SOFIA BUSINESS TOWERS Investment opportunity 2

Similar documents
INVESTBULGARIA

;

TENANT DESIGN MANUAL UPDATED JULY 2016

PROPERTY FACTS. Your Green Office In The Heart of The City

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

Click screenshot to play the video!

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

Your Preferred Business Address in Damansara Uptown, Petaling Jaya

TENANT DESIGN MANUAL UPDATED AUGUST 2016

TENANT DESIGN MANUAL UPDATED MAY 2016

Reg. Section 1.263(a)-3T(h)(3)(iii)(A) Amounts paid to improve tangible property (temporary).

natural space for business

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

RIDGEDALE A VENUE E AST H ANOVER, NEW J ERSEY

FACT SHEET. Office: 820,000 sf. Number of Floors. 25 floors. Optimum leasing depth - 43 ft. Sustainability. Efficiency 70% Parking.

TENANT DESIGN MANUAL UPDATED JUNE 2016

SCOTIA PLAZA Building Specifications

TENANT DESIGN MANUAL UPDATED JANUARY 2016

TENANT DESIGN MANUAL UPDATED JULY 2015

PLAZA WEST COVINA TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

TENANT DESIGN MANUAL UPDATED JULY 2015

D U L L E S AT DULLES CORNER. Smart Business DULLES CORNER BOULEVARD. dullesmetrocntr.com

100 CHARACTERISTICS OF THE GREEN GLADES ESTATE

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TWELVE OAKS GENERAL INFORMATION (BUILDINGS A, B, C, and D ONLY)

No Surprises: What You Need to Know About the TPRs and Cost Segregation. Trent Baeckl, CPA Tax Senior Manager

CONTENTS INTRODUCTION THE BENEFITS OF THE LOCATION SPACE THE SURROUNDINGS OF THE BUILDING FACILITIES TECHNICAL SPECS AND STRUCTURAL SOLUTIONS

TENANT DESIGN MANUAL UPDATED JUNE 2015

SALE BY AUCTION PREMISES OF THE MONS BRANCH OF THE NATIONAL BANK OF BELGIUM LTD. A. GENERAL INFORMATION. 1. Contact details and further information

Residence 51. LOCATION John Kennedy Area, Limassol. STATUS Under Construction for SALE. COMPLETION DATE September 2010

TENANT DESIGN MANUAL UPDATED JULY 2015

Construction information

Dreaming about excellent office space?

OWNER/MANAGER: RENOVATED: 2009 HEIGHT: Blue Star Properties. 10 floors RENTABLE SQUARE FEET: 278,535 FLOOR SIZES:

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATE JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TWELVE OAKS GENERAL INFORMATION (BUILDING E ONLY)

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART

TENANT DESIGN MANUAL UPDATED JUNE 2015

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

The Destination for Urban Luxury

VIEW VISION OVERVIEW HEILBRONNER STR. 190 STUTTGART



TENANT DESIGN MANUAL UPDATED JULY 2015

Multi-unit residential uses code

TENANT DESIGN MANUAL UPDATED AUGUST 2015

Property Finder PH - Sale, Rent and Sell Houses in the Philippines 1,696,266

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

CONSTRUCTION COST ESTIMATE AND ANALYSIS

MOUNT GRAVATT- CAPALABA ROAD

LOUIS JOLIET MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

BUILDING CODE COMMISSION

RESIDENCE 1A. 1 bedroom, living/dining room plus juliet balcony RESIDENCE 1B JULIET BALCONY BEDROOM LIVING DINING 10'-0" 9'-5" 9'-3" 17'-4"

Utilizing Tall Municipal Structures to Generate Revenue. Darin Freese Water Program Coordinator

Harmony Row Dublin 2. Dublin 2

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

Residencial Altos del Sabinal - "Viviendas desde *. Plaza y Trastero Incluido"

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

HOME INVESTMENTS PARTNERSHIP PROGRAM Local Housing Standards Checklist

ESLA 5116 is a prime quality residential complex consisting of three luxurious buildings.

