Implementation Status & Results Colombia Bogota Urban Services Project (P074726)

Similar documents
Implementation Status & Results Colombia Bogota Urban Services Project (P074726)

Implementation Status & Results Brazil Santos Municipality (P104995)

Implementation Status & Results Brazil Santos Municipality (P104995)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

Implementation Status & Results Macedonia, former Yugoslav Republic of Real Estate Cadastre & Registration Project (P083126)

Public Disclosure Copy

Implementation Status & Results Guatemala LAND ADMINISTRATION II APL (P087106)

Public Disclosure Copy

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219)

Public Disclosure Copy

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report CO Rio Bogota Environmental Recuperation and Flood Control Project (P111479)

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018)

The World Bank Integrated Land Administration System Project (P122219)

Public Disclosure Copy

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Nicaragua LAND ADMINISTRATION (P056018)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Brazil Sergipe State Integrated Project: Rural Poverty (P110614)

Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization Project (P106284)

The World Bank Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Turkey Turkey Land Registration and Cadastre Modernization Project (P106284)

Implementation Status & Results Croatia Integrated Land Administration System Project (P122219)

The World Bank Modernization of Real Property Registration and Cadastre (P151746)

Public Disclosure Copy

The World Bank Competitiveness and Enterprise Development Project (CEDP) (P130471)

The World Bank Indonesia Power Transmission Development Project (P117323)

FOR OFFICIAL USE ONLY

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region Country Sector(s) Theme(s)

FOR OFFICIAL USE ONLY

Arbitration and Dispute Resolution

Procurement Method. Preparatio n of TORs/invi tation

Integrated Safeguards Data Sheet (Initial)

ParcelMap BC. Compiling a Parcel Fabric for the Province of British Columbia. WENDY AMY and ELLEN STYNER

Report No.: ISDSA15389

International Financial Reporting Standards (IFRS) and 2018 Updates

The Effective Analyst: From Research to Execution. Contents are subject to change. For the latest updates visit

45 Court Street New Haven, CT 06511

Ontario West Municipal Conference Assessment Update Retrospective and A Look Ahead

SFR Condo Residential Lot Sales Inventory Sales Inventory Sales Inventory. Month YTD Month Month YTD Month Month YTD Month

Panama - Land Administration Project Project Restructuring Project Paper

Certified Crisis Management Professional. Contents are subject to change. For the latest updates visit

Roles, Responsibilities and Relationships About MPAC Property Assessment in Ontario Updates to Assessment Values in Year Products and Services Role

May 2008 MLS Month in Review

The World Bank Support to the Afghanistan Independent Land Authority (P156225)

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Procurement Plan Baseline

JES2 and JES3 Releases. RSU Level. r6.0 build 151 r2.3, r2.2, r2.1 r2.3, r2.2, r2.1 RSU1803

Financial Analysis Workshop. Contents are subject to change. For the latest updates visit

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment

MLS of Greater Cincinnati - Charts for the Month: November 2017

Monthly Indicators + 7.3% + 6.6% + 8.3% Single-Family Market Overview Condo Market Overview New Listings Pending Sales.

Multi-Family. Acknowledgements. Author. Data Analysis/ Layout. Financial Support. Disclosure. Charles Dalton. Real Data

California Housing Market Update. Monthly Sales and Price Statistics May 2018

Auckland Housing Accord FinalReport for Second Accord Year

Outlook for Median Home Selling Prices. United States data are useless for us.

A Panel Discussion of Developments, Trends and Issues Affecting Commercial Property Iowa Commercial Real Estate Expo

Support to Implementation of Multipurpose Cadastral Information system in Vietnam

MULTIFAMILY 2012 MULTI-FAMILY HAMPTON ROADS MARKET REVIEW. Author. Data Analysis. Financial Support. Disclosure. Charles Dalton.

