STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES STATE PIPELINE COORDINATOR S OFFICE ANALYSIS OF AMENDMENT APPLICATION AND PROPOSED DECISION

Similar documents
RENEWAL DECISION Usibelli Coal Mine, Inc. ADL Surface Lease AS (e)

Municipality of Anchorage, Alaska Parks & Recreation Department

ATTACHMENT B INTERAGENCY LAND MANAGEMENT ASSIGNMENT ADL SPECIAL STIPULATIONS

PRELIMINARY DECISION

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND, AND WATER FINAL FINDING AND DECISION

Construction Permit for Onsite Sewage Treatment System

Lake of the Woods County Land Use Permit Instruction Sheet

COMPETITIVE LAND LEASE FINAL FINDING AND DECISION AS ADL Ultimate Arctic Adventures

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND AND WATER SOUTHCENTRAL REGION

Lake of the Woods County Land Use Permit Instruction Sheet

NOTICE OF FEE INCREASE SCHEDULE A - WATER DEVELOPMENT FEES

DRIVEWAY/ACCESS PERMIT APPLICATION INSTRUCTIONS Douglas County Trunk Highways

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

INSTRUCTIONS AND INFORMATION FOR LAND LEASE APPLICATION

QUESTIONS AND ANSWERS FOR: RFP# 13-34, RFP for Engineering Services for Gas Distribution System Improvements

PRELIMINARY DECISION

ARTICLE 13 CONDOMINIUM REGULATIONS

SANILAC COUNTY ROAD COMMISSION ROAD POLICIES. A. Drainage, Base and Grade Construction (NON BITUMINOUS)

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

Condominium Unit Requirements.

CALL FOR NEW INFORMATION

Prospective Builders, Utilities, Public Agencies, and Engineering Firms

CALL FOR NEW INFORMATION

KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW TIER 1

State of Alaska, Department of Natural Resources Division of Mining, Land & Water South Central Region Office

CHARLES CITY COUNTY SITE PLAN ORDINANCE. This Ordinance shall be known as the Charles City County Site Plan Ordinance.

WATER AGENCY UPDATE TO SCWA TITLE 5 INCREASE EFFECTIVE MARCH 1, All Developers, Builders, Consulting Engineers, and Other Interested Parties

Electrical Safety Statutes and Regulations May 2018 Labor Standards and Safety Division Mechanical Inspection

SECTION SITE SURVEYS

PRELIMINARY DECISION. For an Interagency Land Management Assignment ADL at. to the Department of Natural Resources, Division of Forestry

TOWN OF ARGYLE APPLICATION FOR ON-SITE SEWAGE FACILITY NEW CONSTRUCTION TCEQ REGION NUMBER COUNTY OF INSTALLATION. (Last) (First) (Middle)

ENCROACHMENT AGREEMENT (Farmland O Connell Road)

Septic Tank / Drainfield / Holding Tank Permit Application

M I N U T E S PLANNING & ZONING COMMISSION

Instructions to the Applicant

STATE OF OKLAHOMA TEXAS COUNTY PUBLIC SERVICE/PIPELINE OWNER. LINE INSTALLATION (Revised May 14, 2015)

AAAA. Planning and Zoning Staff Report Lake Shore Land Holdings, LLC CU-PH Analysis

Septic Tank / Drainfield / Holding Tank Permit Application

TRENCHING UNDERGROUND DISTRIBUTION ALL UNDERGROUND DISTRIBUTION DESIGNS ARE TO BE A CUSTOMER PROVIDED TOTAL CONDUIT SYSTEM INSTALLATION.

PRELIMINARY DECISION

USE BY SPECIAL REVIEW HOULIHAN PIPELINE PROJECT 5 OF 6 6 OF 6 E. CO RD 6 / E. 6TH AVE. S. CO RD113 / S. MANILLA RD.

SWIMMING POOLS VILLAGE OF WADSWORTH THE VILLAGE OF COUNTRY LIVING

SPECIAL USE PERMIT APPLICATION FOR NATURAL DEPOSITS, EXTRACTION AND PROCESSING; CONCRETE BATCH PLANTS; HOT MIX (ROAD/ASPHALT) PLANTS

Lane Code CHAPTER 10 CONTENTS

SUMMARY OF SIGN REGULATIONS AND PERMIT PROCESS City of Conroe Code of Ordinances Chapter 90, Section 1-15

PLANNING & DEVELOPMENT

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

The Provincial Lands (Agriculture) Regulations

MINNESOTA POLLUTION CONTROL AGENCY GENERAL PERMIT FOR DISPOSAL OF UNCOMTAMINATED CONCRETE

REGULATIONS OF WALLER COUNTY, TEXAS

Case 4:14-cv JHP-TLW Document 2 Filed in USDC ND/OK on 11/21/14 Page 1 of 10

[Type e-signature] This document has been electronically signed.