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Hinchinbrook Shire Adopted Infrastructure Charges Resolution CR1-2018

PRICE REDUCTION FOR SALE RETAIL CREATIVE OFFICE WAREHOUSE SPACE. Historic West Adams Boulevard Corridor

TENANT DESIGN MANUAL UPDATED JUNE 2015

CIRA CENTRE. Philadelphia, PA

TENANT DESIGN MANUAL UPDATED JULY 2015

MASTER PLAN ONE CITY, ONE LIFE.

Building Specifications

PREMIER OFFICE COMPLEX LOCAL, LONG-STANDING OWNERSHIP & MANAGEMENT SUPERIOR TECHNOLOGY

RENTER'S INSPECTION WORKSHEET Free form provided at

STANDARD MOTOR PRODUCTS BUILDING. Long Island City, NYC. A landmark for innovation since 1919 SMP BUILDING

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

MONTROSE COUNTY COMMERCE PARK

GENERAL INFORMATION. Landlord s Tenant Coordinator

LOCATION MAP. Source 5A/B

THE SAMRYA TWIN TOWERS DOHA

TENANT DESIGN MANUAL UPDATED JULY 2015

a) Tenant shall require its Contractor to provide and maintain the following insurance coverage:

470 Nepperhan Avenue S P A C E F O R L E A S E. Yonkers, NY ± 50,000 SF. Space Available for Triple Net Lease

South Eschborn near Frankfurt/Main Mergenthaler Allee 35-37, Eschborn/Taunus Office building

Michael A. Gross Tucson Realty & Trust Co. Executive Vice President. 333 N. Wilmot Rd. Ste. 340 Tucson, AZ 85711

HOLLEY NAVARRE WATER SYSTEM, INC. IMPACT FEE POLICIES, PROCEDURES & CALCULATIONS

5. Turnover Condition : Bare Shell, rough flooring, fire sprinkler and smoke detectors for installation., Fan Coil Units provided

TENANT DESIGN MANUAL UPDATED JULY 2015

Apartment Lifts There are individual lifts dedicated to the Building. Security lifts to all levels including car park.

Live somewhere precious. Rendering is artist s impression only. E.&O.E.

Plan A. 1,573(A2) -1,587(A1) Square Feet Three-Story 2 bedrooms 2.5 bathrooms Bedroom Downstairs Great Room Kitchen with Breakfast Island 2-Car Garage

Transcription:

www.galaxy-bg.com SOFIA BUSINESS TOWERS Investment opportunity Invest with confidence

CONTENTS: 0 Visualizations 0 Locations 0 Access 09 Silhouettes Plans Sections 9 Areas

SOFIA BUSINESS TOWERS There are projects that can change the appearance of a city and become a symbol of its development. There are office buildings, which could change the image of companies and support their prosperity. There are places that over time become increasingly relevant and in demand. Such projects rarely appear on the market and are destined for success. Sofia Business Towers is one of them: - An impressive project that will change the city s skyline, - An innovative building, which will give a new impulse in the business of its inhabitants, - The perfect business location, with great prospects for development. The album presents the details of an ultimate project - Sofia Business Towers. The following pages describe the concept of the project, the specific characteristics and parameters of the building. They present a text and graphic information on the types of areas. Below there are the floor plans and three-dimensional visualization of the exterior. Aggregated indicators: Area Property total: m RLE (a regulated land plot) II: 59 m RLE III: m Area: 50 m Total area:,5 m Height to the highest point of the building: 00 m The album was created by A & A Architects. All graphics and text materials on this album are copyrighted. April. Sofia. 0.

05.

.0

0.

