt 7 P.O. Box 5116 Norwalk, CT

BEFORE THE NEW JERSEY BOARD OF PUBLIC UTILITIES

Impact of Wind Turbines on Market Value of Texas Rural Land

UNITED STATES DISTRICT COURT FOR THE NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION

-vv- Los Angeles Department of.. P_.Water & Power RESOLUTION NO. MARCIE L. EDWARDS General Manager. DATE: May 28, 2015

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210

Belfast Municipal Airport Airspace Obstruction Analysis

Easement Program Guidelines for Locating Towers and Communication Devices

INTERROGATORIES OF THE CORPORATION THE COUNTY OF MIDDLESEX

Community Wind Project Development

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS

ROAD USE AGREEMENT RELATING TO THE DEVELOPMENT OF (WIND FARM NAME) WIND FARM

Section 5 SERVICE EXTENSIONS Electric Tariff 1 st Revised Sheet No. 15 Filed with Iowa Utilities Board Cancels Original Sheet No.

Request for Proposals

An Ordinance Governing Wind Energy Conversion Systems In The Unincorporated Areas of Coles County, Illinois

PUBLIC HEARING. Loop 88 Segment 3 Thursday, October 12, 2017 Lubbock-Cooper Performing Arts Center at 6:00p.m. Date. Footer Text

RENTS, ROYALTIES, EASEMENTS AND LAND VALUES

Natural Gas Pipelines: The Role of Conservation Commissions MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS

Keys Energy Services Relocation of Electrical Facilities Frequently Asked Questions

Guideline: Distribution Pole to Pillar

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

Anatomy Of An Appraisal

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

A PUBLIC RIGHT-OF-WAY MANAGEMENT ORDINANCE BY THE CITY OF SOUTHLAKE, TEXAS; REGULATING THE PHYSICAL USE, OCCUPANCY AND MAINTENANCE

ICP/IDNO Land Rights Guide

Pipelines & Eminent Domain THE PROPOSED KINDER MORGAN PERMIAN HIGHWAY PIPELINE OCTOBER 29, 2018 JIM BRADBURY JAMES D.

3RD PARTY ENQUIRIES TECHNICAL QUESTION GUIDANCE NOTE

UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF GEORGIA ATLANTA DIVISION

SECTION WATER SYSTEM EXTENSION

KIRKLAND ALERT. IRS Unveils Start of Construction Rules for Solar, Other ITC-Eligible Technologies. Attorney Advertising

SOLAR ENERGY FACILITIES ORDINANCE #17-07 KOCHVILLE TOWNSHIP

PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON

Before the Office of Administrative Hearings. For the. Minnesota Public Utility Commission

ARLINGTON COUNTY, VIRGINIA

Policy: Distribution Subdivision

Land Use, Transportation, and Infrastructure Committee of the Denver City Council FROM: Scott Robinson, Senior City Planner DATE: March 22, 2018 RE:

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item CONDITIONAL USE PERMIT FOR VERIZON WIRELESS; 1287 E 1200 RD (SLD)

IN THE SUPREME COURT OF TEXAS

UNIFORM RULE 5. Administration of Williamson Act Contracts

BOARD OF ZONING ADJUSTMENT STAFF REPORT Date: July 9, 2018

SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN:

Silver Line Acceptance

Right-of-Way Acquisition and

RESOLUTION NO. R To Acquire Real Property Interests Required for the Lynnwood Link Extension

RESOLUTION NO. R To Acquire Real Property Interests Required for the Downtown Redmond Link Extension

ENCROACHMENT AGREEMENT (Farmland O Connell Road)

RESOLUTION NUMBER 2017-

TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. POLICY BULLETIN NO. 3-4

Texas Land Trust Conference March 6, 2015

Solar Basics for the Real Estate Practitioner

SUBJECT: Request by SCE for Approval to Grant Easement and License Pursuant to G.O.173

Utilizing Tall Municipal Structures to Generate Revenue. Darin Freese Water Program Coordinator

SECTION F: Facilities Development

CHOWAN WIND ENERGY FACILITIES ORDINANCE REVIEW. Chairman Lou Sarratt March 31, 2015 Sub-Committee Members: Patti Kersey Jim Leggett Jim Robison

EMINENT DOMAIN LANDOWNER GUIDE What Every Wisconsin Landowner Should Know

PLACEMENT OF SECURITY HUTS ON CITY OWNED LAND

APPENDIX B. Fee Simple v. Conservation Easement Acquisitions NTCOG Water Quality Greenprint - Training Workshops

Transbay Transit Center

Across-the-Fence Value and Hostage Occupancy Agreements

ATTACHMENT 2: CONSULTATION UPDATE NO. 3 PART 3 LANDOWNER ENGAGEMENT

Land Rights For Connection Customers

KANE COUNTY AGRICULTURE COMMITTEE AGENDA

Answers to Frequently Asked Questions about Conservation Use Valuation and Preferential Agricultural Assessment

Texas Parks and Wildlife Foundation Buffer Lands Program Program Description and Application

A Property Owner s Survival Guide to Eminent Domain. 10 Things You Must Know When the Government Wants Your Property

Cunningham-Dooms 500 kv Rebuild

6. The entity proposing to take your property must make a good faith offer to buy the property before it files a lawsuit to condemn the property.

