CONSULTATION STATEMENT

Similar documents
PUBLIC RIGHTS OF WAY. Guidance for Planners and Developers

Lanteglos by Fowey HOUSING NEED SURVEY. Report Date: 1 st March Version: 1.1 Document Status: Final Report


BIRMINGHAM DEVELOPMENT PLAN EXAMINATION 2014 MATTER E: GREEN BELT POLICY & THE LANGLEY SUE

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns.

57 Foscote Road London NW4 3SE

1 Cumbrian Gardens London NW2 1EB

2. Draft Settlement Boundaries Planning Policy and local principles

South Stoke Housing Development Open Day Introduction 1

Draft Neighbourhood Plan for the former Land Settlement Association Estate at Great Abington March 2017

Wigan Core Strategy Examination Additional Hearing Sessions

AT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council

108 Holders Hill Road London NW4 1LJ

TENANT PARTICIPATION STRATEGY

Housing Needs Survey Report for Pillerton Priors Parish Council

Land at Sheldon Heath Road and Platt Brook Way, Sheldon, Birmingham, B26 2DS

Housing Needs Survey Report. Arlesey

RYEDALE SITES LOCAL PLAN MATTER 4 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

Simon Court 2-4 Neeld Crescent London NW4 3RR

Strategy DPD (2012) and 7.4, 7.5, 7.6 and 7.21 of the London Plan Before the development hereby permitted is occupied the parking

North Northamptonshire Authorities Monitoring Report (AMR) 2015/16. Assessment of Housing Land Supply ( )

Subdivision of existing dwellinghouse to create 1x one bedroom flat and 1x two bedroom flat

STRONG FOUNDATIONS AFFORDABLE HOMES IN THE COUNTRYSIDE THE ROLE OF ENTRY LEVEL EXCEPTION SITES EXECUTIVE SUMMARY CLA MEMBER S VIEW

Site Allocations Plan

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017

Supporting Information

PRODUCED BY MIDLANDS RURAL HOUSING

Masshouse Plot 3, Land at Masshouse Lane/Park Street, Masshouse Plaza, City Centre, Birmingham, B5

Team Leader: Alex Harrison Minor Applications Team Leader Contact Details:

SCOTTISH GOVERNMENT RESPONSE TO PRIVATE RENTED HOUSING (SCOTLAND) BILL STAGE 1 REPORT

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND

Viability and the Planning System: The Relationship between Economic Viability Testing, Land Values and Affordable Housing in London

Appeal Ref: APP/J3720/W/18/ Land off The Burrows, Newbold-on-Stour, Stratford-on-Avon, Warwickshire CV37 8UP

124 Middleton Hall Road, Kings Norton, Birmingham, B30 1DH

DCLG consultation on proposed changes to national planning policy

Application No: Location: Northfields (Formally Turner Village), Turner Road, Colchester. Scale (approx): 1:1250

Change of use from residential (C3) to 7 bedroom HMO (Sui Generis) and insertion of new rooflight at rear.

Newlands Planning Application - Public Consultation Frequently Asked Questions

RYEDALE SITES LOCAL PLAN MATTER 3 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

Ludgvan Parish HOUSING NEED SURVEY. Report Date: 21 st January Version: 1.2 Document Status: Final Report

16 Sevington Road London NW4 3SB

DESIGN, ACCESS & PLANNING STATEMENT

UTT/17/2725/FUL (FELSTED) (Minor Councillor application)

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division

The base charges, officer rates and premium level charges are published in the Planning Fees and Charges Schedule available online: barnet.gov.

Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7

R E Q U E S T F O R P R O P O S A L S

The site is located within the area forming phase 2 of the Town Centre redevelopment scheme. The relevant previous planning history is as follows:-

UNIT 1 and 2, 23 SALISBURY GROVE, MYTCHETT, CAMBERLEY, GU16 6BP

Planning Rationale in Support of an Application for Plan of Subdivision and Zoning By-Law Amendment

CHESHIRE WEST AND CHESTER COUNCIL

WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

Together with Tenants

Allesley Parish Council s Response to the Draft Coventry Local Plan 2014

Briefing paper A neighbourhood guide to viability

Woldingham Association

Minimum Educational Requirements

Settlement Boundary Report

Land at East Bay Close, Cardiff. Planning Statement Proposed Redevelopment to Provide Student Accommodation.

REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED

The Horizon, 54 New Coventry Road, Sheldon, Birmingham, B26 3BB

LAND SOUTH OF ST.FREMUND WAY, SYDENHAM, LEAMINGTON SPA

Paragraph 47 National Planning Policy Framework. rpsgroup.com/uk

Description: Change of use from job centre (A1) to 15 bedroom sui generis HMO (C4)

Tudor Court 2 Crewys Road London NW2 2AA

Welsh Government Housing Policy Regulation

Delivering Affordable Sustainable Housing. Community Land

Managing Change in the Historic Environment: Demolition of Listed Buildings

Badby Parish. Housing Needs Survey Report

Proposed Variation to Stage 1 Proposed District Plan VISITOR ACCOMMODATION DRAFT

RESIDENTIAL DEVELOPMENT SITE. Land off North Road, South Kilworth, LEICESTERSHIRE

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

Link Housing s Tenant Engagement and Community Development Strategy FormingLinks

PRODUCED BY MIDLANDS RURAL HOUSING

Section 12A Purpose of Subdivision Provisions

Matter 2 Duty to Co-operate

Review of the Plaistow and Ifold Site Options and Assessment Report Issued by AECOM in August 2016.

EAST HERTS DISTRICT PLAN VILLAGE POLICY - DISCUSSION PAPER. RESPONSE BY JED GRIFFITHS MA DipTP FRTPI Past President RTPI

Research report Tenancy sustainment in Scotland

Royal Pier Waterfront, Southampton. Financial Viability Assessment

Housing White Paper Summary. February 2017

Trip Rate and Parking Databases in New Zealand and Australia

34 Carver Street, Jewellery Quarter, Birmingham, B1 3AL

Barratt Metropolitan Limited Liability Partnership

Housing Delivery. A Welsh Government Perspective. Neil Hemington, Chief Planner, Welsh Government

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

The Scottish Social Housing Charter

Rawlinson House, Lewisham, London SE13 5EL

Matter A: Housing need and the housing trajectory (BDP policies PG1, TP28 & TP30)

An Bord Pleanála. Inspector s Report. Single storey extension to rear at 26 Fitzroy Avenue, Drumcondra, Dublin 3.

Controls over HMOs. Legislative Controls

3 Accommodation Road London NW11 8ED

2. The Purpose of the Estates Strategy

Customer Engagement Strategy

Representation re: Sullivans Cove Planning Scheme /2015 Amendments - Macquarie Point Site Development: Affordable housing

1 Adopting the Code. The Consumer Code Requirements and good practice Guidance. 1.1 Adopting the Code. 1.2 Making the Code available

Riverton Properties Ltd Proposed Special Housing Area

Houses in Multiple Occupation in the Article 4 Direction Area of Selly Oak, Edgbaston and Harborne wards DRAFT FOR PUBLIC CONSULTATION

RICS property measurement 2nd edition: Basis for conclusions. Purpose

Choice-Based Letting Guidance for Local Authorities

Transcription:

October 2016 LB BIR.4109 BLOOR HOMES CONSULTATION STATEMENT Tanworth Lane, Cheswick Green PHASES 2 & 2A TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) PLANNING AND COMPULSORY PURCHASE ACT 2004 Pegasus Group 5 The Priory London Road Canwell Sutton Coldfield West Midlands B75 5SH T 0121 308 9570 F 0121 323 2215 W www.pegasuspg.co.uk Birmingham Bracknell Bristol Cambridge Cirencester East Midlands Leeds Liverpool London Manchester Copyright Pegasus Planning Group Limited 2011. The contents of this document must not be copied or reproduced in whole or in part without the written consent of Pegasus Planning Group Limited

CONTENTS: Page No 1. INTRODUCTION 1 2. THE APPROACH TO CONSULTATION 4 3. PUBLIC CONSULTATION RESPONSES QUANTITATIVE ANALYSIS 6 4. CONSULTATION RESPONSES ISSUES RAISED 7 5. SUMMARY AND CONCLUSIONS 11 APPENDICES APPENDIX A SCHEME LEAFLET APPENDIX B DISTRIBUTION AREA October 2016 LB BIR.4109