The project Sofia Business Towers is located in one of the most attractive locations in Sofia - Tsarigradsko Shosse Blvd. Tsarigradsko Shosse Blvd. connects the city center with the ring road, highway Trakiya towards Plovdiv and Istanbul. It also is the main artery for access to Sofia Airport by road junction with Brussels Blvd. and major urban highway for access to several residential areas with a population of more than 00 000 inhabitants. The boulevard is the only true urban highway built to date in Sofia, crossing intersections on two levels. All these factors turn Tsarigradsko Shosse Blvd. in the most important contemporary urban artery in Sofia and highly preferred place for location of business and commercial objects. Excellent communication access and opportunities for construction of large-scale projects have created prerequisites for the rapid development of the area around the boulevard and building sites with great appeal. The proximity to the airport is of great importance for future tenants and their foreign partners. There are few locations that can boast both with access to the airport and the center of a European capital within 0 minutes. Urban transport is also very developed in the project area. In a perimeter of 00 meters there are bus stops serving bus lines and trolleybus lines. At a distance of one bus stop there is a subway station. Access time by car: - Sofia Airport - min. - Center of Sofia - 0 min. - Ring Road - min Four pedestrian entrances are designed from the ground level, two entrances for cars to underground garages and loading ramp for servicing outlets. There is a possibility for a pedestrian link to the adjacent building of Sofia University..0

Some large projects, that are attracting thousands of daily visitors and employees, as The Mall, Europe Trade Center, Mega Park, Hotel Novotel Sofia were built near Sofia Business Towers. By building the project Sofia Business Towers, it is expected the area will become the largest operating modern business and commercial cluster in Sofia. Through existing road infrastructure and nearby crossroads on two levels it is possible to reach the project from the main directions - Sofia Airport Center Sofia, Mladost residential district, Ring Road (Plovdiv). 09.

00 m high office tower will form the city skyline on Tsarigradsko Shosse Blvd. the busiest transport artery in the capital, becoming an important urban benchmark. The building will mark this part of the boulevard and will be a major landmark and face of the city in front of travelers to and from Sofia Airport..00

Electric installations The building has first category of power from two independent sources with MV for greater security against breakdown in power. The building has two transformers in the basement and one on the roof of Block A and one on the roof of Block B to power the HVAC consumers on the roof. Three additional diesel generators are designed for backup power. For powering of consumers in the buildings, the construction of 9 main transformer boards is planned. Connections between transformers and main transformer boards will be implemented by busbars. For powering various rental units in the building, there are separate switchboards. Each output, that is powering rental unit in main switchboards, is equipped with an automatic switch and three-phase double-tariff electric meter. There is room for the construction of central UPS equipment depending on the specific requirements of future tenants. There is lightning protection system specifically designed for tall buildings, assuming horizontal lightning. Telecommunications Telecommunications infrastructure will be built using the latest generation of symmetrical copper cables and fiber-optic cables. Optical components are prioritized in the main network, in the horizontal network - copper components. The established infrastructure thereby ensures high quality and reliable transmission medium voice, data and video. It is envisaged that the use of fiber-optic and multi-paired symmetrical cables for the construction of the highway district subsystem and symmetrical copper cables mainly for voice transmission. There are four construction communication facilities. And for each office rental units there are office distributors. Every workplace will have one RJ5 for telephony and one RJ5 for computer network. The horizontal wiring is performed with copper cables, which allow the transmission of sound, images and data. The cables are laid in the double floor, with contacts for computers and telephones installed close to workplaces. On the roof of the building there is a possibility for placement of antennas and telecommunications equipment Lighting Artificial lighting is designed in compliance with modern European standards for lighting the premises. Luminaries are mounted on the suspended ceilings. Its management is likely to be connected to the BMS system. An overall evacuation lighting system is designed, which turns on in case of emergency. Ventilation Systems for decentralized ventilation with high efficiency are designed, located on each floor with a supply of fresh air and removal of exhaust air directly to the facade. Fresh air is taken from the facade with fixed dampers with net and integrated pre-filter. Primary heating of the received outside air after recuperators is done by passage of freon climate unit with direct evaporation mounted in the path of the duct. Supply and exhaust of air in the rooms is done with insulated and soundproofed ducts mounted in the ceiling. The latest generation of energy-efficient regenerative channel cameras is used, that significantly reduce energy consumption for processing of fresh air. There is an opportunity for natural ventilation of the premises by opening parts of the facade. All convectors are connected to the BMS system of open windows. Air conditioning The building is equipped with highly efficient freon heat pump air conditioning units of direct evaporation. The system is triple pipe for all offices. Outdoor units are located in specific places on the roofs of the buildings and in separate technical floors. The indoor units are ceiling convectors located in the suspended ceiling of the premises. All coils will be powered by vertical and horizontal pipe network of copper pipes installed in the suspended ceiling with heat insulation. All system will be equipped with its own software for reporting energy consumption and connected with central BMS of the building. 0.

