MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

Similar documents
MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

Appeal of Administrative Decision to the Board of Zoning Appeals (BZA)

SITE PLAN CHECKLIST. The applicant shall meet with Planning Staff at least seven (7) working days prior to submittal of the application.

SITE PLAN APPLICATION For Development Projects in Douglas County Submit in both print and electronic formats, on disc

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

I. Requirements for All Applications. C D W

Residential Minor Subdivision Review Checklist

Residential Major Subdivision Review Checklist

SUBDIVISION APPLICATION

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

MINOR PLAT AMENDMENT APPLICATION CHECK APPLICABLE PERMIT ATTACHMENT:

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

SUBDIVISION APPLICATION

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA

PLANNING COMMISSION SUBDIVISION PLAT APPLICATION

MINOR SUBDIVISION INFORMATION

FINAL PLAT APPLICATION

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

TOWN OF MELBOURNE BEACH 2016 DEVELOPMENT APPLICATION

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

Township of Collier 2418 Hilltop Road Presto, PA 15142

Initial Subdivision Applications Shall Include the Following:

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Sketch Plan 2018 Bargersville Plan Commission Application Kit

TOWNSHIP OF BORDENTOWN LAND DEVELOPMENT APPLICATION CHECKLIST. General Requirements for all Applications

MINOR PLAT FILING APPLICATION

PRELMINARY PLAT CHECKLIST

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax:

SUBDIVISION REGULATIONS

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

The Filing Fee for a Minor Plat is $ PLUS $20.00 per lot created

ARTICLE V PRELIMINARY PLAN SUBMISSION

STONE COUNTY PRELIMINARY PLAT CHECKLIST. Note: Applications need to be in the office by 2 p.m. on the cutoff day.

PRELIMINARY PLAT Checklist

SUBDIVISION REGULATIONS for Lawrence and the Unincorporated Areas of Douglas County, KS

APPLICATION PROCEDURES FOR A MAJOR SUBDIVISION PRELIMINARY PLAT

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

SECTION 6 - APPROVAL OF PLATS. Whenever any subdivision of land is proposed, and before any permit for the

JOINT PLANNING BOARD APPLICATION FORM

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

Preliminary Replat. Application No. List of Required Submittals Only complete applications will be accepted:

MINOR SUBDIVISION PLAT

CITY OF DECATUR, TEXAS

APPLICATION PROCEDURE

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

SUBDIVISION PLAT CHECKLIST. The following information shall be include on the plat:

FINAL PLAT. Community Development Department 8101 Ralston Road Arvada, Colorado 80002

Planned Residential Development ( PRD ) Application

A.3. ARTICLE 7 PLAN REQUIREMENTS FOR MINOR SUBDIVISION AND/OR LAND DEVELOPMENT

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

Minor Subdivision Application

Guide to Replats. Step 1. Step 2. Step 3. Step 4. Step 5. Step 6. Step 7. Step 8. Step 9. Step 10

Plat Checklist PLAT TYPES AND DESCRIPTIONS

Gates County Planning and Zoning

COUNTY OF ALBEMARLE APPLICATION FOR RURAL SUBDIVISION

City of Prior Lake APPLICATION FOR PRELIMINARY PLAT

SUBDIVISION APPLICATION

Plans shall be drawn at a readable scale, signed, and sealed by a Florida Registered Engineer. The application package shall include:

LAND USE PERMIT APPLICATION

Preliminary Subdivision Application (Major) (Four (4) lots or more)

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

Final Plat Approval of a Major Subdivision Application Packet

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

Residential Subdivision Preliminary Plat Application

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

Lake County Planning, Building and Development Department

MINOR PLAT. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals:

SUBDIVISION APPLICATION

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

ARTICLE 8C SITE CONDOMINIUM DEVELOPMENT ORDINANCE

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

Conditional Use Sketch Plan Application Non-Residential Zone

Preliminary Plat Information & Application Packet

City of Midland Application for Site Plan Review

Section SKETCH PLAN REVIEW

CONDOMINIUM REGULATIONS

APPLICATION FOR SUBDIVISION APPROVAL OF A SKETCH PLAN with checklist

Plan and Zoning Commission Review Process

Application for Preliminary Plat Checklist

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

MINOR SUBDIVISION PLAT

FINAL PLAT GUIDE TO SUBDIVIDING PROPERTY. Background

Guide to Minor Developments

SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR MINOR REVISIONS TO PUD PLANS

