RESEARCH TOPIC FOR NAPREC YEAR 2019

Similar documents
Jadual 1: Faktor Pemberat Bagi Jenis Petak (F1)

ESTIMATE IN FORMATION OF CONSTRUCTION CONTRACT EZATUL SHARIDA BINTI AHMAD TERMIZI UNIVERSITI TEKNOLOGI MALAYSIA

LAND ACQUISITION ISSUES FOR JABATAN KERJA RAYA s ROAD WORK PROJECT NOOR FAZURA ABU SAMAAN

THE INFLUENCE OF INTEREST AND UNDERSTANDING OF HOUSING DEVELOPERS ON GATED COMMUNITIES DEVELOPMENT AINUR ZAIREEN BINTI ZAINUDIN

CONSULTANT ARCHITECT S DILIGENCE IN RAIL INFRASTRUCTURE PROJECT SHAMS ARIDA BIN ARIFFIN

INSTRUCTION: This section consists of TWO (2) structured questions. Answer ALL questions.

DOCTRINE OF PRIVITY AND ITS APPLICATION IN RELATION TO SUB-CONTRACTOR S PAYMENT NOR AIDA BINTI MOHD AMIN

Faculty of Built Environment Universiti Teknologi Malaysia

RMK 357 Land Administration [Pentadbiran Tanah]

Section 7 : Road Lighting

INSTRUCTION: This section consists of TWO (2) structured questions. Answer ALL questions.

Faculty of Information and Communication Technology

RMK 357- Land Administration fpentadbiran Tanah]

INSTRUCTION: This section consists of THREE (3) essay questions. Answer ALL questions.

MANUAL PROSEDUR KERJA PEMBANGUNAN APLIKASI

Abstract. the individual apartment units in a multi-storey apartment building. The hypothesis

JADUAL IX KANUN TANAH NEGARA [Aturan 36J (2)] NOTIS TAWARAN

1.0 Company Information. 2.0 Project Information. Licensed Projects : Taman Jaza Perdana. Company : Nusajaza Development Sdn. Bhd.

Practical issue arising and how can developers adapt to new requirement

MESYUARAT PEMBENTANGAN KERTAS PENYELIDIKAN JABATAN BIL. 3/ DISEMBER 2009 DEWAN NUSANTARA, MENARA SRI SAUJANA INSPEN KERTAS PENYELIDIKAN

SALINAN DOKUMEN TERKAWAL

PAYMENT ISSUES THE PRESENT DILEMMAS OF MALAYSIAN CONSTRUCITON INDUSTRY ANG SU SIN, TONY UNIVERSITI TEKNOLOGI MALAYSIA

Jadual H, Fasal 27 Cara Penyerahan Pemilikan Kosong Akta Pemajuan Perumahan (Kawalan Dan Pelesenan) 1966 Akta 118

DLANGUAGE STUDIO NO 30 1 st FLOOR PERSIARAN B RAYA LANGKAWI MALL KEDAH D.A KERTAS PENERANGAN L FRONT OFFICE ASSISTANT

HOUSING DEVELOPMENT FOR RESIDENCE IN SUDAN MOHAMED ABDULLA NUGDALLA UNIVERSITI TEKNOLOGI MALAYSIA

APARTMENTS OWNERSHIP AND MAINTENANCE

NOVATION AGREEMENT IN DESIGN AND BUILD CONTRACTS NATASHA SAHIL UNIVERSITI TEKOLOGI MALAYSIA

KEBERKESANAN PENGELUARAN HAKMILIK KEKAL BERDASARKAN PINDAAN KANUN TANAH NEGARA 1965 (AKTA A1104)

KAWALAN DOKUMEN. Tarikh: 29 Disember 2017 Tarikh: 29 Disember 2017

PROPOSED DISPOSAL OF A PARCEL OF LAND ADJACENT TO SUNWAY CARNIVAL SHOPPING MALL LOCATED IN SEBERANG JAYA, PENANG ( PROPOSED DISPOSAL )

LAND LAW AND SURVEY REGULATION (SGHU 3313)

RMK 357 Land Administration [Pentadbiran Tanah]

SISTEM TEMPAHAN KERETA SEWA BERASASKAN WEB (UKM EZ-CAR) Noor Aznida Farina Binti Md Saad Masnizah Mohd