St. Mary s County Comprehensive Zoning Ordinance Article 1. GENERAL PROVISIONS

This is a New Finding of Adequacy for a Recorded Plat (Plat Book 179, Page ) Replat: LAND USE Guard House Effective Plan: Davie.

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND, AND WATER

Crib Point Pakenham Pipeline Landowner Reference Material & Frequently Asked Questions

WILSON COUNTY Health & Public Safety Office

State of Alaska Department of Natural Resources Division of Mining, Land & Water Northern Region Office

PERMITS, ENCROACHMENTS AND EASEMENTS

FINAL PLAT APPLICATION

ARTICLE XX THE COUNTY BOARD OF MERCER COUNTY, ILLINOIS RESOLUTION AMENDING THE MERCER COUNTY ZONING ORDINANCE SOLAR ENERGY FACILITIES

What You Should Know About Wells at Property Transfer

ARTICLE XI MANUFACTURED AND MOBILE HOME PARKS

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

Trio Petroleum, Inc. (PLN010302)

KERN COUNTY PLANNING AND NATURAL RESOURCES DEPARTMENT INSTRUCTIONS TO APPLICANT FILING MINISTERIAL OIL AND GAS CONFORMITY REVIEW TIERS 2, 3, AND 5

I would like to own a parcel of agricultural land in Alaska. What programs does the State of Alaska have that would allow me to do this?

PLANNING COMMISSION REPORT Regular Agenda Public Hearing Item

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

GUIDELINES FOR LEASING UNDER SLO RULE 5

FINAL APPLICATION. N.J.A.C. 7: (Minor disposals or diversions of parkland)

COASTAL WATER AUTHORITY

Building Safety Department 6401 E Lincoln Dr Paradise Valley, AZ PARADISE VALLEY (480) Application / Permit #: Job Site Information

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE SITING STANDARD AND APPLICATION REQUIREMENTS

* Certain words beginning with capital letters are defined either within the provisions of this rule or in Section I of this rule.

BOROUGH OF HELLERTOWN 685 Main St., Hellertown PA Phone: Fax:

RESOLUTION NO ORDINANCE NO. 02-1

PROCEDURE. Chapter 12: Subdivision Regulations

This is a New Findings of Adequacy for a Recorded Plat (Plat Book 179, Page 131) LAND USE Vacant Effective Plan: Pompano Beach

A Minor Land Excavation Operating Permit is used to:

Name: Address: City/State Phone: *Please include the Commercial/Industrial/Other Establishment Sheet with permit

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

February 27, 2017 ALC File: Application to Exclude the Property form the Agricultural Land Reserve (ALR)

SETTLEMENT AGREEMENT. and Department of Transportation and Public Facilities (collectively, the State ), hereby

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

LINCOLN COUNTY COUNTY ROAD STANDARDS AND ROAD POLICY

Extractive Industrial Regulatory Ordinance No. 21 revised Dec. 28, 2010 EXTRACTIVE INDUSTRIAL REGULATORY ORDINANCE TYRONE TOWNSHIP, MICHIGAN

Texas Pipeline Easement Negotiation Checklist

Instructions for Maps to Accompany Proof of Appropriation and Beneficial Use of Ground Water

NOTICE APPLICATION MUST BE FILLED OUT COMPLETELY.