SPECIAL SERVICE AREA DISCLOSURE

Guide to Combined Preliminary and Final Plats

COUNTY OF ALBEMARLE APPLICATION FOR FAMILY DIVISION. Family Division = $742 (Provide 5 copies of plat)

Transcription:

Lawrence-Douglas County MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Preliminary Plats The applicant shall schedule a Pre-Application meeting with Planning Staff at least seven (7) working days prior to submittal of the application. Pre-Application Meeting (Completed by Planning Staff) Pre-Application Meeting Date, 20. Target Application Submission Date, 20. Application Review Fee $300 (4 lots or less) $500 (over 4 lots) +$50 Legal Ad Fee During the meeting, Planning Staff will assist the applicant to determine if the following items are Required or Not Applicable to the application: Major Subdivision: Preliminary Plat Requirements Required Not Applicable Documentation/Requirement Notes: Major Residential or Nonresidential Subdivision Preliminary Plat 2 paper copies 1 electronic copy Drainage Plan (for all major subdivisions if within City limits and nonresidential subdivisions within UGA) 1 paper copy 1 electronic copy Down Stream Sanitary Sewer Study (DSSSA): 1 paper copy 1 electronic copy Traffic Study (TIS): 2 paper copy 1 electronic copy Property Owner List certified by the County Clerk of all property owners within the notification area of the subject property. 1 paper copy Submittal Requirements Checklist Page 1 of 12 rev 12/2016

MAJOR SUBDIVISIONS Preliminary Plats Submittal Requirements Checklist Lawrence-Douglas County This checklist has been provided to assist you, the applicant, as you prepare your application. Submission of less information than necessary to adequately review and process your application may delay the review process. Please complete and return with your application. Planning Staff will determine the completeness, accuracy, and sufficiency of the application within five (5) working days of application submission. Notes Required Preliminary Plat Requirements Submittal Requirements Checklist Completed Application Form Requirement for Application See Section 20-808(e) for more detail on each requirement Owner Authorization Form if applicant is not the legal owner of the property Proof of property taxes paid obtained from the Douglas County Treasurer. Any unpaid special assessments shall be noted with the application submittal and a proposed redistribution plan for these unpaid special assessments, which meets the City Clerk and City Engineer requirements for lots within the City of Lawrence or with the County Clerk and County Engineer requirements for lots within the unincorporated area of Douglas County, also shall be submitted with the application. Major Subdivision Preliminary Plat, 1 paper and 1 electronic copy (on disc) Payment of Review Fee Certified copy of property ownership. Supplemental Information that demonstrates how public utilities may be extended to the subdivision to accommodate future urban density development. (if determined required at Pre-App Meeting) Drainage Study DSSSA Study per City Administrative Policy, AP-76 Traffic Study per City code 16-1101 all new non-residential development or redevelopments and all residential developments of 11 or more lots or dwelling units. Phasing Plan for Submission of Final Plats Justification for any variances associated with the proposed Subdivision. Property Owner List certified by the County Clerk of all property owners within the notification area of the subject property. Submittal Requirements Checklist Page 2 of 12 rev 12/2016

