West Earl Township 2017 Fee Schedule Item Description Fee

Similar documents
West Earl Township 2016 Fee Schedule Item Description Fee

West Earl Township 2015 Fee Schedule Item Description Fee

TOWNSHIP OF WEST EARL LANCASTER COUNTY, PENNSYLVANIA RESOLUTION

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

Allen Township Northampton County, Pennsylvania TOWNSHIP S GENERAL FEE SCHEDULE FOR 2018

Location in Code Subject Fees

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

Permit Expiration and Permit Renewal Fees. General Administration Fees

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

A RESOLUTION AMENDING THE FEE SCHEDULE OF THE TOWNSHIP OF AMITY, PENNSYLVANIA

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Minor Subdivision or Annexation Plans... $1,500.00

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

Worcester Township Fee Schedule

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

RESOLUTION NO

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

New Hanover Township

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

FORKS TOWNSHIP FEE SCHEDULE AS AMENDED 11/2017

Town of Walworth Fee Schedule 2019

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

BOROUGH OF BRIDGEPORT FEE SCHEDULE 2018

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

City of Washburn 2018 FEE SCHEDULE

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

MUDDY CREEK TOWNSHIP 2018 FEE SCHEDULE RESOUTION #

East Vincent Township Chester County, Pennsylvania

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

*For Special Exception and Conditional Uses, Complete Page 3 of this application.

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

TOWNSHIP OF DOYLESTOWN APPLICATION FOR REVIEW OF SUBDIVISION OR LAND DEVELOPMENT PROPOSAL. Please PRINT; all information MUST be filled out completely

FERGUSON TOWNSHIP 2014 FEE SCHEDULE

MASTER FEE SCHEDULE Amended June 12, 2018

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

SPRING GARDEN FEES SCHEDULE

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

Stroh Ranch Apartment Sites

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

Schedule of City Fees & Charges

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

FEE SCHEDULE. Updated December 18, 2018

Towamencin Township Fee Schedule

Planning&Development Fee Standards

ARTICLE V PRELIMINARY PLAN SUBMISSION

EXHIBIT A to Ordinance No PART 1

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

Chapter Fees (d) OFFICIAL ZONING MAP UPDATE (EXCLUDING FINAL PLATS) $10.00, PER LOT (e) HOME OFFICE PERMIT

CHAPTER VIII 1 PERMIT REQUIREMENTS FOR RETAINING TANKS

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

City of High Point Development Fee Schedule

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

PROVIDENCE TOWNSHIP 2019 BUDGET

Onsite Wastewater Treatment System Remediation Project

THE CORPORATION OF THE CITY OF MISSISSAUGA ROAD OCCUPANCY, LOT GRADING, MUNICIPAL SERVICES PROTECTION BY-LAW

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

RESOLUTION NO. RESOLVED, this 11 th day of December, TOWNSHIP OF FERGUSON. By: Steve Miller, Chairman Board of Supervisors [ S E A L ] ATTEST:

QUARTERLY ZONING REPORT

QUARTERLY ZONING REPORT

SUBDIVISION AND / OR LAND DEVELOPMENT SUBMITTAL REQUIREMENTS

ARTICLE 24 SITE PLAN REVIEW

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

MUNICIPALITY OF PENN HILLS. Ordinance No of 2012

Proposed City of Harris 2016 Fee Schedule

MUNICIPALITY OF THE TOWNSHIP OF McNAB/BRAESIDE GUIDELINES

City of Pleasant Hill. Master Fee Schedule

BUILDING PERMIT SUBMITTAL REQUIREMENTS

KINGSLAND MUNICIPAL UTILITY DISTRICT Schedule of Wastewater Rates, Fees and Charges and Service Policies Effective January 1, 2018

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

APPLICATION PROCEDURE

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

Community Development Fees (as of March 2015)

BOROUGH OF JEFFERSON HILLS CODIFIED FEE SCHEDULE REVISED THROUGH RESOLUTION

W E S T T O W N T O W N S H I P 1039 Wilmington Pike P.O. Box 79 West Chester, PA Westtown, PA PHONE: (610) FAX: (610)

Use permitted by: Right Special Exemption

ARTICLE V AGRICULTURAL PRESERVATION AND RURAL RESIDENTIAL DISTRICT

SEWAGE FACILITIES PLANNING MODULE

PUTNAM TOWNSHIP. Schedule of Development Review Fees. As adopted by the Putnam Township Board August 16, 1995 Effective September 22, 1995

S C H E D U L E A COMPENSATION RATES (COUNTY SERVICES)

ALPINE TOWNSHIP ZONING ORDINANCE TABLE OF CONTENTS

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

TOWN OF HIGHLAND PARK, TX MASTER FEE SCHEDULE

Town of Angier Rate and Fee Schedule Fiscal Year Effective July 1, 2011

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

Transcription:

Item Description Fee ZONING FEES Zoning Hearing Board Application & Appeals $500.00 Application to Amend text of Zoning Ordinance $750.00 Rezoning of curative amendment application $1,200.00 Construction Code Ordinance Appeals $500.00 Zoning Permits Residential Construction Non Residential Construction Based on Project Cost First $5,000 Each $1000 or fraction thereof, in excess of 5,000 Based on Project Cost First $5,000 Each $1,000 or fraction thereof, in excess of $5,000 $150.00 Minimum $3.00 per thousand $250.00 Minimum $3.00 per thousand Agricultural Demolition Based on Square Footage Under 1,000 Square feet $100.00 Over 1,000 Square Feet, but less than 5,000 Square feet $200.00 Over 5,000 Square Feet $500.00 Residential or Agricultural $50.00 Commercial or Industrial $150.00 Driveways New & Expansion under 1000 Square feet $50.00 Highway Occupancy (Street Cut) Permit $35.00 Decks, Patios & Screen Porches Residential Sheds On grade Under 1,000 Square Feet $50.00 Over 1,000 Square Feet $100.00 Under 288 Square Feet $50.00 1 1/4/2017

Over 288 Square feet, but less than 1,000 Square feet $75.00 ZONING FEES Conversion fee for Apartments Per Unit $25.00 Minimum fee $50.00 Occupancy Permit All new Constructions & Conversion $50.00 Electrical/Plumbing/Mechanical Permits $50.00 Temporary Permits Special Events less than 4 weeks $50.00 Seasonal Sales no more than 6 months $150.00 Pools & Hot Tubs Under $10,000 $100.00 Over $10,000 $200.00 Signs Replacement $50.00 New Sign $100.00 Renewal Fee as Required (1/2 the original fee) $100.00 Maximum Soliciting/Peddling Permit (Issued by Police Department) $15.00 per person - Renewa State fees as required per permit $4.00 Note: Any Project over 1,000 Square feet of new surface may require a storm water management review or plan and administrative cost. Replace or Rebuild Structure damaged by fire or natural disaster within 6 months No Twp charge (Inspection fees apply) 2 1/4/2017

LAND DEVELOPMENT/SUBDIVISIONS FEES LAND DEVELOPMENT/SUBDIVISIONS Preliminary, final, revised, and lot-add on Waiver of Land Development Application Fee $ 250.00 Escrow fee $ 500.00 Sketch or Revised Final Plan Application Fee $ 250.00 Escrow Fee $ 1,000.00 Residential Application Fee $500.00 (including Agriculural Uses) Additional fee per lot or unit $50.00 Residential Escrow Deposits Residential Escrow Deposit Minor Residential Subdivision or land development plan 1-5 lots or units of occupancy $1,000.00 Major Residential Subdivision or land development plan 6 or more lots or units of occupancy $6,000.00 Non- Residential Application Fee $1,000.00 Additional fee per 1,000 Square Feet $100.00 Non-Residential Escrow Deposits Non- Residential Subdivision or land development plan 1 acre $5,000.00 Over 1 Acre $10,000.00 At such point as the Escrow fund has been reduced to one-half of the amount posted by the applicant at the time of filling the application or less as a result of withdraws as herein provided, then, and in that event, and at that time, the Township shall bill the applicant/developer an amount sufficient to restore the Escrow fund to the original sum. 3 1/4/2017

STORMWATER MANAGEMENT PLAN FEES Storm Water Management Plan Review Fee $100.00 Escrow Fee $2,000.00 Storm water Management Plan Small Projects Application $50.00 Escrow Fee - review & inspection by Township Engineer $1,500 Escrow Fee - Review by Code Enforcement Officer and inspection by Township Engineer $500.00 Non Residential Subdivisions Non Residential subdivision or land development plan or other $6,000.00 plan. (e.g. public streets only or storm water management facilities only) At such point as the Escrow fund has been reduced to one-half of the amount posted by the applicant at the time of filling the application or less as a result of withdraws as herein provided, then, and in that event, and at that time, the Township shall bill the applicant/developer an amount sufficient to restore the Escrow fund to the original sum. 4 1/4/2017

WATER CONNECTION FEES Water Connections Tapping $2,536.48 Meter and Inspection Cost of Meter plus 15% Connection fee $1500.00 on deposit for time & materials Development Plan Review Escrow Deposit Minor Residential Subdivision or Land Development Plan 1-5 Lots or Units of Occupancy $500.00 Major Residential Subdivision or Landed Development Plan 6 or more Lots or Units of Occupancy $6,000.00 Non-Residential Subdivision or Land Development Plan or other Plan $6,000.00 Water Shut Off $50.00 Water Turn On $50.00 At such point as the Escrow fund has been reduced to one-half of the amount posted by the applicant at the time of filling the application or less as a result of withdraws as herein provided, then, and in that event, and at that time, the Township shall bill the applicant/developer an amount sufficient to restore the Escrow fund to the original sum. 5 1/4/2017