Public Housing. YBhg. Datuk Mohamad Yusoff bin Ghazali Deputy Director General. Ministry of Housing and Local Government (MHLG) 16 th July, 2012

PRACTICAL COMPLETION FOR WATER SUPPLY PROJECTS KHAIRI BIN JAFFAR UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TUI{ HUSSEIN ONN MALAYSIA

PROPOSED ACQUISITION OF A PARCEL OF VACANT LAND ADJACENT TO SUNWAY CARNIVAL SHOPPING MALL LOCATED IN SEBERANG JAYA, PENANG ( PROPOSED ACQUISITION )

THE CONSTRUCTION OF HOUSE PRICE INDEX: MODELLING BY INCORPORATING ABSOLUTE LOCATION NORSHAZWANI AFIQAH BINTI ROSMERA

KEROSAKAN DAN KEMEROSOTAN STRUKTUR KONKRIT DI MALAYSIA MOHD ZAKI BIN MOKHTAR

HOUSING BUBBLE PHENOMENA AND THEIR DETERMINANTS IN KUALA LUMPUR AQMAR BIN HAMID

THE STUDY OF PROBLEMS FACED BY PROPERTY MANAGEMENT IN MANAGING THE HIGH RISE CONDOMINIUM IN MALAYSIA NORAZIAH AZMIN BT ABD LATIF AZMI

Review on Issues and Problems of Transferring Felda Land Ownership

TEMPLATE SERAGAM SENARAI SEMAK DOKUMEN DAN SENARAI SEMAK TERPERINCI AGENSI TEKNIKAL JKT

Course Descriptions Real Estate and the Built Environment

UNIVERSITI TEKNOLOGI MALAYSIA

Zonation of Land Value as a Part of Comprehensive Land Management in Indonesia

CORPORATE SOCIAL RESPONSIBILITY OF DEVELOPERS IN PRODUCT PERSPECTIVE. CASE STUDY: JOHOR BAHRU TAN SAN SAN UNIVERSITI TEKNOLOGI MALAYSIA

OPERASI PERKHIDMATAN SOKONGAN PERPUSTAKAAN SULTAN ABDUL SAMAD Kod Dokumen: UPM/OPR/PSAS/P015. PROSEDUR PERKHIDMATAN MAKLUMAT Tarikh: 18/08/2017

PERBANDINGAN PEMBANGUNAN PERUMAHAN BERKONSEPKAN GATED AND GUARDED COMMUNITY MENDATAR DAN MENEGAK AZIZUL BIN ABD GHANI UNIVERSITI TEKNOLOGI MALAYSIA

DALAM MAHKAMAH RAYUAN MALAYSIA (BIDANG KUASA RAYUAN) RAYUAN SIVIL NO. W-01(NCVC)(A) /2013 ANTARA KEMBANG MASYUR SDN BHD...

General Announcement Reference No. GA APPENDIX 1

RESEARCH PROGRESS. Two Hundreds Years of Neighbourhood Expansion in Seremban Municipality Area, Malaysia

DOKUMEN TIDAK TERKAWAL

Jurnal Teknologi RELATIONSHIP BETWEEN HOUSING AFFORDABILITY AND HOUSE OWNERSHIP IN PENANG. Full Paper. N. M. Sani *

MALAYSIAN RESIDENTIAL PROPERTY MARKET

ELEMEN-ELEMEN KRITIKAL PENGURUSAN PERUBAHAN DI PERINGKAT REKABENTUK PROJEK PEMBINAAN ABDUL AZIZ BIN HARUN

PENGURUSAN. Kod Dokumen: UPM/PGR/P001. PROSEDUR PENGURUSAN DOKUMEN ISO Tarikh: 20/6/2017

OPERASI PERKHIDMATAN SOKONGAN PERPUSTAKAAN SULTAN ABDUL SAMAD Kod Dokumen: UPM/OPR/PSAS/P015. PROSEDUR PERKHIDMATAN MAKLUMAT Tarikh: 29/06/2018

EASY ESTATE ADVERTISING SERVICES : SITI AISHAH BINTI MANSOR

KERAJAAN MALAYSIA SURAT PEKELILING PERBENDAHARAAN BIL. 4 TAHUN 2003

SOCIAL HOUSING IN MALAYSIA

FORM OF ACCEPTANCE AND TRANSFER CONDITIONAL MANDATORY TAKE-OVER OFFER DATUK SERI TAN JING NAM, MR ANDREW TAN JUN SUAN AND DATO TAN LEE SING