Lawrence-Douglas County MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS Preliminary Plats -- Technical Specifications Checklist This checklist has been provided to assist you as you prepare your application. Submission of inaccurate or incomplete technical information necessary to adequately review and process your request may delay the review process. Please complete and return with your application. Planning Staff will use this checklist to review your application to make note that each specification required of the preliminary plat is provided. Major Residential or Nonresidential Subdivision Preliminary Plat Requirements http://www.lawrenceks.org/planning/documents/subregs.pdf Provided Preliminary Plat Contents See Section 20-809(f) for more detail on each specification Notes 20-809 (f)(1) Materials to be included (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) Name of Proposed Subdivision Names and Addresses of Subdivider, Land Planner or Subdivision Designer, and licensed Land Surveyor Date of Preparation, north arrow, and graphic scale Identify the plat as a Preliminary Plat Legal Description of proposed subdivision complete with section, township, range, principal meridian, county and size in acres. Show location of nearest section and/or quarter-section with a description tying it to the point of beginning for the subdivision. A replat shall not be required to be referenced to a section and/or quarter-section corner, provided the original plat for the subject replat is tied to at least one of these corner monuments. Location, description and elevation of all benchmarks established or source used for vertical control. There must be at least one established vertical control point as the basis for the topographic survey included. Show names of adjoining Subdivisions or in the case of unplatted land show the names of the owner or owners of adjoining property. Show Topography at contour intervals not greater than 2 feet of the site. Topography shall be consistent with City of Lawrence and/or Douglas County aerial Topography. Where Land Disturbance, Grading or development has occurred on a site or within 100 feet of the subject site since the date the City of Lawrence and/or Douglas County, whichever is applicable, obtained aerial Topography, an actual field survey shall be required for the topographic data in the vicinity of the disturbed area; General Location Map on the face of the plat, or on a separate sheet of the proposed Subdivision. The map shall be drawn to an appropriate scale and shall show the relationship of the proposed Subdivision to the following: a. The nearest intersection of public streets; and b. If not in the City, any state highway located within ½ mile of the property; and Application Form Page 3 of 12 12/2016

Lawrence-Douglas County c. If in the City, any public school or park located within ¼ mile of the property. If not in the City, any public school within one mile of the property; and d. If in the UGA, the nearest City Limits, and the nearest boundary of the UGA; and e. The zoning of the property and any other zoning districts located within ¼ mile (when within the City or the UGA) or within ½ mile (if in the rural area 20-809 (f)(2) Existing Conditions: (i) Location of designated as Floodplain or Regulatory Floodplain, location and direction of flow of existing water courses; and the surface elevation of the Regulatory Flood; and (ii) Location of any area in the Floodplain Overlay District, location, location and direction of flow or all water courses; and base flood elevation at water course entrances and exits from the proposed subdivision; and (iii) Location of section lines, private or public streets, alleys, easements, and city boundaries within and immediately adjacent to the proposed Subdivision; and (iv) Location of natural features such as unique topographic features, lakes, stream corridors and insofar as can reasonable be shown natural features to be removed (v) Boundaries of stands of mature trees, jurisdictional wetlands, historic sites and archaeological sites on the property proposed for subdivision as identified on the GIS Base Line Environmentally Sensitive Lands Map. http://gis.lawrenceks.org/env/index.html (vi) Existing use of the property, including the location of all existing buildings, indicating those that will be removed and those that will remain on the property after the Final Plat is recorded. (vii) Horizontal location and vertical elevation (if available) of existing sanitary sewers, storm water sewers, and culverts within and adjacent to the proposed Subdivision, and the location of existing water mains, underground wiring, pipelines, and gas lines; and (viii) Zoning of land within and adjacent to the proposed Subdivision; and (ix) Location, description and elevation of all benchmarks established or source used for vertical control; and (x) Types of soil, with the soil types generally indicated on the Preliminary Plat or supplemental sheet; and (xi) For a Subdivision that will rely on the use of On-Site Sewage Management Systems, a summary of available information of the subsurface Water Table, including the depth of the Water Table at the highest, lowest and typical locations within the Subdivision. 20-809 (f)(3) Proposed Improvements (i) (ii) (iii) (iv) (v) (vi) Proposed Streets (including location, width, names, approximate grades), and their relation to Platted Streets or to proposed streets as shown on any Watershed/Sub-basin plan, Sector or Neighborhood Plan of adjacent property; Easements showing width and general purpose Layout of all new municipal utilities proposed to serve the subdivision Blocks and Lots, showing approximate dimensions and proposed Block and Lot numbers Sites designated for other than single-dwelling or single-family use by the adopted comprehensive plan or adopted Watershed/Sub-basin plan, Sector or Neighborhood Plan. Such plan shall be referenced on the face of the Plat. Sites proposed for dedication as drainage way, park, school or other public purpose; and Notes Notes (vii) (viii) Sites proposed by the applicant for land uses not in conformance with adopted comprehensive or neighborhood plans. Such uses shall include a note on the plan that states: Approval of the Preliminary Plat does not certify approval of these proposed land uses. The Building Envelopes of proposed lots if requested by Planning Staff Application Form Page 4 of 12 12/2016