ORDINANCE NO

Permit No: SPR CUP MHR AgLD IPM PUD MP - (Circle one)

NFU Consultation Response

PLANNING COMMISSION REPORT Regular Agenda Non-Public Hearing Item PRELIMINARY PLAT FOR JOHNSTON ADDITION; 706 E 23 RD ST (MKM)

TOWNSHIP OF SCIO MORATORIUM RESOLUTION REGARDING OIL AND GAS OPERATIONS IN TOWNSHIP

COLUMBIA COUNTY SURFACE MINING ORDINANCE

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

CHAPTER 154 RIGHTS OF WAY

ARTICLE 7 UTILITIES AND EASEMENTS

Transcription:

ADL STATE OF ALASKA DEPARTMENT OF NATRAL RESORCES STATE PIPELINE COORDINATOR S OFFICE ANALYSIS OF AMENDMENT APPLICATION AND PROPOSED DECISION TRANS-ALASKA PIPELINE RIGHT-OF-WAY LEASE AMENDMENT - CATHODIC PROTECTION IMPROVEMENTS SAGAVANIRKTOK RIVER, PIPELINE MILEPOST 67.7 63574 Proposed Action: On April 1, 2015, Alyeska Pipeline Service Company (APS, agent for the Trans-Alaska Pipeline System (TAPS) lessees, requested an amendment to modify the Trans Alaska Pipeline Right-of-Way Lease, ADL 63574, to add approximately 0.8 acres of State land along and within the floodplain of the Sagavanirktok River. The lands proposed to be added to the right-of-way is a 150 foot by 225 foot area within the generally described location: SE4SE4 Section 22, Township 1 South, Range 14 East, miat Meridian, Alaska, those lands below the Ordinary High Water Line of the Sagavanirktok River adjacent to the TAPS right-of-way boundary at Pipeline Milepost (PLMP) 67.7 Spur Dike. The purpose of the request is to add lands for installation of a deep anode groundbed to enhance the existing groundbed and corrosion protection of the buried TAPS mainline. The anode groundbed will be composed of an 8-inch diameter drilled angle hole, cased with steel pipe, and will be approximately 300 feet in depth. This additional land will be necessary to support the existing pipeline system as defined in AS 38.35.230(7) and authorized by the Trans-Alaska Pipeline Right-of-Way Lease, ADL 63574. See drawings for more details (Attachments A and B). Authority: AS 38.35.015 and Trans-Alaska Pipeline Right-of-Way Lease, ADL 63574. Administrative Record: Trans-Alaska Pipeline Right-of-Way Lease, ADL 63574, and the associated Right-of-Way Lease Amendment case file. Back2round: Notice of the Right-of-Way Amendment Application was published in the Alaska Dispatch News, Fairbanks Daily News-Miner, and on the State of Alaska and State Pipeline Coordinator s (SPCO) websites on April 20, 2015. Notice of the Right-of-Way Amendment Application was sent for posting in the Prudhoe Bay, Coldfoot and Fairbanks post offices. Per AS 38.35.070, the following coordinate agencies were notified of the application: Alaska Department of Environmental Conservation, Department of Labor and Workforce Development, Department of Transportation and Public Facilities, and the Regulatory Commission of Alaska.

Page 2 of 5 On April 9, 2015, the State Historic Preservation Office determined that no historic properties were affected by this proposed action and provided confirmation of its determination to the SPCO. Project Description: The mainline PLMP 67.7 deep anode groundbed will be installed from a sparsely-vegetated gravel bar at the periphery of the Sagavanirktok River floodplain, just below the ordinary high water mark, adjacent to an existing TAPS Spur Dike. The anode groundbed is comprised of a drilled angle hole approximately 300 feet in depth, 8-inch diameter and cased with steel pipe. The inside of the steel casing will be filled with anodes (ground rods) and calcined petroleum coke (carbon). The coke column will extend from the bottom of the cased hole to about 30 feet from the surface and the top remainder of the casing filled with bentonite to seal that section of the ground bed assembly. Each of the anodes will have a wire attached that will be routed to a junction box by direct burial. Along with the anode lead wires, a 1-inch diameter PVC vent pipe will be installed from the bottom of the drilled groundbed to the junction box. The junction box will be installed on the exiting spur dike. A rubber tire rotary drill rig will be utilized for drilling the groundbed similar to that used for the drilling of conventional potable water wells. A boom truck will be used to load the anodes, and a backhoe will be used for trench excavations to route cables from the anode groundbed to the junction box. Other minor equipment common to Alyeska projects, including loaders, communication shacks and portable toilets may be temporarily placed on site. The purpose of adding land under this proposed amendment, is to supplement the existing groundbed that has failed, and to accommodate the construction activities. The improvements will enhance the protection of the buried pipeline from corrosion. Title: The State of Alaska received title to the lands in Section 22, Township 1 South, Range 14 East, miat Meridian, pursuant to tentative approval from the Bureau of Land Management on October 1, 1992 (GS-5305). The Department of Natural Resources transferred the lands via Quit Claim Deed on September 15, 2007, to the Board of Regents of the niversity of Alaska, Trustees for the niversity of Alaska. The niversity of Alaska transferred the land back to the Department of Natural resources by Statutory Quit Claim Deed (OSL 1425) on May 3, 2010. Planning and Classification: The lands encompassed by this application were classified as Transportation Corridor (TR under classification, CL-NC-02-002; are subject to ADL 50666, North Slope Area Special se Lands; and are within the Dalton Highway corridor (AS 19.40.010). The lands are closed to mineral entry by Mineral Order (MO) 1147, dated August 1, 2014.