KEMENTERIAN PENDIDIKAN

PROCLAMATION OF SALE IN THE MATTER OF DEED OF ASSIGNMENT DATED 16 TH APRIL, 2004

POLITEKNIK MELAKA KEMENTERIAN PENGAJIAN TINGGI MALAYSIA

INFLUENCING FACTORS IN NON-LANDED RESIDENTIAL PROPERTY FACILITIES FOR MANAGEMENT BADRUL HISHAM BIN MOHD RIDZA

TAJUK PEMBENTANGAN : PERUNDANGAN TANAH DI BRUNEI DARUSSALAM DISAMPAIKAN OLEH : AMAL HAYATI HAJI JUNAIDI PEGAWAI TANAH BAHAGIAN PENDAFTARAN

SISTEM PENGURUSAN DOKUMEN (INFOBOX) Athirah Hazira Ab Halim Rodziah Latih ABSTRAK

KOD :

PK504: BUSINESS LAW. INSTRUCTION: This section consists of FOUR (4) structured questions. Answer ALL.

Kajian Penggunaan Termometer yang Berbeza ke atas Kualiti Penggorengan Hasilan Kerepek

(I) PROPOSED ACQUISITION (II) REVISION TO THE UTILISATION OF INITIAL PUBLIC OFFERING ( IPO ) PROCEEDS

PROPOSED TENANCY OF THE FACTORY BY AMSHORE ( PROPOSED TENANCY ) The Board of Directors of Bio Osmo ( Board ) wishes to announce the following:

PROCLAMATION OF SALE

Submit to State PTG by proprietor within 2 weeks. State CS within 1 month. Superstructure Stage

Minimum Educational Requirements

CME GROUP BERHAD ( CME OR COMPANY )

PROCLAMATION OF SALE In The Matter of Loan Agreement, Deed of Assignment and Power of Attorney all dated 14th Day Of January 2002

NALURI VENTURES SDN BHD (Company No.: K) (In Liquidation) TENDER NVSB/LAND/1

SARATOGOA SDN BHD (Company No.: P) (Receiver Appointed)(In Liquidation) TENDER SSB/1

TRANSACTIONS (CHAPTER 10 OF LISTING REQUIREMENTS): NON RELATED PARTY TRANSACTIONS

LAND REFORM IN MALAWI

1. INTRODUCTION 2. DETAILS OF THE LAND DISPOSAL

PROCLAMATION OF SALE IN THE MATTER OF THE FACILITIES AGREEMENT AND DEED OF ASSIGNMENT (FIRST PARTY ASSIGNMENT) BOTH DATED THE 19TH DAY OF MAY, 2009

Strategic Collaborative Approach: A Case Study on Training New Housing Entrepreneurs in Malaysia

OVERVIEW PROCESS OF DEVELOPING HOUSING SCHEME BY FEDERAL/STATE SUBSIDIARY / GOVERNMENT LINK COMPANIES.

PROCLAMATION OF SALE

OSK HOLDINGS BERHAD ("OSK" OR "THE COMPANY")

THE PROCLAMATION OF SALE IN THE MATTER OF THE COMPOSITE LOAN AGREEMENT AND ASSIGNMENT AND POWER OF ATTORNEY BOTH DATED THE 18 TH APRIL 2005 BETWEEN

OPERASI PERKHIDMATAN SOKONGAN. PERPUSTAKAAN SULTAN ABDUL SAMAD Kod Dokumen: UPM/OPR/PSAS/P016

MANUAL KUALITI MK.UiTM CNS.01

PROCLAMATION OF SALE

PROCLAMATION OF SALE IN THE MATTER OF THE COMPOSITE LOAN AGREEMENT AND ASSIGNMENT AND POWER OF ATTORNEY BOTH DATED 12 TH JULY, 2003 BETWEEN

Keywords: Pollutants, swirling flow, double radial swirler, combustion. Kata kunci: Bahan cemar, aliran berpusar, pemusar dwi aliran, pembakaran

PROFESSIONAL PRACTICE (SGHU 4342)

PROCLAMATION OF SALE IN THE MATTER OF COMPOSITE LOAN AGREEMENT AND ASSIGNMENT AND POWER OF ATTORNEY BOTH DATED THE 15TH DAY OF AUGUST 1995