Lawrence-Douglas County Lots that are not rectangular or that have a single dimension of less than 55 feet shall include the Building Envelope permitted under the current Zoning District regulations. A typical Building Envelope diagram may be provided where the majority of Lots are the same size A note referring to such Building Envelope shall be included on the face of the Preliminary Plat regarding the applicable Zoning District and the date of the Zoning provisions on which the preparer has relied in designating the Building Envelope. 20-809 (f)(4) Supplemental Data (i) (ii) A table shown on face of the Plat that includes: a) Gross acreage of the subdivision; and Easements showing width and general purpose; b) Acreage within each Zoning District; c) Acreage to be Dedicated for Streets or roads, if any; d) Acreage to be Dedicated for public uses other than Streets or roads, if any; e) Total number of building lots; f) Maximum, minimum, and average Lot size; g) Phasing schedule if proposing phasing of final platting Statement of the face of the plat, stating method to be used for financing Public Improvements in the Subdivision and providing references to statutes, covenants, or other sources for further information on the details of such financing. Such statement shall contain a heading saying: Provision and Financing of Roads, Sewer and Other Public Services. Financing continued: At a minimum, a financing statement shall indicate the following: a) Whether the Subdivision will have public Streets and roads, Private Streets and roads, or a combination thereof. b) Whether the Subdivision will provide connections to a Public Water Source (naming the source). c) Whether the Subdivision will provide connections to a public system for wastewater treatment (naming the system) or will rely on On-Site Sewage Management Systems or other on-site wastewater treatment systems. d) Whether purchasers of the Lots in the Subdivision will be subject to special assessments or other costs or fees specific to the Subdivision to pay for the capital costs of Streets, roads, water lines and treatment, and/or wastewater lines and treatment; and e) Whether the provision of improved roads, water service and/or wastewater service will depend in any way on a vote, petition or other collective action of property Owners in the Subdivision. Notes (iii) (iv) (v) Narrative explaining the general nature and type of Public Improvements proposed for the Subdivision and the manner by which the Subdivider intends to provide for their installation, for example, by Public Improvement Petition, actual construction, escrow deposit, or performance bond. If other than by Public Improvement Petition, the approximate time for completion of such Improvements should be indicated. Notation on the face of the plat that states: All new telephone, cable television and electrical lines (except high voltage lines) must be located underground when in the City of Lawrence or in Lawrence UGA. Notation on the face of the plat that states: Developer is responsible for the cost of any relocation of existing utilities, if necessary to serve the proposed subdivision. 20-809 (f)(5) Stormwater Drainage Stormwater Drainage information, as follows: (i) (ii) The Preliminary Plat shall contain data, information and supplemental maps of surrounding property in sufficient detail regarding stormwater drainage issues, as determined by the Planning Director or the Planning Commission may request additional data, information and supplemental maps from the applicant regarding storm water drainage as appropriate. Minimum Floor Elevations on lots adjacent to Drainage Easements and on drainage ways Application Form Page 5 of 12 12/2016 Notes

that are designated by the Director of Public Works or his or her designee the Preliminary Plat shall indicate: a. The required minimum habitable floor elevations for Structures on Lots; b. The minimum elevation for foundation opening(s) which shall be certified by a licensed Land Surveyor or Engineer. c. A note that states: If a basement is built on a Lot where a minimum elevation has been established, the building design is encouraged to incorporate a sump pump. Other applicable sections of Subdivision Regulations Applicants should refer to all applicable section of the subdivision regulations including design standards, public improvement standards, administration and enforcement, and all other applicable standards. Refer to full document available on one at http://www.lawrenceks.org/planning/documents/subregs.pdf Lawrence-Douglas County Application Form Page 6 of 12 12/2016