Fire detection and fire fighting Eight addressable fire stations will be constructed in the building by the project. Fire alarm panels are interconnected and are organized so that they are triggered by the occurrence of a fire, in any room that requires a fire alarm. Addressable fire alarm panels (AFAP) are controlled by a microprocessor and have the ability for integrated operation in exceptional circumstances. They allow immediate localization of the room, who gave a signal of a fire or accident. AFAP are connected to fume optical gauge, thermal detectors, manual call points, isolation modules and sirens. Automatic fire fighting will be carried out by sprinkler fire extinguishing system. The same will respond automatically in case of fire, while with the start of fire will signal about the presence of fire. The installation will be equipped with sprinklers and fire fighting alarm control valves. The sprinkler system is divided into 9 extinguishing sections powered by three pumping groups. The system is powered by a storage tank of the necessary supply of water from the street plumbing network Plumbing The water supply of the building will use street water. Due to the great height, the building is divided into three areas for water supply. The first zone is supplied by gravity, while second and third - by pump hydrophore systems which draw water from a tank located in the basement. Power of the tank with water is done by street plumbing. There are two tanks, they will keep water for drinking and household purposes, fire-prevention stock for sprinkler system and fire-prevention stock for manual fire fighting in middle and high zone. Sewerage For drainage of the complex there is two building sewer deviations discharged in municipal sewage. Internal sewerage, waste water consists of vertical part collecting water from appliances and horizontal in the basement, which take them into street sewers. Separate sewerage system is designed for the drainage of roof, it is connected with a tank for collecting rainwater to be reused for irrigation of green areas. Access control System Access Control is connected to building entrances, entrances to offices, technical rooms, exits to the roof, turnstiles, car barriers in underground parking and more. System access control restricts access and presence to certain areas and at certain period of time of employees in the building, according to their duties and responsibilities. Each employee will have individual contactless chip card with a unique 0-digit number, which will be identified in the system. Customers cards are valid for a specified period, after which the system automatically takes the access. The card is read by readers, mounted to entry and exit points (scanners and terminals), connected to a controller (station) operated by a computer with specialized software. There is a video surveillance system. Monitoring is done by cameras for indoor and outdoor installation. Video cameras are located in places where the main stream of people is - lobbies, landings, the perimeter around the building, as well as underground parking. BMS All technical installations of the building are provided with the opportunity to integrate with BMS systems. Full control and measurement of energy consumption, lighting, sun protection, access control and other systems is envisioned with the ability to upgrade the system..0

PLAN OF THE BASEMENT 5 9 0 Main entrance Secondary entrance Entrance / exit for cars Reception Lobby Information commercial gallery Restaurant / cafe Art installation Double room Premium room Office cleaners Terrace RAMP Главен вход Второстепенен вход Вход/ изход автомобили Рецепция 5 Лоби Информация търговска галерия Заведение за хранене/ кафе-бар 9 0 Арт инсталация Двойна стая Премиум стая Офис камериерки Тераса Тоалетни Технически помещения Склад Kухня Офис Конферентна зала 9 Сървър Преддверие 9 9 RAMP N Главен вход Второстепенен Вход/ изход ав Рецепция 5 Лоби Информация т Заведение за Арт инсталаци 9 Двойна стая 0 Премиум стая Офис камерие Тераса Тоалетни Toilets Technical premises Store Kitchen ПМ RAMP Технически по Склад Kухня Офис Office Конферентна з 9 Conference room Server 9 Сървър Преддверие Antechamber 0.