WEB-BASED PROPERTY MANAGEMENT SYSTEM SAFURA ADEELA BINTI SUKIMAN

VNIMPS" P1. AYS OF FORMAL LAND OWNERSHIP AND LAND TITLING WITH REFERENCE TO THE RURAL COMMUNITIES A STUDY OF PEOPLE'S PERCEPTION

PROCLAMATION OF SALE

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS

Transcription:

RESEARCH TOPIC FOR NAPREC YEAR 2019 NO. TOPIC/ISSUE RESEARCH AIM OBJECTIVE FINDING IMPACT 1) Tiada Pemantauan Perundangan Terhadap Perniagaan Penginapan Jangka Pendek 2) Joint Tenancy (Penyewaan Bersama) An Exploratory Study 3) Reviving Abandoned Housing Development Projects : The Way Forward Penelitian secara berfokus atau komprehensif terhadap undangundang yang sesuai untuk mengawalselia penginapan jangka pendek. Mengkaji kesesuaian konsep joint tenancy di Malaysia. 1. Untuk menyelesaikan masalah pembinaan projek terbengkalai. 2. Menambahkan bilangan unit rumah yang siap. 3. Membantu pembeli yang terkilan 1. Mengenal pasti kuantiti dan permintaan terhadap premis yang digunakan untuk perniagaan penginapan jangka pendek. 2. Mengenal pasti jenis kawalan yang diperlukan terhadap premis yang digunakan untuk perniagaan penginapan jangka pendek. 1. Meneliti konsep "joint tenancy" dalam konteks pembangunan tanah di Malaysia. 2. Mengenal pasti masalah dan isu yang berbangkit daripada menerimapakai konsep joint tenancy di Malaysia. 1. Mengenal pasti masalah projek perumahan yang terbengkalai. 2. Mencadangkan mekanisma penyelesaian masalah projek perumahan terbengkalai. Cadangan pemantauan perundangan tentang perkara tersebut dan menyediakan garis panduan kepada pemilik dan orang awam. Mengenal pasti kesesuaian konsep joint tenancy dan mekanisme pengawalan di Malaysia. Cadangan hala tuju pencegahan dan penyelesaian projek perumahan terbengkalai. Pemantauan penggunaan premis penginapan jangka pendek yang terkawal. Penggubalan dasar tentang penerimaan konsep joint tenancy dalam pembangunan tanah di Malaysia. Mengurang dan menyelesaikan masalah projek perumahan terbengkalai. APPENDIX B Laws and Policies (RELP) 6 months Real Estate Laws and Policies (RELP) Laws and Policies (RELP) 1

(aggrieved purchasers). 4. Membantu pemaju untuk menyiapkan projek. 5. Menghidupkan semula projek yang terbengkalai. 4) Rural Infrastructure Planning Penambahbaikan dan pemulihan pembangunan desa (rejuvenate). 1. Mengkaji keberkesanan Dasar Perancangan Fizikal Desa Negara 2030 terhadap pembangunan desa. 2. Mengenal pasti infrastruktur dan kemudahan bagi desa moden. 3. Mencadangkan kerangka penilaian ciriciri desa yang mampan. Dapat menyediakan garis panduan pembangunan desa. Menyediakan kualiti hidup yang lebih baik bagi masyarakat desa. Laws and Policies (RELP) 5) Kajian Mewujudkan Kerangka Piawaian Perumahan Berkualiti di Malaysia Mengkaji semula Garis Panduan Perancangan Perumahan bagi mewujudkan piawaian perumahan yang berkualiti. Membuat benchmarking garis panduan perumahan. 1. Membuat perbandingan garis panduan dan piawaian perumahan berkualiti. 2. Membuat kajian penanda aras dengan negara lain. 3. Mengumpul maklumat asas tentang kualiti keseluruhan perumahan. 4. Membangunkan framework Piawaian 5. Perumahan Berkualiti sama ada dari segi standard / reka bentuk Mewujudkan kerangka piawaian perumahan berkualiti untuk Malaysia. Menyediakan perumahan berkualiti kepada rakyat. Laws and Policies (RELP) 2