We pursue investments that offer highly attractive returns through Real Estate Developments in large urban areas

California Housing Market Update. Monthly Sales and Price Statistics November 2018

California Housing Market Update. Monthly Sales and Price Statistics September 2018

Guidance for Financial Appraisal Tool

PORTFOLIO COMMITTEE ON HOUSING 13 MAY 2008

Monthly Indicators + 4.8% - 3.5% %

Certified Internal Auditor Exam Preparation. Contents are subject to change. For the latest updates visit

State of the MLS. John Chandler. President

Preparing Financial Statements and the Annual Report

The University of Massachusetts Campus Master Plan. Faculty Senate April 21st

METROPOLITAN TRACT PERFORMANCE REPORT For the Quarter Ended March 31, 2008

PROPINSIGHT A Detailed Property Analysis Report

UDIA WA PROPERTY MARKET STATISTICS

July 2012 was $162,256. ($153,956). was $314,607. was $172,488. ($164,426). Kansas City Region Average Sales Price - Existing Homes

Proposal to Restructure

Mineral Resources Authority (MRA) FlexiCadastre Papua New Guinea

Monthly Indicators % % %

Monthly Indicators % + 9.7% %

Quality Improvement of the Real Estate Cadastre in Serbia

Provided by Keller Williams Realty Professional Partners Statistics from September 2010 MLS

Village of Glenview Plan Commission

Puerto Rico Housing Finance Authority Housing Stimulus Programs

Tisbury Elementary School

Implementation of a PPP Transaction in the Rural Water Sector in Uganda. IFC - PPP Transaction Advisory Dakar, June 4, 2012

ParcelMap BC Compiling a Parcel Fabric for the Province of British Columbia. Presented by: Ellen Styner (General Manager) and Wendy Amy (GIS Manager)

RUV Registro Único de Vivienda

Egyptian Nationwide Title Cadastre System

California Housing Market Update. Monthly Sales and Price Statistics October 2018

Financial Modeling Workshop Using Excel

PROPINSIGHT A Detailed Property Analysis Report

657 S Belvoir South Euclid, OH Mark Khuri

Certificate in Financial Management

Information sheet A Data

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 6306-MD. Public Disclosure Authorized

Long Range Master Facilities Plan Phase I: Southern Feeder Pattern

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

M onthly arket. July Table of Contents. Monthly Highlights

Land Information System as new instrument for Land Administration: Case Examples. Mike Cheremshynskyi Consultant, Land Administration Expert

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-74350) ON A LOAN IN THE AMOUNT OF US$30 MILLION. March 28, 2016

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Bogota Urban Services Project (P074726) Operation Name: Bogota Urban Services Project (P074726) Project Stage: Implementation Seq.No: 24 Status: ARCHIVED Archive : 15-Oct-2014 Country: Colombia Approval FY: 2003 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key s Board Approval 13-Mar-2003 Original Closing 31-Oct-2007 Planned Mid Term Review 12-Sep-2005 Last Archived ISR 30-Mar-2014 Effectiveness 05-Aug-2003 Revised Closing 30-Sep-2014 Actual Mid Term Review 27-Sep-2005 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objectives of the Projects are: (i)to improve quality of life of low income families (estratos 1 and 2) by increasing access, coverage, quality, reliability, and interagency coordination in the provision of water, sanitation, transport and related basic services; (ii) to improve city's mobility by providing better access to the public transport system, and improving road safety, traffic management and transport planning; and (iii) to strengthen the institutional and administrative framework for an efficient and sustainable delivery of urban services throughout the city. Has the Project Development Objective been changed since Board Approval of the Project? Yes No losure Authorized Public Disclosure Authorized Component(s) Component Name Component Cost A. IMPROVED MOBILITY 180.86 B. URBAN UPGRADING 76.34 C. INSTITUTIONAL STRENGTHENING 14.46 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status Overview Overall, the original Project progressed in a satisfactory manner. This AF finances the scale-up of the original Project's Component A: Improved Mobility, which consists of the conceptualization and detailed engineering studies of the Integrated Mass Transit System for the city, including Bogotá's first underground metro line; and Component C: Institutional Development, which includes technical assistance to the City Page 1 of 6