1 Introduction 1.1 The purpose of this statement is to set out how Bloor Homes have engaged with the local community and other key stakeholders in relation to proposals for Phases 2 & 2A of land at Tanworth Lane, Cheswick Green, Solihull. Phase 1 is currently under construction, following the granting of outline planning permission in November 2014, for which there was also extensive pre-application consultation. It will outline the consultation process in relation to Phases 2 & 2A, key issues that have emerged to date, and how these issues have been taken on board as part of the scheme design. Public Consultation informing the approach 1.2 Public consultation is now an essential element of the planning and development process. It is about engaging with local communities to shape a proposal so that the subsequent application takes into account, as far as is appropriate and possible, local views and opinions. To be proper, consultation must be undertaken at a time when proposals are still at a formative stage. It must include sufficient reasons for particular proposals to allow those consulted to give intelligent consideration and an intelligent response; adequate time must be given for this purpose; and the product of consultation must be conscientiously taken into account when the ultimate decision is taken. R v Brent London Borough Council ex parte Gunning (1985) 84 LGR 168. 1.3 The quality of the consultation undertaken is seen as increasingly important. The Pegasus Group has developed four quality indicators which can be used to test pre-application consultation. These are: Early engagement - to what extent was there an opportunity to influence and shape development? Meaningful vs tokenism was it real consultation, how did the project change as a result of the comments received, what tools and techniques were used? Involving the wider community what steps were taken to reach out to those who would not normally be involved in planning consultations? Monitoring of the consultation monitor, review and take action to address geographic / demographic gaps. 1.4 The approach adopted by Bloor Homes in this consultation builds from best practice. This report documents the results of the pre-application consultation undertaken for this development and reflects good quality, wide engagement with the local community at a October 2016 LB BIR.4109 Page 1

stage where comments received could be properly taken on board, enabling the emerging plans to be shaped in response to local suggestions. 1.5 The approach adopted is consistent with the government s approach to encouraging community engagement in shaping the future of their local areas, which is reflected in the National Planning Policy Framework (2011) which advises local authorities to encourage any applicants not already required to do so by law to engage with the local community before submitting their applications. 1.6 At the local level, Solihull Council has prepared a Statement of Community Involvement (SCI) (February 2007) which sets out the Councils approach to Community Engagement. It describes how they will consult their local community and other stakeholders on policy development and what will happen to the comments received. Chapter 3 of the Statement deals with Planning Applications, pre-application advice and the development management processes. Of particular relevance are the following paragraphs: Paragraph 3.3.2. We would (therefore) expect developers of applications for major development to involve the wider community in the development of their proposals at a pre-application stage... The type of consultation to be undertaken in each instance will depend on the nature of the application and should be discussed with Development Control Officers at an early stage 1.7 The document then indicates that for proposed housing developments of 50 plus houses, developers should;...consider holding public exhibitions/drop in sessions, public meetings and providing a newsletter to keep people up to date with the progress of the scheme The Structure of this Statement 1.8 This statement provides evidence of the pre-application consultation which has been undertaken by the applicant to assist in informing and shaping the proposals set out in the accompanying planning applications. 1.9 Section 2 sets out the approach which has been adopted towards the consultation on Phase 2 & 2A, following on from consultation undertaken in relation to the outline application 2014/1163, which was granted in November 2014. It includes information relating to the different ways in which awareness of the pre-application consultation was October 2016 LB BIR.4109 Page 2

raised within the locality, the material provided and the different ways in which views could be captured. 1.10 Section 3 provides quantitative information relating to the numbers and origins of the responses received demonstrating how the wider community were involved. 1.11 Section 4 documents the issues raised by the respondents, along with responses to the issues, setting out how these have been taken into account where possible. 1.12 Section 5 contains the conclusions to the report. It notes that the process of consultation has been a positive one, engaging with local people, capturing a wide range of different views, with the outcomes forming a key input to the design and development process. October 2016 LB BIR.4109 Page 3