/patuh syariah/fasiliti/ persekitaran. 6) Adopting Private Lease Scheme (PLS) in development at open market To explore the possibility of selling rights and interest via PLS To look at and study the issues contained in PLS To draf a new act in relating to PLS or draf a proposal to amend the NLC. Impact to owners, investors, purchasers and those in the real estate industry 9 months Real Estate Laws and Policies (RELP) 7) Preparation of Budgeting Model for Strata Building - Sub Model for :- i. Residential ii. Office building, iii. Commercial iv. Landed v. mixed-use development To prepare a standard format for expenses and budgeting purposes which is applicable for the industry. 1. Identify the calculation for maintenance fees or service charges. 2. Identify the actual maintenance cost. 3. Perhaps cost saving 1. Accurate calculation of costing acceptable to the market. 2. A standard template applicable to all. i. To minimise expenses ii. Eventual save cost 6 months Real Estate Management & Services (REMS) 8) Optimizing government assets (quarters) usage/occupancy Government quarters have not received the required attention, maintenance and management. Becomes under developed and under utilised 1. To determine the need for renewal and perhaps construction of new building. 2. To look at the utilisation of the current use for an alternative specific use 3. To venture into other alternative use or a further dynamic and viable use of the current property To suggest a more creative viable and profit orienated approach useage. Highest and best use. i. The government can create and receive income ii. No wastage of use 6 months Real Estate Management & Services (REMS) 3

9) Implementation and impact of development charge on property market 10) The impact of developers failure to rectify defects during DLP on property investment and management. To identify the impact of development charge on land values To enforce and ensure the developers carry out their task deligently 1. Identify the current method of calculation of development charge 2. Analysis on the change in value 1. Create awareness 2. To ensure the authorities carry out enforcement For specific use of the local authority/ town planning Guide for enforcement It will impact on the economy as it generates income for the local authority. Empower the authority 6 months Real Estate Management & Services (REMS) Management & Services (REMS) 11) Integrated development / strata (mixed use development) To eliminate disputes and provide fair rate and proper practise. 1. Identify problems in mixed-use development scheme 2. To identify and the correct formulation to determine the reasonable i. Impact to purchases / owners/ investors ii. A better and more systematic way of management and maintenance Specific use for the information and a guide for industry practitioners 6 months Real Estate Management & Services (REMS) 12) Management Model of Waqf Land Bank To develop a management model for waqf land management and administration Identify waqf issues - legal & administrative, development and management. To create a basic template or model (template) which is practical and sharia compliance A better development model and administrative system for all waqf land Management & Services (REMS) 4

13) Building's operation and maintenance phases are argued to be less efficient, consume more energy and costly (Building Information Modelling 1. Implement BIM for existing building 2. To ensure efficient and effective operation and maintenance tasks 3. To have a better building performance. Life cycle costing BIM for FM. Awareness, training model, application, TOT & Protocol (prototaip) 1. To identify the information that should be prioritized to enable BIM application at operation-maintenance phase. 2. To identify how the information can be collected, stored, utilized and shared in BIM model at operation-maintenance phase. 3. To develop a structured implementation plan or best practices on how BIM can be applied to improve operation and maintenance tasks. i. The type of data that should be collected and how to collect, store, utilize and share them in BIM environment ii. Knowledge and skills for practitioners to implement BIM at operationmaintenance iii. Implementation plan or set of best practices to facilitate BIM application at operationmaintenance phase i. Building owners and buildings managers to manage and maintain their buildings effectively and achieve performance. ii. The findings identify the required knowledge and skills to implement BIM at operationmaintenance phase iii. These findings will help institution to higher learning and the respective professional bodies to improve the training for future building managers so that they are BIM-able iv. Application of BIM at operationmaintenance phase not only will increase building performance, but the building data can be used for future planning to Management & Services (REMS) 5

reduce sick building syndrome and achieve higher productivity and sustainability. 6

14) Pengambilan Tanah/Land Acquisition of leasehold interests including for third parties especially in determining compensation for land acquisition Penilaian kepentingan pemegang pajakan apabila terdapat penjualan/pengambilan tanah. Kajian kes stesen petrol: Pengiraan dalam kes Shell Malaysia Berhad vs. PTG Kuala Lumpur 2011 menunjukkan nilai kepentingan pemegang pajakan lebih tinggi dari nilai kepentingan pemajak (Kes Semenyih Jaya). Untuk menentukan pendekatan nilaian pampasan yang sesuai dalam keskes mahkamah yang berkaitan dan yang telah diputuskan (contohnya kes Shell dan Semenyih Jaya). 1. To determine the correct principles in the valuation of leasehold interests without title 2. To investigate overlapping interests in land acquisition cases Mencadangkan suatu kaedah yang boleh digunakan oleh penilai dalam membuat penilaian yang tepat Implikasi kajian dengan keputusankeputusan mahkamah Improve the credibility of the valuer. Membantu dalam kes rujukan mahkamah Panduan kepada penilaian pampasan yang munasabah (REV) 15) Penilaian Bisnes/Business Research Topics/Issues: To reduce the subjectiveness of the Business To identify and investigate all the parameters affecting the business valuation For reference to practitioners To improve the credibility and accountability of business valuers in Malaysia (REV) 7