Government s Urban Development Institute (IDU) for road administration system and support to Bogotá's Cadastre Unit for enhanced cadastral management and institutional strengthening. The Colombian-Spanish consortium in charge of the detailed engineering studies for the Bogota Metro is advancing well and on time, meeting the 15 month calendar, and completes the studies according to contract scope. Bogota will amend the design studies contract to allow additional studies to be done since the original location of the train depots has been moved to a further location due to soil problems in the original location and land availability issues, and hence the project now requires an operational 4 kilometer link to reach to the depot. This amendment will extend the duration of the contract and increase the scope and will be covered with local resources. The consortium has already started working on this extension. The city administration is programming an open forum to present the results of the study in October, 2014. The Metro project will continue his preparation where the Bank will provide through different instruments (Grants, advisory services) support to the two main stakeholders (Nation and City of Bogota) in different aspects like financing structuring, institutional set up, project management). The results of the study are being published and the city is planning on advancing towards project structuring and bidding stages using the designs as main input for these stages. The rest of project's components has been accomplished and some of them with high innovation and state of the art information. The achievements under the Institutional Development Component are complete and in quality highly satisfactory for the Team, and can be summarized as follows: (i) organizational redesign and institutional strengthening of the Cadastre Unit, including the processes of cadastral update and conservation, and the design and implementation of a geographic information system to generate spatial data of Bogotá; and (ii) definition of the road users costs to be managed by the Instituto de Desarrollo Urbano (IDU) for Bogotá, and implementation of the evaluation tools of Road Networks (RONET), which continues its implementation and is rated satisfactory. The implementation and PDO rating is Moderately Satisfactory. The achievements under the Institutional Development Component are complete and in quality highly satisfactory for the Team, and can be summarized as follows: (i) organizational redesign and institutional strengthening of the Cadastre Unit, including the processes of cadastral update and conservation, and the design and implementation of a geographic information system to generate spatial data of Bogotá; and (ii) definition of the road users costs to be managed by the Instituto de Desarrollo Urbano (IDU) for Bogotá, and implementation of the evaluation tools of Road Networks (RONET), which continues its implementation and is rated satisfactory. The loan is closing on September 30, 2014. Locations Country First Administrative Division Location Planned Actual Colombia Not Entered Usme Colombia Not Entered Usaquen Colombia Not Entered Suba Colombia Not Entered Bosa Colombia Not Entered Distrito Capital de Bogota Colombia Bogota D.C. Bogota Colombia Not Entered Bolivar Page 2 of 6

Country First Administrative Division Location Planned Actual Colombia Not Entered Chapinero Colombia Not Entered San Cristobal Colombia Not Entered Kennedy Colombia Not Entered Rafael Uribe Colombia Not Entered Santa Fe del Tintal Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improvement of overall city mobility as shown by the intermediate outcomes indicators. Improve quality of life in UPZ, as shown by the intermediate outcomes indicators Text Value See intermediate outcome indicators 31-Jul-2011 Several intermediate indicators assess overall improvement in city mobility, including: (1)increased number of Km covered by the busway system; (2) number of passengers transported; (3) increased number of Km interconnecting bike paths; (4) Increased number of km in feeder roads, (5) number of passengers users of feeder roads, (6) number of traffic related accidents, (7) increase in use of bike paths, and (8) number of road safety programs presented. Text Value 80% acceptance of results in survey 31-Jul-2008 Several intermediate indicators assess overall improvement in the quality of life in UPZs, including:(1) Page 3 of 6

number of new water supplyconnections, (2) number of new sewerage connections, (3) number of barrios legalized,(4) number of titling processes finished, (5) number of environmental plans prepared, (6) number of families resettled, (7) number of families trained in improvement works, and (8) number works constructed by community. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target For indicator 1: 1) Increased Number of Km covered by the busway system, 2) Number of passengers transported; 3) Increased Numberof Km interconnecting bike paths; For indicator 1: 1) Increased # of km in feeder roads, 2) Number of passengers users of feeder roads, 3) Number of traffic relatedaccidents, 4) increase in use of bike paths, For indicator 1: Number of road safety programs presented, For indicator 2: 1) Number of new water supply connections, 2) Number of new sewerage connections, 3) Number of barrios legalized,4) Number of titling processes finished, For 2: 1) Number of environmental plans prepared, 2) Number of families resettled, 3) Number of families trained in improvement works, 4) Number works constructed by community. Text Value 1) 0; 2) 750,000; 3)0 1) 10.2 Km; 2) 1.660.000; and 3) 15Km 05-Aug-2003 14-Jun-2010 The number of passengers moved by Transmilenio has increased significantly 31-Oct-2008 Text Value 1)0; 2) Not available; (3) N/A; (4) 3% 1) This indicator should be revised to 111.1 km instead of 338 km; 2) 340,000; (3) 5% 08-May-2003 17-Dec-2009 31-Oct-2008 Text Value N/A 5 programs 05-Aug-2003 17-Dec-2009 31-Oct-2008 Text Value N/A 1) 15.671; 2) 83.234; 3) 55; and 4) 534 08-May-2003 17-Dec-2009 31-Oct-2008 Text Value Not applicable 1)2, 2)1,995, 3)1,066, 4)55 08-May-2003 17-Dec-2009 31-Jul-2008 Page 4 of 6