2 The Approach to Consultation 2.1 A range of activities were undertaken to raise awareness of the consultation to ensure that local people had a range of different opportunities to engage, that they could do so in a meaningful way, and that it was easy for them to make their views known. 2.2 The approach adopted reflects the context of the site, the guidance set out in the NPPF and the Solihull SCI (2007). A number of activities have been undertaken to raise awareness of the proposed development and encourage engagement with the local community. In summary the approach adopted involved: Solihull MBC Planning Department 2.3 A pre-application meeting to outline and discuss Bloor Homes emerging proposals for Phase 2 and Phase 2a development at Tanworth Lane was held with Planning Officers Kim Allen and Matt Preece on 28 July 2016. The meeting considered the necessary scope and range of supporting reports and drawings which would need to accompany the planning applications and appropriate community consultation arrangements. Awareness Raising Leaflets 2.4 A leaflet was designed which set out information about the proposals and explained the rationale behind the consultation. Circa 2,750 were delivered to homes and businesses in Cheswick Green village and the surrounding area from 3 rd to 5 th October 2016. The leaflet included a proposed site layout and set out details of the development and the website address: www.tanworthlanecheswickgreen.co.uk. The aim of the leaflet was to provide initial information about the proposal and invite engagement. In addition to providing information on the proposals and direction to the website, the leaflet contained a pre-paid postage response form for comments. A copy of the leaflet is enclosed at Appendix A and a map of the distribution area can be found in Appendix B. Parish Council 2.5 A meeting was held with Cheswick Green Parish Council on 19 th September 2016 where a Presentation Layout for Phase 2 and Phase 2a was discussed along with the proposed approach to consultation with the local community. Project Website 2.6 A website containing further information to that outlined in the leaflet went live from 3 rd October 2016. Previously a website had been set up for consultation on proposals prior to October 2016 LB BIR.4109 Page 4

the submission of the outline application. This website was updated to include details of the Phase 2 & 2A proposals and the range of work being undertaken to develop ideas to help guide and inform the layout. The site also included an on-line comments form. The aim of this website was to capture the views of any interested parties; including those who had not received a leaflet, and/or who preferred to leave comments electronically. See Photograph 1 below. Photograph 1 Monitoring engagement 2.7 In order to see if the consultation had reached out to the wider community those responding to the consultation were asked to help by completing monitoring information. The FREEPOST response cards and the website asked for information relating to gender, age group, and location in relation to the site. October 2016 LB BIR.4109 Page 5

3 Public Consultation Responses - Quantitative analysis FREEPOST responses 3.1 A total of 17 responses were received using the FREEPOST reply paid form. The issues raised are set out in section 4 below. Of those who provided monitoring information, 3 were male and 8 were female, with 6 respondents either not completing the monitoring or preferring not to say. The majority of postal respondents were within the 36 55 age category, followed by those in the 56 70 age category. 3.2 Where geographical monitoring information was provided, just over half of the respondents lived within a 5 minutes walk of the site. Scheme website 3.3 The website, which contained similar information as the leaflet, went live from the 3 rd October 2016 with on-line comments invited up to the 16 th October 2016. The website attracted 170 visits over this period, with 125 being unique visits. An average of 2 pages were viewed per visit. 3.4 The site also included a comments form. A total of 5 responses were returned through the website, 1 from a male and 4 from females. Two respondents were in the 18 35 age group, two in the 56 70 age group and one over 70. 3.5 With regard to distance from the site one respondent lived within 5 minutes walk, two within 5-10 minutes walk, one a car journey away & one preferred not to say. Summary 3.6 Overall local residents made good use of the opportunities presented to visit the website and to make comments via the FREEPOST comments form. October 2016 LB BIR.4109 Page 6