ALGIERS RATE CASE FREQUENTLY ASKED QUESTIONS

Resettlement Policy Framework

Resolution No. The following resolution is now offered and read:

Wind Energy Easements

ALI-ABA Course of Study Historic Preservation Law. Cosponsored by the National Trust for Historic Preservation. November 3-4, 2005 Washington, D.C.

DESIGN PUBLIC HEARING JULY 7, 2016 CITY COUNCIL HEARING ROOM, FIRST FLOOR ONE GOVERNMENT CENTER FALL RIVER, MASSACHUSETTS 6:30 PM FOR THE PROPOSED

Frequently Asked Questions EAST-WEST TIE TRANSMISSION PROJECT

A TALE OF TWO USES: LANDOWNER PERSPECTIVES ON WIND LEASING AND TRANSMISSION EASEMENTS

Land rights requirements relating to assets to be installed or adopted by SEPD or SHEPD for new connections

Board Agenda Wednesday, May 20, :00 a.m. LCRA Board Room Austin

THE CORPORATION OF THE TOWNSHIP OF NORTH FRONTENAC BY-LAW #123-13

Metro. Board Report. File #: , File Type: Policy Agenda Number: 60.

Transcription:

Sharyland Utilities, L.P. 1900 North Akard Street Dallas, Texas 75201 Toll-free: (866) 354-3335 Frequently Asked Questions Regarding Sharyland Utilities Proposed Wadsworth to New Oliver to Farmland 345 kv Transmission Line and Southeast to New Oliver to Oliver 115 kv Transmission Line Project These Frequently Asked Questions will be updated regularly with new developments and information. For more information, please call 866-354-3335, send an email to ccn@sharyland.com, or visit our website at www.sharyland.com/lubbock.aspx. 1. What is the project? About the Project The project consists of two new high voltage transmission lines to be built by Sharyland Utilities, L.P. (Sharyland). First, the proposed Wadsworth to New Oliver to Farmland transmission line is a new 345 kilovolt (kv) line that will be approximately 42 to 53 miles long. It will connect the existing Wadsworth Station located in Lubbock County, to the existing Farmland Station, located in Lynn County, and will be routed through the proposed New Oliver Station, to be located in Lubbock County. Second, the proposed Southeast to New Oliver to Oliver transmission line is a new 115 kv line that will be approximately 14 to 26 miles long. It will connect the existing Southeast Station to the existing Oliver Station and will also be routed through the proposed New Oliver Station, all of which will be located in Lubbock County. 2. Why is the project needed? This project is part of several proposed new transmission lines that need to be built as part of an overall effort to move a portion of the Lubbock Power & Light (LP&L) electric system from the Southwest Power Pool (SPP) grid to the Electric Reliability Council of Texas (ERCOT) grid. ERCOT is an electrical organization that is regulated by the Public Utility Commission of Texas (PUCT) and that oversees the planning and operation of the electric grid that covers most of Texas. The ERCOT grid serves approximately 90% of the state s electric load. However, most residential and commercial customers located in the Texas Panhandle and South Plains are not connected to the ERCOT grid. These customers are connected to SPP, an interstate transmission grid that is managed by a different regional transmission organization. LP&L s system is currently interconnected to the SPP grid, but on March 8, 2018, the PUCT approved a plan to move a portion of the LP&L system to ERCOT. 3. Why is a portion of the LP&L system moving from SPP to ERCOT? LP&L has determined that moving a portion of its system to ERCOT provides benefits to its system and to its customers, including access to ERCOT s competitive retail electric market. For more information highlighting these benefits, please visit www.lpandl.com/ercot. 1