Six proposed studies for integrated mass transport system to be delivered Planned TA components for IDU to be delivered Yes/No Value No Yes Yes 21-Oct-2008 The six studies are: 1. Conceptual Design of Bogota's Metro; 2. Detailed Engineering Design for Bogota's First Metro Line; 3. LegalStructuring forbogota's First Metro Line; 4. Financial Structuring for Bogota's First Metro Line; 5. Social Assessment for Bogota'sFirst Metro Line; 6. Environmental Assessment for Bogota's First Metro Line 27-Jul-2011 1. Conceptual Design of Bogota's Metro (Completed); 2. Detailed Engineering Design for Bogota's First Metro Line (underway); 3. Legal Structuring forbogota's First Metro Line (underway); 4. Financial Structuring for Bogota's First Metro Line (underway). 31-Mar-2012 Yes/No Value No Yes Yes 21-Oct-2008 14-Jun-2010 31-Mar-2012 Users costs Assessment HDM-4 and RONET Training Planned TA to Cadastre Unit to be delivered Yes/No Value No Yes Yes 21-Oct-2008 Indicators: 1. Properties with 14-Jun-2010 1. Properties with Cadastral 31-Mar-2012 Indicators: 1. Properties with Cadastral information updated information updated Cadastral information updated (50,000); 2. Lag in the Property Tax Base (5 yrs); 3. Reform to the Cadastre's institutional architecture (No); Upgrading of 3 cadastral processes (updating, upgrading and cartography); (2,180,605); 2. Lag in the Property Tax Base (1yrs); 3. Reform to the Cadastre's institutional architecture (Underway); 4. Upgrading of 3 cadastral processes (updating, upgrading and (700,000); 2. Lag in the Property Tax Base (3yrs); 3. Reform to the Cadastre's institutional architecture (Yes);4. Upgrading of 3 cadastral processes (updating, upgrading and 5. Updated properties with cartography) Yes; 5. Updated cartography); 5. Updated cadastral information incorporated to new database (0); 6. Integrated real-estate information repository (0); 7. properties with cadastral information incorporated to new database (N/A); 6. Integrated real-estate properties with cadastral information incorporated to new database (2,000,000); 6. Integrated real-estate Design and Implementation of information repository (0); 7. information repository (1); 7. spatial data (0) Design and Implementation of Design and Implementation of spatial data (1) spatial data (1) Data on Financial Performance (as of 29-Apr-2014) Financial Agreement(s) Key s Page 5 of 6

Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P074726 IBRD-71620 Closed 13-Mar-2003 04-Jun-2003 05-Aug-2003 31-Oct-2007 31-Jul-2010 P074726 IBRD-76090 Closed 21-Oct-2008 23-Feb-2009 26-Jun-2009 31-Jul-2011 30-Sep-2014 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P074726 IBRD-71620 Closed USD 100.00 100.00 0.00 100.00 0.00 100.00 P074726 IBRD-76090 Closed USD 30.00 30.00 0.00 15.27 14.73 51.00 Disbursement Graph Key Decisions Regarding Implementation There are no key decisions for disclosure. Restructuring History Board Approved on 21-Oct-2008, Level two Approved on 12-Sep-2011, Level two Approved on 18-May-2012, Level two Approved on 27-Jun-2013 Related Projects P112852-CO (AF) Bogota Urban Services Page 6 of 6