Page 3 of 5 A land classification establishes the apparent best use of an area, but all other uses are presumed as compatible unless otherwise prohibited. According to 11 AAC 55.205, land classified as Transportation Corridor land is identified for the location of easments and rights-of-way under AS 38.04.065(f), including transportation, pipeline, or utility corridor purposes, or is under consideration for a right-of-way lease. Classification (CL-NC-02-002) is for pipeline purposes, therefore the proposed use is compatible under the classification. The North Slope Area Special se Lands (ADL 50666) designation requires that in addition to permitting requirements under 11 AAC 96.010, a permit is required for motorized vehicle use, unless that use is for subsistence purposes or is on a graveled road. The requirement for a permit or authorization would be fulfilled through the issuance of this proposed right-of-way lease amendment. This requirement does not prohibit the development of lands within the miat Meridian and does not prohibit the construction of a deep anode groundbed. The designated area for the Dalton Highway corridor (AS 19.40) does not prohibit the issuance of this right-of-way amendment for the construction of a deep anode groundbed. Pursuant to AS 19.40.200(, the state may not dispose of state land under AS 38 that is within five miles of the highway right-of-way. However, AS 1 9.40.200(b)(4) states the prohibition on disposal of state land under ( of this section does not apply to a disposal for lands necessary for exploration, development, production or transportation of oil or gas in this project area. The purpose of the deep anode groundbed is to improve cathodic protection of the buried pipeline and protecting the integrity of TAPS and is consistent with the management intent of the area for resource management. There is nothing in the classification, special use designation, or the Dalton Highway corridor designation that prohibits the issuance of this right-of-way amendment for the installation of a deep anode groundbed. Public Notice: Notice of this Analysis and Proposed Decision will be published in the Alaska Dispatch and Fairbanks Daily News-Miner on May 28, 2015. It will also be sent for posting in the Prudhoe Bay, Coldfoot and Fairbanks Post Offices and posted on the State of Alaska and SPCO On-Line Public Notice web pages. If public comment indicates the need for significant changes in the proposed decision, additional public notice will be given on or after June 29, 2015. If no significant change is required, the proposed decision, including any minor changes, will be issued as the final decision of the Department of Natural Resources after June 26, 2015, without further notice. Analysis: AS 38.35, the Alaska Right-of-Way Leasing Act, sets forth the procedures by which certain right-of-way leases are granted by the State of Alaska and the conditions under which they can be amended. As set out in AS 38.35.010, it is the policy of the state that development, use, and control of a pipeline transportation system make the maximum contribution to the development of the human resources of this state, increase the standard of living for all its