Business is subjective? 16) Penilaian Harta/Sumber Alam/ Ekosistem Isu/ Topik Kajian : Penilaian harta/sumber alam/ekosistem dengan mengambil kira faktorfaktor kelestarian dari aspek alam sekitar, sosial dan ekonomi. Penilaian karbon, penilaian nilai pemuliharaan ekosistem, nilai pemuliharaan spesis terancam. Untuk menghasilkan model penilaian yang mengambilkira faktor-faktor kelestarian 1. Mengenal pasti faktorfaktor kelestarian dan kesan kepada penilaian 2. Mencadangkan kaedah penilaian dengan mengambil kira faktorfaktor kelestarian. Membentuk satu model/kerangka yang telah disahkan/dirangka untuk penilaian harta/sumber alam/ekosistem yang mengambil kira faktor kelestarian Memberi input kepada pembuat dasar berkaitan dengan kelestarian harta/sumber alam/ekosistem (REV) 17) Penilaian Tanah Bawah Air/ Of Land Under Water Isu/ Topik Kajian : Ketidakseragaman dalam nilaian tanah bawah air. Contoh: Tasik, lombong, laut. Mengenalpasti faktor/pembolehubah asas nilaian tanah bawah air Membentuk satu model penilaian yang sesuai bagi tanah bawah air Rujukan kepada penilaian tanah bawah air. Penilaian yang konsisten dan mencerminkan nilai pasaran. (REV) 8

18) Penilaian Aset Infrastruktur/ Infrastructure Assets Isu/ Topik Kajian : Penilaian aset infrastruktur awam/swasta untuk pelbagai maksud seperti sewaan & kadaran - konsep sewa / pajakan tanah (sebagai contoh, menara telekomunikasi, jambatan, lebuhraya dan papan iklan luar), di atas tanah milikan individu / pemilik lain. Untuk menyeragamkan amalan dan perlaksanaan kerjakerja nilaian aset infrastruktur awam/swasta untuk pelbagai maksud nilaian 1. Untuk mengenal pasti amalan kerja nilaian semasa. 2. Untuk menentukan faktor - faktor yang di pertimbangkan dalam proses nilaian. 3. Untuk menghasilkan model nilaian pasaran, sewaan & kadaran Model nilaian dan amalan kerja yang seragam Menentukan nilaian yang berpatutan (REV) 19) Penilaian Kaedah Nilai Baki Dan Aliran Tunai Terdiskaun (DCF) Isu/ Topik Kajian : Ketidakseragaman penggunaan kadar parameter di dalam Kaedah Nilai Baki dan Aliran Tunai Terdiskaun (Discounted Cash Flow DCF). Issues in determining the Developer's profit, contingencies, PV/discount rate. Memberi keseragaman penggunaan kadarkadar bagi semua parameter dalam Kaedah Nilai Baki dan DCF. Menentukan model aliran tunai terdiskaun dan nilai baki dalam penilaian harta tanah. Kadar yang munasabah bagi setiap parameter yang digunakan dalam DCF dan kaedah nilai baki. Keseragaman amalan penilaian harta tanah menggunakan kaedah nilai baki dan DCF (REV) 9

20) Teknologi Maklumat Dalam Penilaian Harta Tanah / Information Technology In Real Estate Identify and explore new technology that can enhance the quality in valuation. Nilaian yang lebih telus, cepat, adil dan tepat To develop system tools, apps and prototype. Sustain the valuation profession and relevancy. (REV) Research Topics/issues: How Information Technology (IT) can enhance the valuation profession? The use of IT in real estate profesion 21) Penilaian Kadaran/ Rating Research Topics/issues:Lack of justification in determining the percentage rate of assessment to be levied by the local authority To justify the basis of determining the rates of assessment for various property types in the local authority. To establish the asset life cycle cost model in relation to the rates of assessment adopted by local authority Asset life cycle model for local authority Appropriate rates of assessment in local authority Benefits to local authority in determining the rates of assessment and annual budget. The basis of the budget (REV) 10