About the Parties Involved 4. Who is Sharyland Utilities? Sharyland is a Texas-based electric transmission utility that is fully regulated by the PUCT. Sharyland is committed to providing safe, reliable, and efficient transmission and substation services, ensuring operational excellence, and investing to support the infrastructure needs of the ERCOT grid. Sharyland is privately-owned by Hunter L. Hunt and other members of the family of Ray L. Hunt, and is managed by Hunter L. Hunt. For more information, please call 866-354-3335 or visit www.sharyland.com. 5. Who is Lubbock Power & Light? Lubbock Power & Light is the third largest municipal electric utility in Texas and has been serving the citizens of Lubbock since 1917. LP&L serves more than 104,000 electric meters and owns and maintains 4,936 miles of power lines and three power plants in and around the City of Lubbock. For more information about Lubbock Power & Light visit www.lpandl.com and follow the utility on Facebook and Twitter. 6. What roles will Sharyland and LP&L play in the routing and construction of this project, as well as the other projects that will be constructed as part of this overall transition? Sharyland will be responsible for the routing and construction of all new transmission facilities that will be required as part of this transition effort, but will be closely coordinating with LP&L throughout the process. Sharyland and LP&L have agreed to split the financial responsibility for constructing these projects. However, discussions are still ongoing as to which specific assets will ultimately be owned by Sharyland and LP&L once the facilities are constructed and placed into service. 7. Will Sharyland be providing retail electric service to customers in Lubbock as part of the transition to ERCOT? No. Sharyland will be constructing the needed transmission facilities and operating the 345 kv transmission lines. Sharyland does not provide retail electric delivery service to any retail customers. All LP&L retail customers will continue to be served by LP&L throughout this transition. About the Routing Process 8. How will the route for this project be determined? Sharyland has retained a consulting firm, POWER Engineers, Inc., to conduct an environmental assessment and preliminary alternative route analysis for the lines. Sharyland and LP&L are also hosting public meetings with affected landowners to discuss these preliminary alternative routes. Sharyland sent notification of the project to applicable Local, State, and Federal agencies. These agencies concerns will be addressed throughout the regulatory, construction, and operational phases of the project. Once the environmental assessment is complete and Sharyland has refined the possible routes for these lines, Sharyland and LP&L will then file an application with the PUCT seeking to amend Sharyland s Certificate of Convenience and Necessity (CCN) and asking the PUCT to approve a final route for the lines. 2

9. When will Sharyland and LP&L file a CCN application to determine a route for the proposed transmission lines and how will the PUCT select a route? Sharyland and LP&L plan to jointly file an application with the PUCT to amend Sharyland s CCN in December 2018, so that the PUCT can review and approve a final route for the lines. As part of the CCN application, Sharyland will offer a set of alternative routes for the PUCT to consider. The proceeding could take up to one year to be processed. By law, the PUCT will consider a number of factors when considering possible routes for the proposed lines, including, for example, cost, environmental impacts, whether or not the proposed routes use or parallel existing compatible rights of way, property lines, or other natural or cultural features. The PUCT will also take into account the proximity of the proposed routes to existing habitable structures, like homes and businesses, community values, proximity to recreational and park areas, and historical and aesthetic values. Ultimately, the PUCT will approve only one final route for each line. However, it is important to note that the PUCT can approve any of the proposed route alternatives, or any other combination of the proposed routing links. So, it is very important that landowners stay informed and engaged throughout the route selection process. 10. Do landowners have an opportunity to participate in the route selection and regulatory process? Yes. Sharyland and LP&L will host public open house meetings in Lubbock in October 2018. Potentially affected landowners and the general public may attend, review all the proposed routes, and offer suggestions or voice concerns. Notices for these public meetings are sent directly to potentially affected landowners. Also, when Sharyland and LP&L file the CCN application, Sharyland will send written notices to all affected landowners and notices will be published in local newspapers. In addition, Sharyland will provide potentially affected landowners with contact information and instructions on how they can fully participate in the CCN proceedings before the PUCT. 11. How can a landowner participate in the CCN proceeding? A landowner may participate in two ways. One is to become an intervenor. An intervenor is a person who, upon showing a justifiable interest, is permitted to become a party to the proceeding. As an intervenor, the landowner participates in the CCN proceeding and may make legal arguments, conduct discovery, file testimony, cross examine witnesses and even may decide to testify at a hearing and be subject to cross examination. If a landowner chooses not to fully participate in the CCN proceeding as an intervenor, they may file comments in support of or opposition to Sharyland and LP&L s application and participate as a protestor. A protestor is a person or organization that supports or opposes any matter contained in the application filed with the PUCT. Protestors are NOT parties to the case and may NOT conduct discovery, cross examine witnesses or present a direct case. To become a protestor, a landowner can either send written comments stating a position regarding the CCN application, or if the case progresses to a hearing, a statement of protest can be made on the first day of hearing. 12. What is the expected timeline going forward? Sharyland and LP&L expect to file a CCN application at the PUCT in December 2018. The PUCT has up to a year to make a decision on a final route, and after that approval is received, Sharyland will begin survey work and right-of-way acquisition. It is expected that construction on the transmission lines may begin in mid-2020, and the project is expected to be in-service by mid-2021. 3

