CITY OF HEMET DEVELOPMENT ENGINEERING FEES

Similar documents
Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

CITY OF CORNING TENTATIVE MAPS

The Promised Land in Sight Preliminary Issuance on a LAMP Study

BROADWAY THREE NOTCH ROAD SUBDIVISION

City of Roswell - Fee Schedule

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

Peters Township Planning Department Fee Schedule

DAUPHIN CREEK ESTATES SUBDIVISION

ARTICLE 4 PERMITS REQUIRED FOR DEVELOPMENT OR CONSTRUCTION 4.1 AUTHORIZATION REQUIRED FOR LAND DISTURBANCE OR DEVELOPMENT ACTIVITIES

ANDOVER CODE. Checklist #5 Preliminary Site Plan Conditional Use

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

WESTMINSTER PARK SUBDIVISION

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

CITY OF BELMONT MEMORANDUM. September 20, 2016 Planning Commission Meeting - Agenda Item 4B

Community Services Department BOUNDARY LINE ADJUSTMENT APPLICATION

ZONING AMENDMENT & SUBDIVISION STAFF REPORT Date: July 9, 2015

FENCE BUILDING PERMIT APPLICATION

PLATTING AND DEVELOPMENT INFORMATION PACKET

Township of Collier 2418 Hilltop Road Presto, PA 15142

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

CHAFFEE COUNTY LAND USE CODE

CHAPTER FINAL AND PARCEL MAPS

ENGINEERING DIVISION 130 South Main Street, Lake Elsinore, CA 92530, P , F PRELIMINARY WATER QUALITY MA

MTC ALABAMA SUBDIVISION

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

ALBA BEACH SUBDIVISION, RESUBDIVISION OF LOT 17

THE CI FY OF MOBILE, ALABAMA

CITY OF OAK HARBOR Development Services Department

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT August 18, 2016

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

ZONING & LAND USE APPLICATION

ELIZA JORDAN CORNER SUBDIVISION

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

I. Requirements for All Applications. C D W

EL DORADO COUNTY DEVELOPMENT SERVICES ZONING ADMINISTRATOR STAFF REPORT TENTATIVE PARCEL MAP TIME EXTENSION

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

COMMUNITY DEVELOPMENT DEPARTMENT 333 Broadalbin Street SW, P.O. Box 490 Albany, OR 97321

El Paso County Development Review System Adopted Fee Schedule (2005)

TURTLE CREEK SUBDIVISION, PHASE THREE

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

THE CITY OF MOBILE, ALABAMA

Unified Development Code

The City Engineering Division has reviewed the subject development and has the following comments.

TOWN OF ELIOT PLANNING BOARD SUBDIVISION APPLICATION

CHAPTER 30 BUILDING CODE

ARTICLE 4 CONTENT REQUIREMENTS FOR SUBDIVISION PLATS & PLANS

APPLICATION PROCEDURE

City of Suwanee Development Regulations ARTICLE 10 PLAN AND PLAT SPECIFICATIONS

ZONING AMENDMENT, PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: August 8, 2013

Community Services Department TENTATIVE PARCEL MAP PARCEL MAP WAIVER APPLICATION

Residential Minor Subdivision Review Checklist

SUBDIVISION, PLANNED UNIT DEVELOPMENT, & REZONING STAFF REPORT Date: September 17, 2015

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

Community Development Fees Revised October 2018

JEFFERSON COUNTY, ALABAMA

STAFF RECOMMENDATION

Criteria for Appeals of Flood Insurance Rate Maps. November 30, 201 1

ARTICLE 6 PRELIMINARY PLAT

YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

SECTION 4: PRELIMINARY PLAT

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

FINAL PLAT CHECKLIST

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

SUBDIVISION, PLANNING APPROVAL, & REZONING STAFF REPORT Date: June 4, 2015

Use permitted by: Right Special Exemption

Committed to Service

HAWTHORNE PLACE SUBDIVISON, RESUBDIVISION OF LOT 15 REVISED

Commercial Development Design and Resource Guide February 15, 2017

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

The City Engineering Division has reviewed the subject development and has the following comments.