Главен вход Второстепенен вход Вход/ изход автомобили N Рецепция 5 Лоби Информация търговска галерия Заведение за хранене/ кафе-бар PLAN OF GROUND FLOOR Арт инсталация УПИ I УПИ I 9 Двойна стая 0 Премиум стая Офис камериерки Тераса Тоалетни Технически помещения Склад Kухня Офис Конферентна зала 9 Сървър 9 9 5 Main entrance Secondary entrance Entrance / exit for cars Reception Lobby Преддверие Information commercial area HOTEL Restaurant / cafe Art installation РАМПАRAMP 9 0 Double room Premium room РАМПАRAMP Office chambermaids BLOCK B РАМПАRAMP Terrace Toilets Technical premises Store Kitchen Office BLOCK A РАМПАRAMP 9 Conference room Server Antechamber STOREY PARKING.0

PLAN OF THE LOW-FLOOR OFFICE Main entrance Secondary entrance Entrance / exit for cars Reception N 5 Lobby Information commercial gallery HOTEL Restaurant / cafe Art installation 9 Double room RAMP 0 Premium room Office chambermaids Terrace Toilets Technical premises BLOCK B Store Kitchen Office RAMP Conference room 9 Server Antechamber BLOCK A STOREY PARKING 0.

или PLAN OF THE HIGH OFFICE FLOOR Main entrance ка галерия е/ кафе-бар ия HOTEL BLOCK B Главен вход Второстепенен вход Вход/ изход автомобили Рецепция 5 Лоби Информация търговска галерия Заведение за хранене/ кафе-бар 9 0 Арт инсталация Двойна стая Премиум стая Офис камериерки Тераса Тоалетни Технически помещения Склад Kухня Офис Конферентна зала 9 Сървър Преддверие 9 9 N 5 9 0 Secondary entrance Entrance / exit for cars Reception Lobby Information commercial gallery Restaurant / cafe Art installation Double room Premium room Office chambermaids Terrace Toilets 9 Technical premises Store Kitchen Office Conference room BLOCK A 9 Server STOREY PARKING Antechamber.0

SECTION A-A BLOCK A +00.00 +95.00 +9. +.0 +9.0 +.00 УПИ I +.0 BLOCK B РАМПА РАМПА +. А +.0 РАМПА А +.0 +0.0 РАМПА +5.00 +5. +9.0 +5.0 +.0 +.00 +. +0.0 +.0 STOREY PARKING +.0 +9.00 +.0 +.0 +.0 +. +.0 +.0 +0.00 +.0 +. +.0 +.0 -. -5. -9.00 0. 0. страница www.aaa.bg Главен вход Второстепенен вход Вход/ изход автомобили Рецепция 5 Лоби Информация търговска галерия Заведение за хранене/ кафе-бар Арт инсталация 9 Двойна стая 0 Премиум стая Офис камериерки Тераса Тоалетни Технически помещения Склад Kухня Офис Конферентна зала 9 Сървър Преддверие

РАМПА РАМПА РАМПА РАМПА SECTION B-B BLOCK A B Главен вход УПИ I Второстепенен вхо Вход/ изход автомо Рецепция BLOCK B 5 Лоби Информация търго Заведение за хране Арт инсталация 9 Двойна стая 0 Премиум стая Офис камериерки Тераса Тоалетни Технически помеще Склад Kухня Офис Конферентна зала 9 Сървър Преддверие B HOTEL.0

