Marketing Package Padilla Bay SFR Development Land 9695 Bayview Edison Road Bow, WA 98232

Similar documents
STAFF REPORT. Permit Number: Porter. Kitsap County Board of Commissioners; Kitsap County Planning Commission

4. facilitate the construction of streets, utilities and public services in a more economical and efficient manner;

FINAL DRAFT 12/1/16, Rev. to 7/18/17

CHAPTER 3 PRELIMINARY PLAT

ARTICLE FIVE FINAL DRAFT

Appendix J - Planned Unit Development (PUD)

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

Chapter 100 Planned Unit Development in Corvallis Urban Fringe

DRAFT FOR PUBLIC HEARING (rev. March, 2016)

ARTICLE 13 CONDOMINIUM REGULATIONS

2017 Docket of Proposed Policy, Code, and Map Amendments

APPLICATION REVIEW CHECKLISTS

A. Preserve natural resources as identified in the Comprehensive Plan.

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Condominium Unit Requirements.

RECOMMENDATION Following the public hearing, consider Zoning Case PD14-16, with a Development Plan.

AN ORDINANCE AMENDING THE CITY ZONING ORDINANCE AND THE OFFICIAL CODE OF THE CITY OF CLARKSVILLE RELATIVE TO CLUSTER OPTION DEVELOPMENTS

Special Use Permit - Planned Unit Development Checklist. Property Address:

FINAL SPUD APPLICATION

Investment Opportunity Rupley Site

OFFERING MEMORANDUM. POTENTIAL WATERFRONT REAL ESTATE DEVELOPMENT PUGET SOUND SALISH SEA

Applying Open Space Design Techniques Lowell, MA 5/21/13

Marion County Board of County Commissioners

GOALS, OBJECTIVES, AND STRATEGIES

Draft Zoning Changes for the 2nd Planning Board Public Hearing, January 22, 2018.

PLANNED UNIT DEVELOPMENTS

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

PROPOSED POLICY THE FUTURE OF THE AGRICULTURAL RESERVE

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Staff Report: Date: Applicant: Property Identification: Acreage of Request: Current Zoning of Requested Area: Requested Action: Attached:

Planning & Development Services

Open Space Model Ordinance

ARTICLE XI - CONSERVATION SUBDIVISIONS

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission

Action Recommendation: Budget Impact:

CHAPTER 10 Planned Unit Development Zoning Districts

ARTICLE 14 PLANNED UNIT DEVELOPMENT (PUD) DISTRICT

Tentative Map Application Review Procedures

Medium Density Residential Development Opportunity

CONDITIONAL USE PERMIT Application Packet

Umatilla County Department of Land Use Planning

Proposed Overland Park Kansas Ordinance RE-1 Residential Estates Community

Article Optional Method Requirements

RECOMMENDATION REPORT

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

Major Subdivision Application Packet. Revised June 2018

FUTURE LAND USE. City of St. Augustine Comprehensive Plan EAR-Based Amendments

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

ZONING PERMIT APPLICATION

Frequently Asked Questions

Article 7: Residential Land Use and Development Requirements

Planning Department Oconee County, Georgia

VARIANCE PROCESS APPLICATION

CARA CURREY Engineered, Approved SFR Lots. Auburn, WA

Purpose: Regulations:

FINAL DRAFT 10/23/06 ARTICLE VI

Comprehensive Plan /24/01

Kitsap County Department of Community Development. Administrative Staff Report

City of Fayetteville, Arkansas Page 1 of 1

COMMUNITY DEVELOPMENT. Staff Report. Site Plan Review. SP June 19, 2018

MAJOR SUBDIVISION APPLICATION

LAND USE PERMIT INFORMATION PACKET

BUILD-OUT ANALYSIS GRANTHAM, NEW HAMPSHIRE

ORDINANCE NO

Jurisdictional Determination Request

2030 General Plan. December 6, 7 pm

FRESHWATER WETLANDS PROTECTION IN NEW JERSEY Tools for Municipal Action

CHECKLIST FOR DEVELOPMENT REVIEW

SUBCHAPTER 23-3: DENSITY AND INTENSITY REGULATIONS

SITE PLAN REVIEW PROCEDURES SECTION DEVELOPMENTS REQUIRING SITE PLAN APPROVAL

Initial Subdivision Applications Shall Include the Following:

TOWNSHIP OF ALGOMA COUNTY OF KENT, MICHIGAN. Minutes of a regular meeting of the Township Board of the Township of Algoma, Kent

SECTION PLANNED RESIDENTIAL UNIT DEVELOPMENT

Procedures For Collecting and Monitoring Data

Article 2 Application Type and Standards Requirements

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

AGENDA STATEMENT NO BUSINESS OF THE PLANNING COMMISSION City of Victoria, Minnesota STAFF REPORT. Casco Ventures (Developer)

Chapter ZONING Sections: Title and purpose.

SHOOP RANCH WEST 1,807 + ACRES WISE & DENTON COUNTIES, NEW FAIRVIEW, TX BRYAN PICKENS REPUBLICRANCHES.COM

ZONING CLASSIFICATION SUMMARY SHEET

A. Location. A MRD District may be permitted throughout the County provided it meets the standards established herein.

Chapter LAND DIVISIONS

BANK OWNED. Southwest Dixon Specific Plan Land ±58.29 ACRES SWC West A Street & George Lane Dixon, CA CONTACT US PROPERTY HIGHLIGHTS

OFFERING MEMORANDUM. Apple Valley Self Storage Coshocton Avenue Howard, OH 43028

Concept Plan Project Narrative For 852 River Ranch Court

Venice 295 Acres for Residential Development Venice, FL Sarasota County

TITLE 14 SKAGIT COUNTY CODE CHAPTER ZONING

Wapiti Ridge Estates Area Structure Plan SE W5M. December Prepared For:

APPLICATION PROCEDURE

PLANNED RESIDENTIAL DEVELOPMENT (PRD)

STANDARDS FOR EVALUATING PROPOSALS

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

UNRESERVED REAL ESTATE AUCTION

CITY OF INVER GROVE HEIGHTS 8150 Barbara Avenue Inver Grove Heights, MN (651)

Comprehensive Plan 2030

STAFF REPORT and INFORMATION FOR THE HEARING EXAMINER. Project: Westphal Accessory Dwelling Unit (ADU)

GENESEE COUNTY SMART GROWTH PLAN 2010 Review Report

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016

Transcription:

R E A L E S T A T E E L E V A T E D Marketing Package Padilla Bay SFR Development Land 9695 Bayview Edison Road Bow, WA 98232 4.7-166.55+/- acres SFR development land $1,995,000 - $11,978/acre Potential for up to 33+/- high-end, custom home lots Two points of ingress/egress High elevation land provides excellent views of the Padilla Bay, the San Juan Islands, and the Cascade Mountain range Rural Reserve Zoning - Allows 1 lot per 10 acres or 2 lots per 10 acres through CaRD clustering program Skagit County PUD water (mountain stream) available for site Conveniently located between Anacortes and Mount Vernon/Burlington Options for smaller parcels detailed on the following page Additional information available in Due Diligence Vault - Call for access James Browder Co-founder, Broker 360-319-9168 jim@kulshancommercial.com Allen Stockbridge, JD, CCIM Founder, Designated Broker 360-223-8346 allen@kulshancommercial.com CBA: 545581 NWMLS: 712358