Site Plan Application

City of Duluth Development Regulations

géãç Éy VtÇtÇwt zât 5440 Routes 5 & 20 West Canandaigua, NY Phone: (585) / Fax: (585)

FINAL PLAT APPLICATION

SWIMMING POOL PERMIT APPLICATION PACKET

BAY FOREST PARK SUBDIVISION, RESUBDIVISION OF LOTS 6 & 7 AND BAY FOREST PARK SUBDIVISION LOT 10, OF THE RESUBDIVISON OF LOTS 9 & 10

TOWN OF MANCHESTER BY THE SEA WETLANDS REGULATIONS GENERAL BY LAW ARTICLE XVII APPENDIX A APPLICATION SUBMITTAL REQUIREMENTS 2/26/13

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

FENCE PERMIT APPLICATION

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

Frequently Asked Questions for: Drainage, Watershed and Water Quality Property Owners Near Creeks Developers and Engineers and Definitions of Terms

City of Forest Hill Minor Plat Application

Residential Major Subdivision Review Checklist

DEVELOPMENT AND PERMIT RELATED SERVICES

Subdivision Regulations

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

JOHNNY S RV PARK SUBDIVISION

WESTMINSTER PARK PLACE SUBDIVISION

Floodplain Development Land Use Review

DINKINS ESTATE FAMILY SUBDIVISION

The Litchfield Subdivision Regulations Town of Litchfield, Connecticut

LOT SPLIT APPLICATION

DAWES SWITCHING STATION SUBDIVISION

Transcription:

CITY OF HEMET DEVELOPMENT ENGINEERING FEES PLAN CHECKING FEES Clear & Grub Stockpile- Mass Rough- Single Family Home 1 acre or less Maximum Clear & Grub Stockpile- Mass Rough - Residential Subdivision Clear & Grub Stockpile- Mass Rough - Commercial Sites Precise Grading - Single Family Home 1 acre or Less Precise Grading - Additional Lot Precise Grading - Commercial Sites Erosion & Sediment Control Plans 1 st - 3 rd Review & Approval Erosion & Sediment Control Plans SWPPP Grading Permit Issuance Review Submitted Documents $572.00 Initial deposit of 4% of grading Initial deposit of 4% of grading $1,052.00 $361 Initial deposit of 4% of grading $756.00 $511.00 $239.00 Effective December 14, 2015

Grading Permit Issuance $81.00 Grading Permit Extension/Renewal Research Previous Permit Documentation $193.00 Grading Permit Extension/Renewal Review Submitted Documents $307.00 Grading Permit Extension/Renewal Issuance $142.00 Erosion & Sediment Control Plans 4 th & Subsequent Review $292.00 Grading Plan Revision Traffic Control Plans - Grading $572.00 $108.00 Encroachment Permit - Grading $210.00 Import/Export Fee Per Cubic Yard Plus submittal document administrative fees $0.35 Public Private Improvement Plan Review Initial deposit of 4% of grading Effective Dec. 14, 2015 Page 2 of 10

Public Private Improvement Permit Issuance On/Off-site Improvements $292.00 Public Private Improvement Traffic Control Plans Plan Checking $164.00 Public Private Improvement 4 th & Subsequent Review Plan Checking Public Private Improvement Improvement Plan Revision $292.00 $572.00 Encroachment Permit Plan Checking $210.00 Plans Storage/Scanning Mapping Easements Dedication/Quitclaim 1 st Review & Research Dedication/Quitclaim - Review 1 and 2, Research, Process Docs, & Staff Report Mapping Easements Vacation 1 st Review & Research Vacation - Review 1 & 2, Research, Process Docs, & Staff Report Mapping Street Vacation Summary 1 st Review & Research Summary - Review 1-2, Research, Process Docs, & Staff Report $2.50 $791.00 $1,354.00 $2,887.00 Effective Dec. 14, 2015 Page 3 of 10