PUBLIC SEWER CONNECTION FEES Public Sewer Connection Tapping $2,800.00 Connection if WESA provides Lateral $1,000.00 If owner provides Lateral $110.00 Inspection fee (gravity connection) $97.00 Inspection fee (grinder pump) $125.00 Development Plan Review Escrow Deposits Residential subdivision or land development plan review 1-EDU $1,000.00 Residential subdivision or land development plan review 2-9 EDUs $5,000.00 Residential subdivision or land development plan review 10 or more EDU's $10,000.00 Non-Residential subdivision or land development review 1-EDU $5,000.00 Non-Residential subdivision or land development review 2 or more EDUs $10,000.00 Non-Residential Waste Permit Application $100.00 At such point as the Escrow fund has been reduced to one-half of the amount posted by the applicant at the time of filling the application or less as a result of withdraws as herein provided, then, and in that event, and at that time, the Authority shall bill the applicant/developer an amount sufficient to restore the Escrow fund to the original sum. 6 1/4/2017

ON-LOT SEWAGE DISPOSAL SYSTEMS Testing Soil Profile Descripition Probe (Each) $75.00 Perc Test Excluding digging of holes - for up to six holes for a primary area $325.00 Perc Test Excluding digging of holes - for up to six holes for a replacement area if tested at the same time as the primary area (an additional fee per hole will be charged for each hole over 12 if tested at same time) $100.00 Perc Test Observation If perc test performed by certified SEO hired by applicant Per six hole test $200.00 Perc Test Observation Of alternate area test if tested at the same time as primary area Per six hole test n/c Digging of perc test holes Per Six Holes $150.00 Other Soils Testing 1st Probe & 1st Infiltration Test $350.00 Additional Probe & Infiltration Test (Each) $100.00 Sewage Permit Application New On-Lot system, Repair or Modification $75.00 Minor repair, Modification or Temporary Holding Tank $65.00 7 1/4/2017

Design Review & Inspections Will be provided at the SEO's Hourly Rate of $65.00 Holding Tank DEP Planning Requirement Reviews & All other Annual Inspections, Reports and Tracking $75.00/hour (i.e. form B's, Exceptions, Modules) will be provided at the SEO's hourly rate of $65.00 with a minimum fee of $65.00/hour ON-LOT SEWAGE DISPOSAL SYSTEMS Sewer Management Program Inspections reporting, and administration Will be provided at the SEO's hourly rate of $50.00 with a minimum fee of $50.00. Any on-lot sewage design services or other services not identified above will be provided at the SEO's hourly rate at the time of service. Applicants shall reimburse the SEO for mileage at the rate permitted by DEP. All other work not specifically mentioned will be billed at the hourly rate of the time of service. 8 1/4/2017

UTILITY BILLING PER MONTH Monthly rate Water First 2,300 gallons used $13.33 Per 1,000 gallons used over 2,300 $7.35 Sewer Monthly rate $58.50 Trash Monthly rate $15.00 Semi-Annual $87.00 Annually $170.00 TAGS Red - Oversized Items $4.00 Blue- Appliance/motorized items $12.00 Yellow - Extra Service $1.25 Brown Kraft Bag or green tag (Yard Waste) $1.00 Orange - Tires $2.00 RECYCLING Recycling Bins Replacement Free 9 1/4/2017

Additional Bins $6.00 TAXES/STREET LIGHT PER PROPERTY FRONTAGE Brownstown, Talmage, Farmersville, Meadowview Estates and Sandy Beach Unimproved $0.0600 Improved $0.3800 Westgate, and West Earl Heights Unimproved $0.0700 Improved $0.6700 Batten's Circle, School Lane Farms, Eagleview Estates and Country View Unimproved $0.1500 Improved $1.1900 Hans Groff Village Improved $1.4500 Special Hydrant Upper Leacock $0.0110 10 1/4/2017

MISC. FEES Return Check Charge $20.00 Lions Park Pavilion Rental $50.00 Copies per page $0.25 Ordinance Copies Zoning Book $35.00 Postage and Handling for Mail $5.00 Subdivision and Land Development $25.00 Postage and Handling for Mail $3.50 Stormwater Management $15.00 Postage and Handling for Mail $3.50 Zoning Maps $6.00 Postage and Handling for Mail $1.00 Notary fees $2.00 Accident Reports $15.00 Composting fees Township Residents will receive 20 passes a year, after 20 it will cost $10 per load Non-Township Residents will cost $20 per load Commercial Customers will cost $50.00 per load 11 1/4/2017