About Right of Way Process 13. What is a right-of-way easement? An easement is a legal document that gives a utility certain rights to use privately owned land for a specific purpose. The landowner retains ownership of the property. The proposed project will require easements to be obtained from landowners on the route approved by the PUCT. Easement rights would be purchased along the path of the transmission line as needed to allow for the construction, installation, operation, and maintenance of the transmission line. 14. What type of transmission structures will Sharyland use? How tall are the transmission structures? How much right-of-way will be needed to accommodate these structures? The types of transmission structures to be used on this project are dependent on the operating voltage of the line. This project consists of two lines operating at two different voltages (345 kv or 115 kv). The designs between the 345 kv transmission structures and the 115 kv transmission structures will differ accordingly. The first line, the proposed Wadsworth to New Oliver to Farmland transmission line, will be operated at a voltage of 345 kv. For the most part, Sharyland expects to use steel monopoles with a nominal height of 130 feet tall, unless there are instances where the span or clearance requirements exceed those of monopoles. In those locations, Sharyland plans to use steel lattice structures that are approximately 140 feet tall. Lattice steel structures may also be utilized where angles are required in the transmission line. In addition, the PUCT may determine the types of structures Sharyland uses. For the 345 kv line, Sharyland will obtain a typical width of 175 feet for right-of-way. However, some locations may require more or less right-of-way width due to physical terrain and the type of structures used. In general, the lattice towers are spaced approximately 1,150 to 1,200 feet apart within the right-ofway, allowing for four to six structures per mile. Monopoles are 800 to 1,000 feet apart on average, allowing seven to eight structures per mile. The second line, the proposed Southeast to New Oliver to Oliver transmission line, will be operated at a voltage of 115 kv. For this transmission line, Sharyland expects to use steel monopoles with a nominal height of 85 feet tall, unless there are instances where the span or clearance requirements necessitate additional structure height. While Sharyland expects to use monopoles throughout this line, the PUCT may determine the types of structures Sharyland uses. For the 115 kv line, Sharyland will obtain a typical width of 60 feet for right-of-way. However, some locations may require more or less right-of-way width due to physical terrain and the type of structures used. In general, the steel monopoles are spaced approximately 350 to 500 feet apart within the right-ofway, allowing eleven to fifteen structures per mile. 15. How will I be affected if Sharyland builds a transmission line on my property? Even though Sharyland will have an easement to cross the property, the landowner will still own the property and can continue to use the right-of-way underneath the line for purposes such as grazing, farming, and other purposes that do not interfere with the transmission line or its operation. 16. I m currently in discussions with a wind farm developer who is interested in putting wind turbines on my property. If you build a new transmission line on my property, will that prevent me from being able to have a wind turbine on my property as well? Not necessarily. Placing a transmission line on your property will not in and of itself prevent the placement of wind turbines. However, it could affect the physical location and placement of the turbines once a final route is approved by the PUCT. 4

The 345 kv and 115 kv transmission lines will require a typical right-of-way width of 175 feet and 60 feet, respectively. Obviously, no turbines can be placed in the direct path of the transmission lines. Also, general principles and practices incorporate an additional buffer distance on either side of the right-of-way to ensure that the lines will not be harmed by activities related to the construction, operation, and maintenance of a wind turbine. Other than that, it will be entirely up to the property owner and the wind developer to determine the appropriate number and location of wind turbines on the property and to coordinate those locations with adjacent property owners, roadways, railroads, other utilities, and other land uses. Throughout this process, Sharyland Utilities is committed to working closely with all stakeholders, including landowners and wind developers, towards a common solution that ensures a proper balance in the use of the land. 17. How much will Sharyland pay for right-of-way easements? Sharyland pays a fair market value for transmission line easements. The fair market value is determined by conducting a market study or an appraisal for the easement to be obtained. Sharyland will also include financial damages for things such as crops that may be damaged during construction. 18. Will Sharyland use eminent domain to obtain right-of-way? Sharyland is a certificated electric utility fully regulated by the PUCT, and as such, has the power of eminent domain. However, Sharyland makes every effort to work with landowners throughout the rightof-way acquisition process to avoid a situation that involves eminent domain and the court costs and legal fees that come with it. About Jobs & Benefits to Region 19. Who will Sharyland use to build the proposed transmission line? Will construction and other related jobs be filled locally or will outside contractors be used? Sharyland will use experienced contractors for the construction of this project. Sharyland encourages its construction contractors to use local resources, and these firms may hire local personnel to help with jobs related to the construction of the lines, such as site clearing for towers, setting concrete foundations, and other construction support services. In addition, construction crews will patronize local restaurants, hotels, and other community services throughout the construction phase of the project. At the peak of construction, Sharyland expects approximately 100 people to work on this project. 20. Will Sharyland pay taxes on the new transmission line facilities that it owns and/or operates? Yes. Local taxing authorities, such as county governments and school districts, will have the ability to tax these transmission facilities. Assessments on these new transmission facilities will be the responsibility of the local appraisal districts and subject to taxation by the county, city, and school jurisdictions in which the facilities are located. In addition, local communities will benefit from sales tax revenues during the construction phase of the project. 5