Executive Summary Padilla Bay Executive Summary The Padilla Bay properties in Skagit County, WA consist of nine contiguous lots with a total area of 166.5 acres. Three of the lots are 40 acres in size, two of the lots are 20 acres, one lot is 4.7 acres, and the remaining three lots together make a 60 wide, 2,500 long owned property access from the main county road to the west. In addition, there is an easement from the northern boundary to Bayview Edison Road. All of the properties included are zoned RRV (Rural Reserve), which allows the following: one residential housing unit per ten acre lot (yielding 16 total residences) or what is called 2 for 10, which allows two one-acre residential housing units located on each ten acre lot (yielding 32 residences) with the remaining eight acres permanently designated open space agricultural. The highest and best use of this unique site, in our view, would be to develop 16 single family custom, luxury homes. Quality architectural standards could be maintained with the possible formation of a community association for the development. Housing could be clustered together on site as another option. Skagit County Planning calls this a CaRD system and may be employed, if practical or desired, placing the remaining acreage designated as open space. Outbuildings or non-residential structures such as livestock barns, equestrian center, golf course would be allowed to be built on the open space. The 160+/- acre development site has outstanding vantage points throughout, overlooking the Padilla Bay, the San Juan Islands to the northwest, the Chuckanut Mountain Range to the north, the North Cascade Mountains to the east and the Samish River Basin in the foreground. Perhaps the most important feature of the development site from a technical standpoint, is the Skagit County P.U.D. (Public Utility District) has an eight inch water main less than one quarter mile from the west entrance of the Bayview Edison Road properties. A main line water extension to property would be a considerable advantage over drilling new wells on the building sites. The property has important geographical features that make residential development possible without applying for variances or special use permits. For example: the entire site is outside of the Skagit Aquifer where there are moratoriums on well drilling; the site has few wetlands to mitigate; and septic can be installed on the building sites. and mountain ranges showcasing northwest Washington State. The neighborhood is tranquil, yet is only 20 minutes away from Anacortes and Mount Vernon, major retail, employment and recreation centers. Skagit Regional Airport, Amtrak, Interstate 5, various transportation hubs, boat launches, marinas, state parks, wildlife preserves and recreational amenities are all within a few minutes drive from the site. James Browder Co-founder, Broker 360-319-9168 jim@kulshancommercial.com Allen Stockbridge, JD, CCIM Founder, Designated Broker 360-223-8346 allen@kulshancommercial.com

Maps Pacific Northwest Padilla Bay Development Site

Maps Regional Padilla Bay Development Site

Maps Aerial Cap Sante Marina Anacortes SITE Skagit Regional Airport

Maps Aerial

Maps Topographic

Zoning Map and Description Zoning Description This site is zoned Rural Reserve (RRv), which is designed to allow low-density development and to preserve the open space character of the areas zoned Rural Reserve. Lands that are zoned RRv are typically transitional zones between resource and non-resource lands. SITE There are many permitted uses under RRv including, but not limited to, detached single family dwelling units, agriculture, home based business, and residential accessory units. The density that can be acheived is between 1 and 33 units and is explained in detail on the following page. Zoning Map Key Rural Reserve (RRv) Rural Intermediate (RI) Rural Village Residential (RVR) Bayview Ridge Heavy Industrial (BR-HI) Bayview Ridge Light Industrial (BR-LI) Aviation Related (AVR) Rural Marine Industrial (RMI) Rural Business (RB)

Density Skagit County allows density to be calculated two different ways. The first and most simple calculation is one single family dwelling unit per 10 acres of land. This would allow up to 16 10-acre lots. Density 16 vs. 32 Units Recent Example of CaRD System The second is calculated using a process called Conservation and Reserve Development, or CaRD, which clusters density on large plots of land in order to both increase total density as well as preserve larger pieces of land. The maximum density that can be achieved under this system is two detached single family dwelling units per 10 acres of land. An example of another nearby development that was completed using the CaRD system is shown on the right. The original piece of land is outlined in green. Each parcel included inside the green outline are lots that were created using this process. Open Space In order to achieve a density of two houses per 10 acres, the density was required to be clustered, as you can see to the right. The remaining land became designated as open space, which restricts most further development. Exceptions include agricultural uses, equestrian use, and golf courses, among a small variety of similar uses. In addition, the open space land is required to be owned by one entity and cannot be divided further. Interests in the entity can be split, but the land itself must remain as it is at the time of the subdivision. It appears common to establish a homeowner s association to hold the open space land. The open space land could have a nonresidential community use such as an equestrian center or a golf course. Under this caluclation of density, the site would allow up to 32 1-acre lots, with the remaining land permanently designated as open space.