4 Consultation Responses Issues raised 4.1 The focus of the pre-application consultation was to encourage views and perspectives from the local community to help shape the next phase of housing development on the site, rather than on the principle of development, as this has been determined by the local authority at the outline application stage. 4.2 A total of 22 written responses were received from all sources during the consultation process up to the 16 th October 2016. These were identified through: 17 comments forms received by post; 5 website comments form completed. The responses received often contained more than one comment or issue. Issues Raised 4.3 The comments received through the various approaches described above have been analysed on the basis of the issues raised by respondents and these have been broken down into the key themes set out below: Local Services 4.4 The most common concern that emerged from the consultation responses was the potential impact of the increased number of dwellings on local services, particularly the school and the doctors surgery in the village. The main concern raised was regarding the provision for financial contributions to be made in order to mitigate the impact of the proposed additional dwellings on local services. 4.5 It is the case that the proposed 54 additional dwellings as proposed by Phase 2a will be subject to the Community Infrastructure Levy (CIL) charging schedule adopted by the Council in April 2016. The site s location in Blythe Ward (with the exception of Monkspath) means that it is designated as a rural area for the purposes of CIL charging. For residential development in rural areas the is a charge of 150 per square metre. As per the Council s Regulation 123 List, CIL contributions may be used by the Council to fund primary education facilities and community based healthcare. This scheme will make a substantial CIL contribution which will assist with any necessary education infrastructure to accommodate primary school age children within the additional 54 homes. In addition, further education contributions are to be provided through phased payments identified within the S106 Agreement relating to the outline permission for the site. October 2016 LB BIR.4109 Page 7

Roads and Traffic Issues 4.6 The second most common concern that emerged from the consultation responses was the impact of the proposed additional dwellings on the local road network and increased traffic levels. There were concerns raised that the existing road network would not be able to accommodate the additional number of car journeys that would result from increasing the number of dwellings on the site. 4.7 As part of the Phase 2A application, a Transport Assessment Addendum (TAA) has been produced. The TAA calculated trip generation and distribution for the additional dwellings based on previously agreed trip rates and distributions. The TAA concluded the additional dwellings will not significantly increase traffic flows at local junctions during peak hours and thus the development will not adversely impact on the operation of the junctions. The proposed increase in the number of dwellings is considered acceptable in transport terms. In addition, an updated Travel Plan (to incorporate Phase 2a) has been produced which reaffirms the commitment of Bloor Homes to encourage sustainable transport choices for future residents of the development and which should further reduce traffic impact on the local highway network. Affordable Housing 4.8 There were concerns raised around the inclusion of affordable housing as part of the scheme. One of the responses queried if there has been an increase in the number of affordable houses as a result of the increase in dwellings. The proposal for the additional dwellings within Phase 2A is subject to the same affordable housing requirements as the rest of the development (Phases 1 & 2) and this has been provided for in accordance with the affordable housing policy of Solihull Council. Furthermore, Phase 2A is compliant with the Council s indicative tenure mix for affordable housing as set out in the Meeting Housing Needs SPD. 4.9 However, the majority of responses raised concerns around the principle of affordable housing provision in general rather than specifically in relation to this proposal. Parking 4.10 The consultation responses raised concerns over the level of parking provision to be provided as part of the development and related concerns around on-road parking. October 2016 LB BIR.4109 Page 8

4.11 Phase 2A provides two car parking spaces per dwelling in accordance with the Council s parking standards. In addition, there is space within the curtilage of each dwelling to allow for the storage of bicycles. Flooding 4.12 Concerns around existing and future flood risk were the most common concern of the local community during public consultation at the outline stage of the development. Significant technical and engineering work as approved by Solihull MBC has been undertaken by Bloor Homes to ensure that the development would not lead to an increase in flood risk to neighbouring properties or elsewhere. With respect to Mount Brook, the approved flood alleviation works have progressed well over the Summer, and are due for completion at end November 2016. 4.13 In addition, it is important to note that the overall development area has not been expanded from that approved at outline to accommodate the additional dwellings so the impermeable area of the site has not been increased. As part of the Phase 2A application, a Flood Risk Assessment Addendum has been submitted. This concludes that the development is not subject to significant flood risk nor will it increase flood risk elsewhere. Density/Housing Mix 4.14 The consultation responses also highlighted concerns regarding the density of the proposed development and the proposed housing mix. In order to accommodate the additional dwellings in the same development area Phase 2A does propose an increase in density compared to the original indicative masterplan as submitted at outline. However, the Landscape and Visual Impact Assessment Addendum submitted as part of the Phase 2A noted that the physical and visual impacts of the increased density will be at least partially mitigated by the increase in the number of smaller and linked dwellings which will protect the amenity and privacy of both existing and future residents. The density levels proposed are therefore considered appropriate and acceptable in this location. 4.15 Consultation responses also raised concerns over the proposed changes to the housing mix. Phase 2A proposes an increase in 2 and 3-bed properties in reflection of market demand and in order to better meet local housing need as identified by the Council in the Meeting Housing Need SPD. 4.16 There was also a consultation response from someone looking to reside in the area who was pleased to see the increased provision of 2 and 3-bed houses suitable for young professionals; supporting the Council s assessment of local housing demand. October 2016 LB BIR.4109 Page 9