Main Programme: Critical Analysis of the Malaysian Residential Property Market 22) Sub-Programme 1: Changes in the Lifestyle of Malaysian Population and its Effect on Housing Demand To better understand the Malaysian residential property market and to alleviate the problem of mismatch between supply and demand. To map out pattern of lifestyle of Malaysian and to identify their housing preference. 1. To determine the future lifestyle focusing on demographic and household size. 2. To assess the concept of three generation home for future lifestyle. 3. To estimate the corresponding demand and supply of the preferred housing. 4. To identify the appropriate policy intervention to alleviate the problem of mismatch between demand and supply i. Map out the future pattern of lifestyle. ii. Estimate the demand for such housing based on the preference. iii. Possible policy to facilitate the housing preference due to changes of lifestyle. 1. To facilitate the housing industry in meeting the future needs of the nation in terms of changing lifestyle, aging population, newly urbanised establishment, and rural housing needs and affordability. 2. The research findings will be beneficial to the Kementerian Perumahan dan Kerajaan Tempatan, Kementerian Pembangunan Wanita, Keluarga dan Masyarakat, Kementerian Kemajuan Luar Bandar, REHDA and other professionals related to housing industry. Total 1 year for each project, run concurrently Real Estate Industry Analysis Studies (REIAS) Industry Analysis Studies (REIAS) 23) Sub-Programme 2: Impact of Aging Population on Housing Market Justification of the needs of aging population on their housing preference. i. To identify the pattern/s tructure of aging population in Malaysia. ii. To determine their housing preference and specific needs in 1. Map out the pattern/structure of aging population in Malaysia. 2. To propose design criteria to Industry Analysis Studies (REIAS) 11

24) Sub-Programme 3: Establishment of Newly Urbanised Areas and Their Impact to The Housing Market 25) Sub-Programme 4: A Critical Analysis of Rural Housing Needs and Affordability To match the housing needs of the population in newly urbanised areas. Formulation of Appropriate Mechanism to Alleviate the Problem of Rural Housing Needs and Affordability terms of housing design criteria. iii. To formulate/suggest appropriate policy intervention to enhance their quality of i. To identify factors of newly urbanised areas. ii. To determine effect of the newly urbanised areas on housing market. iii. To identify the appropriate policy intervention to alleviate the problem of mismatch between demand and supply due to establishment of newly urbanised areas. 1. To determine the factors of housing unaffordability in rural areas. 2. To assess existing mechanisms, use in addressing rural housing needs and affordability. 3. To develop appropriate mechanisms for providing housing needs and affordability in rural areas suit the housing preference. 3. Possible policy to facilitate aging population. i. Factors of the establishment of newly urbanised areas. ii. Estimate the demand of housing due to the establishment of newly urbanised areas. iii. Possible policy to facilitate the issue i. Factors of housing unaffordability in rural areas. ii. Mechanisms for providing housing needs and affordability in rural areas. iii. Develop appropriate mechanisms of housing needs and affordability in rural areas. Industry Analysis Studies (REIAS) Industry Analysis Studies (REIAS) 12

26) Assessing the Impact of the Use of Technology, Online Marketing and Online Shopping to the Malaysian Property Market. In the light of the increase in the usage of technology, online marketing and online shopping, there is a need to determine the future demand and supply of office spaces, retail spaces and warehousing. i. To determine the pattern of supply and demand for office spaces, retail spaces and warehouse. ii. To assess the impact of the use of technology, online marketing and online shopping to the supply and demand of property market. iii. To propose strategies to combat the problem of office spaces oversupply, decline in rental value of retails spaces and the potential increase the demand for warehouse. The pattern in terms of future demand and supply of retail spaces, office spaces and warehousing. i. Potentially, to combat the problem of recurring in the oversupply of office spaces and retail spaces. ii. To assist the local authorities in determining the type of commercial development requirement and the corresponding approval. iii. The information is useful for key players for the property industries, people involved in online marketing and policy formulation. Industry Analysis Studies (REIAS) 27) Penyelesaian Pengurusan Harta Pusaka Catatan: 1. Masalah dalam pengurusan harta pusaka kecil 2. Harta pusaka nilai lebih 2 juta To empower the Muslim communities in terms of effective utilisation of inheritance. 1. To establish the extend of the problem of inheritance (Faraid) among the Muslim communities. 2. To estimate the potential of economic loss suffered by the Muslim communities due to unsettle inheritance. 3. To develop mechanism on how best to solve i. Data on the extend of unsettle inheritance. ii. Factors foreseen the unsettle inheritance. iii. Mechanism that can be employed to settle inheritance. iv. Policy direction. i. Muslim secara keseluruhan ii. Majlis Agama Islam di setiap negeri yang terlibat dalam penyelesaian hukum Faraid. iii. Pejabat yang diberi kuasa dalam harta pusaka kecil dan besar. Industry Analysis Studies (REIAS) 13