Pre-Application Meeting Date: Applicant or Agent Information Contact Name(s): Company: Street Address: City/State/Zip Code: Property Owner Information Owner Name(s): Street Address: MAJOR SUBDIVISION PRELIMINARY PLAT Application Form (Completed by Applicant or Applicant s Agent) Planner: Lawrence-Douglas County Primary Phone: Mobile Phone: Fax: E-Mail Address: Primary Phone: Fax: City/State/Zip Code: E-Mail Address: Property and Proposed Division Information Address: City/Zip: Are you proposing a Preliminary Plat or Final Plat? Number of Existing lots: Additional Information Present Zoning: Present land use: Description of present use of land: Number of Proposed lots: Number of existing structures: Description of existing structures: Are you or will you be submitting other applications? If so, what other applications are you submitting? Signature I/We, the undersigned am/are the (owner(s)), (duly authorized agent), (Circle One) of the aforementioned property. By execution of my/our signature, I/we do hereby officially apply for a Preliminary Plat as indicated above. Signature(s): Date Date Date Application Form Page 7 of 12 12/2016

STAFF USE ONLY Application No. Date Received Action or Decision Date Fee $ Date Fee Paid Application Form Page 8 of 12 12/2016

Lawrence-Douglas County OWNER AUTHORIZATION I/WE, hereby referred to as the Undersigned, being of lawful age, do hereby on this day of, 20, make the following statements to wit: 1. I/We the Undersigned, on the date first above written, am/are the lawful owner(s) in fee simple absolute of the following described real property: See Exhibit A, Legal Description attached hereto and incorporated herein by reference. 2. I/We the undersigned, have previously authorized and hereby authorize (Herein referred to as Applicant ), to act on my/our behalf for the purpose of making application with the Planning Office of Lawrence/Douglas County, Kansas, regarding (common address), the subject property, or portion thereof. Such authorization includes, but is not limited to, all acts or things whatsoever necessarily required of Applicant in the application process. 3. It is understood that in the event the Undersigned is a corporation or partnership then the individual whose signature appears below for and on behalf of the corporation of partnership has in fact the authority to so bind the corporation or partnership to the terms and statements contained within this instrument. IN WITNESS THEREOF, I, the Undersigned, have set my hand and seal below. Owner Owner STATE OF KANSAS COUNTY OF DOUGLAS The foregoing instrument was acknowledged before me on this day of, 20, by. My Commission Expires: Notary Public Page 9 of 12 12/2016

APPROVAL AND EXTENSION TIME PERIOD SUBDIVISION REGULATIONS Lawrence-Douglas County PRELIMINARY PLAT* [Section 20-809(j)] Approval time period -- A final plat must be submitted within 24 months of the date approval of the preliminary plat was granted by the Planning Commission or the approval of the preliminary plat shall expire. * Per Section 20-1304(d)(10) of the Development Code, approval of a Preliminary Development Plan constitutes approval of a preliminary plat. In the case of properties that were platted with a Preliminary Development Plan, the approval and extension dates of the Preliminary Development Plan shall apply. (See previous page) Extension -- An extension of up to 24 months may be granted by the Planning Commission for a Preliminary Plat if the cause of failure to submit a final plat is beyond the subdivider s control. A written request must be provided to the Planning Director prior to the expiration date. Additional extensions may be requested, if necessary. FINAL PLAT [Section 20-809(n)(5)] Approval time period -- Approval of a Final Plat shall be effective for no more than 24 months from the date of approval unless all conditions of approval have been completed. Extension An extension may be granted by the Planning Director for good cause. A written request for extension must be provided to the Planning Director prior to the expiration of the original 24 month approval period. MINOR SUBDIVISION/REPLAT (Section 11-108(k) Approval of a Minor Subdivision/Replat by the Planning director and acceptance of dedications by the Governing Body shall be effective for no more than 24 months from the date of acceptance unless all conditions of approval have been completed or an extension has been granted by the Planing Director for good cause. Extension The extension request must be submitted to the Planning Director prior to the expiration of the original 24 month approval period. No action by the City shall be necessary to cause the approval to expire. Its expiration shall be considered a condition of the original approval. Page 10 of 12 12/2016