Office building in RLE III, neighborhood b, locality NPZ East, area Karo, district Mladost, Sofia city Allocation of space in the building Floor Built-up area Common % common % rental Dining Rental area Offices parts parts area options Warehouses Parking places Basement Basement 5,00 0,00 0,00 0,00 Basement 5,00 0,00 Ground floor A + B Ground floor 9,00 05,00,00,00 Ground floor 0 5,00 Floor 5,00 Floor 5,00 Floor 5,00 Storey Floor 5,00 parking Floor 5 5,00 Floor 5,00 Floor 5,00 Floor 5,00 Roof 0,00 Floor 59,00,00 9,5 09,00 0,5 09,00 Floor 9,00,00 9,9 05,00 0,0 05,00 Floor 9,00,00 9,9 05,00 0,0 05,00 Floor 9,00,00 9,9 05,00 0,0 05,00 Floor 5 9,00,00 9,9 05,00 0,0 05,00 Floor 9,00,00 9,9 05,00 0,0 05,00 Floor 9,00,00 9,9 05,00 0,0 05,00 Floor 9,00,00 9,9 05,00 0,0 05,00 Floor 9 9,00,00 9,9 05,00 0,0 05,00 Floor 0 9,00,00 9,9 05,00 0,0 05,00 Floor,00,00,5 95,00, 95,00 Floor 5,00,00, 9,00,5 9,00 Building A Floor 9,00,00,0 9,00,0 9,00 Floor,00,00, 90,00, 90,00 Floor,00,00, 9,00, 9,00 Floor,00,00, 9,00, 9,00 Floor 9,00 90,00,9 999,00,0 999,00 Floor 5,00 90,00,0 995,00,9 995,00 Floor 9 0,00 90,00,,00,,00 Floor 0,00 90,00,,00,9,00 Floor 0,00 90,00,,00,9,00 Floor 59,00,00,,00,9,00 Floor,00,00,5,00,,00 Floor,00,00,5,00,,00 Roof 9,00 9,00 00,00 0,00 0,00 0,00 Floor 9,00 9,00 9,59 90,00 0, 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 5 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Building B Floor 9 9,00 9,00, 90,00 9,9 90,00 Floor 0 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Floor 9,00 9,00, 90,00 9,9 90,00 Roof,00,00 00,00 0,00 0,00 0,00 Total 9 5,00 0,00,9 9,00 9,0 5,00,00 0,00 09 Type m % Retail space Offices Parking places,00, 5,00 9, 09 Built-up area 9,00 Common parts % common parts Rental area % rental area Offices Dining options Warehouses Parking places Ground floor A+B 9,00 05,00 9,,00 0,,00 Storey parking 5,00 Building A 5,00 5,00,0 5,00 9,9 5,00 0,00 0,00 Building B 9 5,00 0,00, 500,00 9, 500,00 0,00 0,00 Built up area above ground 95,00 0,00,0 9,00 5,9 5,00,00 0,00 Built up area underground,00 09 Total built-up 9 5,00 Hotel on Tsarigradsko Shosse Blvd. Allocation of space in the building Underground parking Floor Built-up area Terraces Parking places (pp) m m /pp Floor Basement 0, 0,00 0,,5 Basement Basement 0, 0,00 0,,5 Basement Ground floor 0 0,0 0,00 Ground floor 0 Floor 5,0 0,00 Floor Floor 0, 0,00 Floor Floor 0, 0,00 Floor Floor,50,90 Floor Floor 5 0,0,90 Floor 5 Floor,0,90 Floor Floor 5,0,90 Floor Floor Roof,0,90 9,0 Floor Roof Total 5, 5,0 0, Total Built-up area 0,0 Common Parking places m m /pp Built up area above ground 0, 0,00 0,,5 Built up area underground,00 5,0 Total built-up, 09.