the problem of unsettles inheritance. 4. To propose appropriate strategies to support the implementation of three (3) above. 28) Incorporating Sustainability in Project Evaluation Property development nowadays goes beyond immediate use. However, current project evaluation practices put too much emphasis on monetary returns and existing guidelines ignore the sustainability factor. Consideration should also be given to the three pillars of sustainability i.e. environmental, social and economic sustainability. To develop and recommend sustainability criteria in project evaluation framework. 1. Evaluation of the strength/ weakness of current project evaluation practices; 2. Identification of sustainable project evaluation criteria. The incorporation of sustainability criteria in project evaluation. A Templet - Project Evaluation. Government/ authorities: Enhance and improve the existing project evaluation framework; Environment: Increase in sustainable development; Consumer: Beneficiary of sustainable development; Developer: Oversupply/ glut may be avoided. Development and Finance (REDF) 14

29) Emergence of Virtual Space: Impact on Commercial Real Estate The emergence of online shopping has changed/ disrupted the mode of business transactions/ interactions where physical space becomes less necessary/ needed. This may contribute towards excess supply of floor space. Investigating the impact of the emergence of virtual space (online) on real retail space. 1. Identify demand for real retail space; 2. Investigate the impact of virtual space on retail space; 3. Examine the role of local authority to mitigate the impact of virtual space on the supply of real retail space. Policy framework for retail development approval Real estate investors/ developers: Awareness to current/ dynamic market needs/ changes; investment decisions; Local authority: Policies, decision making; Real estate professionals: Consultation based on market trend Development and Finance (REDF) 30) Marketing Strategy and Price Distortion in the Housing Market Based on market observation, marketing strategy of new houses in the primary market appears to include cash rebates, legal fees, stamp duty, freebies etc. which inflates selling price To determine to what extent has the selling price of a newly built house (developer scheme) been inflated 1. To identify developer s selling price components; 2. To determine the price distortion in developer s selling price The extent of price distortion Ministry of Housing and Local Government (KPKT)/ National Housing Department (JPN): Approval of house price and selling permit; Consumer: Paying for actual worth of the property price; Financial institutions: Avoid over-financing (over-lending). Development and Finance (REDF) 15

31) Property Development: Cost of Doing Business House buyers have been complaining about high house prices in recent times. However, house buyers are sometimes unaware of other elements beside construction cost that affect the total development costs. To determine the actual cost elements in housing developments. 1. To identify cost elements in each development stages from land banking (assembly) until vacant possession; 2. To find out areas where cost may be mitigated (efficient usage of resources). Public will be better informed on housing development costs Government/ authorities: More control in house price approvals (with development cost); Developers: Adjustments in house pricing Development and Finance (REDF) 32) Challenges in Adopting IBS in the Malaysian Construction Industry Foreign workers have a huge contribution in the Malaysian construction industry. The high dependence on foreign labour create risk if shortage occurs in foreign labour supply (inconsistent supply and foreign levy). It is timely that the sector reduce dependency on foreign workers and look into expanding the use of IBS in the construction industry. 1. Evaluating existing measures taken to deal with dependency on foreign labour in the local construction industry; 2. Encourage the use of IBS in the construction sector. 1. To identify the resistance towards adopting IBS; 2. To identify measures/ incentives to encourage usage of IBS; 3. To explore the possibility of substituting foreign labour dependency to IBS. Increasing the use of IBS in the construction industry, thus reducing labour dependency. Increase efficiency/ performance of the construction industry using IBS. Development and Finance (REDF) 16