4.17 Other concerns related to the contention that the 2 and 3-bed properties would be small and not in-keeping with the character of Cheswick Green. The 2 and 3-bed properties are inevitably smaller than the previously proposed 4 and 5-bed properties, though they will meet market demand and the need identified by the Council that in the Rural Housing Market Area (which includes Cheswick Green), 50% of all new market dwellings should have 1 or 2 bedrooms. The proposed change to the dwelling mix will ensure that the development meets this requirement, as 20 of the proposed 32 proposed market units are 2 bedroom properties. 4.18 The heights of the buildings, including the flats, are proposed to be mainly 2 storeys with the occasional 2.5 storey dwelling. These building heights were proposed at outline stage and there has been no increase in building heights to accommodate the higher density. As demonstrated in the Landscape and Visual Impact Assessment Addendum and by the accompanying Design & Access Statement, the development will be in-keeping with the character of Cheswick Green. Green Space 4.19 Responses also raised issues around the loss of green space and were concerned that a lack green space on the site would lead to the development feeling out-of-character for the village setting. The loss of green space as a result of the development as a whole is inevitable, but the increase in the proposed number of dwellings will not lead to the loss of any green space compared to that which was proposed at the outline stage. The development as a whole contains a significant amount of accessible green space which reflects the character of the village and has been designed in order to retain as many trees and hedgerows as possible; in particular those that have been assessed as being of a higher nature conservation value. The site is subject to a blanket Tree Preservation Order and the additional dwellings proposed as part of Phase 2A do not compromise the protected trees no do they encroach on the proposed green space. October 2016 LB BIR.4109 Page 10

5 Summary and Conclusions 5.1 The current planning applications are the product of engagement with the local community. In developing the approach to pre-application consultation the applicants have taken on board the guidance in the Solihull SCI together with other sources of advice on good practice in public engagement. 5.2 This report provides evidence of the pre-application consultation which has been undertaken by the applicant to assist in informing and shaping the proposals set out in the accompanying planning applications. 5.3 Good practice advice relating to pre-application public consultation requires the use of tools and techniques which support the engagement of the wider community. It encourages the use of different approaches to reaching out which in turn encourage balanced, representative and inclusive responses. As this report demonstrates, a range of approaches, tools and techniques have been used and have resulted in a range of different views being expressed by those who have engaged in the process. 5.4 Circa 2,750 leaflets were delivered to residential and business addresses within the village and near vicinity of the site. The leaflet included a FREEPOST response form to encourage responses and the website address for the scheme. 5.5 17 FREEPOST response forms were received as a result of the consultation, together with 5 responses received via the website. 5.6 Turning to the responses received, these demonstrate the breadth of views held within the local community. Of those who expressed a view, there are a range of different opinions on issues of relevance. 5.7 Each response received has been read and considered. The issues raised have been identified and recorded. Each separate issue has been treated as equally important and has been considered in terms if and how the scheme should change in response. Whilst each response has been properly considered, it is not possible to make changes which will satisfy everybody. Section 4 sets out the issues raised and how each of these have been taken into account; where this has not been considered appropriate, a reason has been provided. 5.8 It is clear from the above that the process of pre-application consultation has been a positive one, engaging with local people, capturing a wide range of different views, with October 2016 LB BIR.4109 Page 11

the outcomes forming a key input to the design and development process and shaping the final applications. October 2016 LB BIR.4109 Page 2

APPENDIX A SCHEME LEAFLET October 2016 LB BIR.4109

APPENDIX B DISTRIBUTION AREA October 2016 LB BIR.4109