Mapping Street Vacation Detailed 1 st Review & Research $4,664.00 Parcel Maps Up to 4 Parcels Parcel Maps More than 4 Parcels (Commercial) Parcel Map Waiver Parcel Map Reversion to Acreage Final Maps Up to 25 Lots Final Maps More than 25 Lots Add 1 Hour Per Lot Above 25 $4,265.00 $6,504.00 $2,781.00 $2,992.00 $8,899.00 $445.00 Final Maps Subdivision Agreement & Bonds Processing Final Maps Bond Replacement/Reduction Maps 4 th and Subsequent Review $1,544.00 $1,010.00 $465.00 Effective Dec. 14, 2015 Page 4 of 10

Record of Survey Amended Map Certificate of Compliance Certificate of Correction Centerline Ties Review LLMD Formation Parcel 1-10 W/Engineer s Report Base Fee + Per Parcel Fee of $25.00 LLMD Formation Parcel 11-150 W/Engineer s Report Base Fee + Per Parcel Fee of $20.00 $2,478.00 $1,498.00 $1,358.00 $1,148.00 $239.00 $3,050.00 $3,979.00 LLMD Formation Parcel 151-400 W/Engineer s Report Base Fee + Per Parcel Fee of $10.00 $4,911.00 LLMD Formation Parcel 401+ W/Engineer s Report Base Fee + Per Parcel Fee of $2.50 $5,842.00 CFD (Public Safety) Formation Contracted Minimum Deposit of $3,000.00. Additional costs will be based on project size and level of effort specific to the development. Traffic Impact Analysis $3,000.00 $604.00 Effective Dec. 14, 2015 Page 5 of 10

FEMA - Conditional Letter of Map Revision (CLOMR) $2,286.00 FEMA - Letter of Map Revision (LOMR) FEMA - Letter of Map Amendment (LOMA) FEMA - Elevation Certificate $572.00 $572.00 $541.00 FEMA - Flood Zone Clearance/FIRmette $330.00 Hydrology & Hydraulics 0 to 50 Acres Hydrology & Hydraulics 50 to 100 Acres Hydrology & Hydraulics More than 100 Acres - Each Additional Acre over 100 Water Quality Mgmt Plan (WQMP) Preliminary Water Quality Mgmt Plan (WQMP) Final Third party + Third party + Third party + Third party + Third party + Effective Dec. 14, 2015 Page 6 of 10

INSPECTION FEES Clear & Grub Stockpile- Mass Rough Precise Grading SFH 1 Acre or Less $242.00 Precise Grading Subdivision Lots $546.00 Up to 4 Parcels Precise Grading Additional Lot $242.00 Precise Grading Commercial Sites Grading Erosion & Sediment Control Facilities Special Inspection Per Hour $118.00 Effective Dec. 14, 2015 Page 7 of 10

Public/Private Improvements Improvements Inspections Public/Private Improvements Traffic Control Inspection Public/Private Improvements Storm Water Prevention Plan (SWPPP) Public/Private Improvements WQMP Facilities Inspection Initial Deposit of 4% of Construction Costs with plus Outside Costs Initial deposit from proposal + Public/Private Improvements WQMP Annual Inspection Per Site Effective Dec. 14, 2015 Page 8 of 10

PERMIT FEES Encroachment Permit $129.00 Driveways Residential $336.00 Driveways Commercials $539.00 Driveways Second Approach $336.00 Curb Core $235.00 Max 2 Per Lot Block Party $214.00 Excavation Crossing $264.00 Effective Dec. 14, 2015 Page 9 of 10

Excavation Parallel Transportation Permit Single Trip Per Caltrans $105.00 Transportation Permit Annual Per Caltrans $105.00 Transportation Permit Multi-Trip Per Caltrans 105.00 Documents/Plans Research Per Hour $133.00 Admin Fee Per Hour $105.00 Inspection Public Private Precon Meeting $79.00 Plan Check Lot Line Adjustment Initial base of $564 based on actual cost of & outside costs. Effective Dec. 14, 2015 Page 10 of 10