Development Considerations Cost to Develop Lots The price to install the infrastructure for a 16-lot development would amount to approximately $80,000 per lot. The price to install the infrastructure for a 32-lot development would amount to between $50,000 and $65,000 per lot. This will include: Paved road up to one mile length Curb (including minimal side walk) Gutter, storm drainage, and retention pond Pressurized water lines Puget Sound Energy power This will not include: Septic installation: between $12,000-15,000 per lot Permits for PUD: system development fee of around $12,400 hookup per lot Impact fees Landscaping if needed Change of Land Tax Status To develop the land for SFR, the owner would need to remove the Agricultural Discount status. At that point, the land would be assessed at Market Value, which is currently about $2,110/acre. Thereupon, the owner would need to: Pay back taxes for past seven years on the discrepancy between rates Pay market rate taxes for current year Pay 12% interest on back taxes for current and past 7 years For example, the total due would be $48,607.00 for Parcel #34507 (40 acres) if discount was removed There would be a 20% savings if notice is given 2 years in advance to remove Agricultural Discount Assuming that the other parcels were assessed at a similar value, we estimate that the total back-taxes that must be paid to develop this land would be about $194,000.

Development Considerations Skagit County PUD Water The current end of the Skagit County Public Utility District s water line is currently less than 1,000 feet from the southwest corner of the site, marked by a star on the map to the right. Consulting with an engineer to determine the cost of extending the line is necessary, but we believe that the cost will be somewhere in the $100-130 per linear foot range, both to get it to the site and to extend the line through the site. The distance to extend the line to the site is about 700+/- feet. Upon completion of this development, it is possible that the landowners to the East of this site would be interested in further development. In that event, a latecomer agreement could force the new developers to share the expense of the water line extension. Latecomer agreements can be established through the Skagit County PUD and are valid for up to 10 years. Hookup fees per lot are about $12,400/lot and are payable at the time of building permit application. Larger maps similar to the image to the right can be found in the Due Diligence Vault. Location of Skagit County PUD water line

Maps Hydric Soils Hydric Soil Map The map at the right shows what is known of the site s wetlands condition. The small green circles on the site indicate existing wetlands, according to the National Wetland Inventory. Although the Buyer will need to conduct a wetlands delineation to confirm the location of these wetlands, as well as potential others, the lack of wetlands shown here is a good sign. It is likely that most of the site will be buildable. Hydric Soil Map Key 200 Foot Area Hydric Soils National Wetland Inventory Air Photo Interpretation of Wetland Boundaries

Links Links Skagit County http://skagitcounty.net/departments/home - Maps - http://www.skagitcounty.net/departments/gis/gallery/main.htm - Interactive Map - http://www.skagitcounty.net/maps/imap/ - Comp Plan/Zoning - http://www.skagitcounty.net/departments/gis/gallery/townshipmap.htm - Critical Areas - http://www.skagitcounty.net/gis/documents/critical_areas/category%201%20areas%20aquifer%20recharge%20map.pdf - FEMA 100 yr Floodplain - http://www.skagitcounty.net/gis/documents/flood/fema%20q3%20100%20year%20floodplain%20map.pdf - Hydric Soils - http://www.skagitcounty.net/gis/documents/hydricsoils/t35r3_4.pdf - Skagit County Code - http://www.codepublishing.com/wa/skagitcounty/ - Unified Development - http://www.codepublishing.com/wa/skagitcounty/html/skagitcounty14/skagitcounty14.html - Rural Reserve (Site) Zoning - http://www.codepublishing.com/wa/skagitcounty/html/skagitcounty14/skagitcounty1416.html#14.16.320 - EDASC - http://www.skagit.org/ - Board of Realtors - http://www.npsar.com/ - City Websites - City of Mount Vernon - http://www.mountvernonwa.gov/ - City of Burlington - http://burlingtonwa.gov/ - City of Anacortes - http://www.cityofanacortes.org/ Recreational - San Juan Islands - North Cascades - Skagit County - Pacific Northwest - http://www.co.san-juan.wa.us/parks/ - http://www.nps.gov/noca/index.htm - http://www.skagitcounty.net/departments/parksandrecreation/main.htm - http://www.gonorthwest.com/

Due Diligence Vault Due Diligence Vault Directory Maps - Comp Plan/Zoning - Critical Areas - FEMA 100 yr Floodplain - Hydric Soils - Skagit PUD/Water - Skagit Top Skagit County Code - Unified Development - Rural Reserve (Site) Zoning Please contact the listing brokers for access to these materials.