Page 4 of 5 residents, advance existing and potential sectors of its economy, strengthen free competition in its private enterprise system, and carefully protect its incomparable natural environment. Pursuant to AS 38.35.015, the Commissioner has the power to grant leases of state land for pipeline right-of-way purposes. The Commissioner found it to be in the best interest of the residents of the State of Alaska to issue the Trans-Alaska Pipeline Right-of-Way Lease, ADL 63574 on May 3, 1974, and the Renewal and Amendment of Right-of-Way Lease for the Trans Alaska Pipeline and Associated Rights, ADL 63574 (effective on May 2, 2004). The terms, conditions, stipulations and reservations contained in the Trans-Alaska Pipeline Right-of-Way Lease, ADL 63574, will apply to these lands if added to the lease. AS 38.35.020( requires the applicant to obtain a right-of-way lease on state land from the Commissioner. Although the authorization request to install a deep anode groundbed to enhance the existing groundbed is to improve the protection of the buried pipeline from corrosion and is consistent with the original purpose of the lease, the proposed amendment involves a disposal of an interest in state land beyond what was included during the original adjudication. An amendment to the lease is required when there is a need to dispose of an interest in state land or resources beyond what was issued under the original adjudication. The requested action proposes to install a deep anode groundbed from a sparsely-vegetated gravel bar at the periphery of the Sagavanirktok River floodplain just below the ordinary high water mark adjacent to an existing TAPS Spur Dike. This activity will supplement the existing groundbed and enhance cathodic protection around the buried pipeline, which is defined by Stipulation 1.1.1.36(8) of the Trans-Alaska Pipeline Right-of-Way Lease, ADL 63574, as Related Facilities, the substantial and continuous use of which is necessary for the operation or maintenance of the TAPS pipeline. Findings: The installation of a deep anode groundbed will improve TAPS integrity and is consistent with the management intent of the area for land classified as Transportation Corridor. The installation of the deep anode is an activity governed by and administratively provided for in the lease. The installation of a deep anode groundbed will be a Related Facility, as defined by the lease, and it will be managed under the lease. The proposal to add the above-described lands to the TAPS Right-of-Way Lease, ADL 63574, is consistent with the lease. The terms, conditions and stipulations contained in TAPS Right-of-Way Lease, ADL 63574, adequately address and protect the interest of the State of Alaska. The lessee is required to secure all necessary permits or authorizations required by other state and federal agencies. The SPCO will examine the project area upon completion of the construction activities to ensure all lands are in a condition acceptable to the Commissioner. The Right-of-Way Lease Amendment will require an as-built survey that ties the deep anode to the pipeline centerline for review and acceptance by the Commissioner, pursuant to Section 1(e) of the Trans-Alaska

Page 5 of 5 Pipeline Right-of-Way Lease, ADL 63574, as amended. The addition of these lands to the lease does not constitute a significant amendment to the lease since the impact on State resources will be negligible and the project does not conflict with or significantly change existing use of the land. Approval of the request for the amendment for addition of the described lands is a function of the lease, and is consistent with state statutes and terms of the lease. Proposed Decision: I find that the application to amend the Trans-Alaska Pipeline Right-of- Way Lease, ADL 63574, to include the lands described in this proposed decision is in the best interest of the State and does not constitute a significant amendment to the lease. If no significant change is required as a result of public comment or objection, then the proposed decision, including any minor changes, will be issued as the final decision of the Department of Natural Resources after June 29, 2015, without further notice. Jdj Delgado-jikat Itural Resource Specialist III 5J 11/5 Date Don Perrin Acting State Pipeline Coordinator Date Attachment A: Attachment B: Trans-Alaska Pipeline System, Deep Anode Groundbed PLMP 67.7 Location and Vicinity Map, Sheet 1 of 4, dated 02/16/15 (1 page) Trans-Alaska Pipeline System, Deep Anode Groundbed PLMP 67.7 Site Plan, Sheet 2 of 4, dated 02/16/15 (1 page)

_ F / SWSEISEC22T1SR14E MIAT MERIDIAN I F- r),j) Cd F- F- C-) /PMP 33.5 STATION 3 MILES APPROXIMATE QANTITIES ABOVE ORDINARY HIGH WATER BELOW ORDINARY HIGH WATER (OFF OF WORKPAD ) TOTAl FOOTPRINT: SF Ac) FOOTPRINT: 1600 SF Ac) FOOTPRINT: SF Ac) EXCAVATION & BACKFILL: 24 CY EXCAVATION & BACKFILL: 56 CY EXCAVATION & BACKFILL: CY GRAVEL BEDDING & PADDING: 11 CY GRAVEL BEDDING & PADDING: 18 CY GRAVEL BEDDING & PADDING: 29 CY REV. A 800 (0.02 ADJACENT PROPERTY OWNER: STATE OF ALASKA f (0.04 0 1500 3000 6000 9000 2,400 (0.06 ALYESKA PIPELINE SERVICE Co. DEEP ANODE GRONDF3ED TRANS ALASKA PIPELINE SYSTEM LOCATION DWN. DICFI PLMP 67.7 & J VICINITY MAP DATE: 80 02-26-15 A OO PER677 CKD. JDB APPR.MAF SCALE: AS NOTED SHEET OF N ITflrAn fl.aifl nfl MflT L \lije AAMI Al I V r-) S., Ls) -j 0 -j r-. a Id 4Z. Cd -J Attrhmnt A