Hotel on Tsarigradsko Shosse Blvd. Allocation of space in the building Office building in RLE III, neighborhood b, locality NPZ East, area Karo, district Mladost, Sofia city Allocation of space in the building Floor Basement Basement Ground floor 0 Floor Floor Floor Floor Floor 5 Floor Floor Floor Roof Total Underground parking Built-up Parking Terraces area places (pp) m m /pp Floor 0, 0,00 0,,5 Basement 0, 0,00 0,,5 Basement 0,0 0,00 Ground floor 0 5,0 0,00 Floor 0, 0,00 Floor 0, 0,00 Floor,50,90 Floor 0,0,90 Floor 5,0,90 Floor 5,0,90 Floor,0,90 9,0 Floor Roof 5, 5,0 0, Total Built-up area 0,0 Common Parking places m m /pp Built up area above ground 0, 0,00 0,,5 Built up area underground,00 5,0 Total built-up, Floor Built-up area Common % common parts Rental area % rental Dining Offices parts area options Warehouses Parking places Сутерен Basement 5,00 0,00 0,00 0,00 Basement 5,0 0,00 Партер A+Б Ground floor,0,0,00,00 Ground floor 0 5, Floor 5, Floor 5, Floor 5, Storey Floor 5, parking Floor 5 5, Floor 5, Floor 5, Floor 5, Roof 0,00 Floor,5 0,5,9 09,00,5 09,00 Floor,5 0,5,9 05,00,0 05,00 Floor,5 0,5,9 05,00,0 05,00 Floor,5 0,5,9 05,00,0 05,00 Floor 5,5 0,5,9 05,00,0 05,00 Floor,5 0,5,9 05,00,0 05,00 Floor,5 0,5,9 05,00,0 05,00 Floor,5 0,5,9 05,00,0 05,00 Floor 9,5 0,5,9 05,00,0 05,00 Floor 0,5 0,5,9 05,00,0 05,00 Floor,5 0,5, 95,00,5 95,00 Floor,5 0,5,0 9,00,9 9,00 Building A Floor,5 0,5,0 9,00,9 9,00 Floor 0,5 0,5,9 90,00 5,0 90,00 Floor,5 0,5,9 9,00 5,0 9,00 Floor,5 0,5,9 9,00 5,0 9,00 Floor 9,00 90,00,9 999,00,0 999,00 Floor 5,00 0,00, 995,00, 995,00 Floor 9 9,00 0,00,55,00 5,5,00 Floor 9,00 0,00,,00 5,5,00 Floor 9,00 0,00,,00 5,5,00 Floor 09,00,00 0,0,00 9,0,00 Floor 9,00,00 0,5,00 9,,00 Floor 9,00,00 0,5,00 9,,00 Roof 9,00 9,00 00,00 0,00 0,00 0,00 Floor 090,5 0,5, 90,00, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 5 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Building B Floor 9 00,5 0,5, 90,00 5, 90,00 Floor 0 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Floor 00,5 0,5, 90,00 5, 90,00 Roof,00,00 00,00 0,00 0,00 0,00 Total 5,,, 9,00 5, 5,00,00 0,00 09 Type m % Retail space Offices,00, 5,00 9, 09 Parking places Built-up area 09, Common parts % common parts Rental area % rental area Offices Dining options Warehouses Parking places Ground floor A+B,0,0,,00,5,00 Storey parking 9, Building A 50,0 9,0, 5,00 5,9 5,00 0,00 0,00 Building B,5 0,5,5 500,00 5, 500,00 0,00 0,00 Built up area above ground 5,5,, 9,00, 5,00,00 0,00 Built up area underground 9,0 09 Total built-up 5,.0

Galaxy Investment Group 5 Dunav Blvd. 00 Plovdiv, Bulgaria T +59 9 F + 59 9 office@galaxy-bg.com www.galaxy-bg.com