SITE PLANS: [Section 20-1305(o)(1)] APPROVAL AND EXTENSION TIME PERIOD LAND DEVELOPMENT CODE ARTICLE 13 Lawrence-Douglas County Approval time period -- Building permit must be obtained within 24 months of final approval of the site plan or the approval shall expire. Extension -- Extension of up to 24 months may be approved by City Commission for good cause shown if written request is made by letter to the Planning Director before the expiration date. Additional extensions may be requested, if necessary. SPECIAL USE PERMITS: [Section 20-1306(k)] Approval time period -- Building permit must be obtained within 24 months of the effective date of the decision on the Special Use or the approval shall expire. Extension -- Extension of up to 24 months may be approved by City Commission for good cause shown if written request is made by letter to the Planning Director before the expiration date. Additional extensions may be requested, if necessary. PRELIMINARY DEVELOPMENT PLAN: [Section 20-1304(d)(12)] Approval time period -- Application for a Final Development Plan must be submitted within 24 months after final approval of the preliminary development plan or within 6 months after the date shown on an approved development schedule or the approval shall expire. Extension -- Extension of up to 24 months, or the proposed phasing schedule may be modified to extend all dates by a period up to one-half the original period allowed for development of that phase, may be approved by City Commission for good cause shown if written request is made by letter to the Planning Director before the expiration date. Additional extensions may be requested, if necessary. FINAL DEVELOPMENT PLAN [Section 20-1304(e)(2)(vii)] Approval time period -- A building permit must be obtained within 24 months after the final approval of the Final Development Plan or the approval shall expire. Extension -- Extension of up to 24 months, or the proposed phasing schedule may be modified to extend all dates by a period up to one-half the original period allowed for development of that phase may be approved by City Commission for good cause shown if written request is made by letter to the Planning Director before the expiration date. Additional extensions may be requested, if necessary. Page 11 of 12 12/2016

Lawrence-Douglas County INSTITUTIONAL DEVELOPMENT PLAN [Section 20-1307(g)] Approval time period -- A building permit must be obtained within 24 months after the final approval of the Institutional Development Plan or the approval shall expire. Extension -- Extension of up to 24 months may be approved by the City Commission for good cause shown if written request is made by letter to the Planning Director before the expiration date. Additional extensions may be requested, if necessary. ZONING VARIANCES [Section 20-1309(k)] Approval time period -- A building permit must be obtained within 24 months after the variance has been granted or the variance will expire. The variance will also expire upon expiration of a building permit. Extension -- Extension of up to 24 months may be approved by the Board of Zoning Appeals for good cause shown if written request is made by letter to the Planning Director before the expiration date. Additional extensions may be requested, if necessary. APPROVAL AND EXTENSION TIME PERIOD ZONING REGULATIONS CONDITIONAL USE PERMITS [Section 12-319-2 Time Limitations) Approval time period. Building permit must be obtained within 1 year of County Commission approval of the Conditional Use Permit or the approval shall expire. Extension -- Extension of up to 1 year may be approved by County Commission for good cause shown if written request is made by letter to the Planning Office before the expiration date. Additional extensions may be requested, if necessary. SITE PLAN [Section 12-319A-8 Time Limitations) Approval time period -- Building permit must be obtained within 2 years of the date of the County Commission approval (or Planning Director approval in the case of administrative site plans) or the site plan shall be null and void. Extension -- The Regulations do not include an extension procedure for Site Plans, but it has been interpreted that the CUP extension process would apply to site plans as well. An extension of up to 2 years may be approved by County Commission for good cause shown if written request is made by letter to the Planning Office before the expiration date. Additional extensions may be requested, if necessary. Page 12 of 12 12/2016